File Summary
This is a Project Forms document for Capital Region Water's 2027 Sewer System Improvements Project (Contract No. 2026-12), establishing the administrative framework and forms required for contract execution and project management. The document specifies that the Owner/Contractor Agreement is based on a modified EJCDC C-520 form, with General Conditions derived from a modified EJCDC C-700 standard, and Supplementary Conditions incorporated into the Project Manual. The project involves general construction work on a unit price basis, with sealed bids due October 27, 2026, at 10:00 a.m. through the online PennBid Bonfire Program. Work includes sewer system improvements, water main replacement and installation, water service line replacement, fire hydrant replacement, surface restoration, and all associated materials, equipment, and labor as defined in the Contract Documents. All bid documents are available at no cost through https://pennbid.bonfirehub.com/portal.
The document outlines preconstruction administrative requirements including Performance Bonds (Document 00 61 13) and Payment Bonds (Document 00 61 14). Information and modification forms utilized include Requests for Information/Interpretation (Document 00 63 13), Field Orders (Document 00 63 36), and Change Orders (Document 00 63 63), all in their native format and available upon request. Application for Payment procedures follow EJCDC C-620 standards (Document 00 62 76), while closeout requirements include Affidavits of Release of Liens (Document 00 65 19.16), Consent of Surety to Final Payment (Document 00 65 19.19), Notice of Acceptability of Work (Document 00 65 19.23), and Owner Receipt of As-Built documentation. Capital Region Water intends to award to the lowest responsible bidder and has adopted a Minority Women and Disadvantaged Business Enterprise Plan to ensure equal opportunity participation in the contract.
View the file
Other files
Show 40 more
Latest 50 of 116 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
00 60 00 Project Forms
1.0 General
1.1 FORM OF AGREEMENT AND GENERAL CONDITIONS
A. The following form of Owner/Contractor Agreement and form of the General Conditions shall be used for Project:
1. The Agreement between the Owner and Contractor is included in the Project Manual, modified EJCDC C-520.
2. The General Conditions are included in the Project Manual, modified EJCDC C-700.
3. The Supplementary Conditions for Project are incorporated into a modified copy of the
General Conditions included in the Project Manual.
1.2 ADMINISTRATIVE FORMS
A. Preconstruction Forms:
1. Performance Bond: Document 00 61 13 of the Project Manual.
2. Payment Bond: Document 00 61 14 of the Project Manual.
B. Information and Modification Forms: The following forms contained in the Project Manual will be utilized:
1. Request for Information/Interpretation (RFIs): Document 00 63 13, modified CSI 13.2A.
2. Field Order: Document 00 63 36, modified EJCDC C-942.
3. Change Order Form: Document 00 63 63, modified EJCDC C-941.
4. Forms identified above will be available in their native format and will be made available upon request.
C. Application for Payment: The following forms contained in the Project Manual will be utilized:
1. Application for Payment Form: Document 00 62 76, EJCDC C-620.
2. Forms identified above will be available in their native format and will be made available upon request.
D. Closeout Forms: The following forms contained in the Project Manual will be utilized:
1. Affidavit of Release of Liens: Document 00 65 19.16.
2. Consent of Surety to Final Payment: Document 00 65 19.19.
3. Notice of Acceptability of Work: Document 00 65 19.23, modified EJCDC C-626.
4. Owner Receipt of As-Build documentation, drawings, and data associated with the
Project.
END OF DOCUMENT