04_VGLZ222017_AF_Form_66.xls
Air Force Form XLS spreadsheet 47 KB Posted
- Attached to
- VGLZ 222017 Repair MV Junction Box PEN J1-HH IFB
- Solicitation number
- W50S8523B0006
About this file
This document contains a schedule of material submittals (AF Form 66) for the federal contract opportunity solicitation number W50S8523B0006. The solicitation is for emergency electrical infrastructure repair work at Selfridge Air National Guard Base in Michigan, with a period of performance of one year. Key submittals required within 14 days of notice to proceed include shop drawings, product data sheets, demolition and layout plans, safety data sheets, arc flash analysis, and warranty documentation. The project value is between $250,000 and $500,000 and is set aside exclusively for small businesses. Proposals are due by the date specified in any amendments. A pre-bid conference and site visit is scheduled. Original bid bonds are required with proposals. Funding is expected to be available by 30 September 2023.
View the file
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| SCHEDULE OF MATERIAL SUBMITTALS | |||||
| (AF Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | ||
| VGLZ 212030 | Project Title |
Emergency Electrical Infrastructure Repair for B45 &46
| TO BE COMPLETED BY PROJECT ENGINEER | |||||||||||
| NO. OF COPIES REQUIRED | 3 | ||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OTHER MATERIAL or DATA | OPERATING INSTRUCTIONS | SUBMITTAL |
REQUIRED
BY 14 DAYS
AFTER
NTP DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | ||||
| APPROVAL | REMARKS | |||||||
| APPROVED | DISAPPROVED | |||||||
| 1 | SANGB Form 23 | |||||||
| 2 | Recycling and Disposal Form | |||||||
| 3 | Affirmative Procurement Reporting Form | |||||||
| 4 | DD Form 1354 | |||||||
| 5 | Product specification cut-sheets | X | X | |||||
| 6 | demolition plan and new work lay out plans submittals | X | ||||||
| 7 | Product Safety Data Sheets | X | ||||||
| 8 | Shop Drawings submittals for Cables, conduits, Man holes, Deadfront loop feed, fused load break switch, Deadfront loop feed, fused load break switch, Deadfront loop feed, fused transformer, grounding, ground rods, ground cables, duct bank | X | X | |||||
| 9 | arc flash submittal | X | ||||||
| 10 | Warranty of work | X | ||||||
| 11 | Certified signed Test Report | X | ||||||
| 12 | ||||||||
| 13 | ||||||||
| 14 | ||||||||
| 15 | ||||||||
| 16 | ||||||||
| 17 | ||||||||
| 18 | ||||||||
| 19 | ||||||||
| 20 |
| SCHEDULE OF MATERIAL SUBMITTALS | |||||
| (AF Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | ||
| VGLZ 212030 | Project Title |
Emergency Electrical Infrastructure Repair for B45 &46
| TO BE COMPLETED BY PROJECT ENGINEER | |||||||||||
| NO. OF COPIES REQUIRED | |||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OTHER MATERIAL or DATA | OPERATING INSTRUCTIONS | SUBMITTAL |
REQUIRED
BY 14 DAYS
AFTER NTP DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | ||
| APPROVAL | REMARKS | |||||
| APPROVED | DISAPPROVED | |||||
| 21 | ||||||
| 22 | ||||||
| 23 | ||||||
| 24 | ||||||
| 25 | ||||||
| 26 | ||||||
| 27 | ||||||
| 28 | ||||||
| 29 | ||||||
| 30 | ||||||
| 31 | ||||||
| 32 | ||||||
| 33 | ||||||
| 34 | ||||||
| 35 | ||||||
| 36 | ||||||
| 37 | ||||||
| 38 |
| SCHEDULE OF MATERIAL SUBMITTALS | |||||
| (AF Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | ||
| VGLZ 212030 | Project Title |
Emergency Electrical Infrastructure Repair for B45 &46
| TO BE COMPLETED BY PROJECT ENGINEER | |||||||||||
| NO. OF COPIES REQUIRED | |||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OTHER MATERIAL or DATA | OPERATING INSTRUCTIONS | SUBMITTAL |
REQUIRED
BY 14 DAYS
AFTER NTP DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | ||
| APPROVAL | REMARKS | |||||
| APPROVED | DISAPPROVED | |||||
| 39 | ||||||
| 40 | ||||||
| 41 | ||||||
| 42 | ||||||
| 43 | ||||||
| 44 | ||||||
| 45 | ||||||
| 46 | ||||||
| 47 | ||||||
| 48 | ||||||
| 49 | ||||||
| 50 | ||||||
| 51 | ||||||
| 52 | ||||||
| 53 | ||||||
| 54 | ||||||
| 55 | ||||||
| 56 |
| SCHEDULE OF MATERIAL SUBMITTALS | |||||
| (AF Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | ||
| VGLZ 212030 | Project Title |
Emergency Electrical Infrastructure Repair for B45 &46
| TO BE COMPLETED BY PROJECT ENGINEER | |||||||||||
| NO. OF COPIES REQUIRED | |||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OTHER MATERIAL or DATA | OPERATING INSTRUCTIONS | SUBMITTAL |
REQUIRED
BY 14 DAYS
AFTER NTP DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | ||
| APPROVAL | REMARKS | |||||
| APPROVED | DISAPPROVED | |||||
| 39 | ||||||
| 40 | ||||||
| 41 | ||||||
| 42 | ||||||
| 43 | ||||||
| 44 | ||||||
| 45 | ||||||
| 46 | ||||||
| 47 | ||||||
| 48 | ||||||
| 49 | ||||||
| 50 | ||||||
| 51 | ||||||
| 52 | ||||||
| 53 | ||||||
| 54 | ||||||
| 55 | ||||||
| 56 |
File details come from the government source that posted it. Updated .