AE305-WALL SECTIONS.pdf

PDF 281 KB Posted

Attached to
Construct Mission Training Center (MTC) Facility Federal contract opportunity
Solicitation number
W50S78-24-B-0001
Issued by
Department of the Army National Guard

About this file

This document appears to be the wall sections for a federal construction project. The key details are:

The federal contract opportunity is for the construction of a 15,200 square foot Mission Training Center (MTC) facility for the Texas Air National Guard at Joint Base San Antonio Lackland Air Force Base. The contract will be a single firm fixed-price contract with a duration of 540 calendar days. The project includes demolition, site work, utilities, masonry, roofing, structural steel, HVAC, plumbing, electrical, communications, fire protection, and other related work. In addition to a base bid, there are 8 options including items such as permeable pavement, landscaping, floor coatings, wall/floor tile, additional drains, insignia signage, and fixed seating. The project is set aside 100% for Small Business under NAICS code 236220. A site visit and pre-bid conference are scheduled in August 2024, and the solicitation will be issued through SAM.gov. The government has identified 5 brand name items required for compatibility with existing systems.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Mission Training Center (MTC) Facility, newest first.
File Type Posted
MTC - ABSTRACT Posted 24 Sep 24.pdf PDF
C-301-REMOVAL PLAN.pdf PDF
S-002-TYPICAL DETAILS.pdf PDF
SF101-LOW ROOF FRAMING PLAN.pdf PDF
S-001-GENERAL NOTES.pdf PDF
New Utilities to East.pdf PDF
M-501 DETAILS.pdf PDF
AE501-SECTION DETAILS.pdf PDF
C-401-PROPOSED PLAN.pdf PDF
C-602-DRAINAGE SCHEDULE AND DETAILS.pdf PDF
ES101-ELECTRICAL SITE PLAN.pdf PDF
AE401-ENLARGED PLANS AND DETAILS.pdf PDF
AE503-SECTION DETAILS.pdf PDF
01 45 00 - Quality Control.pdf PDF
Amendment 0004 - 17 Aug 2024.pdf PDF
MTC RFI log 20240917.pdf PDF
C-201-STORMWATER POLLUTION PREVENTION PLAN.pdf PDF
C-601-UTILITY PLAN.pdf PDF
SF102-HIGH ROOF FRAMING PLAN.pdf PDF
G-003-CODE AND LIFE SAFETY PLAN.pdf PDF
M-702 SCHEDULES.pdf PDF
M-701 SCHEDULES.pdf PDF
AE601-ROOM FINISH SCHEDULE AND GLAZING TYPES AND MISC DETAILS.pdf PDF
AE303-WALL SECTIONS.pdf PDF
23 05 48.19 - SEISMIC BRACING FOR HVAC.pdf PDF
23 05 48.00 40 - VIBRATION CONTROLS FOR HAC PIPING AND EQUIPMENT.pdf PDF
11 94 10 - Rooftop Fall Protection Anchors.pdf PDF
W50S78-24-B-0001 - Mission Training Center Amendment 0003.pdf PDF
Attachment 14 - Geotechnical report-TX ANG Mission Training Center B-3.pdf PDF
MTC RFI log.pdf PDF
W50S7824B0001 - MTC - Amendment 02 - 20240829.pdf PDF
Pre-Proposal Site Visit Slides - MTC 27 Aug 24.pptx PPTX presentation
MFR Mission Training Center - 2nd Site Visit Pre-Propsal Conference Minutes.pdf PDF
Pre_Bid_Site Visit_MTC_Attendance_Sheet 27_Aug _2024.pdf PDF
MTC RFI log.pdf PDF
2024.08.21_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_VOL 1 SPECIFICATIONS.pdf PDF
ATTACHMENT 9 SPECS V1 ADDENDUM.pdf PDF
Pre-Proposal Site Visit Slides - MTC 20 Aug 24 (002).pptx PPTX presentation
Pre_Bid_Site Visit_MTC_Attendance_Sheet 20_Aug _2024.pdf PDF
Attachment 6_Industrial Security.pdf PDF
Attachment 5_STRUCTURAL INTERIOR DESIGN.pdf PDF
Attachment 7_ACCESS AND STAGING SITE PLAN.pdf PDF
JA Nm Brand DDC Redacted.pdf PDF
JA Nm Brand Falcon Redacted.pdf PDF
2024.08.15_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_VOL 1 SPECIFICATIONS.pdf PDF
JA Nm Brand Vindicator Sys Redacted.pdf PDF
W50S78-24-B-0001 - Mission Training Center Solicitation.pdf PDF
2024.08.15_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_DRAWINGS.pdf PDF
JA Nm Brand Monaco Redacted.pdf PDF
JA Nm Brand Trane HVAC Redacted.pdf PDF
Show all 50

Construct Mission Training Center (MTC) Facility has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GROUND FLOOR

100' - 0"

LOW EAVE (LOW) DB

115' - 0"

F

C3

AE502

(SSSR1) STEEL

STANDING SEAM

ROOFING

FALL PROTECTION

SYSTEM

4 LAYERS 2" RIGID

INSULATION

1/2" COVERBOARD

STEEL DECK

LIGHT FIXTURE

(FWP2) 2" INSULATED

METAL WALL PANEL

FLUID APPLIED

MEMBRANE AIR

BARRIER

1/2" EXT GYPSUM

SHEATHING

6" CFMF AT 16" OC

6" CFMF AT 16" OC

STEEL STRUCTURE

NOM 4" SPRAY FOAM AIR

BARRIER - OPEN CELL (R-17 MIN.)

WITH ASTM E84 COMPLIANT FIRE

RETARDANT SURFACE FILM

CONT 1/2" EXT

GYPSUM SHEATHING

CLOSURE

1" / 1'-0"

BID OPTION:

ILLUMINATED INSIGNIA

SIGNAGE - O.L.I. #7

(FWP2) 2" INSULATED

METAL WALL PANEL

PREFIN BRAKE METAL

SILL FLASHING

(MV1) MODULAR

BRICK VENEER

CONCRETE PAVING CONCRETE SLAB

STOREFRONT

GLAZING SYSTEM

EX1

SCHEDULED CEILING

A3

VEST

CORRIDOR

25' - 0"

A1

AE502

EX1FIRE ALARM CONTROL

UNIT

RUBBER BASE RB1

SECURITY CAMERA

PREFINISHED METAL

GUTTER AND

DOWNSPOUT

1" / 1'-0"

2 LAYERS OF 5/8” GYSUM

WALL BOARD (GWB) WITH

PERFORATED RF

SHIELDING/ FOIL MEMBRANE

ADHERED BETWEEN

LAYERS

16 GA 3" HORIZ Z-

CHANNEL AT 48"

VERTICALLY

GROUND FLOOR

100' - 0"

LOW EAVE (LOW) DB

115' - 0"

F E

A1

AE103

A3

AE502

8' -8

6'

-4

(SSSR1) STEEL

STANDING SEAM

ROOFING

METAL SOFFIT

FALL PROTECTION

SYSTEM

PREFINISHED METAL

GUTTER AND

DOWNSPOUT

STEEL STRUCTURE

(FWP1) 2" INSULATED

METAL WALL PANEL

FLUID APPLIED

MEMBRANE AIR

BARRIER

1/2" EXT GYPSUM

SHEATHING

STORAGE

MEN

STEEL DECK

6" CFMF AT 16" OC

(FWP1) 2" INSULATED

METAL WALL PANEL

FLUID APPLIED

MEMBRANE AIR BARRIER

1/2" EXT GYPSUM

SHEATHING

NOM 4" SPRAY FOAM AIR

BARRIER - OPEN CELL

(R-17 MIN.) WITH ASTM E84

COMPLIANT FIRE

RETARDANT SURFACE FILM

6" CFMF AT 16" OC

ROWLOCK COURSE

(MV1) MODULAR BRICK

VENEER

2" CAVITY WALL

INSULATION BOARD

CONCRETE

FOUNDATION

CONCRETE SLAB

ROOF HATCH

SAFETY

LANYARD

ROOF ACCESS

LADDER

A2

C4

AE501

A3

AE501

16 GA 3" HORIZ Z-

CHANNEL AT 48"

VERTICALLY

OH

GROUND FLOOR

100' - 0"

STEEL STRUCTURE

CONCRETE SLAB

(SSSR1) STEEL

STANDING SEAM

ROOFING

SCHEDULED

CEILING

MAN TRAP

CORRIDOR

C3

AE503

2 LAYERS OF 5/8"

GYPSUM WALL BOARD

SIM

PERFORATED RF SHIELDING/

FOIL MEMBRANE ADHERED

BETWEEN GWB LAYERS

REFER AE520 FOR TYPICAL

RF SHIELDING/FOIL NOTES

AND DETAILS

5/8” GYSUM WALL BOARD

(GWB) 2 LAYERS

S3f

GROUND FLOOR

100' - 0"

F E

6"6" 3'

-0

6"6" 2'

-0

1' -0

6"

6"

6" 6"

4'-0" 1'-0"

TIERED ACCESS

FLOOR SYSTEM

AND SUPPORTS

PROPOSED FIXED

SEATING WITH

TABLET ARMS -

O.L.I. #8

6'-0" 1'-0"

6'-0" 1'-0"

6'-0" 1'-0"

3' -0

3' -0

3' -0

3' -0

3' -0

1.9" OD STEEL PIPE

HANDRAIL AND WALL

MOUNT BRACKETS

1'-0" 2'-0" 2'-0" 2'-0" 2'-0" 2'-0" 2'-0" 2'-0" 1'-0"

WOOD BLOCKING

BACK-UP - TYP.

AE305

D2

1.9"OD DIA

STEEL PIPE

HANDRAIL AND

WALL

BRACKES

FACE OF FINISH WALL

ESCUTCHEON

COVER PLATE

1 1/2"

MIN

WOOD

BLOCKING

BACKING - TYP.

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

Frankfurt-Short-Bruza Associates,P.C.

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

C

B

A

D

C

B

A

54321

20190310

NDM

Jo int

B as e S an

A nto nio

JB

SA

Ke lly

A nn ex , T ex as

Te xa s A ir

Na tio na l G ua rd

9t h

FW

F-1

6 M iss ion Tr ain ing

C en ter (M

TC

C :\U sers\keisner\D ocum ents\90310_Arch_keisnerU

7YM

G .rvt

9/16/2024 10:21:24 AM

15 AUGUST 2024

WALL SECTIONS

AE305

MJT

BKG

GMD

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

Frankfurt-Short-Bruza Associates,P.C.

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

C

B

A

D

C

B

A

54321

20190310

NDM

Jo int

B as e S an

A nto nio

JB

SA

Ke lly

A nn ex , T ex as

Te xa s A ir

Na tio na l G ua rd

9t h

FW

F-1

6 M iss ion Tr ain ing

C en ter (M

TC

0 1' 2' 4'

1/2" = 1'-0"

C :\U sers\keisner\D ocum ents\90310_Arch_keisnerU

7YM

G .rvt

9/16/2024 10:21:25 AM

15 AUGUST 2024

WALL SECTIONS

AE305

MJT

BKG

GMD

LEGEND GRAPHIC VISUAL PLANE OF CONT AIR

BARRIER WHERE SHOWN ALL SHEETS

SCALE: 1/2" = 1'-0"

WALL SECTION @ ENTRY VESTA1 SCALE: 1/2" = 1'-0"

WALL SECTIONA4SCALE: 1/2" = 1'-0"

WALL SECTIONA3

SCALE: 3/4" = 1'-0"

SECTION DETAIL - CLASSROOM 114 AND MOC 121 - TYP RAISED FLOORING AND SEATINGC3

SCALE: 3" = 1'-0"

HANDRAIL DETAILD2

NOTE: REFERENCE SPECIFICATION SECTIONS

07 05 23 AND 07 27 10.00 10 FOR DESCRIPTION

OF AIR BARRIER SYSTEM

1' 3'2'0

3/4" = 1'-0"

3" 9"6"0

3" = 1'-0"

AREA 1 - GENERAL NOTES

1 Addendum 02 09/16/20241 Addendum 02 09/16/2024

1. APPLY MINIMUM 2” WIDE FOIL TAPE CENTERED

OVER ALL EXPOSED BED AND HEAD JOINTS NO

DRYWALL COMPOUND (LAP 1/2” DOWN HORIZONTALLY

ONTO FLOOR SLAB AND GENEROUSLY LAP AT THE

HEAD OF THE WALL PER DETAIL CONDITION)

2. APPLY MINIMUM 2” WIDE FOIL TAPE CENTERED

OVER ALL VERTICAL FASTENERS HEADS.

3. APPLY MINIMUM 12” WIDE FOIL TAPE CENTERED ON

EACH CORNER INTERSECTION. (6” LAP EACH WAY)

REFER TO SHEET AE002 FOR "AREA 1" PERIMETER

WALL. REFER TO SHEET AE520 FOR TYPICAL RF

SHIELDING/FOIL MEMBRANE NOTES AND DETAILS.

File details come from the government source that posted it. Updated .