M-502 DETAILS.pdf

PDF 222 KB Posted

Attached to
Construct Mission Training Center (MTC) Facility Federal contract opportunity
Solicitation number
W50S78-24-B-0001
Issued by
Department of the Army National Guard

About this file

This document appears to be a detailed drawing set for a federal construction contract opportunity. The drawings provide specifications for the installation of mechanical equipment, piping, and other building systems for a Mission Training Center (MTC) facility for the Texas Air National Guard at Joint Base San Antonio Lackland Air Force Base.

The associated federal contract opportunity is for the construction of this 15,200 square foot MTC facility. The solicitation is a 100% small business set-aside with a NAICS code of 236220 and an estimated value between $10-$25 million. The contract duration is 540 calendar days. The solicitation includes a base bid and eight options such as permeable pavement, landscaping, floor coatings, and specialized equipment. Several brand name items are specified for compatibility with existing systems. Interested offerors must be registered in SAM.gov, and all questions/RFIs must be submitted by email 5 days prior to bid opening.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Mission Training Center (MTC) Facility, newest first.
File Type Posted
MTC - ABSTRACT Posted 24 Sep 24.pdf PDF
C-301-REMOVAL PLAN.pdf PDF
S-002-TYPICAL DETAILS.pdf PDF
SF101-LOW ROOF FRAMING PLAN.pdf PDF
S-001-GENERAL NOTES.pdf PDF
New Utilities to East.pdf PDF
M-501 DETAILS.pdf PDF
AE501-SECTION DETAILS.pdf PDF
AE305-WALL SECTIONS.pdf PDF
C-401-PROPOSED PLAN.pdf PDF
C-602-DRAINAGE SCHEDULE AND DETAILS.pdf PDF
ES101-ELECTRICAL SITE PLAN.pdf PDF
AE401-ENLARGED PLANS AND DETAILS.pdf PDF
AE503-SECTION DETAILS.pdf PDF
01 45 00 - Quality Control.pdf PDF
Amendment 0004 - 17 Aug 2024.pdf PDF
MTC RFI log 20240917.pdf PDF
C-201-STORMWATER POLLUTION PREVENTION PLAN.pdf PDF
C-601-UTILITY PLAN.pdf PDF
SF102-HIGH ROOF FRAMING PLAN.pdf PDF
G-003-CODE AND LIFE SAFETY PLAN.pdf PDF
M-702 SCHEDULES.pdf PDF
M-701 SCHEDULES.pdf PDF
AE601-ROOM FINISH SCHEDULE AND GLAZING TYPES AND MISC DETAILS.pdf PDF
AE303-WALL SECTIONS.pdf PDF
23 05 48.19 - SEISMIC BRACING FOR HVAC.pdf PDF
23 05 48.00 40 - VIBRATION CONTROLS FOR HAC PIPING AND EQUIPMENT.pdf PDF
W50S78-24-B-0001 - Mission Training Center Amendment 0003.pdf PDF
Attachment 14 - Geotechnical report-TX ANG Mission Training Center B-3.pdf PDF
MTC RFI log.pdf PDF
W50S7824B0001 - MTC - Amendment 02 - 20240829.pdf PDF
Pre-Proposal Site Visit Slides - MTC 27 Aug 24.pptx PPTX presentation
MFR Mission Training Center - 2nd Site Visit Pre-Propsal Conference Minutes.pdf PDF
Pre_Bid_Site Visit_MTC_Attendance_Sheet 27_Aug _2024.pdf PDF
MTC RFI log.pdf PDF
2024.08.21_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_VOL 1 SPECIFICATIONS.pdf PDF
ATTACHMENT 9 SPECS V1 ADDENDUM.pdf PDF
Pre-Proposal Site Visit Slides - MTC 20 Aug 24 (002).pptx PPTX presentation
Pre_Bid_Site Visit_MTC_Attendance_Sheet 20_Aug _2024.pdf PDF
Attachment 6_Industrial Security.pdf PDF
Attachment 5_STRUCTURAL INTERIOR DESIGN.pdf PDF
Attachment 7_ACCESS AND STAGING SITE PLAN.pdf PDF
JA Nm Brand DDC Redacted.pdf PDF
JA Nm Brand Falcon Redacted.pdf PDF
2024.08.15_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_VOL 1 SPECIFICATIONS.pdf PDF
JA Nm Brand Vindicator Sys Redacted.pdf PDF
W50S78-24-B-0001 - Mission Training Center Solicitation.pdf PDF
2024.08.15_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_DRAWINGS.pdf PDF
JA Nm Brand Monaco Redacted.pdf PDF
JA Nm Brand Trane HVAC Redacted.pdf PDF
Show all 50

Construct Mission Training Center (MTC) Facility has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VERTICAL IN-LINE

CENTRIFIGUAL PUMP

LONG RADIUS

ELBOW

P

PRESSURE

GAUGE

REMOVABLE

STRAINER

SUCTION

DIFFUSER

BALL VALVE

TEST PLUG

PUMP HEADER

PIPE HANGER PER SPECIFICATIONS

TYPE 'F' SPRING ISOLATOR

(TYPICAL AS SHOWN)

INSTALL WITHIN 12" OF

STRUCTURAL ATTACHMENT

MIN. FIRST THREE HANGERS

DOWNSTREAM AND UPSTREAM

OF ALL PUMPS SHALL HAVE

TYPE 'F' SPRING ISOLATORS (TYP)

FLEXIBLE METAL

HOSE (TYP)

CHECK VALVE

EXPANSION

TANK

3/4" DRAIN LINE, ROUTE

TO FLOOR DRAIN

PROVIDE ACCESS OPENING

IN MOUNTING RING6" TALL CONCRETE

HOUSEKEEPING PAD

FINISH FLOOR

PIPE SIZE AS INDICATED

INSPECTION OPENING

PLUG

CHARGING VALVE CLOSURE

TO SYSTEM

UNION

BYPASS CHEMICAL

FEEDER

3/4" DRAIN VALVE W/ HOSE

CONNECTION AND CAP

6" CONCRETE

HOUSEKEEPING PAD

FINISH FLOOR

FULL-PORT

BALL VALVE

RETURN

SUPPLY

VENT CONNECTION WITH

BALL VALVE AND HOSE

ADAPTER WITH CAP

3/4"

CHECK

VALVE

MAV

MAV

HEATING

WATER COIL

RETURN

SUPPLY

UNION

FLEXIBLE METAL HOSE

BALL VALVE

Y-PATTERN

STRAINER

TEST PLUG PRESSURE-INDEPENDENT

CONTROL VALVE

VALVED AND CAPPED CONNECTION

TO PERMIT BYPASSING COIL WHILE

FLUSHING SYSTEM (LINE SIZE, MAX 2")

DRAIN PLUG

MAV

HEATING

WATER COIL

RETURN

SUPPLY

UNION

FLEXIBLE METAL HOSE

BALL VALVE

Y-PATTERN

STRAINER

TEST PLUG

VALVED AND CAPPED CONNECTION

TO PERMIT BYPASSING COIL WHILE

FLUSHING SYSTEM (LINE SIZE, MAX 2")

DRAIN PLUG

PRESSURE-INDEPENDENT

CONTROL VALVE

A

B

A: TOTAL NEGATIVE STATIC PRESSURE + 1"

B: 1/2 OF ACONDENSATE

FROM DRAIN PAN

SEAL PENETRATION

AIR TIGHT

EQUIPMENT

CASING

DRAIN LINE SHALL BE SAME SIZE

AS DRAIN CONNECTION ON UNIT

UNION

TEE WITH HAND-TIGHT PLUG

(TYPICAL OF 2)

MAV

CHILLED WATER

OR

HEATING WATER

COIL

RETURN

SUPPLY

UNION

FLEXIBLE METAL HOSE

BALL VALVE

Y-PATTERN

STRAINER

TEST PLUG

VALVED AND CAPPED CONNECTION

TO PERMIT BYPASSING COIL WHILE

FLUSHING SYSTEM (LINE SIZE, MAX 2")

DRAIN PLUG

PRESSURE-INDEPENDENT

CONTROL VALVE

CRAC

RETURN

SUPPLY

Y-PATTERN

STRAINER

ISOLATION VALVE

THREADED TEE WITH REMOVABLE CAP

TO PERMIT BYPASSING COIL WHILE

FLUSHING SYSTEM (LINE SIZE, MAX 2")

3/4" DRAIN VALVE WITH

HOSE COUPLING

MAV

UNION

TEST PLUG

CHILLED WATER

OR

HEATING WATER

COIL

RETURN

SUPPLY

UNION

PRESSURE-INDEPENDENT

CONTROL VALVE

Y-PATTERN

STRAINER

ISOLATION VALVE

THREADED TEE WITH REMOVABLE CAP

TO PERMIT BYPASSING COIL WHILE

FLUSHING SYSTEM (LINE SIZE, MAX 2")

MAV

DRAIN PLUG

TEST PLUG

3/4" DRAIN VALVE WITH

HOSE COUPLING

P P

MAV

PHX

HWR

HWS

UNION

BALL VALVE

Y-PATTERN

STRAINER

TEST PLUG

VALVED AND CAPPED CONNECTION

TO PERMIT BYPASSING COIL WHILE

FLUSHING SYSTEM (LINE SIZE, MAX 2")

PRESSURE-INDEPENDENT

CONTROL VALVE

TW

P1

FLEXIBLE

METAL

HOSE

TW

P1

UNION

TW

TW

DHW

DHWR

REFER TO

PLUMBING FOR

CONTINUATION

P1

P1

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

Frankfurt-Short-Bruza Associates,P.C.

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

C

B

A

D

C

B

A

54321

20190310

NDM

Jo in t B as e S an A nt on io

JB

SA

Ke lly A nn ex , T ex as

Te xa s Ai r N at io na l G ua rd 9t h

FW

F- M iss io n Tr ain in g Ce nt er (M

TC

C :\U sers\njd\O neD rive - FSB Architects +

Engineers\D ocum ents\90310_M ech_23_N

D oolittle8ZBW

T.rvt

9/16/2024 12:46:55 PM

15 AUGUST 2024

DETAILS

M-502

RRS

DLC

EAO

SCALE: NTS

VERTICAL CLOSE-COUPLED INLINE CENTRIFUGAL PUMP DETAILD2 SCALE: NTS

EXPANSION TANK DETAILD3 SCALE: NTS

CHEMICAL BYPASS FEEDER DETAILD4

SCALE: NTS

TERMINAL UNIT PIPING DETAILC1 SCALE: NTS

UNIT HEATER PIPING DETAILC3

SCALE: NTS

TYPICAL DRAW-THRU CONDENSATE DRAIN DETAILB4

SCALE: NTS

FAN COIL UNIT PIPING DETAILC4

SCALE: NTS

CRAC UNIT PIPING DETAILB3SCALE: NTS

AIR HANDLING UNIT PIPING DETAILB1

SCALE: NTS

PHX PIPING DETAILA2

1 Addendum 02 09/16/20241