This document appears to be a federal solicitation for the construction of a 15,200 square foot Mission Training Center (MTC) facility for the Texas Air National Guard at Joint Base San Antonio-Lackland Air Force Base. The solicitation is for a single firm fixed-price contract and includes a base bid as well as eight options such as permeable pavement, landscaping, and additional flooring and signage. The project has a 540-calendar day period of performance and is set aside for small businesses under NAICS code 236220 with a size standard of $45 million. Key brand name items are specified for compatibility with existing systems. The solicitation provides details on the site visit, pre-bid conference, and process for submitting questions and requests for information. No paper copies will be distributed, and amendments will be posted to the government's Contract Opportunities webpage.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Mission Training Center (MTC) Facility, newest first.
File Type Posted
C-301-REMOVAL PLAN.pdf PDF
S-002-TYPICAL DETAILS.pdf PDF
SF101-LOW ROOF FRAMING PLAN.pdf PDF
S-001-GENERAL NOTES.pdf PDF
New Utilities to East.pdf PDF
M-501 DETAILS.pdf PDF
AE501-SECTION DETAILS.pdf PDF
AE305-WALL SECTIONS.pdf PDF
C-201-STORMWATER POLLUTION PREVENTION PLAN.pdf PDF
C-601-UTILITY PLAN.pdf PDF
SF102-HIGH ROOF FRAMING PLAN.pdf PDF
G-003-CODE AND LIFE SAFETY PLAN.pdf PDF
M-701 SCHEDULES.pdf PDF
AE601-ROOM FINISH SCHEDULE AND GLAZING TYPES AND MISC DETAILS.pdf PDF
AE303-WALL SECTIONS.pdf PDF
23 05 48.19 - SEISMIC BRACING FOR HVAC.pdf PDF
23 05 48.00 40 - VIBRATION CONTROLS FOR HAC PIPING AND EQUIPMENT.pdf PDF
11 94 10 - Rooftop Fall Protection Anchors.pdf PDF
000 TABLE OF CONTENTS.pdf PDF
01 45 35 - Special Inspections.pdf PDF
C-401-PROPOSED PLAN.pdf PDF
C-602-DRAINAGE SCHEDULE AND DETAILS.pdf PDF
ES101-ELECTRICAL SITE PLAN.pdf PDF
AE401-ENLARGED PLANS AND DETAILS.pdf PDF
AE503-SECTION DETAILS.pdf PDF
01 45 00 - Quality Control.pdf PDF
Amendment 0004 - 17 Aug 2024.pdf PDF
W50S78-24-B-0001 - Mission Training Center Amendment 0003.pdf PDF
Attachment 14 - Geotechnical report-TX ANG Mission Training Center B-3.pdf PDF
MTC RFI log.pdf PDF
W50S7824B0001 - MTC - Amendment 02 - 20240829.pdf PDF
MFR Mission Training Center - 2nd Site Visit Pre-Propsal Conference Minutes.pdf PDF
Pre_Bid_Site Visit_MTC_Attendance_Sheet 27_Aug _2024.pdf PDF
Pre-Proposal Site Visit Slides - MTC 27 Aug 24.pptx PPTX presentation
2024.08.21_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_VOL 1 SPECIFICATIONS.pdf PDF
ATTACHMENT 9 SPECS V1 ADDENDUM.pdf PDF
MTC RFI log.pdf PDF
Pre-Proposal Site Visit Slides - MTC 20 Aug 24 (002).pptx PPTX presentation
Pre_Bid_Site Visit_MTC_Attendance_Sheet 20_Aug _2024.pdf PDF
Attachment 6_Industrial Security.pdf PDF
Attachment 7_ACCESS AND STAGING SITE PLAN.pdf PDF
Attachment 5_STRUCTURAL INTERIOR DESIGN.pdf PDF
JA Nm Brand DDC Redacted.pdf PDF
JA Nm Brand Falcon Redacted.pdf PDF
W50S78-24-B-0001 - Mission Training Center Solicitation.pdf PDF
2024.08.15_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_DRAWINGS.pdf PDF
JA Nm Brand Monaco Redacted.pdf PDF
JA Nm Brand Trane HVAC Redacted.pdf PDF
2024.08.15_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_VOL 1 SPECIFICATIONS.pdf PDF
JA Nm Brand Vindicator Sys Redacted.pdf PDF
Show all 50

Construct Mission Training Center (MTC) Facility has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

Frankfurt-Short-Bruza Associates,P.C.

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

C

B

A

D

C

B

A

54321

20190310

NDM

Jo in t B as e S an A nt on io

JB

SA

Ke lly A nn ex , T ex as

Te xa s Ai r N at io na l G ua rd 9t h

FW

F- M iss io n Tr ain in g Ce nt er (M

TC

C :\U sers\njd\O neD rive - FSB Architects +

Engineers\D ocum ents\90310_M ech_23_N

D oolittle8ZBW

T.rvt

9/16/2024 12:52:59 PM

15 AUGUST 2024

SCHEDULES

M-702

RRS

DLC

EAO

CONDENSING HOT WATER BOILER SCHEDULE

MARK TYPE FLUID

DESIGN FLOW

(GPM)

EWT

(°F)

LWT

(°F)

INPUT

(MBH)

MIN. OUTPUT

(MBH)

MAX. WPD

(FT. W.C.) FUEL

ELECTRICAL DATA

NOTESV / ɸ / Hz

BLR-01 CONDENSING FIRE TUBE WATER 50.0 120 150 600 540 0.19 NATURAL GAS 115/1/60 ALL BLR-02 CONDENSING FIRE TUBE WATER 50.0 120 150 600 540 0.19 NATURAL GAS 115/1/60 ALL

EXPANSION TANK SCHEDULE

MARK TYPE SERVICE

MIN. TANK

VOLUME

(GAL)

MIN. VOLUME

ACCEPTANCE

(GAL)

MIN. SYSTEM

FILL PRESSURE

(PSIG)

RELIEF VALVE

WORKING PRES.

(PSIG) NOTES

XT-01 DIAPHRAGM, VERTICAL FLOOR-MOUNTED HEATING WATER 23 10 15 50 1,2

XT-02 DIAPHRAGM, VERTICAL FLOOR-MOUNTED CHILLED WATER 23 10 15 50 1,3

AIR SEPARATOR SCHEDULE

MARK TYPE SERVICE

SYSTEM

CONNECTION

MIN. FLOW

(GPM)

MAX. WPD

(PSIG) NOTES

AS-01 IN-LINE COALESCING AIR/DIRT SEPARATOR HEATING WATER 2 35 1.3 ALL

AS-02 IN-LINE COALESCING AIR/DIRT SEPARATOR CHILLED WATER 4 145 1.7 ALL

BYPASS CHEMICAL FEEDER SCHEDULE

MARK SERVICE

VOLUME

(GAL) NOTES

BCF-01 HEATING WATER 2 ALL

BCF-02 CHILLED WATER 2 ALL

PUMP SCHEDULE

MARK TYPE SERVICE

CONNECTION SIZE DUTY POINT MOTOR

NOTES

INLET

(IN.)

OUTLET

(IN.)

CAPACITY

(GPM)

TDH

(FT. WC.)

MIN.

EFF. BHP RPM HP V / ɸ / Hz

CWP-01 VERTICAL CLOSE-COUPLED IN-LINE CENTRIFUGAL CHILLED WATER 2 2 145 80 76.7 3.82 3600 5 460 / 3 / 60 ALL CWP-02 VERTICAL CLOSE-COUPLED IN-LINE CENTRIFUGAL CHILLED WATER 2 2 145 80 76.7 3.82 3600 5 460 / 3 / 60 ALL HWP-01 VERTICAL CLOSE-COUPLED IN-LINE CENTRIFUGAL HEATING WATER 1.25 1.25 50 40 59.5 0.55 3600 1 460 / 3 / 60 ALL HWP-02 VERTICAL CLOSE-COUPLED IN-LINE CENTRIFUGAL HEATING WATER 1.25 1.25 50 40 59.5 0.55 3600 1 460 / 3 / 60 ALL

1.

2.

3.

NOTES:

PROVIDE BOILER WITH LOW NOX BURNER (<30 PPM CORRECTED FOR 3% OXYGEN).

PROVIDE ASME CSD-1 COMPLIANT AND UL-LISTED FUEL TRAIN.

PROVIDE FACTORY-FURNISHED OR FACTORY-INSTALLED COMPONENTS AND ACCESSORIES TO

INCLUDE BUT NOT BE LIMITED TO: SUPPLY WATER TEMPERATURE SENSOR, RETURN WATER

TEMPERATURE SENSOR, MANUAL RESET HIGH-LIMIT AQUASTAT, SAFETY RELIEF VALVE, AND

LOW WATER CUTOFF.

1.

2.

3.

NOTES:

PROVIDE NEMA MG-1 PREMIUM EFFICIENCY INVERTER-DUTY MOTOR WITH SHAFT GROUNDING RINGS AND

TEFC ENCLOSURE.

PROVIDE UNIT-MOUNTED VARIABLE FREQUENCY DRIVE.

PUMP SELECTION SHALL HAVE A NON-OVERLOADING MOTOR HP.

1.

2.

3.

NOTES:

PROVIDE ASME STAMPED VESSEL RATED FOR 125 PSIG OR GREATER WORKING PRESSURE.

PROVIDE TOP-SIDE THREADED CONNECTION FOR AIR VENT AND BOTTOM-SIDE THREADED CONNECTION FOR DRAIN VALVE.

FLANGED CONNECTIONS.

1.

2.

3.

NOTES:

PROVIDE ASME STAMPED VESSEL RATED FOR 125 PSIG OR GREATER WORKING PRESSURE.

SELECTION BASED ON HEATING WATER SYSTEM VOLUME: 225 GAL.

SELECTION BASED ON CHILLED WATER SYSTEM VOLUME: 450 GAL.

1.

2.

3.

NOTES:

DOME-BOTTOM, ASME STAMPED VESSEL RATED

FOR 125 PSIG OR GREATER WORKING

PRESSURE.

PROVIDE WITH LEGS TO KEEP FEEDER ABOVE

MECHANICAL ROOM FLOOR.

PROVIDE UNIT MANUFACTURER'S FILTER BAG

KIT INCLUDING ONE SPARE FILTER.

BUFFER TANK SCHEDULE

MARK TYPE SERVICE

SYSTEM CONNECTION

(IN.)

VOLUME

(GAL.) NOTES

BT-01 VERTICAL HEATING WATER 2 125 ALL

BT-02 VERTICAL CHILLED WATER 3 100 ALL

1.

2.

3.

NOTES:

ASME STAMPED VESSEL RATED FOR 125 PSIG OR GREATER WORKING PRESSURE.

FLANGED CONNECTIONS.

CONNECTIONS HIGH ON TANK.

FLOW CONTROL VALVE SCHEDULE

MARK ASSOCIATED EQUIPMENT

FLUID

TEMP

(°F)

DESIGN FLOW

RATE

(GPM)

NOMINAL

VALVE SIZE

(IN.)

VALVE MAX.

FLOW RATE

(GPM)

DIFF. PRESSURE

RANGE (ΔPSIG)

VALVE TYPE ACTION NOTESMIN. MAX.

FCV-CW1 CW MIN FLOW BYPASS 42.0 60.0 2 1/2 85 4.4 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8

FCV-CW2 CH-01 ISO VALVE 42.0 92.2 3 - - - BALL VALVE 2-POSITION 2,5,6,7,8

FCV-CW3 CH-02 ISO VALVE 42.0 92.2 3 - - - BALL VALVE 2-POSITION 2,5,6,7,8

FCV-CW4 FCU-01 42.0 5.2 3/4 7.5 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8 FCV-CW5 FCU-02 42.0 1.3 1/2 5 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8 FCV-CW6 FCU-03 42.0 1.3 1/2 5 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8 FCV-CW7 FCU-04 42.0 6.0 3/4 7.5 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8 FCV-CW8 AHU-01 42.0 53.3 2 1/2 85 4.4 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8

FCV-CW9 CRAC-01 42.0 16.0 - - - - - MODULATING 9

FCV-CW10 CRAC-02 42.0 16.0 - - - - - MODULATING 9

FCV-CW11 CRAC-03 42.0 16.0 - - - - - MODULATING 9

FCV-CW12 CRAC-04 42.0 16.0 - - - - - MODULATING 9

FCV-CW13 CRAC-05 42.0 16.0 - - - - - MODULATING 9

FCV-CW14 FCU-05 42.0 6.0 3/4 7.5 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8 FCV-CW15 FCU-06 42.0 6.0 3/4 7.5 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8 FCV-HW1 HW MIN FLOW BYPASS 150.0 30.0 1 1/2 33 4.4 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8

FCV-HW2 BLR-01 ISO VALVE 150.0 17.0 1 1/2 - - - BALL VALVE 2-POSITION 2,5,6,7,8

FCV-HW3 BLR-02 ISO VALVE 150.0 17.0 1 1/2 - - - BALL VALVE 2-POSITION 2,5,6,7,8

FCV-HW4 VAV-01 150.0 3.3 3/4 7.5 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8 FCV-HW5 VAV-02 150.0 0.9 1/2 5 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8 FCV-HW6 VAV-03 150.0 1.1 1/2 5 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8 FCV-HW7 VAV-04 150.0 5.0 3/4 7.5 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8 FCV-HW8 VAV-05 150.0 2.1 1/2 5 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8 FCV-HW9 VAV-06 150.0 1.2 1/2 5 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8 FCV-HW10 VAV-07 150.0 1.2 1/2 5 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8 FCV-HW11 VAV-08 150.0 1.2 1/2 5 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8 FCV-HW12 VAV-09 150.0 1.8 1/2 5 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8 FCV-HW13 VAV-10 150.0 0.8 1/2 5 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8 FCV-HW14 VAV-11 150.0 0.4 1/2 5 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8 FCV-HW15 PHX-01 150.0 7.2 1 12 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8 FCV-HW16 UH-01 150.0 1.9 1/2 5 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8 FCV-HW17 UH-03 150.0 1.0 1/2 5 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8 FCV-HW18 FCU-01 150.0 2.1 1/2 5 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8 FCV-HW19 FCU-02 150.0 0.9 1/2 5 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8 FCV-HW20 FCU-03 150.0 0.9 1/2 5 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8 FCV-HW21 FCU-04 150.0 2.0 1/2 5 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8 FCV-HW22 AHU-01 150.0 30.5 1 1/4 28.5 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8,10 FCV-HW23 VAV-12 150.0 0.8 1/2 5 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8 FCV-HW24 VAV-13 150.0 0.6 1/2 5 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8 FCV-HW25 VAV-14 150.0 0.6 1/2 5 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8 FCV-HW26 VAV-15 150.0 0.8 1/2 5 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8 FCV-HW27 VAV-16 150.0 2.4 1/2 5 5.0 60.0 PRESSURE INDEPENDENT CONTROL VALVE MODULATING 1,2,3,4,8

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

NOTES:

PROVIDE PRESSURE INDEPENDENT CONTROL VALVE IN ACCORDANCE WITH THE SPECIFICATIONS.

PROVIDE ACTUATOR FOR USE WITH 24V POWER SOURCE.

PROVIDE ACTUATOR WITH 0-100% POSITION INDICATOR.

REFER TO CONTROL DIAGRAMS FOR NECESSARY ACTUATOR FAILURE POSITIONS.

PROVIDE ACTUATOR WITH LIMIT SWITCHES.

PROVIDE ACTUATOR WITH NEMA 4X ENCLOSURE.

PROVIDE ACTUATOR WITH 600 IN-LB MINIMUM OUTPUT TORQUE AT 24V.

2-WAY VALVE.

VALVE IS PROVIDED FACTORY-INSTALLED IN ASSOCIATED EQUIPMENT.

VALVE SELECTED TO PROVIDE HIGHER RESOLUTION CONTROL AT SIGNIFICANTLY LOWER THAN DESIGN FLOW RATES.

FLOW METER SCHEDULE

MARK TYPE SERVICE

LINE SIZE

(IN.)

MAX FLOW

(GPM)

MIN FLOW

(GPM) NOTES

FM-CH01 ELECTROMAGNETIC INSERTION FLOW METER CHILLED WATER 4 145 60 1,3,4,5

FM-HW01 ELECTROMAGNETIC INSERTION FLOW METER HEATING WATER 2 35 30 2,3,4,5

1.

2.

3.

4.

5.

NOTES:

FLUID IS WATER WITH EXPECTED MAX TEMP OF 58°F AND MIN TEMP OF 42°F.

FLUID IS WATER WITH EXPECTED MAX TEMP OF 150°F AND MIN TEMP OF 80°F.

PROVIDE ALL ADAPTERS AND FITTINGS NECESSARY FOR INTERFACE WITH A BACNET DDC SYSTEM.

WET CALIBRATED AND ACCURATE TO WITHIN +/- 1% OF READING.

NEMA 4 ENCLOSURE.

AIR-COOLED CHILLER SCHEDULE

MARK TYPE REFRIGERANT

EAT DB

(°F)

EVAPORATOR DATA ELECTRICAL DATA EFFICIENCY REQUIREMENTS

J&A

MANUFACTURER NOTES

FULL LOAD CAPACITY

(TONS)

FLOW

(GPM)

FLUID

TYPE

EWT

(°F)

LWT

(°F)

MAX. WPD

(FT. WC.) FOULING FACTOR KW MCA MOCP V / ɸ / Hz EER NPLV.IP

CH-01 SCROLL 454B 105.0 61.76 92.2 WATER 54.0 42.0 3.1 0.000100 67 129 175 460 / 3 / 60 10.3 16.8 TRANE ALL CH-02 SCROLL 454B 105.0 61.76 92.2 WATER 54.0 42.0 3.1 0.000100 67 129 175 460 / 3 / 60 10.3 16.8 TRANE ALL

1.

2.

3.

4.

NOTES:

SCHEDULED PERFORMANCE BASED ON 409'-0" ELEVATION.

LOW AMBIENT KIT.

HOT GAS BYPASS.

THERMAL DISPERSION FLOW SWITCH.

HEAT EXCHANGER SCHEDULE

MARK SERVICE TYPE

CAPACITY

(MBH)

HOT SIDE COLD SIDE

NOTESFLUID

FLOW

(GPM)

EWT

(°F)

LWT

(°F)

WPD

(PSI) FLUID

FLOW

(GPM)

EWT

(°F)

LWT

(°F)

WPD

(PSI)

PHX-01 DOMESTIC HOT WATER DOUBLE-WALL WITH AIR GAP BRAZED PLATE ONE-PASS 179 BOILER WATER 7.2 135.0 85.0 0.24 DOMESTIC WATER 4.5 50.0 130.0 0.09 ALL

1.

2.

3.

4.

5.

NOTES:

SELECTION SHALL INCLUDE FOULING FACTOR OF 0.00010 HR-FT2-°F/BTU ON BOTH SIDES OF THE HEAT EXCHANGER.

SELECTION SHALL INCLUDE MINIMUM 10% EXCESS SURFACE AREA.

316L STAINLESS STEEL PLATES AND COPPER BRAZING.

PROVIDE ASME SECTION VIII DIV 1 STAMPED VESSEL.

PROVIDE WITH CERTIFICATION FOR USE WITH POTABLE WATER.

DUCT CONSTRUCTION AND LEAKAGE TESTING SCHEDULE

SYSTEM

DUCT PRESSURE CLASS SUPPLY RETURN / OUTSIDE AIR

DUCT TEST PRESSURE:

INCHES OF WATER COLUMN

INCHES OF WATER COLUMN ROUND RECTANGULAR

DUCT SEAL

CLASS

DUCT LEAK

CLASS

SUPPLY

DUCT

RETURN

DUCT

EXHAUST

DUCT

OUTSIDE

AIR DUCT

DUCT SEAL

CLASS

DUCT LEAK

CLASS

DUCT SEAL

CLASS

DUCT LEAK

CLASS

AHU-01 2 A 3 A 6 2.0

-1 A 6 1.0

-1 A 6 1.0

CRAC-01 0.5 A 12 A 24 0.5

-0.5 A 24 0.5 -0.5 A 12 0.5

CRAC-02 0.5 A 12 A 24 0.5

-0.5 A 24 0.5

-0.5 A 12 0.5

CRAC-03 0.5 A 12 A 24 0.5

-0.5 A 24 0.5 -0.5 A 12 0.5

CRAC-04 0.5 A 12 A 24 0.5

-0.5 A 24 0.5

-0.5 A 12 0.5

CRAC-05 0.5 A 12 A 24 0.5

-0.5 A 24 0.5

FCU-01 0.5 A 24 0.5

-0.5 A 24 0.5

FCU-02 0.5 A 24 0.5

-0.5 A 24 0.5

FCU-03 0.5 A 24 0.5

-0.5 A 24 0.5

FCU-04 0.5 A 24 0.5

-0.5 A 24 0.5

EF-01 -1 A 24 1.0

EF-02 -0.5 A 24 0.5

EF-03 -0.5 A 24 0.5

RF-01 -0.5 A 24 0.5

RF-02 -0.5 A 24 0.5

VIBRATION ISOLATOR SCHEDULE

ASSOCIATED EQUIPMENT ISOLATOR

NOTESMARK TYPE

SUPPORT

METHOD

MOTOR

HP RPM DESIGNATION

MIN. STATIC

DEFLECTION

(IN)

AHU-01 AIR HANDLER FLOOR MOUNT 20 2735 TYPE C 1" 1,2

CRAC-05 CRAC UNIT SUSPENDED 2 - TYPE F 1" 1

FCU-01 FAN COIL UNIT SUSPENDED < 1/2 - TYPE F 1" 1

FCU-02 FAN COIL UNIT SUSPENDED < 1/2 - TYPE F 1" 1

FCU-03 FAN COIL UNIT SUSPENDED < 1/2 - TYPE F 1" 1

FCU-04 FAN COIL UNIT SUSPENDED < 1/2 - TYPE F 1" 1

EF-01 INLINE FAN SUSPENDED < 1/2 1550 TYPE F 1" 1

RF-01 INLINE FAN SUSPENDED 3 1140 TYPE F 1" 1

RF-02 INLINE FAN SUSPENDED < 1/2 1354 TYPE F 1" 1

CW PUMPS / PIPING VERT. INLINE PUMP & ASSOC. PIPING SUSPENDED 5 - TYPE F 1" 1

HW PUMPS / PIPING VERT. INLINE PUMP & ASSOC. PIPING SUSPENDED 1 - TYPE F 1" 1

1.

2.

NOTES:

REFER TO SPECIFICATION FOR CHARACTERISTICS OF EACH ISOLATOR TYPE.

ISOLATOR IS FACTORY FURNISHED AND INSTALLED.

1 Addendum 02 09/16/2024

5.

6.

7.

8.

9.

VARIABLE SPEED FANS.

PROVIDE WITH HAIL GUARDS.

PROVIDE WITH CRANKCASE HEATERS.

PROVIDE WITH EVAPORATOR FREEZE PROTECTION TO -20°F AMBIENT.

PROVIDE WITH SINGLE-POINT UNIT MOUNTED CIRCUIT BREAK WITH EXTERNAL LOCKABLE HANDLE.

4.

5.

6.

7.

8.

PROVIDE FACTORY-FURNISHED CONDENSATE TRAP AND CONDENSATE NEUTRALIZER.

BOILER'S PACKAGED CONTROLLER SHALL HAVE NON-VOLATILE MEMORY THAT RETAINS ITS PROGRAMMING

AFTER LOSS OF POWER

CONFIGURED FOR CONDENSING OPERATION.

MINIMUM 10:1 BURNER TURNDOWN RATIO.

PROVIDE DIRECT VENTED BOILER KIT TO DRAW COMBUSTION AIR FROM OUTSIDE.

4.

5.

6.

PROVIDE SUCTION DIFFUSER WITH REMOVABLE STRAINER AND LINE SIZE SYSTEM CONNNECTION.

CAPABLE OF INTEGRATINO INTO BACNET FRONT-END CONTROL SYSTEM.

INTEGRATED SENSORLESS PUMP CONTROL.