This document appears to be a set of technical details for the design and installation of various mechanical components for the Mission Training Center (MTC) facility project. It includes specifications for rigid and flexible ductwork, diffusers, air handlers, piping, and other HVAC-related elements. The document provides detailed drawings and installation requirements for these components, as well as guidance on penetrations through walls and other building elements.

The related federal contract opportunity is for the construction of the 15,200 square foot MTC facility at Joint Base San Antonio Lackland Air Force Base in Texas. The project is a 100% small business set-aside with a NAICS code of 236220 and a construction value between $10-25 million. The contract duration is 540 calendar days. The solicitation includes a base bid for the overall facility construction along with several options for additional items such as landscaping, floor finishes, and signage. The solicitation also identifies several brand name items that will be required for compatibility with existing systems.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Mission Training Center (MTC) Facility, newest first.
File Type Posted
MTC - ABSTRACT Posted 24 Sep 24.pdf PDF
C-301-REMOVAL PLAN.pdf PDF
S-002-TYPICAL DETAILS.pdf PDF
SF101-LOW ROOF FRAMING PLAN.pdf PDF
S-001-GENERAL NOTES.pdf PDF
New Utilities to East.pdf PDF
AE501-SECTION DETAILS.pdf PDF
AE305-WALL SECTIONS.pdf PDF
C-401-PROPOSED PLAN.pdf PDF
C-602-DRAINAGE SCHEDULE AND DETAILS.pdf PDF
ES101-ELECTRICAL SITE PLAN.pdf PDF
AE401-ENLARGED PLANS AND DETAILS.pdf PDF
AE503-SECTION DETAILS.pdf PDF
01 45 00 - Quality Control.pdf PDF
Amendment 0004 - 17 Aug 2024.pdf PDF
MTC RFI log 20240917.pdf PDF
C-201-STORMWATER POLLUTION PREVENTION PLAN.pdf PDF
C-601-UTILITY PLAN.pdf PDF
SF102-HIGH ROOF FRAMING PLAN.pdf PDF
G-003-CODE AND LIFE SAFETY PLAN.pdf PDF
M-702 SCHEDULES.pdf PDF
M-701 SCHEDULES.pdf PDF
AE601-ROOM FINISH SCHEDULE AND GLAZING TYPES AND MISC DETAILS.pdf PDF
AE303-WALL SECTIONS.pdf PDF
23 05 48.19 - SEISMIC BRACING FOR HVAC.pdf PDF
23 05 48.00 40 - VIBRATION CONTROLS FOR HAC PIPING AND EQUIPMENT.pdf PDF
11 94 10 - Rooftop Fall Protection Anchors.pdf PDF
W50S78-24-B-0001 - Mission Training Center Amendment 0003.pdf PDF
Attachment 14 - Geotechnical report-TX ANG Mission Training Center B-3.pdf PDF
MTC RFI log.pdf PDF
W50S7824B0001 - MTC - Amendment 02 - 20240829.pdf PDF
Pre-Proposal Site Visit Slides - MTC 27 Aug 24.pptx PPTX presentation
MFR Mission Training Center - 2nd Site Visit Pre-Propsal Conference Minutes.pdf PDF
Pre_Bid_Site Visit_MTC_Attendance_Sheet 27_Aug _2024.pdf PDF
MTC RFI log.pdf PDF
2024.08.21_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_VOL 1 SPECIFICATIONS.pdf PDF
ATTACHMENT 9 SPECS V1 ADDENDUM.pdf PDF
Pre-Proposal Site Visit Slides - MTC 20 Aug 24 (002).pptx PPTX presentation
Pre_Bid_Site Visit_MTC_Attendance_Sheet 20_Aug _2024.pdf PDF
Attachment 6_Industrial Security.pdf PDF
Attachment 5_STRUCTURAL INTERIOR DESIGN.pdf PDF
Attachment 7_ACCESS AND STAGING SITE PLAN.pdf PDF
JA Nm Brand DDC Redacted.pdf PDF
JA Nm Brand Falcon Redacted.pdf PDF
2024.08.15_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_VOL 1 SPECIFICATIONS.pdf PDF
JA Nm Brand Vindicator Sys Redacted.pdf PDF
W50S78-24-B-0001 - Mission Training Center Solicitation.pdf PDF
2024.08.15_TX-ANG_149TH MISSION TRAINING CENTER_REVISED B3_DRAWINGS.pdf PDF
JA Nm Brand Monaco Redacted.pdf PDF
JA Nm Brand Trane HVAC Redacted.pdf PDF
Show all 50

Construct Mission Training Center (MTC) Facility has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRANCH SUPPLY

DUCT W/ DUCTWRAP

RIGID DUCTWORK, WITH

EXTERNAL INSULATION

DIFFUSER SUSPENDED CEILING SYSTEMSURFACE MOUNT

PROVIDE BLANKET INSULATION

ON BACK OF DIFFUSER

INSULATED FLEXIBLE

DUCT. MAX. LENGTH

TO BE 5 FEET

RIGID ELBOW, WITH

EXTERNAL INSULATION

RUN-OUT DUCT TO BE SAME

DIAMETER AS DIFFUSER NECK

MANUAL

BALANCING

DAMPER

MANUAL DAMPER

45 DEGREE BRANCH

ENTRY CONNECTION

LAY-INSURFACE MOUNT

FLEXIBLE DUCT TO BE SAME

SIZE CONNECTED DUCTWORK.

EXHAUST REGISTER

OR GRILLE

FLEX. CONNECTION

ANGLE SUPPORT

HANGER ROD

VIBRATION ISOLATOR

HANG FROM ABOVE

CONNECTED RIGID DUCT TO BE

SAME SIZE AS FAN CONNECTION

(MIN. 2 DUCT DIAMETERS)

EXHAUST FAN

TRANSITION TO DUCT

SIZE AS REQUIRED

TRANSITION AS

REQUIRED TO DUCT

SIZE DOWNSTREAM OF

TERMINAL UNIT

HOT WATER HEATING COIL

TERMINAL

UNIT

INTERNAL DUCT

LINER

TERMINAL UNIT

BRANCH TAKE-OFF

DUCT SIZE AS

INDICATED ON

PLANS

AIR VALVE

ACTUATOR

CONTROL ENCLOSURE

LEAVE MIN. 12" CLEAR FROM ALL

OBSTRUCTIONS TO PERMIT

SEVICE

INSULATED ACCESS PANEL

TO PERMIT INSPECTION OF

AIR FLOW SENSOR

AIR FLOW

SENSOR

CONNECTED RIGID DUCT TO BE SAME

SIZE AS TERMINAL INLET SIZE (MIN. 6

DUCT DIAMETERS)

NOTE: REFER TO C4/M-502

FOR APPLICABLE COIL PIPING DETAIL.

6" FLEXIBLE

CONNECTION

DUCT

CMU WALL

GROUT

INSULATION

1" CLEARANCE BETWEEN

2" x 2" x 1/4"

TACKWELDED OR

RIVETED TO SLEEVE

20 GAGE GALVANIZED

STEEL COLLAR

(EXPOSED ONLY).

SECURE TO WALL ON 6

INCH CENTERS

(MINIMUM 4

FASTENERS PER SIDE).

20 GAGE

GALVANIZED

STEEL SLEEVE

FINISHED ESCUTCHEON

PIPING EXPOSED TO VIEWCONCEALED PIPING

PIPE AND INSULATION

PER SPECIFICATIONS

SEAL OR CAULK

SLEEVES

TERMINATE SLEEVE FLUSH

WITH FINISHED WALL

NON-LOAD BEARING WALLS:

MIN. 20 GA GALV. SHEET METAL SLEEVE

LOAD BEARING WALLS:

SCH 30 CARBON STEEL PIPE SLEEVE

FINISHED WALL

SURFACE

SEALING AND

ANCHORING

SEAL SLEEVE WITH TIGHTLY

PACKED CAULKING

COAT EXTERIOR SURFACES

STANDARD WEIGHT STEEL

CENTER PIPE

IN SLEEVE

BREAKAWAY SLIP JOINT

(TYP.)

TYP.

6" FLEXIBLE CONNECTION

SECURE RETAINING ANGLE TO

WALL SLEEVE WITH 1/2" LONG

WELDS @ 8" O.C.

10 GAUGE STEEL WALL

SLEEVE

1-1/2" x 1-1/2" x 1/8"

PERIMETER RETAINING

ANGLE. SECURE ANGLES

@ 3" O.C. ANGLES MUST

LAP STRUCTURAL

OPENING 1" MINIMUM

1/2" DIA. HARDENED

STEEL BARS AT 6" O.C.

EACH WAY. WELD AT ALL

INTERSECTIONS

HINGED ACCESS

DOOR WITH LOCK

HASP

SECURE AREA NON-SECURE AREA

NOTE: DUCT BARS ONLY REQUIRED FOR

DUCTS EXCEEDING 96 SQUARE INCHES

IN CROSS-SECTIONAL AREA.

HONEYCOMB

WAVE GUIDE

SHEILDING PANEL

SEE RF SHIELDING DETALS

SHEET AE520

FINISHED

ESCUTCHEON

PIPING EXPOSED TO VIEWCONCEALED PIPING

PIPE AND INSULATION

PER SPECIFICATIONS

SEAL OR CAULK

SLEEVES

TERMINATE SLEEVE FLUSH

WITH FINISHED WALL

LOAD BEARING WALLS:

SCH 30 CARBON STEEL PIPE SLEEVE

FINISHED WALL

SURFACE

NON-LOAD BEARING WALLS:

MIN. 20 GA GALV. SHEET METAL SLEEVE

SECURE AREA NON-SECURE AREA

GROUND PIPE WITHIN 6 INCH

OF THE SECURE PERIMETER

PENETRATION USING NO. 4

COPPER WIRE TO THE

BUILDING GROUND

WIRE CONTINUED

GROUND/BOND TO METALLIC

STRUCTURE ABOVE

SEE RF SHIELDING

DETAILS SHEET AE520

EXTERIOR WALL

SEE PLAN

FOR CONTINUATION.

SLEEVE CAULKING AND

SEALANT (LINKBELT SEAL

OPTIONAL)

SIZE SLEEVE TO

PROVIDE A MIN.

OF 2" CLEARANCE ALL

AROUND.

FLOORGRADE

ASMR GAS METER

ASSEMBLY 1200 CFH

TOTAL LOAD

GAS LINE SLEEVE, SEE

SITE PLAN FOR CONT.

AS SIZED BY

UTILITY COMPANY

GAS LINE

SLEEVE

VENT

STANDARD FLAT-

HEAD GAS COCK

WITH BRASS PLUG

AND WASHER.

GAS PRESSURE REGULATOR

10 IN.W.C.

UNION (TYP).

G

PLUG VALVE

REF PLANS FOR

SIZE AND CONT.

EQUIPMENT

UNION (TYP.)

DIRT LEG (LINE SIZE)

MINIMUM 3" DEEP

P

PRESSURE TEST

PORT (TYP.)

STRAINER

PEA EA

VIBRATION ISOLATOR, SPRING HANGER

MIN. 1" STATIC DEFLECTION

MIN. ONE EQUIVALENT DUCT

DIAMETER STRAIGHT DUCTWORK

MIN. THREE EQUIVALENT DUCT

DIAMETERS STRAIGHT DUCTWORK

FAN PROPELLER

DIRECT DRIVE MOTOR

FLEXIBLE CONNECTOR (TYP.)

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

Frankfurt-Short-Bruza Associates,P.C.

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

C

B

A

D

C

B

A

54321

20190310

NDM

Jo in t B as e S an A nt on io

JB

SA

Ke lly A nn ex , T ex as

Te xa s Ai r N at io na l G ua rd 9t h

FW

F- M iss io n Tr ain in g Ce nt er (M

TC

C :\U sers\njd\O neD rive - FSB Architects +

Engineers\D ocum ents\90310_M ech_23_N

D oolittle8ZBW

T.rvt

9/16/2024 12:46:54 PM

15 AUGUST 2024

DETAILS

M-501

RRS

DLC

EAO

SCALE: NTS

TYPICAL DIFFUSER INSTALLATIOND1 SCALE: NTS

TYPICAL EXHAUST/RETURN GRILLE INSTALLATION DETAILD2 SCALE: NTS

CENTRIFUGAL IN-LINE FAN INSTALLATION DETAILD4

SCALE: NTS

TYPICAL SINGLE-DUCT VAV TERMINAL UNIT INSTALLATION DETAILC1 SCALE: NTS

DUCT PENETRATION THROUGH NON-FIRE RATED WALLSC3

SCALE: NTS

TYPICAL INTERIOR WALL PIPE PENETRATION DETAILB1

SCALE: NTS

PIPE PENETRATION THROUGH EXTERIOR WALLC4

SCALE: NTS

TYPICAL SECURE AREA DUCT PENETRATION DETAILA4SCALE: NTS

TYPICAL SECURE AREA PIPE PENETRATION DETAILA2SCALE: NTS

TYPICAL GAS METER / REGULATOR / ENTRY DETAILA1

SCALE: NTS

TYPICAL GAS CONNECTION DETAILB4

SCALE: NTS

HORIZONTAL MOUNTED AXIAL

INLINE FAN INSTALLATION DETAILB2

1 Addendum 02 09/16/2024

File details come from the government source that posted it. Updated .