AE303-WALL SECTIONS.pdf

PDF 210 KB Posted

Attached to
Construct Mission Training Center (MTC) Facility Federal contract opportunity
Solicitation number
W50S78-24-B-0001
Issued by
Department of the Army National Guard

About this file

This document is a government file containing wall section details for a mission training center (MTC) facility. The related federal contract opportunity is for the construction of the 15,200 square foot MTC facility for the Texas Air National Guard at Joint Base San Antonio Lackland Air Force Base. The solicitation is a firm fixed-price contract with a 540-calendar day period of performance after notice to proceed. The project includes a base bid and eight options such as permeable pavement, landscaping, specialty flooring, and signage. Several brand name items are specified for compatibility with existing systems. This is a 100% small business set-aside with a NAICS code of 236220 and a construction magnitude between $10-25 million. A site visit and pre-bid conference are scheduled, and all questions and requests for information must be submitted by a specified deadline prior to bid opening.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Mission Training Center (MTC) Facility, newest first.
File Type Posted
MTC - ABSTRACT Posted 24 Sep 24.pdf PDF
C-301-REMOVAL PLAN.pdf PDF
S-002-TYPICAL DETAILS.pdf PDF
SF101-LOW ROOF FRAMING PLAN.pdf PDF
S-001-GENERAL NOTES.pdf PDF
New Utilities to East.pdf PDF
M-501 DETAILS.pdf PDF
AE501-SECTION DETAILS.pdf PDF
AE305-WALL SECTIONS.pdf PDF
C-401-PROPOSED PLAN.pdf PDF
C-602-DRAINAGE SCHEDULE AND DETAILS.pdf PDF
ES101-ELECTRICAL SITE PLAN.pdf PDF
AE401-ENLARGED PLANS AND DETAILS.pdf PDF
AE503-SECTION DETAILS.pdf PDF
01 45 00 - Quality Control.pdf PDF
Amendment 0004 - 17 Aug 2024.pdf PDF
MTC RFI log 20240917.pdf PDF
C-201-STORMWATER POLLUTION PREVENTION PLAN.pdf PDF
C-601-UTILITY PLAN.pdf PDF
SF102-HIGH ROOF FRAMING PLAN.pdf PDF
G-003-CODE AND LIFE SAFETY PLAN.pdf PDF
M-702 SCHEDULES.pdf PDF
M-701 SCHEDULES.pdf PDF
AE601-ROOM FINISH SCHEDULE AND GLAZING TYPES AND MISC DETAILS.pdf PDF
23 05 48.19 - SEISMIC BRACING FOR HVAC.pdf PDF
23 05 48.00 40 - VIBRATION CONTROLS FOR HAC PIPING AND EQUIPMENT.pdf PDF
11 94 10 - Rooftop Fall Protection Anchors.pdf PDF
W50S78-24-B-0001 - Mission Training Center Amendment 0003.pdf PDF
Attachment 14 - Geotechnical report-TX ANG Mission Training Center B-3.pdf PDF
MTC RFI log.pdf PDF
W50S7824B0001 - MTC - Amendment 02 - 20240829.pdf PDF
Pre-Proposal Site Visit Slides - MTC 27 Aug 24.pptx PPTX presentation
MFR Mission Training Center - 2nd Site Visit Pre-Propsal Conference Minutes.pdf PDF
Pre_Bid_Site Visit_MTC_Attendance_Sheet 27_Aug _2024.pdf PDF
MTC RFI log.pdf PDF
2024.08.21_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_VOL 1 SPECIFICATIONS.pdf PDF
ATTACHMENT 9 SPECS V1 ADDENDUM.pdf PDF
Pre-Proposal Site Visit Slides - MTC 20 Aug 24 (002).pptx PPTX presentation
Pre_Bid_Site Visit_MTC_Attendance_Sheet 20_Aug _2024.pdf PDF
Attachment 6_Industrial Security.pdf PDF
Attachment 5_STRUCTURAL INTERIOR DESIGN.pdf PDF
Attachment 7_ACCESS AND STAGING SITE PLAN.pdf PDF
JA Nm Brand DDC Redacted.pdf PDF
JA Nm Brand Falcon Redacted.pdf PDF
2024.08.15_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_VOL 1 SPECIFICATIONS.pdf PDF
JA Nm Brand Vindicator Sys Redacted.pdf PDF
W50S78-24-B-0001 - Mission Training Center Solicitation.pdf PDF
2024.08.15_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_DRAWINGS.pdf PDF
JA Nm Brand Monaco Redacted.pdf PDF
JA Nm Brand Trane HVAC Redacted.pdf PDF
Show all 50

Construct Mission Training Center (MTC) Facility has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GROUND FLOOR

100' - 0"

(FWP1) 2" INSULATED

METAL WALL PANEL

(SSSR1) STEEL

STANDING SEAM

ROOFING

STEEL STRUCTURE

(SSSR1) STEEL

STANDING SEAM

ROOFING

STEEL STRUCTURE

BOLTED STRINGER

UNDERSTRUCTURE

ACCESS FLOORING

SCHEDULED CEILING

CONCRETE SLAB

CONCRETE SLAB

METAL LADDER

NOM 4" SPRAY FOAM

AIR BARRIER - OPEN

CELL (R-17MIN.) WITH

ASTM E84 COMPLIANT

FIRE RETARDANT

SURFACE FILM

4 LAYERS 2" RIGID

INSULATION

1/2" COVER BOARD

STEEL DECK

FLUID APPLIED

MEMBRANE AIR

BARRIER

VISUAL LINE OF

AIR BARRIER

1/2" EXT GYPSUM

SHEATHING

4 LAYERS 2" RIGID

INSULATION

STEEL DECK

1' -6

1'-8"

A1

AE501

1/2" COVER

BOARD

16 GA 3" HORIZ Z-

CHANNEL AT 48"

VERTICALLY

RF

SHIELDING

MEMBRANE

CORR

2 LAYERS OF 5/8”

GYSUM WALL BOARD

(GWB) WITH

PERFORATED RF

SHIELDING/ FOIL

MEMBRANE ADHERED

BETWEEN LAYERS

GROUND FLOOR

100' - 0"

LOW EAVE (LOW) DB

115' - 0"

(SSSR1) STEEL

STANDING

SEAM ROOFING

BRICK ROWLOCK

COURSE

(MV1) MODULAR

BRICK VENEER

CONCRETE

FOUNDATION

ACCESS FLOORING

6" CFMF AT 16" OC

2" CAVITY WALL

INSULATION BOARD

FLUID APPLIED

MEMBRANE AIR

BARRIER

STEEL STRUCTURE

SCHEDULED CEILING

SCHEDULED DOOR

AND FRAME

STEEL

STRUCTURE

1/2" EXT GYPSUM

SHEATHING

C4

AE603

C4

AE501

OH

4" 2'

8"

4" 1'

4"

7'

4" 1'

4"

(FWP1) 2" INSULATED

METAL WALL PANEL

SIM

CONCRETE SLAB

NOM 4" SPRAY

FOAM AIR

BARRIER - OPEN

CELL (R-17MIN.)

WITH ASTM E84

COMPLIANT FIRE

RETARDANT

SURFACE FILM

4 LAYERS 2" RIGID

INSULATION

1/2" COVER

BOARD

STEEL DECK

1'

6"

BOLTED STRINGER

UNDERSTRUCTURE

VISUAL LINE OF AIR

BARRIER

1'-7 7/8"

'-0

16 GA 3" HORIZ Z-

CHANNEL AT 48"

VERTICALLY

CORR

2 LAYERS OF 5/8” GYSUM

WALL BOARD (GWB) WITH

PERFORATED RF SHIELDING/

FOIL MEMBRANE ADHERED

BETWEEN LAYERS

D1

AE303

OH

GROUND FLOOR

100' - 0"

(SSSR1) STEEL

STANDING

SEAM ROOFING

BRICK ROWLOCK

COURSE

(MV1) MODULAR

BRICK VENEER

CONCRETE

FOUNDATION

6" CFMF AT 16" OC

2" CAVITY WALL

INSULATION BOARD

FLUID APPLIED

MEMBRANE AIR

BARRIER

1/2" EXT GYPSUM

SHEATHING

NOM 4" SPRAY

FOAM AIR

BARRIER - OPEN

CELL (R-17MIN.)

WITH ASTM E84

COMPLIANT FIRE

RETARDANT

SURFACE FILM

(FWP1) 2" INSULATED

METAL WALL PANEL

CONCRETE SLAB

4 LAYERS 2" RIGID

INSULATION

1/2" COVER BOARD

STEEL DECK

SCHEDULED CEILING

3' -0

1'

-4

VISUAL LINE OF

AIR BARRIER

C1

AE502

1'-7 7/8"

C4

AE501

A3

AE501

16 GA 3" HORIZ Z-

CHANNEL AT 48"

VERTICALLY

GUEST

WORKSTATIONS

2 LAYERS OF 5/8” GYSUM

WALL BOARD (GWB) WITH

PERFORATED RF

SHIELDING/ FOIL MEMBRANE

ADHERED BETWEEN

LAYERS

D1

AE303

OH

SIM

GROUND FLOOR

100' - 0"

(SSSR1) STEEL

STANDING

SEAM ROOFING

BRICK ROWLOCK

COURSE

(MV1) MODULAR

BRICK VENEER

CONCRETE

FOUNDATION

6" CFMF AT 16" OC

2" CAVITY WALL

INSULATION BOARD

FLUID APPLIED

MEMBRANE AIR

BARRIER

1/2" EXT GYPSUM

SHEATHING

NOM 4" SPRAY

FOAM AIR

BARRIER - OPEN

CELL (R-17MIN.)

WITH ASTM E84

COMPLIANT FIRE

RETARDANT

SURFACE FILM

(FWP1) 2" INSULATED

METAL WALL PANEL

CONCRETE SLAB

4 LAYERS 2" RIGID

INSULATION

1/2" COVER BOARD

STEEL DECK

SCHEDULED CEILING

3' -0

3'

-0

3' -0

4"

2' -8

1'

-4

VISUAL LINE OF

AIR BARRIER

LIGHT FIXTURE

1'-7 7/8"

C4

AE501

SIM

'-0

A3

AE501

16 GA 3" HORIZ Z-

CHANNEL AT 48"

VERTICALLY

CORRIDOR

2 LAYERS OF 5/8” GYSUM

WALL BOARD (GWB) WITH

PERFORATED RF

SHIELDING/ FOIL MEMBRANE

ADHERED BETWEEN

LAYERS

OH

FLUID APPLIED MEMBRANE

AIR BARRIER

16 GA - 3" Z HORIZ FURRING

CHANNEL AT 48" OC VERTICALLY

WITH 3" LEG TURN DOWN AND

2" LEG TURN UP

(FWP1) 2" INSULATED

METAL WALL PANEL

PERFORATED RF SHIELDING/

FOIL MEMBRANE

REFER AE520 FOR TYPICAL RF

SHIELDING/FOIL NOTES AND

DETAILS

3" 1/2" 6"

NOM 4" SPRAY FOAM AIR

BARRIER - OPEN CELL

(R-17 MIN.) WITH ASTM E84

COMPLIANT FIRE RETARDANT

SURFACE FILM

6" CFMF AT 16" OC

1/2" EXT GYPSUM SHEATHING

5/8” GYSUM WALL BOARD

(GWB) 2 LAYERS

2" MAX CONDUIT ROUTING BEHIND

FWP1 ON EXTERIOR OF SECURE

AREA 1 PERIMETER TO MINIMIZE

PENETRATIONS ON SECURE WALL.

REFER TO ELECTRICAL AND TELECOM

FOR CONDUIT SIZES AND QUANTITY

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

Frankfurt-Short-Bruza Associates,P.C.

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

C

B

A

D

C

B

A

54321

20190310

NDM

Jo int

B as e S an

A nto nio

JB

SA

Ke lly

A nn ex , T ex as

Te xa s A ir

Na tio na l G ua rd

9t h

FW

F-1

6 M iss ion Tr ain ing

C en ter (M

TC

0 1' 2' 4'

1/2" = 1'-0"

C :\U sers\keisner\D ocum ents\90310_Arch_keisnerU

7YM

G .rvt

9/16/2024 10:17:27 AM

15 AUGUST 2024

WALL SECTIONS

AE303

MJT

BKG

GMD

SCALE: 1/2" = 1'-0"

WALL SECTIONA3

LEGEND GRAPHIC VISUAL PLANE OF CONT AIR

BARRIER WHERE SHOWN ALL SHEETS

SCALE: 1/2" = 1'-0"

WALL SECTIONA4SCALE: 1/2" = 1'-0"

WALL SECTIONA1 SCALE: 1/2" = 1'-0"

WALL SECTIONA2

NOTE: REFERENCE SPECIFICATION SECTIONS

07 05 23 AND 07 27 10.00 10 FOR DESCRIPTION

OF AIR BARRIER SYSTEM

AREA 1 - GENERAL NOTES

1. APPLY MINIMUM 2” WIDE FOIL TAPE CENTERED

OVER ALL EXPOSED BED AND HEAD JOINTS NO

DRYWALL COMPOUND (LAP 1/2” DOWN HORIZONTALLY

ONTO FLOOR SLAB AND GENEROUSLY LAP AT THE

HEAD OF THE WALL PER DETAIL CONDITION)

2. APPLY MINIMUM 2” WIDE FOIL TAPE CENTERED

OVER ALL VERTICAL FASTENERS HEADS.

3. APPLY MINIMUM 12” WIDE FOIL TAPE CENTERED ON

EACH CORNER INTERSECTION. (6” LAP EACH WAY)

REFER TO SHEET AE002 FOR "AREA 1" PERIMETER

WALL. REFER TO SHEET AE520 FOR TYPICAL RF

SHIELDING/FOIL MEMBRANE NOTES AND DETAILS.

SCALE: 3" = 1'-0"

TYP 3" Z FURRING CHANNEL DETAILD1

3" 9"6"0

3" = 1'-0"

1 Addendum 02 09/16/2024