About this file

This is a Consent of Surety to Final Payment form executed by Capital Region Water (CRW) for the 2027 Sewer System Improvements Project, Contract No. 2026-12, located at 3003 North Front Street, Harrisburg, Pennsylvania. The document serves as the surety's formal approval for final payment to the contractor upon completion of work. The form requires the surety company to certify that it has conducted a careful examination of the contractor's books and records or received an affidavit confirming that all claims for labor, materials, and equipment have been satisfactorily settled. The surety must authorize an examination or receive documentation substantiating that no outstanding liabilities exist before approving the final construction cost invoices for payment.

The document explicitly states that approval of final payment by the surety does not relieve the surety of any obligations to the owner as set forth in the surety's bonds. The form requires execution by an authorized representative of the surety company, with signature, printed name, title, and company seal. If executed by anyone other than the President or Vice President of the surety company, the document must be accompanied by a certificate of authority dated the same day, demonstrating that the signatory has been authorized to execute such instruments on behalf of the surety company. This form is a standard contractual requirement ensuring that all stakeholder obligations remain in effect despite the approval of final payment.

View the file

Other files

File Type Posted
00 41 20 Qualifications Statement (CRW).pdf PDF
00 00 00 Cover.pdf PDF
33 01 30 Operation and Maintenance of Sewer Utilities.pdf PDF
00 43 13 Bid Bond Damages Form.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
00 55 00 Notice to Proceed.pdf PDF
00 21 13 Instructions to Bidders.pdf PDF
00 61 19 - Warranty Bond.pdf PDF
01 41 26-C - Chlorinated Water Discharge - Incident Report Cover Sheet & Form.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
01 10 00 - Summary.pdf PDF
00 63 36 - Field Order Form.pdf PDF
00 51 00 Notice of Award.pdf PDF
31 23 19 Dewatering.pdf PDF
01 22 00 - Unit Prices.pdf PDF
00 52 00 Agreement.pdf PDF
03 11 00 Concrete Forming.pdf PDF
00 45 36 EEO Certificate.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
33 05 05.31 - Hydrostatic Testing.pdf PDF
33 13 00 - Disinfection of Water Utility Distribution.pdf PDF
2026.09.29 Contract Drawings for Upload to PennBid.pdf PDF
01 25 00 - Substitution Procedures.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 01 10 Table of Contents.pdf PDF
33 05 53 - Identification For Utilities Piping and Equipment.pdf PDF
01 35 15 - Notifications and Other Coordination.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
03 30 00 Cast-in-Place Concrete.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 31 13 - Project Coordination.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
32 13 13 - Concrete Paving.pdf PDF
00 21 13-1 Owner Minority, Women and Other DBE Forms.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
01 41 26-A - City of Harrisburg Street Closure Request Form.pdf PDF
33 14 17 - Site Water Service Utility Laterals.pdf PDF
00 65 16 Certificate of Substantial Completion.pdf PDF
03 60 00 Grouting.pdf PDF
00 45 33 Certification of Non-Segregated Facilities and Non-Employment of Illegal Alien Labor.pdf PDF
33 05 05.41 - Air Testing.pdf PDF
00 31 43 Permit Applications.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
01 78 36 - Warranties.pdf PDF
33 01 31 TV Inspection of Sewer Pipelines.pdf PDF
00 72 00 - General Conditions 2013.pdf PDF
33 14 13 - Public Water Utility Distribution Piping.pdf PDF
Show 40 more

Latest 50 of 116 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

00 65 19.19 Consent of Surety to Final

Payment

CONSENT OF SURETY TO FINAL PAYMENT

To Owner: Capital Region Water Contractor:

Address: 3003 North Front Street Contract No.: 2026-12

Harrisburg, PA Contract Name:

Project: 2027 Sewer System Improvements

Project Contract Date:

In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the

SURETY:

Address:

, Surety, as surety on the bond of

CONTRACTOR:

Address:

, Contractor, after a careful examination of the books and records of said Contractor or after receipt of an affidavit from the said Contractor or after receipt of an affidvait form the said Contractor, which examination or affidavit satisfied this Surety Company that all claims for labor, materials, and equipment have been satisfactorily settleds, hereby approves of the final payment to the said Contractor and by these presents witnesseth that the payment to the Contractor of the final construction cost invoices shall not relieve the Surety of any of its obligations to the Owner set forth in said Surety’s Bonds.

IN WITNESS WHEREOF the said Surety Company has hereunto set its hand and seal this day of

Attested: (Surety)

(SEAL) (Signature of Authorized Representative)

(Printed Name and Title)

00 65 19.19 Consent of Surety to Final

Payment

NOTE: This statement, if executed by any person other than the President or Vice President of the

Surety Company, must be accompanied by a certificate of same date showing authority conferred upon the person so signing to execute such instruments on behalf of the Surety

Company represented.

File details come from the government source that posted it. Updated .