AE502-SECTION DETAILS.pdf
PDF 203 KB Posted
- Attached to
- Construct Mission Training Center (MTC) Facility Federal contract opportunity
- Solicitation number
- W50S78-24-B-0001
- Issued by
- Department of the Army National Guard
About this file
This document appears to be a set of section details related to the construction of a 15,200 square foot Mission Training Center (MTC) facility for the Texas Air National Guard at Joint Base San Antonio Lackland Air Force Base.
The key details are that the solicitation is for a firm fixed-price contract to provide construction services including demolition, site work, concrete, masonry, roofing, structural steel, HVAC, plumbing, electrical, and other work. The project includes a base bid and 8 optional items such as permeable pavement, landscaping, and specialty flooring and finishes. There are also several brand name items specified for compatibility with existing systems. The project is set aside 100% for small businesses under NAICS code 236220, with an estimated value between $10-25 million. A site visit and pre-bid conference will be held, with all questions and RFIs due at least 5 days prior to bid opening. The contract duration is 540 calendar days after notice to proceed.
View the file
Other files for this federal contract opportunity
Show all 50
Construct Mission Training Center (MTC) Facility has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STEEL DECK
PREFINISHED RAKE
TRIM
(FWP1) 2" INSULATED
METAL WALL PANEL
SELF-ADHERING
UNDERLAYMENT
(SSSR1) STEEL
STANDING SEAM
ROOFING
1/2" COVER BOARD
1/2" EXTERIOR
SHEATHING
STRUCTURAL STEEL
1/4" BENT PLATE STEEL
16 GA - 6" CFMF
AT 16" OC
FLUID APPLIED
MEMBRANE AIR
BARRIER
VISUAL PLANE OF
AIR BARRIER
3" 16 GA HORIZ FURRING
CHANNEL AT 48" OC
VERTICALLY
PERFORATED RF
SHIELDING/ FOIL
MEMBRANE
REFER AE520 FOR
TYPICAL RF
SHIELDING/FOIL
NOTES AND DETAILS
NOM 4" SPRAY FOAM
AIR BARRIER - OPEN
CELL (R-17 MIN.) WITH
ASTM E84 COMPLIANT
FIRE RETARDANT
SURFACE FILM
5/8” GYSUM WALL
BOARD (GWB) 2
LAYERS
F
16 GA - 6" CFMF
AT 16" OC
1/2" EXT GYPSUM
SHEATHING
FLUID APPLIED
MEMBRANE AIR
BARRIER
5 1/2" 6" 8 3/8"
1'-7 7/8"
1/2" EXT GYPSUM
SHEATHING
FLUID APPLIED
MEMBRANE AIR
BARRIER
7/8" 16 GA HORIZ
FURRING CHANNEL AT
48" OC VERTICALLY
5/8" GYPSUM WALL
BOARD (GWB) 2 LAYERS
1/2" EXT GYPSUM
SHEATHING
NOM 4" SPRAY FOAM
AIR BARRIER - OPEN
CELL (R-17 MIN.) WITH
ASTM E84 COMPLIANT
FIRE RETARDANT
SURFACE FILM
16 GA - 6" CFMF AT
16" OC
SOFFIT LIGHT
FIXTURE
8' - 8"
METAL BUILDING
WALL PANEL TRIM
3" - 16 GA HORIZ
FURRING CHANNEL AT
48" OC VERTICALLY
3 5/8" CFMF AT 16" OC
METAL WALL PANEL
SOFFIT
(FWP2) 2" INSULATED
METAL WALL PANEL
VISUAL PLANE OF
AIR BARRIER
1/2" HORIZONTAL
RESILIENT CHANNELS
AT 24" OC VERTICALLY
FLUID APPLIED
MEMBRANE AIR
BARRIER
F
FOUR - 2" LAYERS
ROOF INSULATION
1/2" PROT BOARD
STEEL DECK
SELF-ADHERED
UNDERLAYMENT
16 GA - 6" CFMF JOIST
FRAMING AT 16" OC
(FWP2) 2" INSULATED
METAL WALL PANEL
16 GA CLIPS AT EACH
JOIST
5-1/4"H X 9"V CONT 12
GA CLIP
STEEL STRUCTURE
3"H X 5"V CONT 12 GA
CLIP
16 GA - 6" CFMF
AT 16" OC
1/2" EXT GYPSUM
SHEATHING
FLUID APPLIED
MEMBRANE AIR
BARRIER
SELF-ADHERED
UNDERLAYMENT
(SSSR1) PREFIN HIGH
EAVE CLOSURE AND
ZEE FLASHING
LIGHTNING PROTECTION
AIR TERMINAL (SSSR1) STEEL
STANDING SEAM
ROOFING
16 GA - 7/8" HORIZ
FURRING CHANNELS AT
48" OC VERTICALLY
(FWP2) 2" INSULATED
METAL WALL PANEL
16 GA CLIPS AT EACH
JOIST
5-1/4"H X 9"V CONT 12
GA CLIP
3"H X 5"V CONT 12 GA
CLIP
FLUID APPLIED
MEMBRANE AIR BARRIER
(SSSR1) PREFIN LOW
EAVE CLOSURE
FLASHING
LIGHTNING PROTECTION
AIR TERMINAL
16 GA - 6" CFMF AT 16" OC
1/2" EXT GYPSUM
SHEATHING
STEEL STRUCTURE
STEEL DECK
6" X 6" PRE-FINISHED
DOWNSPOUT
8" X 8" PRE-FINISHED
DOWNSPOUT
25' - 0"
3" 16 GA HORIZ FURRING
CHANNEL AT 48" OC
VERTICALLY
F
8' - 8"
3 1/2"
6" 10" 6" 8 3/8"
16 GA - 6" CFMF AT
16" OC
1/2" EXT GYPSUM
SHEATHING
FLUID APPLIED
MEMBRANE AIR
BARRIER
METAL BUILDING
WALL PANEL TRIM
3" - 16 GA HORIZ
FURRING CHANNEL AT
48" OC VERTICALLY
METAL WALL PANEL
SOFFIT
(FWP2) 2" INSULATED
METAL WALL PANEL
5/8" GYPSUM WALL
BOARD
1/2" GYPSUM WALL
BOARD
NOM 4" SPRAY FOAM
AIR BARRIER - OPEN
CELL (R-17 MIN.) WITH
ASTM E84 COMPLIANT
FIRE RETARDANT
SURFACE FILM
16 GA - 6" CFMF AT
16" OC
VISUAL PLANE OF
AIR BARRIER
SCHEDULED CEILING
STOREFRONT
SYSTEM
SEALANT
6" CFMF BOX
HEADER
SEALANT OVER
BACKER ROD
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
Frankfurt-Short-Bruza Associates,P.C.
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20190310
NDM
Jo int
B as e S an
A nto nio
JB
SA
Ke lly
A nn ex , T ex as
Te xa s A ir
Na tio na l G ua rd
9t h
FW
F-1
6 M iss ion Tr ain ing
C en ter (M
TC
C :\U sers\keisner\D ocum ents\90310_Arch_keisnerU
7YM
G .rvt
9/16/2024 10:25:13 AM
15 AUGUST 2024
SECTION DETAILS
AE502
MJT
BKG
GMD
SCALE: 3" = 1'-0"
SECTION DETAILC1
SCALE: 3" = 1'-0"
SECTION DETAILA3
SCALE: 3" = 1'-0"
SECTION DETAILC3
LEGEND GRAPHIC VISUAL PLANE OF CONT AIR
BARRIER WHERE SHOWN ALL SHEETS
SCALE: 3" = 1'-0"
SECTION DETAILA1
3" 9"6"0
3" = 1'-0"
NOTE: REFERENCE SPECIFICATION SECTIONS
07 05 23 AND 07 27 10.00 10 FOR DESCRIPTION
OF AIR BARRIER SYSTEM
1 Addendum 02 09/16/2024