AE601-ROOM FINISH SCHEDULE AND GLAZING TYPES AND MISC DETAILS.pdf

PDF 167 KB Posted

Attached to
Construct Mission Training Center (MTC) Facility
Solicitation number
W50S78-24-B-0001
Issued by

About this file

This document appears to be a federal government construction solicitation for a Mission Training Center (MTC) facility at Joint Base San Antonio (JBSA) Lackland Air Force Base for the Texas Air National Guard.

The solicitation is for a firm fixed-price contract for construction services to build a 15,200 square foot FTU 4-ship F-16 MTC facility. The work includes demolition, site work, utilities, building construction, and various specialty systems. The solicitation includes a base bid and 8 options for additional scope. It also lists 5 brand name items required for compatibility with existing systems. The project is set aside 100% for small businesses under NAICS code 236220. The contract duration is 540 calendar days after notice to proceed. Pre-bid site visits are scheduled for August 20th and August 27th, and all questions must be submitted 5 days before bid opening.

View the file

Other files

File Type Posted
MTC - ABSTRACT Posted 24 Sep 24.pdf PDF
SF101-LOW ROOF FRAMING PLAN.pdf PDF
S-002-TYPICAL DETAILS.pdf PDF
01 45 35 - Special Inspections.pdf PDF
M-702 SCHEDULES.pdf PDF
23 05 48.19 - SEISMIC BRACING FOR HVAC.pdf PDF
SB102-SLAB AND WALL PLAN.pdf PDF
AE501-SECTION DETAILS.pdf PDF
AE502-SECTION DETAILS.pdf PDF
AE303-WALL SECTIONS.pdf PDF
23 05 48.00 40 - VIBRATION CONTROLS FOR HAC PIPING AND EQUIPMENT.pdf PDF
M-701 SCHEDULES.pdf PDF
AE101-FLOOR PLAN.pdf PDF
S-001-GENERAL NOTES.pdf PDF
AE305-WALL SECTIONS.pdf PDF
M-502 DETAILS.pdf PDF
AE001-PARTITION TYPES ANNOTATION SYMBOLS ABBREVIATIONS AND ACCESSIBILITY MOUNTING HEIGHTS.pdf PDF
C-301-REMOVAL PLAN.pdf PDF
New Utilities to East.pdf PDF
11 94 10 - Rooftop Fall Protection Anchors.pdf PDF
C-201-STORMWATER POLLUTION PREVENTION PLAN.pdf PDF
AE603-DOOR DETAILS.pdf PDF
C-601-UTILITY PLAN.pdf PDF
000 TABLE OF CONTENTS.pdf PDF
M-501 DETAILS.pdf PDF
AE304-WALL SECTIONS.pdf PDF
SF102-HIGH ROOF FRAMING PLAN.pdf PDF
G-003-CODE AND LIFE SAFETY PLAN.pdf PDF
01 45 00 - Quality Control.pdf PDF
MTC RFI log 20240917.pdf PDF
AE401-ENLARGED PLANS AND DETAILS.pdf PDF
ES101-ELECTRICAL SITE PLAN.pdf PDF
AE503-SECTION DETAILS.pdf PDF
Amendment 0004 - 17 Aug 2024.pdf PDF
C-401-PROPOSED PLAN.pdf PDF
C-602-DRAINAGE SCHEDULE AND DETAILS.pdf PDF
W50S78-24-B-0001 - Mission Training Center Amendment 0003.pdf PDF
MTC RFI log.pdf PDF
W50S7824B0001 - MTC - Amendment 02 - 20240829.pdf PDF
Attachment 14 - Geotechnical report-TX ANG Mission Training Center B-3.pdf PDF
MFR Mission Training Center - 2nd Site Visit Pre-Propsal Conference Minutes.pdf PDF
Pre_Bid_Site Visit_MTC_Attendance_Sheet 27_Aug _2024.pdf PDF
Pre-Proposal Site Visit Slides - MTC 27 Aug 24.pptx PPTX presentation
W50S78-24-B-0001 - Mission Training Center Amendment 0001.pdf PDF
2024.08.21_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_VOL 1 SPECIFICATIONS.pdf PDF
ATTACHMENT 9 SPECS V1 ADDENDUM.pdf PDF
MTC RFI log.pdf PDF
Pre-Proposal Site Visit Slides - MTC 20 Aug 24 (002).pptx PPTX presentation
Pre_Bid_Site Visit_MTC_Attendance_Sheet 20_Aug _2024.pdf PDF
MFR Mission Training Center - Site Visit Pre-Propsal Conference Minutes.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7 1/2" 6 1/2" 1 5/8"

BRICK ROWLOCK

COURSE

MASONRY ANCHORS

(MV1) MODULAR BRICK

VENEER

2" CAVITY WALL

INSULATION BOARD

FLUID APPLIED

MEMBRANE AIR

BARRIER

16" GA - 6" CFMF

AT 16" OC

5/8" GWB

1/2" HORIZONTAL

RESILIENT

CHANNEL AT 24"

OC VERTICALLY

ALUMINUM FRAME

STOREFRONT AND

GLAZING

PRE-FINISHED METAL

FLASHING AND DRIP

EDGE

1/2" EXT GYPSUM

SHEATHING

NOM 4" SPRAY

FOAM AIR

BARRIER

SEALANT

103'-0"

SILL RO

1/2" PLYWOOD

VISUAL PLANE

OF AIR BARRIER

5/8"1/2"6"1/2"2"3 1/2"3 5/8"

1/2"

1/2" SOLID

SURFACE

MATERAL

1 5/8"

16" GA - 6" CFMF

CHANNEL

5/8" GWB

6" CFMF BOX

BEAM HEADER

1/2" HORIZONTAL

RESILIENT

CHANNEL AT 24"

OC VERTICALLY

ALUMINUM FRAMED

STOREFRONT

PREFIN METAL WALL

PANEL TRIM

FWP1 2" INSULATED

METAL WALL PANEL

3" 16 GA HORIZ

FURRING CHANNEL AT

48" OC VERTICALLY

FLUID APPLIED

MEMBRANE AIR

BARRIER

1/2" EXT GYPSUM

SHEATHING

16 GA PREFIN METAL

FLASHING

107'-4" AT GLAZING

HEAD RO

108'-8" AT ENTRY

INSULATED LAMINATED

GLASS UNIT

SELF-ADHERED

UNDERLAYMENT

FLASHING

3/ 8"

2"

MINIMAL EXPANDING

FOAM INFILL

SEALANT AND

BACKER ROD

2" 3"

1/2" 6" 1/2" 5/8" 7 1/4"

VISUAL PLANE

OF AIR BARRIER

3 7/8" 1 5/8" 6"

1/2" PLYWOOD

9 1/2"

NOM 4" SPRAY FOAM

AIR BARRIER

TYP NOTE

HEAD

JAMB

SILL

HEAD

JAMB

SILL

EX2

D1/AE601

C1/AE601

B1/AE601

1, 2, 3

TYP NOTE

HEAD

JAMB

SILL

HEAD

JAMB

SILL

EX1

A1/AE502

C1/AE601

A1/AE601

1, 2, 4

SIM.

A4/AE602

3' -0

2"

2' -7

2"

1' -3

2"

4' -4

" R .O

2" 1'-6" 2" 3'-0" 2"

5'-0" R.O.

8' -8

5'-4"

2" 1'-8 1/2" 2"

3'-1 1/2" 2"

2" 2'

-1 0"

2" 3'

-1 0" 2

1/ 2"

1' -3

/2

2"

GROUND FLOOR

100' - 0"

SLOPE

6 1/2"

ALUMINUM FRAME

AND GLAZING

PRE-FINISHED METAL

FLASHING W/END DAMS

CONT. BACKER ROD &

SEALANT , BOTH SIDES

EDGE OF

CONCRETE SLAB

1 5/8"

1/2" EXPANSION

MATERIAL

16" GA - 6" CFMF

CHANNEL

5/8" GWB

6" CFMF BOX

BEAM HEADER

1/2" HORIZONTAL

RESILIENT

CHANNEL AT 24"

OC VERTICALLY

ALUMINUM FRAMED

STOREFRONT

PREFIN METAL WALL

PANEL TRIM

FWP1 2" INSULATED

METAL WALL PANEL

3" 16 GA HORIZ

FURRING CHANNEL AT

48" OC VERTICALLY

FLUID APPLIED

MEMBRANE AIR

BARRIER

1/2" EXT GYPSUM

SHEATHING

INSULATED

LAMINATED GLASS

UNIT

SELF-ADHERED

UNDERLAYMENT

FLASHING

2"

MINIMAL EXPANDING

FOAM INFILL

SEALANT AND

BACKER ROD

2" 3"

1/2" 6" 1/2" 5/8" 7 1/4"

VISUAL PLANE

OF AIR BARRIER

3 7/8" 1 5/8" 6"

9 1/2"

NOM 4" SPRAY FOAM

AIR BARRIER

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

Frankfurt-Short-Bruza Associates,P.C.

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

C

B

A

D

C

B

A

54321

20190310

NDM

Jo int

B as e S an

A nto nio

JB

SA

Ke lly

A nn ex , T ex as

Te xa s A ir

Na tio na l G ua rd

9t h

FW

F-1

6 M iss ion Tr ain ing

C en ter (M

TC

3" 9"6"0

3" = 1'-0"

C :\U sers\keisner\D ocum ents\90310_Arch_keisnerU

7YM

G .rvt

9/16/2024 10:29:08 AM

15 AUGUST 2024

ROOM FINISH SCHEDULE &

GLAZING TYPES AND MISC.

DETAILS

AE601

MJT

BKG

GMD

ROOM FINISH SCHEDULE

ROOM

NUMBER ROOM NAME Area FLOOR FINISH

BASE

FINISH

WALL FINISHES CEILING

FINISH NOTESNORTH SOUTH EAST WEST

101 VEST 38 SF WOC1 RB1 - - PT1 PT1 GWB, PT3

102 BREAK ROOM 262 SF VCT1 RB1 PT1 PT1 PT1 PT1 ACP1

103 GUEST

WORKSTATIONS

162 SF VCT1 RB1 PT1 PT1 PT1 PT1 ACP1

104 MX / WS 170 SF VCT1 RB1 PT1 PT1 PT1 PT1 ACP1

105 CORRIDOR 456 SF VCT1 RB1 PT1 PT1 PT1 PT1 ACP1

106 MECH 399 SF CONC1 RB1 PT1 PT1 PT1 PT1 EXP, PT3 1

107 STORAGE 110 SF VCT1 RB1 PT1 PT1 PT1 PT1 EXP, PT3 1

108 MEN 290 SF CONC1 (OLI #5 -

PRC1)

RB1

(OLI #4 -

PRCB1)

PT4 (OLI #4 - PT4 /

PRC1 / PRC2)

PT4 (OLI #4 - PT4 /

PRC1 / PRC2)

PT4 (OLI #4 - PRC1

/ PRC2)

PT4 (OLI #4 - PT4 /

PRC1 / PRC2)

GWB, PT3 2

109 MAN TRAP 134 SF VCT1 RB1 PT1 PT1 PT1 PT1 ACP1 / PT6 5

110 WAITING 120 SF VCT1 RB1 PT1 PT1 PT1 - ACP1

111 JAN 23 SF CONC1 RB1 PT1 PT1 / FRP1 PT1 / FRP1 PT1 EXP, PT3 1, 2, 4

112 WOMEN 140 SF CONC1 (OLI #5 -

PRC1)

RB1

(OLI #4 -

PRCB1)

PT4 (OLI #4 - PT4 /

PRC1 / PRC2)

PT4 (OLI #4 - PT4 /

PRC1 / PRC2)

PT4 (OLI #4 - PT4 /

PRC1 / PRC2)

PT4 (OLI #4 - PT4 /

PRC1 / PRC2)

GWB, PT3 2

113 ELEC 112 SF CONC1 RB1 PT1 PT1 PT1 PT1 EXP, PT3 1

114 CLASSROOM 731 SF CPT2 / RAF1/

CONC1

RB1 PT1 PT1 PT1 PT1 ACP1 / PT6 5, 6

115 AP PM OFFICE 183 SF CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 / PT6 5

116 AP PM 389 SF CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 / PT6 5

117 COMM 96 SF CONC2 RB1 PT1 PT1 PT1 PT1 EXP, PT3 1

118 AREA 1 COMM 180 SF RAF2/ CONC1 RB1 PT1 PT1 PT1 PT1 EXP, PT3 1, 5, 6

119 FIRE RISER 60 SF CONC1 RB1 PT1 PT1 PT1 PT1 EXP, PT3 1

120 STUDENT STUDY 516 SF RAF1/ CONC1 RB1 PT1 PT1 PT1 PT1 ACP1 / PT6 5, 6

121 MOC 713 SF CPT2 / RAF1/

CONC1

RB1 PT1 PT1 PT1 PT1 ACP1 / PT6 5, 6

122 SIM 1 1242 SF CONC2 (OLI #3 -

ERF1)

RB1

(OLI #3 -

ERB1)

PT1 PT1 PT1 PT1 ACP1 / PT6 5

123 SIM 2 1243 SF CONC2 (OLI #3 -

ERF1)

RB1

(OLI #3 -

ERB1)

PT1 PT1 PT1 PT1 ACP1 / PT6 5

124 AREA 1 ELEC. 194 SF RAF2/ CONC1 RB1 PT1 PT1 PT1 PT1 EXP, PT3 1, 5, 6

125 NETWORK SERVER 144 SF RAF2/ CONC1 RB1 PT1 PT1 PT1 PT1 ACP1 / PT6 5, 6

126 BDS 6 271 SF RAF1/ CONC1 RB1 PT1 PT1 PT1 PT1 ACP1 / PT6 5, 6

127 CORR 628 SF RAF1/ CONC1 RB1 PT1 PT1 PT1 PT1 ACP1 / PT6 5, 6

128 BDS 5 273 SF RAF1/ CONC1 RB1 PT1 PT1 PT1 PT1 ACP1 / PT6 5, 6

129 MX AREA / SPARES 351 SF RAF2/ CONC1 RB1 PT1 PT1 PT1 PT1 ACP1 / PT6 5, 6

130 BDS 1 356 SF RAF1/ CONC1 RB1 PT1 PT1 PT1 PT1 ACP1 / PT6 5, 6

131 BDS 2 349 SF RAF1/ CONC1 RB1 PT1 PT1 PT1 PT1 ACP1 / PT6 5, 6

132 BDS 3 346 SF RAF1/ CONC1 RB1 PT1 PT1 PT1 PT1 ACP1 / PT6 5, 6

133 BDS 4 359 SF RAF1/ CONC1 RB1 PT1 PT1 PT1 PT1 ACP1 / PT6 5, 6

134 SIM 3 1240 SF CONC2 (OLI #3 -

ERF1)

RB1

(OLI #3 -

ERB1)

PT1 PT1 PT1 PT1 ACP1 / PT6 5

135 SIM 4 1240 SF CONC2 (OLI #3 -

ERF1)

RB1

(OLI #3 -

ERB1)

PT1 PT1 PT1 PT1 ACP1 / PT6 5

GENERAL NOTES

A. FINISHES LISTED IN ROOM FINISH SCHEDULE ARE

BASE BID UNLESS NOTED OTHERWISE.

B. REFER TO SPECIFICATION SECTION 090600

"SCHEDULES FOR FINISHES" FOR FINISH CODE

LEGEND AND FINISHES, MATERIALS, PATTERNS,

AND COLORS.

C. MANUFACTURER NAME AND DESCRIPTION

INDICATED ARE EXAMPLES INTENDED TO INDICATE

COLOR, PATTERN, DESIGN INTENT, AND QUALITY

OF MATERIALS. THEY ARE NOT INTENDED TO LIMIT

CHOICE OF MANUFACTURER'S FOR EQUAL

PRODUCTS. THE MANUFACTURERS LISTED ARE A

BASIS OF DESIGN. FINAL COLOR AND PATTERN

SELECTIONS ARE BY CONTRACTING OFFICER

FROM MANUFACTURERS FULL CATALOG OF COLOR

AND FINISH OPTIONS AVAILABLE.

a. THE "FINISH" MANUFACTURERS LISTED IN THE

FINISH SCHEDULE LEGEND ARE FOR COLOR

REPRESENTATION AND BASIS OF DESIGN ONLY

AND ARE NOT TO BE CONSIDERED AS SOLE

SOURCE PRODUCTS. THE CONTRACTOR MAY

PRESENT ALTERNATE 'OR EQUAL'

MANUFACTURERS WITH SUPPORTING BACK-UP

DATA ALONG WITH COLOR CHARTS FROM ALL

STANDARD FINISHES AND COLORS CURRENTLY

AVAILABLE FOR FINAL SELECTION BY THE

CONTRACTING OFFICER.

D. LISTED PRODUCTS ARE INCLUDED TO ILLUSTRATE

MINIMUM QUALITY AND PERFORMANCE

REQUIREMENTS ONLY. ANY PRODUCT MAY BE

USED THAT INCLUDES THE SAME SALIENT

QUALITIES AS THOSE INDICATED.

E. REFER TO SHEET AE102 FOR REFLECTED CEILING

PLAN.

F. REFER TO SHEETS AE402 FOR INTERIOR

ELEVATIONS.

G. REFER TO SHEET AE403 FOR FINISH DETAILS AND

FLOORING TRANSITIONS.

H. ALL INTERIOR MTL DOORS SHALL BE PAINTED

(PT5), UNO.

I. ALL INTERIOR WOOD DOORS SHALL RECEIVE

WOOD STAIN (WD1), UNO.

J. ALL INTERIOR MTL DOOR FRAMES SHALL BE

PAINTED (PT5), UNO.

K. ALL EXTERIOR STEEL DOORS AND FRAMES SHALL

BE PAINTED PT6 ON THE EXTERIOR SIDE AND PT5

ON THE INTERIOR SIDE. THE TRANSITION LINE

BETWEEN THE TWO PAINTS SHALL OCCUR AT AN

INSIDE CORNER AT THE MIDPOINT OF THE DOOR

FRAME.

L. ALL GROUT AT TILED SURFACES IS TO BE (GR1),

U.N.O.

M. ALL BASE & WALL CABINETRY IS TO BE PLASTIC

LAMINATE (PLAM1), U.N.O.

N. ALL COUNTERTOPS & WINDOW SILLS ARE TO BE

SOLID SURFACE (SSM1), U.N.O.

O. ALL EXPOSED VERTICAL STEEL FRAMING

(INCLUDING COLUMNS, BRACE FRAMING, ETC.)

SHALL RECEIVE SEMIGLOSS PAINT TO MATCH

ADJACENT WALL, UNO.

P. WHERE EXPOSED STRUCTURE CEILINGS ARE

SCHEDULED TO RECEIVE PAINT, THE EXPOSED

CEILING AND ALL STRUCTURAL ELEMENTS SHALL

BE PAINTED WITH SCHEDULED PAINT COLOR.

Q. PAINTED GYP BD WALLS IN WET AREAS

(INCLUDING RESTROOMS, JANITOR CLOSETS, ETC.)

SHALL RECEIVE EPOXY PAINT IN COLOR TO MATCH

SCHEDULED PAINT.

R. ALL EXTERIOR WINDOWS SHALL RECEIVE ROLLER

SHADES (RS1).

S. REFER TO SHEET AE503 FOR ACCESS FLOORING

DETAILS.

T. FLOOR FINISHES SHOWN ON ACCESS FLOORING

ARE FACTORY INSTALLED ON ACCESS FLOOR

PANELS.

U. ALL SCHEDULED FLOOR, WALL, AND BASE

FINISHES ARE BASE BID, UNO. REFER TO INTERIOR

ELEVATION SHEET AE402 AND FINISH PLANS SHEET

IN102 FOR EXTENT OF BID ALTERNATE FINISHES.

FINISH SCHEDULE NOTES

1. ALL EXPOSED STRUCTURE CEILINGS SHALL BE

PAINTED, PT3 - UNO.

2. ALL EXPOSED GWB IN ROOMS INDICATED SHALL BE

PAINTED WITH EPOXY PAINT COLOR TO MATCH

SCHEDULED PAINT.

3. NOT USED.

4. INSTALL FIBER REINFORCED PANEL (FRP1) ON

WALLS INDICATED, REFER TO ELEVATIONS FOR

EXTENTS.

5. FOR VISUAL INTRUSION DETECTION INSPECTION

PURPOSES IN ALL AREA 1 PERIMETER WALL AREAS

INDICATED ON FLOOR PLAN SHEET AE101: 1) ROOMS

WITH NO CEILINGS - FINISH ALL PARTITIONS AS

SCHEDULED FROM TRUE FLOOR TO TRUE CEILING

(ROOF DECK). 2) ROOMS WITH CEILINGS - FINISH ALL

PARTITIONS AS SCHEDULED FROM TRUE FLOOR TO

THE CEILING GRID & TILES AND PAINT THE

REMAINDER OF THE PARTITIONS (PT6) FLAT BLACK

ABOVE THE CEILING GRID & TILES UP TO THE TRUE

CEILING (ROOF DECK) INCLUDING A 6" FULL SPRAY

OVERLAP ONTO THE STEEL ROOF DECK

STRUCTURE. (NO PAINT IS REQUIRED ON THE

REMAINDER OF THE STEEL STRUCTURE AND STEEL

ROOF DECK) REFER TO DETAIL C1/AE403

6. PROVIDE TREATED CONCRETE UNDER RAF TO KEEP

DUST DOWN.

FINISH LEGEND

ACP ACOUSTICAL CEILING PANEL

CONC CONCRETE

CPT CARPET TILE

ERF EPOXY RESINOUS FLOORING

ERB EPOXY RESINOUS INTEGRAL BASE

EXP EXPOSED TO STRUCTURE

GR GROUT

GWB GYPSUM BOARD

PLAM PLASTIC LAMINATE

PT PAINT

PRC PORCELAIN TILE

PRCB PORCELAIN TILE BASE

RAF RAISED ACCESS FLOORING

RB RUBBER BASE

SSM SOLID SURFACE MATERIAL

VCT VINYL COMPOSITE TILE

WOC WALK-OFF CARPET

GLAZING GENERAL NOTES

A. ALL FRAME DIMENSIONS ARE NOMINAL ROUGH

OPENING AND CONTRACTOR SHALL COORDINATE

ACTUAL OPENING SIZES WITH RESPECT TO

REQUIRED SHIM SPACE AND ADJACENT MATERIALS.

B. ALL EXTERIOR ALUMINUM FRAMES SHALL RECEIVE

1/8" CLEAR ANODIZED BRAKE METAL SILL FLASHING

PANS BENEATH ANCHORS AND SHIMS WITH A 1/4"

VERTICAL BRAKE NEAR THE INSIDE FACE OF FRAME

EXTENDING OUT TO DRAIN AND DOWN 1/4" OVER

BRICK ROWLOCK SILL COURSE SET IN BUTYL

SEALANT INCLUDING CLEANED SEALING BEADS AT

EACH JAMB.

C. PROVIDE MINIMAL EXPANDING FOAM TO FILL THE

ENTIRE PERIMETER SHIM CAVITY AROUND EACH

EXTERIOR ALUMINUM STOREFRONT FRAME TO

PROVIDE ENHANCED THERMAL PERFORMANCE AND

TO BLOCK AIR AND MOISTURE INFILTRATION.

D. NO EXPOSED FASTENERS SHALL BE ALLOWED IN

THE ALUMINUM STOREFRONT FRAMES.

SCALE: 3" = 1'-0"

SILL DETAILB1

SCALE: 3" = 1'-0"

HEAD DETAILD1

GLAZING TYPE NOTES

1. 2 1/2" X 6 1/2" BLAST RESISTANT ALUM FRAMING

WITH STEEL INSERTS AS SPECIFIED AND REQUIRED

BY FINAL, SUBMITTED AND APPROVED BLAST

DESIGN.

2. INSULATED BLAST RESISTANT LAMINATED VISION

GLAZING AS SPECIFIED AND REQUIRED BY FINAL,

SUBMITTED AND APPROVED BLAST DESIGN.

3. INTERIOR SILL TO RECEIVE SOLID SURFACE (SSM1).

4. TEMPERED SAFETY GLAZING AT ENTIRE INTERIOR

ALUM STOREFRONT FRAME "EX1" IN VESTIBULE 101.

LEGEND GRAPHIC VISUAL PLANE OF CONT AIR

BARRIER WHERE SHOWN ALL SHEETS

SCALE: 3/8" = 1'-0"

GLAZING ELEVATIONS

2' 6'4'0

3/8" = 1'-0"

SCALE: 3" = 1'-0"

SILL DETAILA1

SCALE: 3" = 1'-0"

JAMB DETAILC1

NOTE: REFERENCE SPECIFICATION SECTIONS

07 05 23 AND 07 27 10.00 10 FOR DESCRIPTION

OF AIR BARRIER SYSTEM

1 Addendum 02 09/16/2024

A3

File details come from the government source that posted it. Updated .