AE503-SECTION DETAILS.pdf

PDF 338 KB Posted

Attached to
Construct Mission Training Center (MTC) Facility
Solicitation number
W50S78-24-B-0001
Issued by

About this file

This document appears to be a section detail sheet related to a federal contract opportunity for the construction of a Mission Training Center (MTC) facility for the Texas Air National Guard at Joint Base San Antonio Lackland Air Force Base.

The key details are:

The federal contract opportunity is a solicitation (Solicitation Number W50S78-24-B-0001) for the construction of a 15,200 square foot FTU 4-ship F-16 MTC facility, including demolition, site work, utilities, roofing, HVAC, plumbing, electrical, and other construction activities. The project has a base bid with eight additional options such as permeable pavement, landscaping, floor and wall finishes, additional drains, signage, and fixed seating. Several brand name items are specified for compatibility with existing systems. The contract duration is 540 calendar days. The project is set aside 100% for small businesses under NAICS code 236220. A site visit and pre-bid conference are scheduled, and all questions and RFIs must be submitted by a specific date prior to bid opening.

View the file

Other files

File Type Posted
MTC - ABSTRACT Posted 24 Sep 24.pdf PDF
SF101-LOW ROOF FRAMING PLAN.pdf PDF
S-002-TYPICAL DETAILS.pdf PDF
01 45 35 - Special Inspections.pdf PDF
M-702 SCHEDULES.pdf PDF
23 05 48.19 - SEISMIC BRACING FOR HVAC.pdf PDF
SB102-SLAB AND WALL PLAN.pdf PDF
AE501-SECTION DETAILS.pdf PDF
AE502-SECTION DETAILS.pdf PDF
AE303-WALL SECTIONS.pdf PDF
23 05 48.00 40 - VIBRATION CONTROLS FOR HAC PIPING AND EQUIPMENT.pdf PDF
M-701 SCHEDULES.pdf PDF
AE601-ROOM FINISH SCHEDULE AND GLAZING TYPES AND MISC DETAILS.pdf PDF
AE101-FLOOR PLAN.pdf PDF
S-001-GENERAL NOTES.pdf PDF
AE305-WALL SECTIONS.pdf PDF
M-502 DETAILS.pdf PDF
AE001-PARTITION TYPES ANNOTATION SYMBOLS ABBREVIATIONS AND ACCESSIBILITY MOUNTING HEIGHTS.pdf PDF
C-301-REMOVAL PLAN.pdf PDF
New Utilities to East.pdf PDF
11 94 10 - Rooftop Fall Protection Anchors.pdf PDF
C-201-STORMWATER POLLUTION PREVENTION PLAN.pdf PDF
AE603-DOOR DETAILS.pdf PDF
C-601-UTILITY PLAN.pdf PDF
000 TABLE OF CONTENTS.pdf PDF
M-501 DETAILS.pdf PDF
AE304-WALL SECTIONS.pdf PDF
SF102-HIGH ROOF FRAMING PLAN.pdf PDF
G-003-CODE AND LIFE SAFETY PLAN.pdf PDF
01 45 00 - Quality Control.pdf PDF
MTC RFI log 20240917.pdf PDF
AE401-ENLARGED PLANS AND DETAILS.pdf PDF
ES101-ELECTRICAL SITE PLAN.pdf PDF
Amendment 0004 - 17 Aug 2024.pdf PDF
C-401-PROPOSED PLAN.pdf PDF
C-602-DRAINAGE SCHEDULE AND DETAILS.pdf PDF
W50S78-24-B-0001 - Mission Training Center Amendment 0003.pdf PDF
MTC RFI log.pdf PDF
W50S7824B0001 - MTC - Amendment 02 - 20240829.pdf PDF
Attachment 14 - Geotechnical report-TX ANG Mission Training Center B-3.pdf PDF
MFR Mission Training Center - 2nd Site Visit Pre-Propsal Conference Minutes.pdf PDF
Pre_Bid_Site Visit_MTC_Attendance_Sheet 27_Aug _2024.pdf PDF
Pre-Proposal Site Visit Slides - MTC 27 Aug 24.pptx PPTX presentation
W50S78-24-B-0001 - Mission Training Center Amendment 0001.pdf PDF
2024.08.21_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_VOL 1 SPECIFICATIONS.pdf PDF
ATTACHMENT 9 SPECS V1 ADDENDUM.pdf PDF
MTC RFI log.pdf PDF
Pre-Proposal Site Visit Slides - MTC 20 Aug 24 (002).pptx PPTX presentation
Pre_Bid_Site Visit_MTC_Attendance_Sheet 20_Aug _2024.pdf PDF
MFR Mission Training Center - Site Visit Pre-Propsal Conference Minutes.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C

STEEL STRUCTURE

CONT UNFACED BLANKET

INSULATION ADHERED TO BOTH

SIDES OF BEAM WEB WITH

SPRAY ADHESIVE

UNFACED BLANKET

INSULATION

16 GA - 8" CFMF AT 16" OC

CONT 16 GA - 3 1/2" X 1 1/2" CFMF

CLIP ANGLE (BOTH SIDES) - PROVIDE

BREAK METAL CLIP ANGLES WITH

THE 1" PER FOOT ROOF SLOPE

CONT 16 GA - 3 1/2" X 3 1/2" CFMF

CLIP ANGLE (BOTH SIDES) - PROVIDE

BREAK METAL CLIP ANGLES WITH

THE 1" PER FOOT ROOF SLOPE

CONT SAFING INFILL

1/2" PROT BOARD

SELF-ADHERED

UNDERLAYMENT

CONT OVERLAPPING

FLEXIBLE SPRAY (BOTH

SIDES)

DEFLECTION TRACK

1" D

EF

(SSSR1) STEEL

STANDING SEAM

ROOFING

FOUR - 2" LAYERS

ROOF INSULATION

CONT FIRE CAULK

(BOTH SIDES)

TWO LAYERS OF 5/8" GWB

(BOTH SIDES)

FOUR - 2" LAYERS

ROOF INSULATION

SELF-ADHERED

UNDERLAYMENT

STEEL DECK

CONT SAFING INFILL

CONT OVERLAPPING

FLEXIBLE SPRAY (BOTH

SIDES)

STEEL STRUCTURE

CONT UNFACED BLANKET

INSULATION ADHERED TO

BOTH SIDES OF BEAM WEB

WITH SPRAY ADHESIVE

UNFACED BLANKET

INSULATION

16 GA - 8" CFMF AT 16" OC

DEFLECTION TRACK

CONT FIRE CAULK

(BOTH SIDES)

CONT 16 GA - 3 1/2" X 1 1/2"

CFMF CLIP ANGLE (BOTH

SIDES)

CONT 16 GA - 3 1/2" X 3 1/2"

CFMF CLIP ANGLE (BOTH

SIDES)

1/2" PROT BOARD

(SSSR1) STEEL

STANDING SEAM

ROOFING

TWO LAYERS OF 5/8" GWB

(BOTH SIDES)

GROUND FLOOR

100' - 0"

CUNFACED BLANKET

INSULATION

16 GA - 8" CFMF AT

16" OC

16 GA - 8" CFMF

CHANNEL

CONT FIRE/ACOUSTICAL

SEALANT (BOTH SIDES)

SCHEDULED BASE

(BOTH SIDES)

2" DEEP BOLTED

STRINGER

UNDERSTRUCTURE

24" X 24" CONCRETE FILLED

ACCESS FLOOR PANEL.

SPECIFIED FLOOR

COVERING TO BE FACTORY

INSTALLED.

1'

6"

CONCRETE SLAB

9 3/4"4 1/4"

5/8” GYPSUM WALL BOARD

(GWB) 2 LAYERS

3"

REFER TO SHEET

IN101 FOR FINISH

DETAILS AT

TRANSITION FROM

CONCRETE TO

ACCESS FLOOR

MECHANICAL

EQUIPMENT

COUNTERFLASHING

INSULATED

MECHANICAL

EQUIPMENT CURB

(SSSR1) STEEL

STANDING SEAM

ROOFING

SELF-ADHERED

UNDERLAYMENT

1/2" COVERBOARD

FOUR - 2" LAYERS ROOF

INSULATION

STEEL DECK

STEEL ANGLE OPENING

SUPPORT FRAME

STEEL STRUCTURE

PREFIN METAL

FLASHING SILL PAN TO

MATCH METAL WALL

PANEL COLOR SET IN

MASTIC SEALANT BEAD

WITH BRAKE UPTURN AT

BACK FACE OF PANEL

PREFIN METAL

FLASHING SILL PAN TO

MATCH METAL WALL

PANEL COLOR

PREFIN MECHANICAL

LOUVER

1/2" EXT GYPSUM

SHEATHING

FLUID APPLIED VAPOR

BARRIER

FWP1 2" INSULATED

METAL WALL PANEL

NOM 4" SPRAY FOAM

AIR BARRIER - OPEN

CELL (R-17 MIN.) WITH

ASTM E84 COMPLIANT

FIRE RETARDANT

SURFACE FILM3" 16 GA HORIZ FURRING

CHANNEL AT 48" OC

VERTICALLY

6" CFMF AT 16" OC

6" CFMF BOX HEADER

6" CFMF AT 16" OC

NOM 4" SPRAY FOAM

AIR BARRIER

3" - 16 GA HORIZ

FURRING CHANNEL AT

48" OC VERTICALLY

FWP1 2" INSULATED

METAL WALL PANEL

1/2" EXT GYPSUM

SHEATHING

FLUID APPLIED VAPOR

BARRIER

LO

U

VE

R

S C

H

ED

U

LE

S R

EF

ER

T O

M

EC

H

3"x1" CFMF

PERIMETER CLOSURE

3"x1" CFMF

PERIMETER CLOSURE

3 5/8"

2"

6"

1/2" 5/8"

5/8" GWB

1/2” GWB

VENT PIPE CENTERED

IN ROOF PANEL (PNTD

TO MATCH ROOF)

SS DRAWBAND WITH

BUTYL SEALANT

RUBBER FLASHING

BOOT

SEAL PENETRATION WITH

BUTYL SEALANT

(SSSR1) STEEL

STANDING SEAM

ROOFING

FOUR - 2" LAYERS

ROOF INSULATION

1/2" PROT BOARD

STEEL DECK

SQUARE FRAMED 8" - 16 GA

CFMF STUDS CLIPPED

TOGETHER (LOOSE

INSULATION INFILL)

SEAL PENETRATION

SELF ADHERED

UNDERALYMENT

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

Frankfurt-Short-Bruza Associates,P.C.

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

C

B

A

D

C

B

A

54321

20190310

NDM

Jo int

B as e S an

A nto nio

JB

SA

Ke lly

A nn ex , T ex as

Te xa s A ir

Na tio na l G ua rd

9t h

FW

F-1

6 M iss ion Tr ain ing

C en ter (M

TC

3" 9"6"0

3" = 1'-0"

C :\U sers\keisner\D ocum ents\90310_Arch_keisnerU

7YM

G .rvt

9/16/2024 10:26:44 AM

15 AUGUST 2024

SECTION DETAILS

AE503

MJT

BKG

GMD

SCALE: 3" = 1'-0"

SECTION DETAIL (STC 50)

HEAD OF WALLC4

SCALE: 3" = 1'-0"

SECTION DETAIL (STC 50)

HEAD OF WALLC3

SCALE: 3" = 1'-0"

SECTION DETAIL (STC 50)

BASE OF WALL & ACCESS FLOORA3

SCALE: 3" = 1'-0"

CURB DETAILC1

SCALE: 3" = 1'-0"

LOUVER HEAD/SILL DETAILB1

LEGEND GRAPHIC VISUAL PLANE OF CONT AIR

BARRIER WHERE SHOWN ALL SHEETS

SCALE: 3" = 1'-0"

ROOF VENT PIPE DETAIL - NON-SECURE AREAA1

NOTE: REFERENCE SPECIFICATION SECTIONS

07 05 23 AND 07 27 10.00 10 FOR DESCRIPTION

OF AIR BARRIER SYSTEM

1 Addendum 02 09/16/2024

File details come from the government source that posted it. Updated .