SF102-HIGH ROOF FRAMING PLAN.pdf

PDF 298 KB Posted

Attached to
Construct Mission Training Center (MTC) Facility
Solicitation number
W50S78-24-B-0001
Issued by

About this file

This document appears to be a high roof framing plan for a facility construction project. The plan provides details on the structural framing, including the sizes and locations of roof joists, girders, and beams. It also includes notes on roof deck specifications, loads, and framing requirements.

The related federal contract opportunity is for the construction of a 15,200 square foot F-16 Mission Training Center (MTC) facility for the Texas Air National Guard at Joint Base San Antonio Lackland Air Force Base. The contract will be a single firm fixed-price award set aside for small businesses, with a contract duration of 540 calendar days. The solicitation includes a base bid as well as several options and brand name items. A site visit and pre-bid conference are scheduled, and all questions and requests for information must be submitted prior to bid opening.

View the file

Other files

File Type Posted
MTC - ABSTRACT Posted 24 Sep 24.pdf PDF
SF101-LOW ROOF FRAMING PLAN.pdf PDF
S-002-TYPICAL DETAILS.pdf PDF
01 45 35 - Special Inspections.pdf PDF
M-702 SCHEDULES.pdf PDF
23 05 48.19 - SEISMIC BRACING FOR HVAC.pdf PDF
SB102-SLAB AND WALL PLAN.pdf PDF
AE501-SECTION DETAILS.pdf PDF
AE502-SECTION DETAILS.pdf PDF
AE303-WALL SECTIONS.pdf PDF
23 05 48.00 40 - VIBRATION CONTROLS FOR HAC PIPING AND EQUIPMENT.pdf PDF
M-701 SCHEDULES.pdf PDF
AE601-ROOM FINISH SCHEDULE AND GLAZING TYPES AND MISC DETAILS.pdf PDF
AE101-FLOOR PLAN.pdf PDF
S-001-GENERAL NOTES.pdf PDF
AE305-WALL SECTIONS.pdf PDF
M-502 DETAILS.pdf PDF
AE001-PARTITION TYPES ANNOTATION SYMBOLS ABBREVIATIONS AND ACCESSIBILITY MOUNTING HEIGHTS.pdf PDF
C-301-REMOVAL PLAN.pdf PDF
New Utilities to East.pdf PDF
11 94 10 - Rooftop Fall Protection Anchors.pdf PDF
C-201-STORMWATER POLLUTION PREVENTION PLAN.pdf PDF
AE603-DOOR DETAILS.pdf PDF
C-601-UTILITY PLAN.pdf PDF
000 TABLE OF CONTENTS.pdf PDF
M-501 DETAILS.pdf PDF
AE304-WALL SECTIONS.pdf PDF
G-003-CODE AND LIFE SAFETY PLAN.pdf PDF
01 45 00 - Quality Control.pdf PDF
MTC RFI log 20240917.pdf PDF
AE401-ENLARGED PLANS AND DETAILS.pdf PDF
ES101-ELECTRICAL SITE PLAN.pdf PDF
AE503-SECTION DETAILS.pdf PDF
Amendment 0004 - 17 Aug 2024.pdf PDF
C-401-PROPOSED PLAN.pdf PDF
C-602-DRAINAGE SCHEDULE AND DETAILS.pdf PDF
W50S78-24-B-0001 - Mission Training Center Amendment 0003.pdf PDF
MTC RFI log.pdf PDF
W50S7824B0001 - MTC - Amendment 02 - 20240829.pdf PDF
Attachment 14 - Geotechnical report-TX ANG Mission Training Center B-3.pdf PDF
MFR Mission Training Center - 2nd Site Visit Pre-Propsal Conference Minutes.pdf PDF
Pre_Bid_Site Visit_MTC_Attendance_Sheet 27_Aug _2024.pdf PDF
Pre-Proposal Site Visit Slides - MTC 27 Aug 24.pptx PPTX presentation
W50S78-24-B-0001 - Mission Training Center Amendment 0001.pdf PDF
2024.08.21_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_VOL 1 SPECIFICATIONS.pdf PDF
ATTACHMENT 9 SPECS V1 ADDENDUM.pdf PDF
MTC RFI log.pdf PDF
Pre-Proposal Site Visit Slides - MTC 20 Aug 24 (002).pptx PPTX presentation
Pre_Bid_Site Visit_MTC_Attendance_Sheet 20_Aug _2024.pdf PDF
MFR Mission Training Center - Site Visit Pre-Propsal Conference Minutes.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8 5

5 4

4 3

F

C C

A A

D

B B

C1

SF201

C3

SF201

DECK BRG

ELEV = 130'-3 5/8"

'-1

0"

'-4

'-0

8'

-0

'-1

0"

30'-10"18'-10"16'-10"30'-10"10'-7"10'-1"23'-1"28'-11"

97'-4"72'-8"

170'-0"

DECK BRG

ELEV = 123'-1 5/8"

W

X3

W

X3

W

X3

W

X3

W

X3

W

X3

W

X3

W

X3

W

X3

W

X3

W18X40W14X22W14X30W18X40 W

X3

W

X3

W

X2

W

X3

W

X1

W18X35 W14X30 W14X22 W18X35

W24X55W18X35W18X35W24X55

KS

P3

KS

P3

KS

P3

KS

P3

KS

P1

KS

P1 28

KS

P1

KS

P1

E

S-004 B3

S-004 C5

BR

AC

ED

BA

Y

BR

AC

ED

BA

Y

BRACED

BAY

BR

AC

ED

BA

Y

BR

AC

ED

BA

Y

(6) EQ SPACES = 30'-10"(4) EQ SPACES = 18'-10"(4) EQ SPACES = 16'-10"(7) EQ SPACES = 30'-10"

BRACED

BAY

S-004 B5

TYP

S-004 B5

S-004 B2

B.7

C.3

S-004 D5

G

'-0

4' -0

S-004 C3

SIM

B4

SF102

ROOF SUPPORTED CRAC-05 (500#)

(200# POINT LOADS TO JOISTS)

ROOF SUPPORTED FCU,

250# EACH, COORDINATE

LOCATIONS AND LOADS

TO JOISTS.

C2

SF201

C4

SF201

A2

SF201 A1

SF201

SUPPORT ANGLES -

REFER SIMILARA3 / S-003

FRAMING PLAN NOTES

1 ROOF HATCH OPENING, COORDINATE LOCATION

WITH ARCH. REFER A3/S-003 ROOF FRAMED

OPENING.

B1 / S-004 1.

2.

A.

a.

B.

a.

PROVIDE BOTTOM FLANGE BRACES ON ALL ROOF

GIRDERS AND BEAMS (REFER ). SPACE

FLANGE BRACES AT 10'-0" OC MAX TYP W/ ADD'L

LOCATIONS AS NOTED. COORDINATE WITH JOIST

LOCATIONS

ROOF DECKING:

LOW ROOF - 1.5B 18 GA ROOF DECK

#12 SELF-TAPPING SCREWS USING A 36/7

PATTERN AT SUPPORTS AND (6) #10 SELF-

TAPPING SCREW SIDELAP FASTENERS PER

SPAN

HIGH ROOF - 1.5B 18 GA ROOF DECK

#12 SELF-TAPPING SCREWS USING A 36/7

PATTERN AT SUPPORTS AND (6) #10 SELF-

TAPPING SCREW SIDELAP FASTENERS PER

SPAN

2 ROOF HOOD OPENING, COORDINATE LOCATION

WITH MECH. REFER A3/S-003 ROOF FRAMED

OPENING, SIMILAR.

JOIST DESIGN LOAD NOTES

1.

2.

3.

4.

WIND LOAD (WL) TO BE AS PER DETAILS AND ASSOCIATED

TABLE WHICH ARE DOWNWARD FORCES FOR COMPONENTS AND

CLADDING PRESSURES.

WIND LOAD (WL) TO BE AS PER DETAILS AND ASSOCIATED

TABLE WHICH ARE GROSS UPLIFT FORCES FOR COMPONENTS AND

CLADDING PRESSURES.

COLLATERAL LOAD WORSE CASE OF 12 PSF UNIFORM LOAD OR A 100 LB

POINT LOAD CENTERED BETWEEN EACH BOTTOM CHORD PANEL POINT.

LIVE LOAD IS NON-REDUCIBLE.

JOIST LOAD COMBINATIONS

COLLATERAL LOAD (CL) SEE NOTE 3

DEAD LOAD (DL) 145 PLF PLUS JOIST SELF WEIGHT

WIND LOAD (WL) SEE NOTE 1

WIND LOAD (WL) SEE NOTE 2

LIVE LOAD (LL) 100 PLF

SNOW LOAD (SL) 25 PLF

28KSP1

TRIBUTARY WIDTH = 5.0 FEET

C

COLLATERAL LOAD (CL) SEE NOTE 3

DEAD LOAD (DL) 145 PLF PLUS JOIST SELF WEIGHT

WIND LOAD (WL) SEE NOTE 1

WIND LOAD (WL) SEE NOTE 2

LIVE LOAD (LL) 100 PLF

SNOW LOAD (SL) 25 PLF

26KSP3

TRIBUTARY WIDTH = 5.0 FEET

A

GC

C1 / S-005

C1 / S-005

1.

2.

3.

4.

5.

6.

7.

1.2 DL + 1.6 CL + 1.6 LL

1.2 DL + 1.6 CL + 1.6 SL

1.2 DL + 1.6 CL + 1.6 LL + 0.5 WL

1.2 DL + 1.6 CL + 1.6 SL + 0.5 WL

1.2 DL + 0.5 LL + 1.0 WL

1.2 DL + 0.5 SL + 1.0 WL

0.9 DL + 1.0 WL

500LB

�5'-1" �8"

F

HSS6X6X1/4

HSS6X6X1/4

TYP

1' -6

8'-4 1/4" 4'-1 3/4" 4'-1 3/4"

SF502

A2

SF502

A1

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

Frankfurt-Short-Bruza Associates,P.C.

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

C

B

A

D

C

B

A

54321

20190310

NDM

Jo in t B as e S an A nt on io

JB

SA

Ke lly A nn ex , T ex as

Te xa s Ai r N at io na l G ua rd 9t h

FW

F- M iss io n Tr ain in g Ce nt er (M

TC

C :\U sers\nolm stead\D ocum ents\90310_Stru_nolm steadFK74B.rvt 09/13/24 16:34:06

15 AUGUST 2024

HIGH ROOF FRAMING PLAN

SF102

BJW

CGH

CGH

0 4' 8' 16'

1/8" = 1'-0"

N

SCALE: 1/8" = 1'-0"

HIGH ROOF FRAMING PLANB1

SCALE: 3/8" = 1'-0"

ENLARGED FRAMING PLANB4

2' 6'4'0

3/8" = 1'-0"

1 Addendum 02 09/16/2024

File details come from the government source that posted it. Updated .