This document appears to be a typical details sheet containing information about drilled pier and grade beam construction for a federal contract opportunity. The key details include:
The federal contract opportunity is for the construction of a 15,200 square foot Mission Training Center (MTC) facility for the Texas Air National Guard at Joint Base San Antonio Lackland Air Force Base. The solicitation is a 100% small business set-aside with an estimated value between $10-25 million. The contract duration is 540 calendar days. The solicitation includes a base bid as well as 8 optional items such as permeable pavement, landscaping, and specialized flooring. The solicitation also identifies 5 brand name items that must be used for compatibility with existing systems. Interested offerors must be registered in SAM.gov. A site visit and pre-bid conference are scheduled. Questions and RFIs must be submitted within 5 days of the bid opening.
View the file
Other files for this federal contract opportunity
Show all 50
Construct Mission Training Center (MTC) Facility has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRILLED PIER SCHEDULE
PIER
MARK
SHAFT
DIAMETER
REINFORCING
LONGITUDINAL TIES
QUANTITY SIZE SIZE SPACING
TOP OF
PIER
ELEVATION
BOTTOM
OF PIER
ELEVATION
P1 2'-0" 8 #7 #4 10" OC 96'-8" 79'-0"
P2 2'-0" 8 #7 #4 10" OC 95'-8" 79'-0"
P3 2'-0" 8 #7 #4 10" OC 79'-0"
P4 2'-0"
96'-8"
BELL
DIAMETER
4'-0" 4'-0" 6'-0"
6'-0" 8 #7 #4 10" OC 95'-8" 79'-0"
PIER CAP OR
GRADE BEAM
TY
P
DOWEL QUANTITY AND SIZE TO
MATCH PIER REINFORCING. PROVIDE
STD HOOK AT TOP AND CLASS "B"
TENSION EMBEDMENT INTO PIER
3" CLEAR TO TIE
CAGE SPACERS REQUIRED
TO MAINTAIN CLEARANCE
REFER TO DRILLED PIER
SCHEDULE FOR SIZE
AND SPACING OF TIES
PLASTIC SHOE
REQUIRED TO
MAINTAIN CLEAR
COVER
EQUAL SPACING BETWEEN
LONGITUDINAL
REINFORCING
48 BAR Ø LAP
MINIMUM PIER CAP REINFORCING:
#6 HOOKED BARS AT 6" (MAX) ON CENTER EACH WAY, TOP AND
BOTTOM. EXTEND GRADE BEAM REINFORCING THROUGH PIER CAPS
TYPICAL. FOR EACH CONTINUOUS #8 BAR FROM GRADE BEAMS, ONE
#6 PIER CAP BAR IN THE SAME DIRECTION MAY BE ELIMINATED TO
REDUCE CONGESTION. REFER TO GRADE BEAM SCHEDULE FOR SIZE
AND REINFORCING.
DRILLED PIER
(IN PLAN SECTION)
B
EA
M S
C H
ED
U
LE
R
EF
ER
G
R
AD
E
NOTE: FOR ESTIMATING PURPOSES, BOTTOM OF PIER
ASSUMED TO BE 21 FEET BELOW FINISH FLOOR ELEVATION.
TOP OF PIER ELEV
REFER SCHEDULE
BOTTOM OF PIER
ELEVATION 79'-0"
TOP OF PIER CAP OR
GRADE BEAM ELEV
REFER PLANS
REFER TO DRILLED PIER
SCHEDULE FOR REINFORCING
SIZE AND NUMBER
UNLESS NOTED OTHERWISE
REFER SCHEDULE
BELL DIAMETER
1' -0
DIAMETER
SHAFT
2"
3" TYP
IF GRADE BEAMS COMING INTO PIER CAP ARE OF
DIFFERENT DEPTHS OR ELEVATIONS, ENLARGE
PIER CAP TO ENCAPSULATING DEPTH OF ALL
INCOMING GRADE BEAMS.
NOTE:
BARS MAY BE CONTINUOUS
ACROSS MORE THAN ONE
SPAN.
REFER GRADE BEAM SCHEDULE FOR
GREATER TOP REINFORCEMENT OF
SPANS L1 AND L2
FIRST STIRRUP 3" FROM
FACE OF SUPPORT
PROVIDE STD
HOOK, TYP
DRILLED PIER
TYPICAL
REFER SCHEDULE
FOR BOTTOM
REINFORCING
FACE OF SUPPORT
FOR ROUND PIER
TYPICAL
FIRST STIRRUP 3" FROM
FACE OF SUPPORT
END OF CLEAR SPAN
TYPICAL
INTERIOR CLEAR SPAN
TYPICAL
INTERIOR CLEAR SPAN
TYPICAL
ELEVATION
L1 L2 L3
EQ. EQ.
SPLICE
CLASS B
SPLICE
CLASS B
SPLICE
CLASS B
SPLICE
CLASS B
FACE OF PIER CAP
FACE OF SUPPORT =
0.45 X PIER Ø OR TO
PIER CAP
0.89 X PIER CAP Ø
OR WIDTH OF
TY
PI
C
AL
3" C
LE
AR
TY
P
2" C
LR
#4 STIRRUPS AT 8" ON CENTER FOR THE
FIRST 10 FEET FROM THE CENTER LINE
OF THE SUPPORT AT EACH END OF THE
GRADE BEAM AND BALANCE AT 10" ON CENTER
CONCRETE REINFORCEMENT LAP LENGTH SCHEDULE
BAR
SIZE
TOP
#4
#5
#6
#7
#8
#9
#10
#11
1.
2.
3.
4.
5.
VALUES ARE BASED ON 4,000 PSI CONCRETE, MINIMUM 60,000 PSI
REINFORCEMENT STEEL AND NORMAL WEIGHT CONCRETE. LENGTHS
ARE IN INCHES.
CENTER TO CENTER SPACING WAS ASSUMED TO BE GREATER THAN
1.0 db PLUS TWICE THE CONCRETE COVER
TOP BARS ARE HORIZONTAL BARS WITH MORE THAN 12 INCHES OF
CONCRETE CAST BELOW THE BARS.
FOR GRADE 75 REINFORCING BARS, MULTIPLY THE TABULATED VALUES
BY 1.25. FOR GRADE 80 REINFORCING BARS, MULTIPLY THE TABULATED
VALUES BY 1.33.
FOR LIGHTWEIGHT CONCRETE, DIVIDE THE TABULATED VALUES BY
0.75.
#3
LAP
CLASS
A B A B A B A B A B A B A B
A B
A B
OTHER
UNCOATED
COVER=0.75"
TOP OTHER
UNCOATED
COVER=1.50"
TOP OTHER
UNCOATED
COVER=2.00"
TOP OTHER
UNCOATED
COVER=3.00"
CONTROL JOINT
COLUMN AND BASE PLATE -
REFER PLAN
CONCRETE FILL AROUND
COLUMNS MATCHING
SPECIFIED CONCRETE
MIX DESIGN
INTERIOR
CONTROL
JOINT, TYP
CONTROL
JOINT
COLUMN AND BASE PLATE -
REFER PLAN
CORNER EXTERIOR
90.00°
90.00°
90.00°
CONCRETE FILL AROUND
COLUMNS MATCHING
SPECIFIED CONCRETE
MIX DESIGN
COLUMN AND
BASE PLATE -
REFER PLAN
1.
2.
NOTES:
ELONGATE BLOCKOUT AS NEEDED
FOR GUSSET PLATES.
PROVIDE EXPANSIVE MATERIAL
AROUND COLUMN PRIOR
TO INFILLING BLOCKOUT
WITH CONCRETE.
3. AS THIS IS A STRUCTURAL SLAB,
LIMIT BLOCKOUT SIZES AS MUCH AS
PRACTICAL AND MAINTAIN AT LEAST
A MINIMUM 6 INCHES BEARING ON
GRADE BEAMS, TYP
(MIN)
3"
(MIN)
3"
(M
IN
)3"
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
Frankfurt-Short-Bruza Associates,P.C.
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20190310
NDM
Jo in t B as e S an A nt on io
JB
SA
Ke lly A nn ex , T ex as
Te xa s Ai r N at io na l G ua rd 9t h
FW
F- M iss io n Tr ain in g Ce nt er (M
TC
C :\U sers\nolm stead\D ocum ents\90310_Stru_nolm steadFK74B.rvt 09/13/24 16:34:03
15 AUGUST 2024
TYPICAL DETAILS
S-002
BJW
CGH
CGH
SCALE: NTS
DRILLED PIER SCHEDULEC3
SCALE: NTS
DRILLED PIER & PIER CAPC1
SCALE: NTS
GRADE BEAM REINFORCINGD3
1 Addendum 02 09/16/2024
SCALE: NTS
SLAB BLOCKOUT - CIRCULARA1
File details come from the government source that posted it. Updated .