ES101-ELECTRICAL SITE PLAN.pdf

PDF 303 KB Posted

Attached to
Construct Mission Training Center (MTC) Facility Federal contract opportunity
Solicitation number
W50S78-24-B-0001
Issued by
Department of the Army National Guard

About this file

This document appears to be an electrical site plan for the construction of a Mission Training Center (MTC) facility at Joint Base San Antonio (JBSA) Lackland Air Force Base (AFB) for the Texas Air National Guard (TXANG) 149th Fighter Wing (FW).

The key details are: The construction project is for a 15,200 square foot FTU 4-ship F-16 MTC facility, with a contract duration of 540 calendar days. The project includes demolition, site work, utilities, HVAC, plumbing, electrical, and other general construction. The solicitation includes a base bid and eight options such as permeable pavement, landscaping, and specialized flooring and finishes. Brand name equipment is specified for compatibility with existing systems. The procurement is a 100% small business set-aside with a NAICS code of 236220 and an estimated value between $10-25 million. A site visit and pre-bid conference will be held, and all questions/RFIs must be submitted 5 days prior to bid opening.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Mission Training Center (MTC) Facility, newest first.
File Type Posted
C-201-STORMWATER POLLUTION PREVENTION PLAN.pdf PDF
C-601-UTILITY PLAN.pdf PDF
SF102-HIGH ROOF FRAMING PLAN.pdf PDF
G-003-CODE AND LIFE SAFETY PLAN.pdf PDF
M-702 SCHEDULES.pdf PDF
M-701 SCHEDULES.pdf PDF
AE601-ROOM FINISH SCHEDULE AND GLAZING TYPES AND MISC DETAILS.pdf PDF
AE303-WALL SECTIONS.pdf PDF
23 05 48.19 - SEISMIC BRACING FOR HVAC.pdf PDF
23 05 48.00 40 - VIBRATION CONTROLS FOR HAC PIPING AND EQUIPMENT.pdf PDF
11 94 10 - Rooftop Fall Protection Anchors.pdf PDF
000 TABLE OF CONTENTS.pdf PDF
01 45 35 - Special Inspections.pdf PDF
C-301-REMOVAL PLAN.pdf PDF
S-002-TYPICAL DETAILS.pdf PDF
SF101-LOW ROOF FRAMING PLAN.pdf PDF
S-001-GENERAL NOTES.pdf PDF
New Utilities to East.pdf PDF
M-501 DETAILS.pdf PDF
AE501-SECTION DETAILS.pdf PDF
AE305-WALL SECTIONS.pdf PDF
C-401-PROPOSED PLAN.pdf PDF
C-602-DRAINAGE SCHEDULE AND DETAILS.pdf PDF
AE401-ENLARGED PLANS AND DETAILS.pdf PDF
AE503-SECTION DETAILS.pdf PDF
01 45 00 - Quality Control.pdf PDF
Amendment 0004 - 17 Aug 2024.pdf PDF
W50S78-24-B-0001 - Mission Training Center Amendment 0003.pdf PDF
Attachment 14 - Geotechnical report-TX ANG Mission Training Center B-3.pdf PDF
MTC RFI log.pdf PDF
W50S7824B0001 - MTC - Amendment 02 - 20240829.pdf PDF
MFR Mission Training Center - 2nd Site Visit Pre-Propsal Conference Minutes.pdf PDF
Pre_Bid_Site Visit_MTC_Attendance_Sheet 27_Aug _2024.pdf PDF
Pre-Proposal Site Visit Slides - MTC 27 Aug 24.pptx PPTX presentation
2024.08.21_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_VOL 1 SPECIFICATIONS.pdf PDF
ATTACHMENT 9 SPECS V1 ADDENDUM.pdf PDF
MTC RFI log.pdf PDF
Pre-Proposal Site Visit Slides - MTC 20 Aug 24 (002).pptx PPTX presentation
Pre_Bid_Site Visit_MTC_Attendance_Sheet 20_Aug _2024.pdf PDF
Attachment 7_ACCESS AND STAGING SITE PLAN.pdf PDF
Attachment 6_Industrial Security.pdf PDF
Attachment 5_STRUCTURAL INTERIOR DESIGN.pdf PDF
W50S78-24-B-0001 - Mission Training Center Solicitation.pdf PDF
2024.08.15_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_DRAWINGS.pdf PDF
JA Nm Brand Monaco Redacted.pdf PDF
JA Nm Brand Trane HVAC Redacted.pdf PDF
JA Nm Brand DDC Redacted.pdf PDF
JA Nm Brand Falcon Redacted.pdf PDF
2024.08.15_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_VOL 1 SPECIFICATIONS.pdf PDF
JA Nm Brand Vindicator Sys Redacted.pdf PDF
Show all 50

Construct Mission Training Center (MTC) Facility has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1234589

F

E

D

C

B

A

NHMP1

F

F

F

NHMP1 - 1

UTILITY

XFMR

NEW 4 WAY

SWITCH

PRIMARY SERVICE CABLE

PROVIDED BY UTILITY.

CONTRACTOR SHALL PROVIDE

(3)-4" CONDUIT DUCTBANK

FROM SWITCH TO

TRANSFORMER. COORDINATE

WITH CPS ENERGY CUSTOMER

SERVICE REPRESENTATIVE FOR

FINAL ROUTING AND

INSTALLATION OF PRIMARY

DUCTBANK. RE: B4 / ET501

SWITCH PROVIDED BY

UTILITY. UTILIZE EXISTING

PAD LOCATION FOR NEW

SWITCH.

EE

E

REFER TO DETAIL A3 ON SHEET

EP401 FOR DUCTBANK DETAIL.

E E E E E E E E E E E

E

E

E

E

E

E

E

E

E

E

E

EXISTING TELECOMM MAN HOLE.

REFER TO CIVIL

SHEET C-601 FOR

EXACT ROUTING.

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T T T T T T T T T T

REFER TO DETAIL A3 ON SHEET

EP401 FOR DUCTBANK DETAIL.

PROVIDED BY UTILITY.

PULL 24 STRAND SMF AND 50

PAIR PE89 COPPER FROM THIS

LOCATION. COORDINATE WITH

BASE CE.

E

NMTS

POLYMER CONCRETE, TIER 15,

18"X18"X12" HAND HOLE FOR

EXTERIOR POLE LIGHTING CIRCUIT.

REFER TO DETAIL D2 ON SHEET

EP401 FOR HANDHOLE DETAIL.

(4) 4"

12' x 6' x 7'

MANHOLE

FOR

TELECOMM

B4 / ET501

4'X4'X4' HANDHOLE

REFER TO DETAIL A4 ON SHEET

ES501 FOR MANHOLE DETAIL.

CONTRACTOR PROVIDED PAD

PER CPS ENERGY

SPECIFICATIONS.

REFER TO DETAIL D2 ON SHEET

EP401 FOR HANDHOLE DETAIL.

8' x 8' x 10' MANHOLE FOR POWER.

CONTRACTOR SHALL PROVIDE AND

INSTALL MANHOLE IN ACCORDANCE WITH

CPS ENERGY PROVIDED SPECIFICATIONS

AND FINAL CONSTRUCTION SKETCHES.

COORDINATE WITH CPS ENERGY

CUSTOMER SERVICE REPRESENTATIVE

FOR ALL MANHOLE REQUIREMENTS.

E

E

CONDUIT AND

CONDUCTORS AS

SHOWN ON PLAN

ANCHOR BOLTS, (4) 36"x1"x4"

(OR PER MANUF.)

CAST CONCRETE BASE

AGAINST UNDISTURBED

OR COMPACTED (95% MIN.)

EARTH

#3 DEFORMED RE-BAR

SECTION A-A

GROUNDING LUG BONDED TO POLE

STEEL AT POLE INTERIOR

NEAR HANDHOLE AND CONTINUED

TO GROUND ROD.

3/4" CHAMFER

CAST CONCRETE BASE

AGAINST UNDISTURBED

OR COMPACTED (95% MIN.)

EARTH

24"

MIN.

8'-0"

AA

HANDHOLE WITH GASKET

GROUND WIRE, #12

CONDUIT BUSHING

GALVANIZED STEEL BASE COVER

(4) 1" DIAMETER ANCHOR RODS

(ASTM F 1554 GR 55) X 36" EMBED

WITH HEX NUT TACK WELD AT

BOTTOM. OR PER MANUFACTURER.

FINISHED GRADE

#4 CLOSED CIRCULAR TIES AT

10' OC (MAX) PROVIDE HALF

SPACE AT BOTTOM.

6#5 DEFORMED REBARS

3" MIN. CLEARANCE

LEVELING NUTS ABOVE AND

BELOW POLE BASE PLATE

GROUT IN ALL AROUND BETWEEN

BOTTOM OF POLE BASE PLATE

AND

TOP OF POLE CONCRETE BASE

FOLLOWING POLE ERECTION AND

FINAL LEVELING

ELEVATION VIEW

24"

MIN.

3/4" X 10'

COPPER-CLAD STEEL

GROUND ROD

POLE ASSEMBLY SHALL BE RATED

TO WITHSTAND SUSTAINED 100MPH

WINDS WITH GUST UP TO 130MPH.

#6 LONGITUDINAL REINFORCING

WITH 90 DEGREE STANDARD

HOOKS AT TOP.

AT 4" O/C MAX.

6#5 DEFORMED REBARS

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

Frankfurt-Short-Bruza Associates,P.C.

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

C

B

A

D

C

B

A

54321

20190310

NDM

Jo in t B as e S an A nt on io

JB

SA

Ke lly A nn ex , T ex as

Te xa s Ai r N at io na l G ua rd 9t h

FW

F- M iss io n Tr ain in g Ce nt er (M

TC

C :\U sers\ajohnsen\D ocum ents\90310_Elec_2023U pgrade_ajohnsen45M

M D

.rvt

9/13/2024 8:58:53 AM

15 AUGUST 2024

ELECTRICAL SITE PLAN

ES101

WCM

ATJ

ATJ

0 8' 16' 32'

1/16" = 1'-0"

N

SCALE: 1/16" = 1'-0"

ELECTRICAL SITE PLANB1

GENERAL NOTES

A.

B.

C.

D.

UNDERGROUND CONDUIT RUNS ARE

DIAGRAMMATIC. CONTRACTOR IS RESPONSIBLE

FOR FINAL ROUTING OF CONDUIT.

RE: DETAIL B4 ON THIS SHEET FOR FIXTURE TYPE

F POLE DETAIL.

NOT USED.

RE: DETAILS ON SHEET ES501 FOR MANHOLE

DETAIL.

SCALE: NTS

TYPICAL AREA LIGHT POLE/BASE DETAILB4

1 ADDENDUM 02 09/16/2024

File details come from the government source that posted it. Updated .