ES101-ELECTRICAL SITE PLAN.pdf
PDF 303 KB Posted
- Attached to
- Construct Mission Training Center (MTC) Facility Federal contract opportunity
- Solicitation number
- W50S78-24-B-0001
- Issued by
- Department of the Army National Guard
About this file
This document appears to be an electrical site plan for the construction of a Mission Training Center (MTC) facility at Joint Base San Antonio (JBSA) Lackland Air Force Base (AFB) for the Texas Air National Guard (TXANG) 149th Fighter Wing (FW).
The key details are: The construction project is for a 15,200 square foot FTU 4-ship F-16 MTC facility, with a contract duration of 540 calendar days. The project includes demolition, site work, utilities, HVAC, plumbing, electrical, and other general construction. The solicitation includes a base bid and eight options such as permeable pavement, landscaping, and specialized flooring and finishes. Brand name equipment is specified for compatibility with existing systems. The procurement is a 100% small business set-aside with a NAICS code of 236220 and an estimated value between $10-25 million. A site visit and pre-bid conference will be held, and all questions/RFIs must be submitted 5 days prior to bid opening.
View the file
Other files for this federal contract opportunity
Show all 50
Construct Mission Training Center (MTC) Facility has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1234589
F
E
D
C
B
A
NHMP1
F
F
F
NHMP1 - 1
UTILITY
XFMR
NEW 4 WAY
SWITCH
PRIMARY SERVICE CABLE
PROVIDED BY UTILITY.
CONTRACTOR SHALL PROVIDE
(3)-4" CONDUIT DUCTBANK
FROM SWITCH TO
TRANSFORMER. COORDINATE
WITH CPS ENERGY CUSTOMER
SERVICE REPRESENTATIVE FOR
FINAL ROUTING AND
INSTALLATION OF PRIMARY
DUCTBANK. RE: B4 / ET501
SWITCH PROVIDED BY
UTILITY. UTILIZE EXISTING
PAD LOCATION FOR NEW
SWITCH.
EE
E
REFER TO DETAIL A3 ON SHEET
EP401 FOR DUCTBANK DETAIL.
E E E E E E E E E E E
E
E
E
E
E
E
E
E
E
E
E
EXISTING TELECOMM MAN HOLE.
REFER TO CIVIL
SHEET C-601 FOR
EXACT ROUTING.
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T T T T T T T T T T T
REFER TO DETAIL A3 ON SHEET
EP401 FOR DUCTBANK DETAIL.
PROVIDED BY UTILITY.
PULL 24 STRAND SMF AND 50
PAIR PE89 COPPER FROM THIS
LOCATION. COORDINATE WITH
BASE CE.
E
NMTS
POLYMER CONCRETE, TIER 15,
18"X18"X12" HAND HOLE FOR
EXTERIOR POLE LIGHTING CIRCUIT.
REFER TO DETAIL D2 ON SHEET
EP401 FOR HANDHOLE DETAIL.
(4) 4"
12' x 6' x 7'
MANHOLE
FOR
TELECOMM
B4 / ET501
4'X4'X4' HANDHOLE
REFER TO DETAIL A4 ON SHEET
ES501 FOR MANHOLE DETAIL.
CONTRACTOR PROVIDED PAD
PER CPS ENERGY
SPECIFICATIONS.
REFER TO DETAIL D2 ON SHEET
EP401 FOR HANDHOLE DETAIL.
8' x 8' x 10' MANHOLE FOR POWER.
CONTRACTOR SHALL PROVIDE AND
INSTALL MANHOLE IN ACCORDANCE WITH
CPS ENERGY PROVIDED SPECIFICATIONS
AND FINAL CONSTRUCTION SKETCHES.
COORDINATE WITH CPS ENERGY
CUSTOMER SERVICE REPRESENTATIVE
FOR ALL MANHOLE REQUIREMENTS.
E
E
CONDUIT AND
CONDUCTORS AS
SHOWN ON PLAN
ANCHOR BOLTS, (4) 36"x1"x4"
(OR PER MANUF.)
CAST CONCRETE BASE
AGAINST UNDISTURBED
OR COMPACTED (95% MIN.)
EARTH
#3 DEFORMED RE-BAR
SECTION A-A
GROUNDING LUG BONDED TO POLE
STEEL AT POLE INTERIOR
NEAR HANDHOLE AND CONTINUED
TO GROUND ROD.
3/4" CHAMFER
CAST CONCRETE BASE
AGAINST UNDISTURBED
OR COMPACTED (95% MIN.)
EARTH
24"
MIN.
8'-0"
AA
HANDHOLE WITH GASKET
GROUND WIRE, #12
CONDUIT BUSHING
GALVANIZED STEEL BASE COVER
(4) 1" DIAMETER ANCHOR RODS
(ASTM F 1554 GR 55) X 36" EMBED
WITH HEX NUT TACK WELD AT
BOTTOM. OR PER MANUFACTURER.
FINISHED GRADE
#4 CLOSED CIRCULAR TIES AT
10' OC (MAX) PROVIDE HALF
SPACE AT BOTTOM.
6#5 DEFORMED REBARS
3" MIN. CLEARANCE
LEVELING NUTS ABOVE AND
BELOW POLE BASE PLATE
GROUT IN ALL AROUND BETWEEN
BOTTOM OF POLE BASE PLATE
AND
TOP OF POLE CONCRETE BASE
FOLLOWING POLE ERECTION AND
FINAL LEVELING
ELEVATION VIEW
24"
MIN.
3/4" X 10'
COPPER-CLAD STEEL
GROUND ROD
POLE ASSEMBLY SHALL BE RATED
TO WITHSTAND SUSTAINED 100MPH
WINDS WITH GUST UP TO 130MPH.
#6 LONGITUDINAL REINFORCING
WITH 90 DEGREE STANDARD
HOOKS AT TOP.
AT 4" O/C MAX.
6#5 DEFORMED REBARS
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
Frankfurt-Short-Bruza Associates,P.C.
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20190310
NDM
Jo in t B as e S an A nt on io
JB
SA
Ke lly A nn ex , T ex as
Te xa s Ai r N at io na l G ua rd 9t h
FW
F- M iss io n Tr ain in g Ce nt er (M
TC
C :\U sers\ajohnsen\D ocum ents\90310_Elec_2023U pgrade_ajohnsen45M
M D
.rvt
9/13/2024 8:58:53 AM
15 AUGUST 2024
ELECTRICAL SITE PLAN
ES101
WCM
ATJ
ATJ
0 8' 16' 32'
1/16" = 1'-0"
N
SCALE: 1/16" = 1'-0"
ELECTRICAL SITE PLANB1
GENERAL NOTES
A.
B.
C.
D.
UNDERGROUND CONDUIT RUNS ARE
DIAGRAMMATIC. CONTRACTOR IS RESPONSIBLE
FOR FINAL ROUTING OF CONDUIT.
RE: DETAIL B4 ON THIS SHEET FOR FIXTURE TYPE
F POLE DETAIL.
NOT USED.
RE: DETAILS ON SHEET ES501 FOR MANHOLE
DETAIL.
SCALE: NTS
TYPICAL AREA LIGHT POLE/BASE DETAILB4
1 ADDENDUM 02 09/16/2024
File details come from the government source that posted it. Updated .