This document is a Code and Life Safety Plan for the construction of a Mission Training Center (MTC) facility. The Plan outlines the applicable building codes and standards, use and occupancy classifications, construction type, and egress requirements for the 15,198 square foot facility. The facility will support the Texas Air National Guard's 149th Fighter Wing and will include areas for business use, storage, mechanical/electrical equipment, and waiting spaces. The Plan provides an occupancy schedule detailing the room names, areas, and occupant loads. The related federal contract opportunity is for the construction of this MTC facility, with a total contract duration of 540 calendar days. The solicitation includes a base bid and eight options, and specifies several brand name items required for compatibility with existing systems. The contract will be set aside for small businesses under NAICS code 236220.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Mission Training Center (MTC) Facility, newest first.
File Type Posted
C-301-REMOVAL PLAN.pdf PDF
S-002-TYPICAL DETAILS.pdf PDF
SF101-LOW ROOF FRAMING PLAN.pdf PDF
S-001-GENERAL NOTES.pdf PDF
New Utilities to East.pdf PDF
M-501 DETAILS.pdf PDF
AE501-SECTION DETAILS.pdf PDF
AE305-WALL SECTIONS.pdf PDF
C-201-STORMWATER POLLUTION PREVENTION PLAN.pdf PDF
C-601-UTILITY PLAN.pdf PDF
SF102-HIGH ROOF FRAMING PLAN.pdf PDF
M-702 SCHEDULES.pdf PDF
M-701 SCHEDULES.pdf PDF
AE601-ROOM FINISH SCHEDULE AND GLAZING TYPES AND MISC DETAILS.pdf PDF
AE303-WALL SECTIONS.pdf PDF
23 05 48.19 - SEISMIC BRACING FOR HVAC.pdf PDF
23 05 48.00 40 - VIBRATION CONTROLS FOR HAC PIPING AND EQUIPMENT.pdf PDF
11 94 10 - Rooftop Fall Protection Anchors.pdf PDF
000 TABLE OF CONTENTS.pdf PDF
01 45 35 - Special Inspections.pdf PDF
C-401-PROPOSED PLAN.pdf PDF
C-602-DRAINAGE SCHEDULE AND DETAILS.pdf PDF
ES101-ELECTRICAL SITE PLAN.pdf PDF
AE401-ENLARGED PLANS AND DETAILS.pdf PDF
AE503-SECTION DETAILS.pdf PDF
01 45 00 - Quality Control.pdf PDF
Amendment 0004 - 17 Aug 2024.pdf PDF
W50S78-24-B-0001 - Mission Training Center Amendment 0003.pdf PDF
Attachment 14 - Geotechnical report-TX ANG Mission Training Center B-3.pdf PDF
MTC RFI log.pdf PDF
W50S7824B0001 - MTC - Amendment 02 - 20240829.pdf PDF
MFR Mission Training Center - 2nd Site Visit Pre-Propsal Conference Minutes.pdf PDF
Pre_Bid_Site Visit_MTC_Attendance_Sheet 27_Aug _2024.pdf PDF
Pre-Proposal Site Visit Slides - MTC 27 Aug 24.pptx PPTX presentation
2024.08.21_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_VOL 1 SPECIFICATIONS.pdf PDF
ATTACHMENT 9 SPECS V1 ADDENDUM.pdf PDF
MTC RFI log.pdf PDF
Pre-Proposal Site Visit Slides - MTC 20 Aug 24 (002).pptx PPTX presentation
Pre_Bid_Site Visit_MTC_Attendance_Sheet 20_Aug _2024.pdf PDF
Attachment 6_Industrial Security.pdf PDF
Attachment 7_ACCESS AND STAGING SITE PLAN.pdf PDF
Attachment 5_STRUCTURAL INTERIOR DESIGN.pdf PDF
JA Nm Brand DDC Redacted.pdf PDF
JA Nm Brand Falcon Redacted.pdf PDF
W50S78-24-B-0001 - Mission Training Center Solicitation.pdf PDF
2024.08.15_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_DRAWINGS.pdf PDF
JA Nm Brand Monaco Redacted.pdf PDF
JA Nm Brand Trane HVAC Redacted.pdf PDF
2024.08.15_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_VOL 1 SPECIFICATIONS.pdf PDF
JA Nm Brand Vindicator Sys Redacted.pdf PDF
Show all 50

Construct Mission Training Center (MTC) Facility has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T

T

T

T

T

T

H

R

H R

H

R

1 HR 1 HR

H

R

H R

H

R

H R

H

R

H

R

H R

H

R

H R

1 HR 1 HR

1 HR1 HR

H

R

H R

H

R

H R

1 HR

H

R

1 HR1 HR 1 HR

1 HR1 HR 1 HR1 HR

H

R

H

R

H R

H

R

H R

H

R

1 HR 1 HR1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR1 HR 1 HR

1 HR 1 HR1 HR 1 HR

H

R

H R

H

R

H R

H

R

H

R

H R

H

R

H R

H

R

1 HR 1 HR1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR 1 HR

H

R

H R

H

R

H R

H

R

H

R

H R

H

R

H R

H

R

H R

H

R

H R

H

R

H R

H

R

H R

H

R

1 HR1 HR

H

R

H R

H

R

H R

H

R

1 HR1 HR

1 HR 1 HR

ONE HOUR FIRE RATED WALL, RE: AE0011 HR

38'-0"

TRAVEL

DISTANCE

DENOTES

EXIT ROUTE

DENOTES

BUILDING EXIT

BREAK POINT

OCCUPANT LOAD NUMBER

AT EXIT COMPONENT

EXIT COMPONENT MAXIMUM

OCCUPANT CAPACITY NUMBER

1 # OF OCCUPANTS

CLEAN AGENT FIRE EXTINGUISHER ON

WALL BRACKET (UL 1A:10B:C)

MOUNTED AT 48" AFF.

(EXTINGUISHERS ARE GFGI)

DRY CHEMICAL FIRE EXTINGUISHER IN

SEMI-RECESSED WALL CABINET (UL 20A:120B:C)

MOUNTED 48" AFF. (EXTINGUISHER IS GFGI)

LIFE SAFETY LEGEND

PLUMBING FIXTURES

FIXTURE TYPE ACT.

PER TABLE 403.1: 184 MALE AND 45 FEMALE RATIO

W.C. (MEN)

W.C. (WOMEN)

LAV. (MEN)

LAV. (WOMEN)

DRINKING FOUNTAIN

SERVICE SINK

UTA OCCUPANCY: 229 REQ.

151 and over 6 3+2 UR

RATIO: 80 MALE /20 FEMALE

UFC 3-420-01 PLUMBING SYSTEMS (04-01-2021)

36 TO 55 2

PER TABLE 403.2: 51 MALE AND 13 FEMALE RATIO

PER TABLE 403.1.3:

229/75= 3

1 PER FLOOR

151 and over

36 TO 55

CC

FF

AA

D D

B B

E E

SIM 3

BDS 2

BDS 1

AREA 1 ELEC.

BDS 6

SIM 1

BDS 5

MX AREA /

SPARES

SIM 4

CORR

NETWORK

SERVER

BDS 3

BDS 4

CLASSROOM

AREA 1

COMM

AP PM

OFFICE

MECH

CORRIDOR

GUEST

WORKSTATIONS

MX / WS

MEN

WAITING

JAN.

MAN TRAP

BREAK ROOM

VEST

STORAGE

WOMEN

STUDENT

STUDY

C O

M M

O N

P

AT

H

9'

AP PM

COMM

ELEC

MOC

SIM 2

FIRE RISER

G G

KNOX BOX1

NFPA BUSINESS USE

NFPA BUSINESS USE - COLLABORATION ROOMS >

450 SF (41.8 SM)

UFC IT EQUIPMENT ROOMS INCLUDING THOSE

WITH SMALL WORK AREAS

UFC MECHANICAL, ELECTRICAL, OTHER BUILDING

EQUIPMENT SPACES

UFC WAITING SPACES OTHER THAN THOSE IN

THEATERS AND ASSEMBLY OCCUPANCIES WHERE

PERSONS ARE ADMITTED TO THE BUILDING AT

TIMES WHEN SEATS ARE NOT AVAILABLE

C O

M M

O N

P

AT

H

8'

C O

M M

O N

P

AT

H

9'

TRAVEL DISTANCE 102'

C O

M M

O N

P

AT

H

4'

TR

AV

EL

D

IS

TA

N C

E

TR

AV

EL

D

IS

TA

N

C E

C O

M M

O N

P

AT

H

8'

C O

M M

O N

P

AT

H

9'

C O

M M

O N

P

AT

H

8'

C O

M M

O N

P

AT

H

9'

TRAVEL

DISTANCE 55'

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

Frankfurt-Short-Bruza Associates,P.C.

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

C

B

A

D

C

B

A

54321

20190310

NDM

Jo int

B as e S an

A nto nio

JB

SA

Ke lly

A nn ex , T ex as

Te xa s A ir

Na tio na l G ua rd

9t h

FW

F-1

6 M iss ion Tr ain ing

C en ter (M

TC

C :\U sers\keisner\D ocum ents\90310_Arch_keisnerU

7YM

G .rvt

9/13/2024 3:01:13 PM

15 AUGUST 2024

CODE AND LIFE SAFETY PLAN

G-003

MJT

KTE

GMD

BUILDING CODES & STANDARDS:

- UFC 1-200-01 DoD BUILDING CODE; WITH CHANGE 2 (06-12-2023)

- UFC 1-200-02 HIGH PERFORMANCE AND SUSTAINABLE

BUILDING REQUIREMENTS, WITH CHANGE 2 (06-01-2022)

- UFC 3-600-01 FIRE PROTECTION ENGINEERING FOR

FACILITIES, WITH CHANGE 6 (05-06-2021)

- INTERNATIONAL BUILDING CODE 2021

- INTERNATIONAL MECHANICAL CODE 2021

- INTERNATIONAL PLUMBING CODE 2021

- NATIONAL ELECTRICAL CODE NFPA 70, 2023

- INTERNATIONAL ENERGY CONSERVATION CODE 2021

- FIRE CODE NFPA 1, 2024

- LIFE SAFETY CODE NFPA 101, 2024

- NATIONAL FIRE ALARM AND SIGNALING CODE NFPA 72,

- STANDARD FOR THE INSTALLATION OF SPRINKLER

SYSTEMS NFPA 13, 2022

- ARCHITECTURAL BARRIERS ACT (ABA); WITH DoD

MEMORANDUM

USE AND OCCUPANCY: (IBC 2021)

INDIVIDUAL CLASSIFICATION OF OCCUPANCY

-BUSINESS GROUP B (SECTION 304.1) AND

-STORAGE GROUP S-1 (SECTION 311.2) -

MECHANICAL, ELECTRICAL, OTHER EQUIPMENT

SPACES

CODE ANALYSIS BASED ON NON-SEPARATED MIXED

USE OCCUPANCY USING THE MOST RESTRICTIVE

OCCUPANCY CLASSIFICATION B-1 (508.3.2)

TYPE OF CONSTRUCTION (IBC 2021 TABLE 601):

TYPE II-B WITH AUTOMATIC SPRINKLER SYSTEM

ALLOWABLE HEIGHT (IBC 2021):

ALLOWABLE BUILDING HEIGHT (TABLE 504.3): 75'

ACTUAL HEIGHT: 31'-6" FT

ALLOWABLE AREA (IBC 2021):

BUILDING MAXIMUM 1 STORY ABOVE GRADE WITH

AUTOMATIC SPRINKLER SYSTEM ALLOWABLE AREA

FACTOR (TABLE 506.2): 92,000 GSF

ACTUAL AREA: 15,198 GSF

MEANS OF EGRESS REQUIREMENTES (NFPA 101, 2022)

MAXIMUM DEAD END CORRIDOR LENGTH: 50'-0"

MAXIMUM COMMON PATH TRAVEL: 100'-0"

MAXIMUM TRAVEL DISTANCE: 300'-0"

MINIMUM EXIT ACCESS CORRIDOR WIDTH: 36"

MINIMUM NUMBER OF EXITS: 2, PROVIDED: 3

0 4' 8' 16'

1/8" = 1'-0"

SCALE: 1/8" = 1'-0"

CODE AND LIFE SAFETY PLANB1

N

OCCUPANCY AREA SCHEDULE

ROOM

NUMBER ROOM NAME AREA

OCCUPANT

LOAD FACTOR

OCCUPANT

LOAD REMARKS

BUSINESS

101 VEST 38 SF 1:150 1

102 BREAK ROOM 262 SF 1:150 2

103 GUEST WORKSTATIONS 162 SF 1:150 2

104 MX / WS 170 SF 1:150 2

105 CORRIDOR 456 SF 1:150 3

108 MEN 290 SF 1:150 2

109 MAN TRAP 134 SF 1:150 1

112 WOMEN 140 SF 1:150 1

114 CLASSROOM 731 SF 1:15 49

115 AP PM OFFICE 183 SF 1:150 2

116 AP PM 389 SF 1:150 3

120 STUDENT STUDY 516 SF 1:15 35

121 MOC 713 SF 1:15 49

122 SIM 1 1242 SF 1:150 9

123 SIM 2 1243 SF 1:150 9

126 BDS 6 271 SF 1:150 2

127 CORR 628 SF 1:150 5

128 BDS 5 273 SF 1:150 2

129 MX AREA / SPARES 351 SF 1:150 3

130 BDS 1 356 SF 1:150 3

131 BDS 2 349 SF 1:150 3

132 BDS 3 346 SF 1:150 3

133 BDS 4 359 SF 1:150 3

134 SIM 3 1240 SF 1:150 9

135 SIM 4 1240 SF 1:150 9

STORAGE

106 MECH 399 SF 1:500 1

107 STORAGE 110 SF 1:500 1

111 JAN 23 SF 1:500 1

113 ELEC 112 SF 1:500 1

117 COMM 96 SF 1:500 1

118 AREA 1 COMM 180 SF 1:500 1

119 FIRE RISER 60 SF 1:500 1

124 AREA 1 ELEC. 194 SF 1:500 1

125 NETWORK SERVER 144 SF 1:300 1

WAITING SPACES

110 WAITING 120 SF 1:15 8

OCCUPANCY LEGEND

TOTAL 229 OCC

CODE SUMMARYNFPA 101 TABLE 7.3.3.1 EGRESS CAPACITY FACTOR

LEVEL COMPONENTS = 0.2" WIDTH PER OCCUPANT

(36" DR) 32" CLEAR DIVIDED BY 0.2" = 160 OCCUPANTS

(44" DR) 40" CLEAR DIVIDED BY 0.2" = 200 OCCUPANTS

(72" DR) 66" CLEAR DIVIDED BY 0.2" = 330 OCCUPANTS

1 Addendum 02 09/16/2024