AE101-FLOOR PLAN.pdf

PDF 415 KB Posted

Attached to
Construct Mission Training Center (MTC) Facility Federal contract opportunity
Solicitation number
W50S78-24-B-0001
Issued by
Department of the Army National Guard

About this file

This document is a solicitation for the construction of a 15,200 square foot Mission Training Center (MTC) facility for the Texas Air National Guard at Joint Base San Antonio Lackland Air Force Base. The project includes demolition, site work, landscaping, concrete, utilities, masonry, roofing, structural steel, HVAC, plumbing, electrical, communications, and other miscellaneous work. The solicitation includes a base bid and eight options, such as permeable pavement, landscaping, and epoxy floor coatings. The contract duration is 540 calendar days and the project is set aside 100% for small businesses. Specific brand name items are required for compatibility with existing systems. The solicitation provides details on the site visit, pre-bid conference, question/RFI submission, and registration requirements. The magnitude of construction is between $10,000,000 and $25,000,000.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Mission Training Center (MTC) Facility, newest first.
File Type Posted
MTC - ABSTRACT Posted 24 Sep 24.pdf PDF
C-401-PROPOSED PLAN.pdf PDF
C-602-DRAINAGE SCHEDULE AND DETAILS.pdf PDF
ES101-ELECTRICAL SITE PLAN.pdf PDF
AE401-ENLARGED PLANS AND DETAILS.pdf PDF
AE503-SECTION DETAILS.pdf PDF
01 45 00 - Quality Control.pdf PDF
Amendment 0004 - 17 Aug 2024.pdf PDF
MTC RFI log 20240917.pdf PDF
SB102-SLAB AND WALL PLAN.pdf PDF
M-502 DETAILS.pdf PDF
AE001-PARTITION TYPES ANNOTATION SYMBOLS ABBREVIATIONS AND ACCESSIBILITY MOUNTING HEIGHTS.pdf PDF
AE603-DOOR DETAILS.pdf PDF
AE502-SECTION DETAILS.pdf PDF
AE304-WALL SECTIONS.pdf PDF
C-201-STORMWATER POLLUTION PREVENTION PLAN.pdf PDF
C-601-UTILITY PLAN.pdf PDF
SF102-HIGH ROOF FRAMING PLAN.pdf PDF
G-003-CODE AND LIFE SAFETY PLAN.pdf PDF
M-702 SCHEDULES.pdf PDF
M-701 SCHEDULES.pdf PDF
AE601-ROOM FINISH SCHEDULE AND GLAZING TYPES AND MISC DETAILS.pdf PDF
AE303-WALL SECTIONS.pdf PDF
23 05 48.19 - SEISMIC BRACING FOR HVAC.pdf PDF
23 05 48.00 40 - VIBRATION CONTROLS FOR HAC PIPING AND EQUIPMENT.pdf PDF
11 94 10 - Rooftop Fall Protection Anchors.pdf PDF
000 TABLE OF CONTENTS.pdf PDF
Attachment 14 - Geotechnical report-TX ANG Mission Training Center B-3.pdf PDF
MTC RFI log.pdf PDF
W50S7824B0001 - MTC - Amendment 02 - 20240829.pdf PDF
Pre-Proposal Site Visit Slides - MTC 27 Aug 24.pptx PPTX presentation
MFR Mission Training Center - 2nd Site Visit Pre-Propsal Conference Minutes.pdf PDF
Pre_Bid_Site Visit_MTC_Attendance_Sheet 27_Aug _2024.pdf PDF
MTC RFI log.pdf PDF
W50S78-24-B-0001 - Mission Training Center Amendment 0001.pdf PDF
2024.08.21_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_VOL 1 SPECIFICATIONS.pdf PDF
ATTACHMENT 9 SPECS V1 ADDENDUM.pdf PDF
MFR Mission Training Center - Site Visit Pre-Propsal Conference Minutes.pdf PDF
Pre-Proposal Site Visit Slides - MTC 20 Aug 24 (002).pptx PPTX presentation
Pre_Bid_Site Visit_MTC_Attendance_Sheet 20_Aug _2024.pdf PDF
Attachment 5_STRUCTURAL INTERIOR DESIGN.pdf PDF
Attachment 1_SOW.pdf PDF
Attachment 7_ACCESS AND STAGING SITE PLAN.pdf PDF
2024.08.15_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_VOL 1 SPECIFICATIONS.pdf PDF
JA Nm Brand Vindicator Sys Redacted.pdf PDF
2024.08.15_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_VOL 2 SPECIFICATIONS.pdf PDF
W50S78-24-B-0001 - Mission Training Center Solicitation.pdf PDF
2024.08.15_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_DRAWINGS.pdf PDF
JA Nm Brand Monaco Redacted.pdf PDF
JA Nm Brand Trane HVAC Redacted.pdf PDF
Show all 50

Construct Mission Training Center (MTC) Facility has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

2' - 0"

2'

0"

16 GA PREFIN BRAKE

METAL SILL FLASHING

PREFIN METAL IMWP

CORNER TRIM

(FWP1) 2"

INSULATED METAL

WALL PANELS

16 GA 3" HORIZ Z-CHANNEL

AT 48" VERTICALLY

FLUID APPLIED

MEMBRANE AIR BARRIER

1/2" EXT GYPSUM

SHEATHING

6" COLD FORMED METAL

FRAMING

5/8” PERFORATED FOIL

BACKED GWB WITH THE

PAPER FACE AGAINST

THE CFMF STUDS AND

THE FOIL FACING THE

INTERIOR OF THE SPACE

5/8" PERFORATED FOIL

BACKED GWB WITH PAPER

FACING INTERIOR AND

FINISH AS SCHEDULED

NOM 4" SPRAY FOAM AIR

BARRIER - OPEN CELL

(R-17 MIN.) WITH ASTM

E84 COMPLIANT FIRE

RETARDANT SURFACE

FILM

(MV1) MODULAR

BRICK VENEER (BELOW)

STEEL STRUCTURE

8 3/8" 6" 1/2"

3" 2"

CC

FF

AA

AE302

B2

AE302

B2

D D

B B

AE302

C2

AE302

C2

AE301

B1

AE301

B1

AE301

A1

AE301

A1

AE302

A2

AE302

A2

AE301

C1

AE301

C1

E E

AE304

A2

SIM 1

AREA 1 ELEC.

124 BDS 1

BDS 2

SIM 3

CORR

BDS 5

MX AREA /

SPARES

BDS 3

SIM 4

BDS 6

123A

129A

128A 132A 135A

124A

134A122A

131A126A

S2

S3

S3

S3

S3

S3

S3

S3

S3

S3S3 S3

S3

S3

S3

S3

S3

3'

3/

8"

6'

4" 3'

4"

1'

6"

6'

8"

5'

8" 6'

2"

6'

4" 3'

4"

3/

8"

3/

8"

0" 4'

0"

4'

0"

6'

8"

3'

8"

0"

3/ 8"

S3

S3

S2

121A

S3

S3

8 3/8"30'-6"18'-10"16'-10"31'-2"

MEN

WAITING

WOMEN

AP PM

OFFICE

MECH

MX / WS

GUEST

WORKSTATIONS

BREAK ROOM

STORAGE

VEST

101 AREA 1

COMM

STUDENT

STUDY

CLASSROOM

CORRIDOR

JAN.

NETWORK

SERVER

18'-10"

BDS 4

2'-4" 8'-4" 1'-4" 41'-4" 1'-4" 8'-4" 2'-4" 18'-0"

B2

AE202

B1

AE201

C2

AE202

C1

AE201

130A

118A

120A

127A

104A

103A

108A

111A 112A

125A

4' -0

7'

-4

5' -0

4'

-0

5' -0

'-4

5' -0

9'

-4

5' -0

8'

-0

3' -4

'-8

EX2

EX2

EX2

AE402 D1

3'-5" 5'-0" 3"

22'-8 1/8" 41'-3 7/8" 18'-0 1/8"

10'-11 3/8" 7'-0" 11'-10" 1'-4" 18'-3" 2'-10" 20'-5" 9"

10'-11 3/8" 5'-6" 14'-8" 13'-6" 4'-9"

1'-2 1/2"

5'-0" 17'-1 1/8" 8 1/2" 31'-2" 16'-10" 18'-10" 30'-6" 8 3/8"

'-0

'-0

4'

-0

'-0

3' - 0"

2' - 0"

1' - 0"

4' - 0"

4' - 0"

3' - 0"

2' - 0"

1' - 0"

EX2

123B 129B 135B

127B

134B122B

105A

106A 113A 117A

ELEC

AP PM

COMM

2'-0" 28'-11" 19'-9" 3'-4" 10'-1" 10'-7" 30'-10" 16'-10" 18'-10" 30'-10" 2'-0"

2' -0

4'

-0

'-1

0" 8'

-0

'-0

'-4

'-1

0" 2'

-0

2' -0

4'

-0

'-1

0" 8'

-0

'-0

'-4

'-1

0" 2'

-0

2'-0" 28'-11" 19'-9" 3'-4" 10'-1" 10'-7" 30'-10" 16'-10" 18'-10" 30'-10"

2'-0"

SIM 2

123MOC

C1

AE401

C2

AE401

4'-0" 4'-8"

6'-4" 7'-4" 6'-4" 7'-4" 3'-4" 5'-4" 3'-4" 8" 4'-0" 19'-11 7/8" 4'-0 1/8" 16'-4" 8'-4" 7'-4" 2'-0" 6'-4" 1'-8" 25'-4" 1'-4" 8'-4" 2'-4" 14'-0" 4'-0"

174'-0"

A2A2

B1

C1

C1

C1

A2

C1

S3

S2

S2

S3

S3S2

S2

A2

A3

A2 A2

S2

S2 S2

5' -1

1/

4"

'-2

/4

6' -0

'-0

'-2

/2

9'

-9

/8

3/

8" 8'

-4

'-0

'-1 0"

6' -0

'-0

/8

18'-0 3/8" 12'-4" 12'-0" 7'-0" 8 1/2"

2'-7 1/2"

1' -2

/8

'-0

/8

5'

-1

/8

'-0

'-9

/8

5' -6

1/ 2"

7' -9

/8

9'

-7

3/

8"

A3

FIRE RISER

119A

C1

133A

EX2

A4

AE101

116A

114A

A1

AE101

G G

174'-0"

D1

MAN TRAP

S2 B1

107A

A1

AE603

115A

109A

115B

S1

S3

S3S3

C1

S3

D4

AE401

D4

AE401

A2

B1

AE603

SIM

101A

101B

AE402

B4

16'-8 1/2" 3'-8"

16'-5 3/4" 4'-11 1/2"

8 8

B2

S3f

S3f

S3f

F 5'-8 7/8"

BREAK

ROOM

VEST

STORAGE

AE305

A1

G

107A

101A

101B

1' -0

CORRIDOR

EX1

A1

AE401

A2

A2 B2

1' -6

1' -6

CL

3'-4" 5'-4" 2'-8"

3/

8" 6"

5/

8" 1'

-4

8"

CL

CLCL

EX1

B3

7' -7

/2

3' -4

8'-3 1/2"

6'-8 3/4"

TO GRID 10

8'-4 3/4"

TO GRID 10

A3

AE401

A

2'

0"

2' - 0"

FLUID APPLIED

MEMBRANE AIR BARRIER

1/2" EXT GYPSUM

SHEATHING

6" COLD FORMED

METAL FRAMING

NOM 4" SPRAY FOAM AIR

BARRIER - OPEN CELL

(R-17 MIN.) WITH ASTM E84

COMPLIANT FIRE

RETARDANT SURFACE FILM

(MV1) MODULAR

BRICK VENEER

STEEL STRUCTURE

MASONRY ANCHORS

8 3/8" 6" 1/2" 2"

7 1/8"

2" CAVITY WALL

INSULATION BOARD

5/8” PERFORATED FOIL

BACKED GWB WITH THE

PAPER FACE AGAINST

THE CFMF STUDS AND

THE FOIL FACING THE

INTERIOR OF THE SPACE

5/8" PERFORATED FOIL

BACKED GWB WITH PAPER

FACING INTERIOR AND

FINISH AS SCHEDULED

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

Frankfurt-Short-Bruza Associates,P.C.

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

C

B

A

D

C

B

A

54321

20190310

NDM

Jo int

B as e S an

A nto nio

JB

SA

Ke lly

A nn ex , T ex as

Te xa s A ir

Na tio na l G ua rd

9t h

FW

F-1

6 M iss ion Tr ain ing

C en ter (M

TC

0 4' 8' 16'

1/8" = 1'-0"

C :\U sers\keisner\D ocum ents\90310_Arch_keisnerU

7YM

G .rvt

9/16/2024 10:35:22 AM

15 AUGUST 2024

FLOOR PLAN

AE101

MJT

BKG

GMD

GENERAL NOTES

A. ALL EXTERIOR PERIMETER MASONRY WAINSCOT

BASE COURSE DIMENSIONS ARE NOMINAL AND THE

CONTRACTOR SHALL BE RESPONSIBLE FOR

COORDINATING ADJUSTMENTS AT OPENINGS TO

ACCOUNT FOR DOOR FRAMES.

B. ALL INTERIOR DIMENSIONS ARE FROM FACE OF

STUD TO FACE OF STUD OR FACE OF CMU OR

CONCRETE AS INDICATED - UNLESS NOTED

OTHERWISE.

C. ALL STC RATED WALLS INDICATED WITHIN THE 18"

RECESSED SLAB AREA SHALL BE CONSTRUCTED TO

EXTEND AND SEAL COMPLETELY TO THE LOWER

CONCRETE SLAB - NOTE: ALL 24"X24" ACCESS TILES

SHALL TERMINATE AT THE PERIMETER OF EACH

ROOM AS INDICATED.

D. FULL 24" X 24" ACCESS FLOOR TILES SHALL START

AT THE LOCATION INDICATED WITH TILES CUT TO

FIT AROUND THE REMAINING PERIMETER.

E. THE CONTRACTOR SHALL SUBMIT FOR APPROVAL

THE LOCATIONS OF ALL OF THE FIXED AND

REMOVABLE SECTIONS OF THE 3/8" CHECKER

PLATE TO THOROUGHLY COORDINATE AND

FUNCTION WITH THE ELECTRICAL POWER AND

FLIGHT SIMULATOR EQUIPMENT.

SHEET KEYNOTES

LEGEND

1. OUTLINE OF FLIGHT SIMULATOR EQUIPMENT - GFGI.

2. MECHANICAL EQUIPMENT.

3. FULL 24" X 24" ACCESS FLOOR TILE START POINT.

4. PAINTED 3/8" STEEL CHECKER PLATE COVERING

CONCRETE TRENCH FOR FUTURE F35 SIMULATOR

POWER AND SIGNAL CABLING INSTALLATION.

5. SINGLE PEDESTAL FIXED SEATING W/ UPHOLSTERED

SEAT AND BACK, FOLDAWAY TABLET ARMS, AND

ACCESS FLOORING SUPPORT STRUCTURE FOR EACH

SEAT - CLASSROOM-114 AND MOC-121 - O.L.I. #8

6. CELL PHONE LOCKERS

7. 1.9" OD PNTD STEEL PIPE HANDRAIL AND WALL

MOUNT BRACKETS

8. EXPOSED STACKED 2" VENT PIPE, RE: PLUMBING

9. FURRING WALL FOR STACKED 2" VENT PIPE, RE:

PLUMBING & AE001 FOR PARTITION TYPE.

24" X 24" CONCRETE FILLED

METAL PAN ACCESS FLOOR

TILE SYSTEM AT RECESSED

CONCRETE FLOOR (TIERED

FLOORING SYSTEM STEPS IN

CLASSROOM #114 AND MOC #

121, N.I.C.)

SCALE: 1 1/2" = 1'-0"

IMWP OUTSIDE CORNER DETAIL - HIGHA1

6" 1'-6"1'0

1 1/2" = 1'-0"

SCALE: 1/8" = 1'-0"

GROUND FLOOR PLANB1

N

OUTLINE OF SECURE

PERIMETER 1 WALL

SCALE: 1/2" = 1'-0"

ENLARGED PLAN @ ENTRYA4SCALE: 1 1/2" = 1'-0"

IMWP OUTSIDE CORNER DETAIL - LOWA2

0 1' 2' 4'

1/2" = 1'-0"

NOTE: REFERENCE SPECIFICATION SECTIONS

07 05 23 AND 07 27 10.00 10 FOR DESCRIPTION

OF AIR BARRIER SYSTEM

GRAPHIC VISUAL PLANE OF

CONT AIR BARRIER WHERE

SHOWN ALL SHEETS

1 Addendum 02 09/16/2024

ACCESSIBLE ELEMENT

File details come from the government source that posted it. Updated .