M-502 DETAILS.pdf
PDF 222 KB Posted
- Attached to
- Construct Mission Training Center (MTC) Facility Federal contract opportunity
- Solicitation number
- W50S78-24-B-0001
- Issued by
- Department of the Army National Guard
About this file
This document appears to be a detailed drawing set for a federal construction contract opportunity. The drawings provide specifications for the installation of mechanical equipment, piping, and other building systems for a Mission Training Center (MTC) facility for the Texas Air National Guard at Joint Base San Antonio Lackland Air Force Base.
The associated federal contract opportunity is for the construction of this 15,200 square foot MTC facility. The solicitation is a 100% small business set-aside with a NAICS code of 236220 and an estimated value between $10-$25 million. The contract duration is 540 calendar days. The solicitation includes a base bid and eight options such as permeable pavement, landscaping, floor coatings, and specialized equipment. Several brand name items are specified for compatibility with existing systems. Interested offerors must be registered in SAM.gov, and all questions/RFIs must be submitted by email 5 days prior to bid opening.
View the file
Other files for this federal contract opportunity
Show all 50
Construct Mission Training Center (MTC) Facility has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VERTICAL IN-LINE
CENTRIFIGUAL PUMP
LONG RADIUS
ELBOW
P
PRESSURE
GAUGE
REMOVABLE
STRAINER
SUCTION
DIFFUSER
BALL VALVE
TEST PLUG
PUMP HEADER
PIPE HANGER PER SPECIFICATIONS
TYPE 'F' SPRING ISOLATOR
(TYPICAL AS SHOWN)
INSTALL WITHIN 12" OF
STRUCTURAL ATTACHMENT
MIN. FIRST THREE HANGERS
DOWNSTREAM AND UPSTREAM
OF ALL PUMPS SHALL HAVE
TYPE 'F' SPRING ISOLATORS (TYP)
FLEXIBLE METAL
HOSE (TYP)
CHECK VALVE
EXPANSION
TANK
3/4" DRAIN LINE, ROUTE
TO FLOOR DRAIN
PROVIDE ACCESS OPENING
IN MOUNTING RING6" TALL CONCRETE
HOUSEKEEPING PAD
FINISH FLOOR
PIPE SIZE AS INDICATED
INSPECTION OPENING
PLUG
CHARGING VALVE CLOSURE
TO SYSTEM
UNION
BYPASS CHEMICAL
FEEDER
3/4" DRAIN VALVE W/ HOSE
CONNECTION AND CAP
6" CONCRETE
HOUSEKEEPING PAD
FINISH FLOOR
FULL-PORT
BALL VALVE
RETURN
SUPPLY
VENT CONNECTION WITH
BALL VALVE AND HOSE
ADAPTER WITH CAP
3/4"
CHECK
VALVE
MAV
MAV
HEATING
WATER COIL
RETURN
SUPPLY
UNION
FLEXIBLE METAL HOSE
BALL VALVE
Y-PATTERN
STRAINER
TEST PLUG PRESSURE-INDEPENDENT
CONTROL VALVE
VALVED AND CAPPED CONNECTION
TO PERMIT BYPASSING COIL WHILE
FLUSHING SYSTEM (LINE SIZE, MAX 2")
DRAIN PLUG
MAV
HEATING
WATER COIL
RETURN
SUPPLY
UNION
FLEXIBLE METAL HOSE
BALL VALVE
Y-PATTERN
STRAINER
TEST PLUG
VALVED AND CAPPED CONNECTION
TO PERMIT BYPASSING COIL WHILE
FLUSHING SYSTEM (LINE SIZE, MAX 2")
DRAIN PLUG
PRESSURE-INDEPENDENT
CONTROL VALVE
A
B
A: TOTAL NEGATIVE STATIC PRESSURE + 1"
B: 1/2 OF ACONDENSATE
FROM DRAIN PAN
SEAL PENETRATION
AIR TIGHT
EQUIPMENT
CASING
DRAIN LINE SHALL BE SAME SIZE
AS DRAIN CONNECTION ON UNIT
UNION
TEE WITH HAND-TIGHT PLUG
(TYPICAL OF 2)
MAV
CHILLED WATER
OR
HEATING WATER
COIL
RETURN
SUPPLY
UNION
FLEXIBLE METAL HOSE
BALL VALVE
Y-PATTERN
STRAINER
TEST PLUG
VALVED AND CAPPED CONNECTION
TO PERMIT BYPASSING COIL WHILE
FLUSHING SYSTEM (LINE SIZE, MAX 2")
DRAIN PLUG
PRESSURE-INDEPENDENT
CONTROL VALVE
CRAC
RETURN
SUPPLY
Y-PATTERN
STRAINER
ISOLATION VALVE
THREADED TEE WITH REMOVABLE CAP
TO PERMIT BYPASSING COIL WHILE
FLUSHING SYSTEM (LINE SIZE, MAX 2")
3/4" DRAIN VALVE WITH
HOSE COUPLING
MAV
UNION
TEST PLUG
CHILLED WATER
OR
HEATING WATER
COIL
RETURN
SUPPLY
UNION
PRESSURE-INDEPENDENT
CONTROL VALVE
Y-PATTERN
STRAINER
ISOLATION VALVE
THREADED TEE WITH REMOVABLE CAP
TO PERMIT BYPASSING COIL WHILE
FLUSHING SYSTEM (LINE SIZE, MAX 2")
MAV
DRAIN PLUG
TEST PLUG
3/4" DRAIN VALVE WITH
HOSE COUPLING
P P
MAV
PHX
HWR
HWS
UNION
BALL VALVE
Y-PATTERN
STRAINER
TEST PLUG
VALVED AND CAPPED CONNECTION
TO PERMIT BYPASSING COIL WHILE
FLUSHING SYSTEM (LINE SIZE, MAX 2")
PRESSURE-INDEPENDENT
CONTROL VALVE
TW
P1
FLEXIBLE
METAL
HOSE
TW
P1
UNION
TW
TW
DHW
DHWR
REFER TO
PLUMBING FOR
CONTINUATION
P1
P1
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
Frankfurt-Short-Bruza Associates,P.C.
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20190310
NDM
Jo in t B as e S an A nt on io
JB
SA
Ke lly A nn ex , T ex as
Te xa s Ai r N at io na l G ua rd 9t h
FW
F- M iss io n Tr ain in g Ce nt er (M
TC
C :\U sers\njd\O neD rive - FSB Architects +
Engineers\D ocum ents\90310_M ech_23_N
D oolittle8ZBW
T.rvt
9/16/2024 12:46:55 PM
15 AUGUST 2024
DETAILS
M-502
RRS
DLC
EAO
SCALE: NTS
VERTICAL CLOSE-COUPLED INLINE CENTRIFUGAL PUMP DETAILD2 SCALE: NTS
EXPANSION TANK DETAILD3 SCALE: NTS
CHEMICAL BYPASS FEEDER DETAILD4
SCALE: NTS
TERMINAL UNIT PIPING DETAILC1 SCALE: NTS
UNIT HEATER PIPING DETAILC3
SCALE: NTS
TYPICAL DRAW-THRU CONDENSATE DRAIN DETAILB4
SCALE: NTS
FAN COIL UNIT PIPING DETAILC4
SCALE: NTS
CRAC UNIT PIPING DETAILB3SCALE: NTS
AIR HANDLING UNIT PIPING DETAILB1
SCALE: NTS
PHX PIPING DETAILA2
1 Addendum 02 09/16/20241