This document is an amendment to a solicitation for the construction of a 15,200 square foot Mission Training Center (MTC) facility for the Texas Air National Guard at Joint Base San Antonio-Lackland Air Force Base. The amendment revises the specifications, drawings, and schedules, and changes the bid opening date to September 24, 2024. The project consists of a base bid for constructing the MTC facility, as well as eight optional items such as permeable pavement, landscaping, and specialty flooring. The solicitation is set aside for small businesses under NAICS code 236220 with a size standard of $45 million average annual revenue. Brand name requirements are specified for certain components to ensure compatibility with existing systems. A pre-bid conference and site visits are scheduled for August 20 and 27, 2024, and all questions must be submitted by September 19, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Mission Training Center (MTC) Facility, newest first.
File Type Posted
C-301-REMOVAL PLAN.pdf PDF
S-002-TYPICAL DETAILS.pdf PDF
SF101-LOW ROOF FRAMING PLAN.pdf PDF
S-001-GENERAL NOTES.pdf PDF
New Utilities to East.pdf PDF
M-501 DETAILS.pdf PDF
AE501-SECTION DETAILS.pdf PDF
AE305-WALL SECTIONS.pdf PDF
C-201-STORMWATER POLLUTION PREVENTION PLAN.pdf PDF
C-601-UTILITY PLAN.pdf PDF
SF102-HIGH ROOF FRAMING PLAN.pdf PDF
G-003-CODE AND LIFE SAFETY PLAN.pdf PDF
M-702 SCHEDULES.pdf PDF
M-701 SCHEDULES.pdf PDF
AE601-ROOM FINISH SCHEDULE AND GLAZING TYPES AND MISC DETAILS.pdf PDF
AE303-WALL SECTIONS.pdf PDF
23 05 48.19 - SEISMIC BRACING FOR HVAC.pdf PDF
23 05 48.00 40 - VIBRATION CONTROLS FOR HAC PIPING AND EQUIPMENT.pdf PDF
11 94 10 - Rooftop Fall Protection Anchors.pdf PDF
000 TABLE OF CONTENTS.pdf PDF
01 45 35 - Special Inspections.pdf PDF
C-401-PROPOSED PLAN.pdf PDF
C-602-DRAINAGE SCHEDULE AND DETAILS.pdf PDF
ES101-ELECTRICAL SITE PLAN.pdf PDF
AE401-ENLARGED PLANS AND DETAILS.pdf PDF
AE503-SECTION DETAILS.pdf PDF
01 45 00 - Quality Control.pdf PDF
W50S78-24-B-0001 - Mission Training Center Amendment 0003.pdf PDF
Attachment 14 - Geotechnical report-TX ANG Mission Training Center B-3.pdf PDF
MTC RFI log.pdf PDF
W50S7824B0001 - MTC - Amendment 02 - 20240829.pdf PDF
MFR Mission Training Center - 2nd Site Visit Pre-Propsal Conference Minutes.pdf PDF
Pre_Bid_Site Visit_MTC_Attendance_Sheet 27_Aug _2024.pdf PDF
Pre-Proposal Site Visit Slides - MTC 27 Aug 24.pptx PPTX presentation
2024.08.21_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_VOL 1 SPECIFICATIONS.pdf PDF
ATTACHMENT 9 SPECS V1 ADDENDUM.pdf PDF
MTC RFI log.pdf PDF
Pre-Proposal Site Visit Slides - MTC 20 Aug 24 (002).pptx PPTX presentation
Pre_Bid_Site Visit_MTC_Attendance_Sheet 20_Aug _2024.pdf PDF
Attachment 6_Industrial Security.pdf PDF
Attachment 7_ACCESS AND STAGING SITE PLAN.pdf PDF
Attachment 5_STRUCTURAL INTERIOR DESIGN.pdf PDF
JA Nm Brand DDC Redacted.pdf PDF
JA Nm Brand Falcon Redacted.pdf PDF
W50S78-24-B-0001 - Mission Training Center Solicitation.pdf PDF
2024.08.15_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_DRAWINGS.pdf PDF
JA Nm Brand Monaco Redacted.pdf PDF
JA Nm Brand Trane HVAC Redacted.pdf PDF
2024.08.15_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_VOL 1 SPECIFICATIONS.pdf PDF
JA Nm Brand Vindicator Sys Redacted.pdf PDF
Show all 50

Construct Mission Training Center (MTC) Facility has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F9J3RP3229AW01 KELL189014

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to incorporate the most recent Wage Determination, provide answers to the Request For Information (RFI) received and to include updated plans and specifications as indicated on the continuation page. Updated plans, drawings and specifications w ill be updated on SAM.gov as separate documents. The bid opening will date has been changed to 24 September 2024, 1000 CST. No further RFIs will be accepted.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 19

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Sep-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W50S7824B0001

X 9B. DATED (SEE ITEM 11)

15-Aug-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Sep-2024

CODE

USPFO TX 149 MISSION SUPPORT CONTRACTING

107 HENSLEY STREET, BLDG 962, SUITE 2

LACKLAND AFB TX 78236-0123

W50S78 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W50S7824B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

ADDENDUM 2 UPDATE

This Addendum forms a part of the Contract Documents and modifies the Original Documents dated 15 August 2024.

ATTACHMENTS – Separate documents posted on SAM.gov

Items in this addendum take precedence over the original bid documents. Items not specifically revised remain in effect. This addendum consists of the following attachments:

Specifications:

TABLE OF CONTENTS

01 45 00 – QUALITY CONTROL

01 45 35 – SPECIAL INSPECTIONS

11 94 10 – ROOFTOP FALL PROTECTION ANCHORS

23 05 48.00 40 – VIBRATION CONTROLS FOR HAC PIPING AND EQUIPMENT

23 05 48.19 – SEISMIC BRACING FOR HVAC

Drawings:

G-003 – CODE AND LIFE SAFETY PLAN

C-201 – STORMWATER POLLUTION PREVENTION PLAN

C-301 – REMOVAL PLAN

C-401 – PROPOSED PLAN

C-601 – UTILITY PLAN

C-602 – DRAINAGE SCHEDULE AND DETAILS

AE001 – PARTITION TYPES, ANNOTATION SYMBOLS, ABBREVIATIONS AND ACCESSIBILITY

MOUNTING HEIGHTS

AE101 – FLOOR PLAN

AE303 – WALL SECTIONS

AE304 – WALL SECTIONS

AE305 – WALL SECTIONS

AE401 – ENLARGED PLANS AND DETAILS

AE501 – SECTION DETAILS

AE502 – SECTION DETAILS

AE503 – SECTION DETAILS

AE601 – ROOM FINISH SCHEDULE & GLAZING TYPES AND MISC. DETAILS

AE603 – DOOR DETAILS

S-001 – GENERAL NOTES

S-002 – TYPICAL DETAILS

SB102 – SLAB AND WALL PLAN

SF101 – LOW ROOF FRAMING PLAN

SF102 – HIGH ROOF FRAMING PLAN

M-501 – DETAILS

M-502 – DETAILS

M-701 – SCHEDULES

M-702 – SCHEDULES

ES101 – ELECTRICAL SITE PLAN

MODIFICATIONS TO THE SPECIFICATIONS

ITEM 01.1-1 Refer to attached TABLE OF CONTENTS, dated 16 September 2024:

A. Project Table of Contents is hereby revised and re-issued in its entirety to incorporate changes noted as part of thisAddendum related to specifications included on the project.

ITEM 01.1-2 Refer to attached Specification Section 01 45 00 – QUALITY CONTROL, dated 16 September 2024:

A. Specification Section 01 45 00 is hereby revised and re-issued in its entirety.

ITEM 01.1-3 Refer to attached Specification Section 01 45 35 – SPECIAL INSPECTIONS, dated 16 September 2024:

A. Specification Section 01 45 35 is hereby revised and re-issued in its entirety to reference sheets for special inspections.

ITEM 01.1-4 Refer to attached Specification Section 11 94 10 – ROOFTOP FALL PROTECTION ANCHORS, dated 16 September 2024:

A. Specification Section 11 94 10 is hereby revised and re-issued in its entirety to update information per

RFI.

ITEM 01.1-5 Refer to attached Specification Section 23 05 48.00 40 – VIBRATION CONTROLS FOR HAC PIPING AND EQUIPMENT, dated 16 September 2024:

A. Specification Section 23 05 48.00 40 is hereby revised and re-issued in its entirety to remove seismic information.

ITEM 01.1-6 Refer to attached Specification Section 23 05 48.19 – SEISMIC BRACING FOR HVAC, dated 16 September 2024:

A. Specification Section 23 05 48.19 is hereby removed in its entirety.

MODIFICATIONS TO THE DRAWINGS

ITEM 01.2-1 Refer to attached Sheet G-003 – CODE AND LIFE SAFETY PLAN, dated 16 September 2024:

A. Sheet G-003 is hereby revised and re-issued in its entirety to update ADA seating in rooms 114 & 121.

- Replace Sheet G-003 dated 15 August 2024 with attached revised Sheet G-003 dated 16 September 2024.

ITEM 01.2-2 Refer to attached Sheet C-201 – STORMWATER POLLUTION PREVENTION PLAN, dated 16 September2024:

A. Sheet C-201 is hereby revised and re-issued in its entirety to update utility information.

- Replace Sheet C-201 dated 15 August 2024 with attached revised Sheet C-201 dated 16 September 2024.

ITEM 01.2-3 Refer to attached Sheet C-301 – REMOVAL PLAN, dated 16 September 2024:

A. Sheet C-301 is hereby revised and re-issued in its entirety to update sidewalk removal.

- Replace Sheet C-301 dated 15 August 2024 with attached revised Sheet C-301 dated 16 September 2024.

ITEM 01.2-4 Refer to attached Sheet C-401 – PROPOSED PLAN, dated 16 September 2024:

A. Sheet C-401 is hereby revised and re-issued in its entirety to update utility information and sidewalk extents.

- Replace Sheet C-401 dated 15 August 2024 with attached revised Sheet C-401 dated 16 September 2024.

ITEM 01.2-5 Refer to attached Sheet C-601 – UTILITY PLAN, dated 16 September 2024:

A. Sheet C-601 is hereby revised and re-issued in its entirety to update utility information.

- Replace Sheet C-601 dated 15 August 2024 with attached revised Sheet C-601 dated 16 September 2024.

ITEM 01.2-6 Refer to attached Sheet C-602 – DRAINAGE SCHEDULE AND DETAILS, dated 16 September 2024:

A. Sheet C-602 is hereby revised and re-issued in its entirety to update utility information.

- Replace Sheet C-602 dated 15 August 2024 with attached revised Sheet C-602 dated 16 September 2024.

ITEM 01.2-7 Refer to attached Sheet AE001 – PARTITION TYPES, ANNOTATION SYMBOLS, ABBREVIATIONS AND ACCESSIBILITY MOUNTING HEIGHTS, dated 16 September 2024:

A. Sheet AE001 is hereby revised and re-issued in its entirety to remove door number symbol note.

- Replace Sheet AE001 dated 15 August 2024 with attached revised Sheet AE001 dated 16 September 2024.

ITEM 01.2-8 Refer to attached Sheet AE101 – FLOOR PLAN, dated 16 September 2024:

A. Sheet AE101 is hereby revised and re-issued in its entirety to update seating in rooms 114 & 121 and update section details.

- Replace Sheet AE101 dated 15 August 2024 with attached revised Sheet AE101 dated 16 September

2024.

ITEM 01.2-9 Refer to attached Sheet AE303 – WALL SECTIONS, dated 16 September 2024:

A. Sheet AE303 is hereby revised and re-issued in its entirety to update section details.

- Replace Sheet AE303 dated 15 August 2024 with attached revised Sheet AE303 dated 16 September 2024.

ITEM 01.2-10 Refer to attached Sheet AE304 – WALL SECTIONS, dated 16 September 2024:

A. Sheet AE304 is hereby revised and re-issued in its entirety to update section details.

- Replace Sheet AE304 dated 15 August 2024 with attached revised Sheet AE304 dated 16 September 2024.

ITEM 01.2-11 Refer to attached Sheet AE305 – WALL SECTIONS, dated 16 September 2024:

A. Sheet AE305 is hereby revised and re-issued in its entirety to update section details.

- Replace Sheet AE305 dated 15 August 2024 with attached revised Sheet AE305 dated 16 September 2024.

ITEM 01.2-12 Refer to attached Sheet AE401 – ENLARGED PLANS AND DETAILS, dated 16 September 2024:

A. Sheet AE401 is hereby revised and re-issued in its entirety to update section details.

- Replace Sheet AE401 dated 15 August 2024 with attached revised Sheet AE401 dated 16 September 2024.

ITEM 01.2-13 Refer to attached Sheet AE501 – SECTION DETAILS, dated 16 September 2024:

A. Sheet AE501 is hereby revised and re-issued in its entirety to update section details.

- Replace Sheet AE501 dated 15 August 2024 with attached revised Sheet AE501 dated 16 September 2024.

ITEM 01.2-14 Refer to attached Sheet AE502 – SECTION DETAILS, dated 16 September 2024:

A. Sheet AE502 is hereby revised and re-issued in its entirety to update section details.

- Replace Sheet AE502 dated 15 August 2024 with attached revised Sheet AE502 dated 16 September

2024.

ITEM 01.2-15 Refer to attached Sheet AE503 – SECTION DETAILS, dated 16 September 2024:

A. Sheet AE503is hereby revised and re-issued in its entirety to update section details.

- Replace Sheet AE503 dated 15 August 2024 with attached revised Sheet AE503dated 16 September 2024.

ITEM 01.2-16 Refer to attached Sheet AE601 – ROOM FINISH SCHEDULE & GLAZING TYPES AND MISC.

DETAILS, dated 16 September 2024:

A. Sheet AE601 is hereby revised and re-issued in its entirety to update section details.

- Replace Sheet AE601 dated 15 August 2024 with attached revised Sheet AE601 dated 16 September 2024.

ITEM 01.2-17 Refer to attached Sheet AE603 – DOOR DETAILS, dated 16 September 2024:

A. Sheet AE603 is hereby revised and re-issued in its entirety to update section details.

- Replace Sheet AE603 dated 15 August 2024 with attached revised Sheet AE603 dated 16 September 2024.

ITEM 01.2-18 Refer to attached Sheet S-001 – GENERAL NOTES, dated 16 September 2024:

A. Sheet S-001 is hereby revised and re-issued in its entirety to update steel construction notes.

- Replace Sheet S-001 dated 15 August 2024 with attached revised Sheet S-001 dated 16 September 2024.

ITEM 01.2-19 Refer to attached Sheet S-002 – TYPICAL DETAILS, dated 16 September 2024:

A. Sheet S-002 is hereby revised and re-issued in its entirety to add blockout section details.

- Replace Sheet S-002 dated 15 August 2024 with attached revised Sheet S-002 dated 16 September 2024.

ITEM 01.2-20 Refer to attached Sheet SB102 – SLAB AND WALL PLAN, dated 16 September 2024:

A. Sheet SB102 is hereby revised and re-issued in its entirety to update sheet notes.

- Replace Sheet SB102 dated 15 August 2024 with attached revised Sheet SB102 dated 16 September 2024.

ITEM 01.2-21 Refer to attached Sheet SF101 – LOW ROOF FRAMING PLAN, dated 16 September 2024:

A. Sheet SF101 is hereby revised and re-issued in its entirety to show support angles.

- Replace Sheet SF101 dated 15 August 2024 with attached revised Sheet SF101 dated 16 September 2024.

ITEM 01.2-22 Refer to attached Sheet SF102 – HIGH ROOF FRAMING PLAN, dated 16 September 2024:

A. Sheet SF102 is hereby revised and re-issued in its entirety to show support angles.

- Replace Sheet SF102 dated 15 August 2024 with attached revised Sheet SF102 dated 16 September 2024.

ITEM 01.2-23 Refer to attached Sheet M-501 – DETAILS, dated 16 September 2024:

A. Sheet M-501 is hereby revised and re-issued in its entirety to revise penetration details.

- Replace Sheet M-501 dated 15 August 2024 with attached revised Sheet M-501 dated 16 September 2024.

ITEM 01.2-24 Refer to attached Sheet M-502 – DETAILS, dated 16 September 2024:

A. Sheet M-502 is hereby revised and re-issued in its entirety to remove steam humidifier.

- Replace Sheet M-502 dated 15 August 2024 with attached revised Sheet M-502 dated 16 September 2024.

ITEM 01.2-25 Refer to attached Sheet M-701 – SCHEDULES, dated 16 September 2024:

A. Sheet M-701 is hereby revised and re-issued in its entirety to revise multiple schedule information.

- Replace Sheet M-701 dated 15 August 2024 with attached revised Sheet M-701 dated 16 September

2024.

ITEM 01.2-26 Refer to attached Sheet M-702 – SCHEDULES, dated 16 September 2024:

A. Sheet M-702 is hereby revised and re-issued in its entirety to revise flow control valve schedule and air-cooled chiller schedule notes.

- Replace Sheet M-702 dated 15 August 2024 with attached revised Sheet M-702 dated 16 September 2024.

ITEM 01.2-27 Refer to attached Sheet ES101 – ELECTRICAL SITE PLAN, dated 16 September 2024:

A. Sheet ES101 is hereby revised and re-issued in its entirety to update electrical utilities.

- Replace Sheet ES101 dated 15 August 2024 with attached revised Sheet ES101 dated 16 September 2024.

All other terms and condtions remain unchanged.

SECTION 00 21 00 - INSTRUCTIONS

The following have been modified:

INSTRUCTION TO OFFERORS

SECTION 00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

1. Description of the Project:

Construct a Formal Training Unit (FTU) 4-ship F-16 Mission Training Center (MTC) facility utilizing conventional design and construction methods to accommodate the mission of the facility. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements.

The facility should be compatible with applicable DoD, Air Force, and base design standards. In addition, local materials and construction techniques shall be used where cost effective. This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria. Special Construction Requirements:

Raised flooring as required, high bay area for simulators, and Secure Compartmentalized Information Facility (SCIF) specifications and construction in accordance with ICD/ICS 705 is necessary for most of the facility. As described in the statement of work, this project is to be completed based on a previously completed 100% design. The Brand Name requirements in support of this project are: a. Intrusion Detection System: Honeywell Vindicator Electronic System, b. Fire alarm control panel: Monaco MAAP-X, c. Heating, Ventilation, and Air Conditioning (HVAC) Chiller System: Trane North America, d. Direct Digital Control System: WebCTRL Building Automation System.

2. Instructions to Bidders:

2.1. You are invited to submit a bid in response to our Invitation for Bids (IFB) entitled:

W50S78-24-B-0001 entitled F-16 Mission Training Center, Project Number KELL189014, at the Texas Air National Guard, Joint Base San Antonio (JBSA) Lackland Air Force Base (AFB), 149th Fighter Wing.

2.2. As a result of this solicitation, the Government intends to award a Firm Fixed Price (FFP) contract resulting from this solicitation to the responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering only price.

2.3. This solicitation is set-aside 100% for small businesses and only qualified bidders may submit bids. Per the North American Industry Classification System NAICS 236220, the small business size standard is $45 million average annual revenue for the previous 5 years. The PSC Code is Y1CZ.

3. Notice of Pre-Bid Conference and Site Visits:

3.1. There will be two Site Visits and Pre-Bid conference will be conducted, first on 20 August 2024 at 1:00 PM (CST) and the second on 27 August 2024 at 1:00 PM (CST) for the purposes of briefing on the bid requirements and allowing for questions regarding this solicitation. These conferences will be held at the 149 Civil Engeering Squadron, building 970, located at 1413 Billy Mitchell Blvd, Lackland AFB, Texas, 78236. Interested Contractors are highly encouraged to attend the pre-bid conference. The site visit will be held following the conference.

3.2. Due to security conditions, all offerors must register to attend this conference and site visit. Contractors are to be sponsored by 149th FW members. Required Guest Information to be submitted to all three Government personnel, includes: Last/First name, DOB, Country of Birth, ID Type, ID Number, Country of Issue, and State of issue.

Email the above information for all attendees to all three Government personnel:

Send TO:

Jose Acosta-Andujar (jose.acosta_andujar.1@us.af.mil), Frank Ramirez (frank.ramirez.3@us.af.mil), Trevor Ellis (trevor.ellis.4@us.af.mil).

SUBJECT: SITE VISIT – W50S7824B0001 Construct Mission Training Center.

3.3. This information must be provided 5 business days prior to the meeting,in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government’s denial of your access to the pre-proposal conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site.

3.4. Visitors must pick up their passes at the Installation’s Main Visitor’s Center located at the Luke Gate next to Wilford Hall Hospital, prior to arrival. Please arrive 1 – 2 hours early to allow sufficient time for processing. You will be required to present the following information upon arrival: (1) Vehicle Registration, (2) Valid Drivers License, (3) Proof of Insurance for Vehicle, (4) Safety Inspection and Car Rental agreement if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.

3.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.

3.6. A record of the conference shall be made and furnished to all prospective bidders via posting at www.SAM.gov. The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.

4. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS:

4.1. Submit all questions via email (in writing) to the contracting office at the address shown below. DO NOT contact engineers or AE firm, as this will only delay receipt of answers. Questions must be received 5 calendar days prior to bid opening. Answers will be provided with questions, on a non-attribution basis to all eligible, interested parties.

4.2. Submit all questions in the format shown below by email to the contracting office at the addresses show below. Do NOT contact AE or Engineering personnel directly. Doing so will only delay your answer. All questions must come through the Contracting Office.

Email: 149MSG.MSC.Contracting@us.af.mil CC: mark.green.23@us.af.mil and joel.yerkey.1@us.af.mil Subject Line: RFI - W50S7824B0001 Construct Mission Training Center

PRE-BID INQUIRY FORMAT

Date of Bid Inquiry: _______________ From: ______________________________ Company Name: _____________________________ Address:_____________________________________________________________________ Phone Number: _____________________________ Email address: __________________________________________________________________ Bid Inquiry: (Please clearly state your question) (If sent via an attachment word docs are preferred to facilitate posting of answers to the master Q&A document.)

Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach bidders before the submission of their bid. Any changes to the drawings, specifications, etc. will be issued in the form of an amendment. However, any answers that clarify or provide an interpretation to the drawings, specifications, etc. will NOT be posted via amendment but rather as a response to the RFI on SAM.gov at https://www.SAM.gov. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of bids. For security reasons, all technical and engineering data related to this solicitation will be distributed using the Contract Opportunities (SAM.gov) system. Plans and specifications are locked on SAM.gov and require Contractors to request explicit access from the Contracting Officer OR export controlled access through DLA. See complete instructions on SAM.gov. SAM.gov is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with SAM.gov before accessing the system. Amendments, if/when issued will be posted to https://www.SAM.gov for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible due to various reasons.

5. BID SUBMISSION:

Hand Carried Bids and Mailed in Bids, are the ONLY allowed methods for qualifying for the Public Bid Opening. Bid Submissions on a formatted disk will also be required on day bids are due. A formatted disk with your bid submission is required. Formatted disk bid documents will not be assessed by the Government until after Public Bid Opening has occurred. Files on the formatted disk are for Electronic Records keeping only.

NOTE: If mailing in Bid, please allow for adequate days for delivery so Bid will make it to the United States mailed in Bids that are past the Bid Opening time may not be considered for opening.

BIDS ARE TO BE RECIEVED NO LATER THAN THE DATE LISTED IN BLOCK 13 OF THE

SF 1442.

Bid Package - Address to:

149th Fighter Wing Contracting Office Attention: M. Green / J. Yerkey (Phone: 210-925-8211) 107 Hensley St.

Bldg. 962, STE 2 Lackland AFB, TX 78236 (For Solicitation W50S78-24-B-0001)

Bid package must be completed and mailed to the 149th Fighter Wing Contracting Office at 107 Hensley St., at Bldg. 962, STE 2, Lackland AFB, TX, 78236, or hand carried to the identified repository box at the 149th Fighter Wing Contracting Office at 107 Hensley St., at Bldg. 962, STE 2, Lackland AFB, TX, 78236, prior to the time set for bid closing in paragraph 13A of the Standard Form 1442. Bid submission in any other manner WILL NOT be accepted.

Listed in Amendment #2, please note the following: 1. If no Base access is necessary for your firm, a Contracting personnel point of contact will be present at the Growdon Gate (1213 Growdon Rd, San Antonio, TX 78227) in the commercial search area to receive bids. Upon the Bid closing time, all received Bids will be brought to the Contracting Office to be opened immediately. 2. If Base access is desired, please provide the Last Name, First Name, Middle Initial, Date of Birth, Country of Birth, Driver's License number, Driver's License State of Issue, to jose.acosta_andujar.1@us.af.mil, trevor.ellis.4@us.af.mil, mark.green.23@us.af.mil, and joel.yerkey.1@us.af.mil. Please allow a minimum of five (5) working days for processing of Base Access requests prior to the Bid opening date. Please note a Contracting personnel point of contact will be at the Contracting office (107 Chappie James Way, Bldg. 962, San Antonio, TX, 78236) to recieve Bids. Upon the Bid closing time, all received Bids will be read aloud in accordance with normal Invitation For Bid procedures. Contractors may call into a telephone line to hear the Bid opening. The telephone line to call is 210-925-0149.

By submission of its bid, the offeror agrees to all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to meet a requirement may result in an offer being determined unacceptable.

The formatted disk bid package shall include the following four separate attachments:

a. Attachment 1: Standard Form 1442 with BLOCKS 14-20 completed.

b. Attachment 2: Bid Guarantee in accordance with FAR Clause 52.228-1, Bid Guarantee.

c. Attachment 3: Provisions filled-in with required information. 52.204-8, 52.209-7, and 52.222-22.

d. Attachment 4: Reps and Certs

Late bids will be handled in accordance with FAR Provision 52.214-7, Late Submissions, Modifications, and Withdrawal of Bids. Also, please see LATE BIDS notice at the end of these instructions.

Disk Formats:

The subject line of the formatted disk package shall include the bid number and offeror’s name in the following format: W50S78-24-B-0001: OFFEROR’S NAME. If multiple disks are required to be submitted, indicate in the subject line that multiple emails will be received using the following format:

(Disk 1 of 3), (Disk 2 of 3), (Disk 3 of 3). The following is a sample subject line:

SUBJECT: W50S78-24-B-0001 COMPANY XYZ (Disk 2 of 3).

The formatted disk shall list the following information:

i. Address of the office specified in Block 7 of the solicitation.

ii. Time and Date specified in for receipt of bid.

iii. Solicitation Number

iv. Name and address of bidder

Each complete bid in response to this solicitation must be submitted individually/separately and must be properly identified. 149th Fighter Wing Contracting, will not be responsible for electronic responses that are not submitted correctly and/or are improperly identified. If you submit an offer under an incorrect solicitation number, your offer may not be considered.

Files must be readable using Microsoft Office Word 2013 (or lower) or Adobe PDF (set to minimum 200 dots per inch).

DO NOT submit attachments in .ZIP files. Any bid package, or portion thereof, submitted as a .ZIP file will be REJECTED.

Do not password protect disks or disk files.

To avoid rejection of an offer, vendors must make every effort to ensure their formatted disk submission is virus free. Submissions, or portions thereof, which the automatic system detects the presence of a virus, or which are otherwise unreadable, will be treated as “unreadable” pursuant to FAR 14.406, Receipt of an Unreadable Electronic Bid, and be handled accordingly for the supplied formatted disk(s). Offerors are required to ensure adequate time for Government receipt of the bid submission by the bid closing time.

PUBLIC BID OPENING See Block 13 of the SF1442 LOCATION: 149th Fighter Wing Contracting Office at 107 Chappie James Way, Bldg. 962, (Contracting Office), San Antonio, TX, 78236.

PLEASE NOTE: Synopsis days and times are only tentative, and should not be considered as actual. All dates are subject to change, and changes shall be posted to SAM via solicitation amendment(s). All bids are to be deposited in the bid repository box no later than the date listed in the Standard Form 1442 Block 13A.

LATE BIDS. Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR 14.304 and in accordance with clause 52.214-7. Please refer to these Clauses and Provisions for information on what the government will determine as a late bid.

6. WAGE DETERMINATION: The Construction Wage Rates Requirements formerly known as Davis Bacon Wage Rates applicable to this project are TX 20240231dated 08/30/2024 modification 5, for Bexar County, Texas. Applicable wage rates can be found at https://sam.gov/content/home “Wage Determinations”.

7. BID PREPARATION EXPENSES AND PRE-CONTRACT COSTS: This IFB does not commit the Government to pay costs incurred in preparation and submission of bids or for other costs incurred prior to award of a formal contract.

8. CLAUSES: Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text. Removal of sections at time of award: Sections 00 10 00 and 00 45 00 will be removed as a result of an award but will be deemed to be incorporated by reference in that award.

9. DISPOSITION OF UNSUCCESSFUL BIDS: In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful bids including the bid bond.

10. OFFERORS QUALIFICATIONS: To establish its responsibility, the apparent low bidder will have a thorough past performance evaluation completed using Contractor Performance Assessment Reporting System , and Federal Awardee Performance and Integrity Information System. Additionally the contractor may be requested by the Government prior to award, to submit a statement regarding previous experience in performing comparable work, the business and technical organization, financial and bonding resources, and plant available to be used in performing the work. This action may be taken to determine if the contractor is responsible.

11. BRAND NAME SPECIFICATIONS: In accordance with FAR 6.302-1(c), Brand Name Justification have been completed and attached to this solicitation, detailing the specific brand(s) that must be used for certain components to complete this project. The Brand Name requirements in support of this project are:

a. Intrusion Detection System: Honeywell Vindicator Electronic System

b. Fire alarm control panel: Monaco MAAP-X

c. Heating, Ventilation, and Air Conditioning (HVAC) Chiller System: Trane North America

d. Direct Digital Control System: WebCTRL Building Automation System

END OF SECTION 00 21 00

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been modified:

WAGE DETERMINATION

"General Decision Number: TX20240231 08/30/2024

Superseded General Decision Number: TX20230231

State: Texas

Construction Type: Building

County: Bexar County in Texas.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2024. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. |

|contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2024. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2024 1 01/12/2024 2 04/05/2024 3 06/14/2024 4 07/05/2024 5 08/30/2024

* ASBE0087-014 06/03/2024

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR (Duct, Pipe and Mechanical System Insulation)....$ 29.50 8.79

BOIL0074-003 07/01/2023

Rates Fringes

BOILERMAKER......................$ 37.00 24.64

ELEC0060-003 01/01/2024

Rates Fringes

ELECTRICIAN (Communication Technician Only).................$ 33.50 18%+5.45

ELEC0060-004 01/01/2024

Rates Fringes

ELECTRICIAN (Excludes Low

Voltage Wiring)..................$ 33.50 18%+5.45

ELEV0081-001 01/01/2024

Rates Fringes

ELEVATOR MECHANIC................$ 48.92 37.885+a+b

FOOTNOTES:

a. 6% under 5 years based on regular hourly rate for all hours worked. 8% over 5 years based on regular hourly rate for all hours worked.

b. Holidays: New Year's Day; Memorial Day; Independence Day;

Labor Day; Thanksgiving Day; Friday after Thanksgiving Day;

Christmas Day; and Veterans Day.

ENGI0450-002 04/01/2014

Rates Fringes

POWER EQUIPMENT OPERATOR

Cranes......................$ 34.85 9.85

IRON0066-013 06/01/2023

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 26.00 7.53

IRON0084-011 06/01/2023

Rates Fringes

IRONWORKER, ORNAMENTAL...........$ 27.51 8.13

PLUM0142-009 07/01/2024

Rates Fringes

HVAC MECHANIC (Electrical Temperature Control Installation & Unit Installation Only)...............$ 36.87 11.48 PIPEFITTER (Including HVAC Pipe Installation)...............$ 36.87 11.48 Including HVAC Pipe Installation

PLUMBER..........................$ 36.87 11.48

Excludes HVAC Pipe Installation

SFTX0669-002 04/01/2024

Rates Fringes

SPRINKLER FITTER (Fire

Sprinklers)......................$ 36.15 23.88

* SHEE0067-004 07/03/2024

Rates Fringes

Sheet metal worker Excludes HVAC Duct Installation................$ 32.24 15.89 HVAC Duct Installation Only.$ 32.24 15.89

* SUTX2014-006 07/21/2014

Rates Fringes

BRICKLAYER.......................$ 22.15 0.00

CARPENTER (Acoustical Ceiling Installation Only)...............$ 17.83 0.00

CARPENTER (Form Work Only).......$ 13.63 ** 0.00

CARPENTER, Excludes Acoustical Ceiling Installation, Drywall Hanging, Form Work, and Metal Stud Installation................$ 16.86 ** 4.17

CAULKER..........................$ 15.00 ** 0.00

CEMENT MASON/CONCRETE FINISHER...$ 22.27 5.30

DRYWALL FINISHER/TAPER...........$ 13.81 ** 0.00

DRYWALL HANGER AND METAL STUD

INSTALLER........................$ 15.18 ** 0.00

ELECTRICIAN (Low Voltage Wiring Only).....................$ 20.39 3.04

IRONWORKER, REINFORCING..........$ 12.27 ** 0.00

LABORER: Common or General......$ 10.75 ** 0.00

LABORER: Mason Tender - Brick...$ 11.88 ** 0.00

LABORER: Mason Tender - Cement/Concrete..................$ 12.00 ** 0.00

LABORER: Pipelayer..............$ 11.00 ** 0.00

LABORER: Roof Tearoff...........$ 11.28 ** 0.00

LABORER: Landscape and Irrigation.......................$ 8.00 ** 0.00

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 15.98 ** 0.00

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 14.00 ** 0.00

OPERATOR: Bulldozer.............$ 14.00 ** 0.00

OPERATOR: Drill.................$ 14.50 ** 0.00

OPERATOR: Forklift..............$ 12.50 ** 0.00

OPERATOR: Grader/Blade..........$ 23.00 5.07

OPERATOR: Loader................$ 12.79 ** 0.00

OPERATOR: Mechanic..............$ 18.75 5.12

OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 16.03 ** 0.00

OPERATOR: Roller................$ 12.00 ** 0.00

PAINTER (Brush, Roller and Spray), Excludes Drywall Finishing/Taping.................$ 13.07 ** 0.00

ROOFER...........................$ 12.00 ** 0.00

TILE FINISHER....................$ 11.32 ** 0.00

TILE SETTER......................$ 14.94 ** 0.00

TRUCK DRIVER: Dump Truck........$ 12.39 ** 1.18

TRUCK DRIVER: Flatbed Truck.....$ 19.65 8.57

TRUCK DRIVER: Semi-Trailer Truck............................$ 12.50 ** 0.00

TRUCK DRIVER: Water Truck.......$ 12.00 ** 4.11

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.20) or 13658 ($12.90). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

State Adopted Rate Identifiers

Classifications listed under the ""SA"" identifier indicate that the prevailing wage rate set by a state (or local) government was adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

01/03/2024 reflects the date on which the classifications and rates under the SSA identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"