This document is a set of wall section drawings for a construction project. The drawings provide detailed specifications for the wall assembly, including the use of steel standing seam roofing, insulated metal wall panels, spray foam air barrier, brick veneer, and gypsum wall board with RF shielding.
The related federal contract opportunity is for the construction of a 15,200 square foot Mission Training Center (MTC) facility for the Texas Air National Guard at Joint Base San Antonio Lackland Air Force Base. The project has a base bid as well as eight options, including items such as permeable pavement, landscaping, epoxy floor coating, and additional under floor drains. The contract will be a single firm fixed-price award set aside for small businesses, with a projected value between $10-25 million and a 540 calendar day period of performance. The solicitation will be available through SAM.gov, with a site visit, pre-bid conference, and deadline for questions and RFIs prior to bid opening.
View the file
Other files for this federal contract opportunity
Show all 50
Construct Mission Training Center (MTC) Facility has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GROUND FLOOR
100' - 0"
A
(SSSR1) STEEL
STANDING
SEAM ROOFING
(MV1) MODULAR
BRICK VENEER
CONCRETE
FOUNDATION
CONCRETE SLAB
6" CFMF AT 16" OC
FLUID APPLIED AIR
AND WATER
BARRIER
STEEL
STRUCTURE
STEEL
STRUCTURE
SCHEDULED
CEILING
(FWP1) 2"
INSULATED METAL
WALL PANEL
FALL PROTECTION
SYSTEM
NOM 4" SPRAY FOAM
AIR BARRIER - OPEN
CELL (R-17 MIN.) WITH
ASTM E84 COMPLIANT
FIRE RETARDANT
SURFACE FILM
C3
AE501
4" 2'
8"
1'
4"
1/2" EXT GYPSUM
SHEATHING
A3
AE501
C4
AE501
OH
4 LAYERS 2"
RIGID
INSULATION
1/2" COVER
BOARD
STEEL DECK
1" / 1'-0"
1'-7 7/8"
16 GA 3" HORIZ Z-
CHANNEL AT 48"
VERTICALLY
2 LAYERS OF 5/8” GYSUM
WALL BOARD (GWB) WITH
PERFORATED RF
SHIELDING/ FOIL MEMBRANE
ADHERED BETWEEN
LAYERS
SIM 2
GROUND FLOOR
100' - 0"
HIGH EAVE (LOW) DB
123' - 0"
(SSSR1) STEEL
STANDING SEAM
ROOFING
(FWP1) 2"
INSULATED METAL
WALL PANEL
CONCRETE
FOUNDATION
CONCRETE SLAB
6" CFMF AT 16" OC
FLUID APPLIED AIR
AND WATER
BARRIER
STEEL
STRUCTURE
SCHEDULED
CEILING
NOM 4" SPRAY FOAM
AIR BARRIER - OPEN
CELL (R-17 MIN.) WITH
ASTM E84 COMPLIANT
FIRE RETARDANT
SURFACE FILM
STEEL
STRUCTURE
2'
8" 4"
2'
8" 4"
2'
8" 4"
2'
8" 4"
1/2" EXT GYPSUM
SHEATHING
A3
AE501
C1
AE501
FALL PROTECTION
SYSTEM
4 LAYERS 2" RIGID
INSULATION
1/2" COVER BOARD
STEEL DECK
1" / 1'-0"
'-0
1'
-4
G
(MV1) MODULAR
BRICK VENEER
2" CAVITY WALL
INSULATION
BOARD
C4
AE501
SIM
1'-7 7/8"
SNOW GUARD
SYSTEM
16 GA 3" HORIZ Z-
CHANNEL AT 48"
VERTICALLY
2 LAYERS OF 5/8” GYSUM
WALL BOARD (GWB)
WITH PERFORATED RF
SHIELDING/ FOIL
MEMBRANE ADHERED
BETWEEN LAYERS
SIM 1
OH
GROUND FLOOR
100' - 0"
LOW EAVE (LOW) DB
115' - 0"
F
(SSSR1) STEEL
STANDING SEAM
ROOFING
BRICK ROWLOCK
COURSE
CONCRETE
FOUNDATION
CONCRETE SLAB
6" CFMF AT 16" OC
FLUID APPLIED
MEMBRANE AIR
BARRIER
STEEL
STRUCTURE
SCHEDULED
CEILING
(FWP1) 2" INSULATED
METAL WALL PANEL
FALL PROTECTION
SYSTEM
NOM 4" SPRAY
FOAM AIR
BARRIER - OPEN
CELL (R-17 MIN.)
WITH ASTM E84
COMPLIANT FIRE
RETARDANT
SURFACE FILM
C1
AE501
1/2" EXT GYPSUM
SHEATHING
C4
AE501
PREFINISHED
METAL GUTTER
AND DOWNSPOUT
2' -8
4"
'-0
2" CAVITY WALL
INSULATION
BOARD(MV1) MODULAR
BRICK VENEER
1'-7 7/8"
1" / 1'-0"
A3
AE501
SNOW GUARD
SYSTEM
16 GA 3" HORIZ Z-
CHANNEL AT 48"
VERTICALLY
2 LAYERS OF 5/8” GYSUM
WALL BOARD (GWB)
WITH PERFORATED RF
SHIELDING/ FOIL
MEMBRANE ADHERED
BETWEEN LAYERSCLASSROOM
OH
GROUND FLOOR
100' - 0"
LOW EAVE (LOW) DB
115' - 0"
F
(SSSR1) STEEL
STANDING SEAM
ROOFING
CONCRETE
FOUNDATION
ACCESS
FLOORING
6" CFMF AT 16" OC
FLUID APPLIED
MEMBRANE AIR
BARRIER
STEEL STRUCTURE
(FWP1) 2"
INSULATED METAL
WALL PANEL
C1
AE501
1/2" EXT GYPSUM
SHEATHING
C4
AE501
SIM
FALL PROTECTION
SYSTEM
PREFINISHED
METAL GUTTER
AND DOWNSPOUT
3' -0
4"
2' -8
4"
2' -8
4"
2' -8
4"
2' -8
1' -4
'-0
1'
6"
CONCRETE SLAB
2" CAVITY WALL
INSULATION
BOARD
(MV1) MODULAR
BRICK VENEER
NOM 4" SPRAY FOAM
AIR BARRIER - OPEN
CELL (R-17 MIN.) WITH
ASTM E84 COMPLIANT
FIRE RETARDANT
SURFACE FILM
1'-7 7/8"
1" / 1'-0"
SNOW GUARD
SYSTEM
2 LAYERS OF 5/8” GYSUM
WALL BOARD (GWB) WITH
PERFORATED RF
SHIELDING/ FOIL
MEMBRANE ADHERED
BETWEEN LAYERS
AREA 1
COMM
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
Frankfurt-Short-Bruza Associates,P.C.
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20190310
NDM
Jo int
B as e S an
A nto nio
JB
SA
Ke lly
A nn ex , T ex as
Te xa s A ir
Na tio na l G ua rd
9t h
FW
F-1
6 M iss ion Tr ain ing
C en ter (M
TC
C :\U sers\keisner\D ocum ents\90310_Arch_keisnerU
7YM
G .rvt
9/16/2024 10:19:29 AM
15 AUGUST 2024
WALL SECTIONS
AE304
MJT
BKG
GMD
SCALE: 1/2" = 1'-0"
WALL SECTIONA4SCALE: 1/2" = 1'-0"
WALL SECTIONA3
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
Frankfurt-Short-Bruza Associates,P.C.
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20190310
NDM
Jo int
B as e S an
A nto nio
JB
SA
Ke lly
A nn ex , T ex as
Te xa s A ir
Na tio na l G ua rd
9t h
FW
F-1
6 M iss ion Tr ain ing
C en ter (M
TC
0 1' 2' 4'
1/2" = 1'-0"
C :\U sers\keisner\D ocum ents\90310_Arch_keisnerU
7YM
G .rvt
9/16/2024 10:19:29 AM
15 AUGUST 2024
WALL SECTIONS
AE304
MJT
BKG
GMD
LEGEND GRAPHIC VISUAL PLANE OF CONT AIR
BARRIER WHERE SHOWN ALL SHEETS
SCALE: 1/2" = 1'-0"
WALL SECTIONA1 SCALE: 1/2" = 1'-0"
WALL SECTIONA2
NOTE: REFERENCE SPECIFICATION SECTIONS
07 05 23 AND 07 27 10.00 10 FOR DESCRIPTION
OF AIR BARRIER SYSTEM
AREA 1 - GENERAL NOTES
1 Addendum 02 09/16/20241 Addendum 02 09/16/2024
1. APPLY MINIMUM 2” WIDE FOIL TAPE CENTERED
OVER ALL EXPOSED BED AND HEAD JOINTS NO
DRYWALL COMPOUND (LAP 1/2” DOWN HORIZONTALLY
ONTO FLOOR SLAB AND GENEROUSLY LAP AT THE
HEAD OF THE WALL PER DETAIL CONDITION)
2. APPLY MINIMUM 2” WIDE FOIL TAPE CENTERED
OVER ALL VERTICAL FASTENERS HEADS.
3. APPLY MINIMUM 12” WIDE FOIL TAPE CENTERED ON
EACH CORNER INTERSECTION. (6” LAP EACH WAY)
REFER TO SHEET AE002 FOR "AREA 1" PERIMETER
WALL. REFER TO SHEET AE520 FOR TYPICAL RF
SHIELDING/FOIL MEMBRANE NOTES AND DETAILS.
File details come from the government source that posted it. Updated .