This document is a set of general notes for the structural design criteria governing the construction of a Mission Training Center (MTC) facility for the Texas Air National Guard (TXANG) at Joint Base San Antonio (JBSA) Lackland Air Force Base.
The key details include:
- The facility is a 15,200 square foot FTU 4-ship F-16 MTC building, designed to comply with applicable federal, state, and local codes as well as DoD, Air Force, and base design standards.
- The project includes demolition, site work, utilities, HVAC, plumbing, electrical, communications, fire protection, and other associated construction activities.
- In addition to a base bid, the solicitation includes 8 options such as permeable pavement, landscaping, specialty flooring, and signage.
- Several brand name items are specified for compatibility with existing systems.
- The contract duration is 540 calendar days, and the project is set aside 100% for small businesses under NAICS code 236220.
View the file
Other files for this federal contract opportunity
Show all 50
Construct Mission Training Center (MTC) Facility has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGN CRITERIA
GOVERNING BUILDING CODE: IBC 2021, APPLICABLE UFC'S
BUILDING RISK CATEGORY: II
DESIGN LOADS:
DEAD LOADS:
ROOF SYSTEM ..................................................... 20 PSF SUPERIMPOSED
10 PSF ROOF SYSTEM
10 PSF FUTURE PV PER NGB
FRAMING................................................................ ACTUAL WEIGHT OF MATERIALS, UNLESS NOTED OTHERWISE
INSULATION........................................................... 1 PSF
CEILING COLLATERAL........................................... 3 PSF
MISC/MECH COLLATERAL..................................... 5 PSF
LIVE LOADS:
ROOF (NON-REDUCIBLE)....................................... 20 PSF
MECHANICAL PLATFORMS.................................... 150 PSF
MECHANICAL FLOOR ............................................. 250 PSF
ALL OTHER FLOORS .............................................. 100 PSF
CONCENTRATED POINT LOADS
STRUCTURAL SLAB (ACCESS FLOOR PANEL) 1225 LBS
SNOW LOAD: (ASCE 7-10)
BASIC GROUND SNOW LOAD, (P g)...................... 5 PSF
TERRAIN CATEGORY............................................. C
ROOF EXPOSURE................................................... FULL
EXPOSURE FACTOR, (Ce)...................................... 1.0 THERMAL FACTOR, (Ct)......................................... 1.0 SLOPE FACTOR, (Cs).............................................. 1.0 IMPORTANCE FACTOR, (Is).................................... 1.0 SLOPED ROOF SNOW, (P s).................................... N/A
WIND LOAD: (ASCE 7-16)
BUILDING DESIGN:
BASIC WIND SPEED................................................. 108 MPH
EXPOSURE CATEGORY........................................... C
IMPORTANCE FACTOR, (lw).................................... 1.0 TOPOGRAPHIC FACTOR, (Kzt)............................... 1.0
BUILDING ENCLOSURE CATEGORY....................... ENCLOSED BUILDING
SEISMIC DESIGN DATA: (ASCE 7-16)
SHORT PERIOD ACCELERATION, Ss ................... 0.05 g LONG PERIOD ACCELERATION, S1...................... 0.02 g
SOIL SITE CLASS ................................................... D
SITE COEFFICIENT, Fa ........................................... 1.6 SITE COEFFICIENT, Fv .......................................... 2.4 DESIGN SPECTRAL ACCELERATION, S Ds ............ 0.054 g DESIGN SPECTRAL ACCELERATION, S D1 ........... 0.032 g
SEISMIC DESIGN CATEGORY .............................. A
ANALYSIS METHOD................................................ EQUIVALENT LATERAL FORCE
SEISMIC FORCE RESISTING SYSTEM.................. STEEL SYSTEMS NOT SPECIFICALLY
DETAILED FOR SEISMIC RESISTANCE
DESIGN BASE SHEAR............................................ 62 kips R=3.0, Ω=3.0, Cd=3.0, IE=1.0, Cs=0.066
TEMPERATURE:
STRUCTURE SHALL BE ANALYZED FOR T = +110,-0 °F (±55 °F TOTAL ΔT )
ACI AMERICAN CONCRETE INSTITUTE
ADD'L ADDITIONAL
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
ANCH ANCHOR
AR ANCHOR ROD
ARCH ARCHITECTURAL
ASCE AMERICAN SOCIETY OF CIVIL ENGINEERS
ASD ALLOWABLE STRESS DESIGN
ASTM AMERICAN SOCIETY FOR TESTING AND
MATERIALS
AT ANTI-TERRORISM
AWS AMERICAN WELDING SOCIETY
BM BEAM
BO BOTTOM OF
BOS BOTTOM OF STEEL
BOT BOTTOM
BP BASE PLATE
BR BRACING
BRG BEARING
BTWN BETWEEN
CJ CONSTRUCTION JOINT
CENTER LINE
CL CENTER LINE
CL COLLATERAL LOAD
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONNX CONNECTION
CONT CONTINUOUS
COORD COORDINATE
CR CENTER OF RADIUS
DBA DEFORMED BAR ANCHOR
DBE DECK BEARING ELEVATION
DEG DEGREE
db DIAMETER BAR
DIA DIAMETER
DL DEAD LOAD
DN DOWN
DWLS DOWELS
EA EACH
EE EACH END
EF EACH FACE
EJ EXPANSION JOINT
EL ELEVATION
ELEV ELEVATION
EQ EQUAL
EQUIV EQUIVALENT
EW EACH WAY
EXP EXPANSION
ºF/C DEGREES FAHRENHEIT/CELSIUS
FF FINISH FLOOR
FFE FINISHED FLOOR ELEVATION
FIN FINISH
FLR FLOOR
FLG FLANGE
FND FOUNDATION
FT FOOT/FEET
FTG FOOTING
FS FAR SIDE
GA GAGE
GALV GALVANIZED
GB GRADE BEAM
HORIZ HORIZONTAL
IBC INTERNATIONAL BUILDING CODE
IN INCH/INCHES
JB JOIST BEARING
JST JOIST
JT JOINT
LBS POUNDS
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LONG LONGITUDINAL
LRFD LOAD AND RESISTANCE FACTOR DESIGN
LSH LONG SIDE HORIZONTAL
LSSH LONG SLOTTED HOLES
MBM METAL BUILDING MANUFACTURER
MFR MANUFACTURER
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFG MANUFACTURER
MIN MINIMUM
MPH MILES PER HOUR
NS NEAR SIDE
NTS NOT TO SCALE
OC ON CENTER
OH OPPOSITE HAND
OPNG OPENING
OVS OVERSIZED
PERIM PERIMETER
PL PLATE
± PLUS/MINUS
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POINT
REF REFER
REINF REINFORCE/REINFORCING
REQ'D REQUIRED
SCHED SCHEDULE
SDI STEEL DECK INSTITUTE
SF SQUARE FEET
SIM SIMILAR
SJ SAWCUT JOINT
SJI STEEL JOIST INSTITUTE
SL SNOW LOAD
SSLT SHORT SLOTTED HOLES
SSMA STEEL STUD MANUFACTURERS
ASSOCIATION
STD STANDARD
STIFF STIFFENER
TO TOP OF
TOF TOP OF FOUNDATION/FOOTING
TOS TOP OF STEEL
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VERT VERTICAL
W/ WITH
W/O WITHOUT
WL WIND LOAD
WP WORKING POINT
WWF WELDED WIRE FABRIC
WWR WELDED WIRE REINFORCEMENT
ABBREVIATIONS
MATERIAL DESIGN VALUES
CONCRETE (MINIMUM ULTIMATE COMPRESSIVE STRENGTH AT 28 DAYS,
NORMAL WEIGHT, UNLESS NOTED OTHERWISE)
SLABS ON GRADE AND FOUNDATIONS....................... 4,000 PSI
ALL OTHER STRUCTURAL CONCRETE, UNO.............. 4,000 PSI
CONCRETE REINFORCEMENT(MINIMUM YIELD STRENGTH)
ALL DEFORMED BARS, UNLESS NOTED OTHERWISE.
(ASTM A615, GRADE 60).......................................... Fy = 60,000 PSI WELDED WIRE FABRIC (ASTM A185).......................... Fy = 60,000 PSI SMOOTH BARS (ASTM A82).......................................... Fy = 70,000 PSI DEFORMED BAR ANCHORS (ASTM A706)................... Fy = 60,000 PSI
STRUCTURAL STEEL (MINIMUM YIELD STRENGTH)
WIDE FLANGES (ASTM A992 OR A572, GR. 50).......... Fy = 50,000 PSI HSS RECTANGULAR (ASTM A500, GRADE C).............. Fy = 50,000 PSI PIPES (ASTM A53, GRADE B)........................................ Fy = 35,000 PSI
BASE PLATES AND EMBED PLATES (ASTM A572)...... Fy = 50,000 PSI ALL OTHER PLATES (ASTM A36).................................. Fy = 36,000 PSI
ANCHOR RODS
(ASTM F 1554, WELDABLE GRADE 55).................... Fy = 55,000 PSI
COLD FORMED STRUCTURAL SHAPES....................... Fy = 33,000 PSI (MIN)
ALL OTHER SHAPES, UNLESS NOTED
OTHERWISE (ASTM A36).......................................... Fy = 36,000 PSI
MISCELLANEOUS NOTES
1.
2.
3.
4.
STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH
PROJECT SPECIFICATIONS AND ALL OTHER DISCIPLINE
CONSTRUCTION DOCUMENTS.
IF THERE IS CONFLICTING INFORMATION, THE MORE STRINGENT
SHALL BE ASSUMED. IF THERE IS NOT A CLEAR INTENT,
CONTACT THE ARCHITECT/ENGINEER OF RECORD.
GENERAL NOTES AND TYPICAL DETAILS APPLY TO THE ENTIRE
PROJECT AND CONVEY ENGINEERING INTENT. SPECIFIC
DETAILS ARE NOT DRAWN FOR EVERY CONDITION OF
CONSTRUCTION OR ASSEMBLY. MANY CONDITIONS SIMILAR TO
THOSE DEPICTED EXIST AND THOSE SIMILAR CONDITIONS ARE
INCLUDED IN THE CONTRACT SCOPE OF WORK. THE
CONTRACTOR SHALL INCLUDE COST OF THE WORK FOR THESE
SIMILAR CONDITIONS. FUTURE CLARIFICATION OF DETAILS
SHALL NOT BE THE BASIS OF ADDITIONAL COMPENSATION FOR
THE CONTRACTOR.
REFERENCE DATUM ELEVATION 100'-0" IS EQUAL TO THE ACTUAL
FINISH FLOOR ELEVATION PROVIDED BY CIVIL. REFERENCED
ELEVATIONS ARE BASED ON THIS DATUM ELEVATION.
CONSTRUCTION NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
ALL DIMENSIONS AND ELEVATIONS RELATED TO EXISTING
STRUCTURES MUST BE VERIFIED IN THE FIELD AS REQUIRED FOR NEW
CONSTRUCTION. SIGNIFICANT DISCREPANCIES SHALL BE REPORTED
TO THE ARCHITECT/ENGINEER OF RECORD.
THE SPECIFIED DIMENSIONS ON THE DRAWINGS SHALL GOVERN,
SCALING DRAWINGS IS AT THE RISK OF THE CONTRACTOR.
CONTACT THE ARCHITECT/ENGINEER OF RECORD IF INTERFERING
PIPES, UTILITIES, OR FIXTURES ARE IDENTIFIED THAT MAY IMPACT
CONSTRUCTION.
THE CONTRACTOR SHALL PROVIDE AND INSTALL ALL SHORING, PROPS,
AND GUYS REQUIRED FOR THE TEMPORARY SUPPORT OF THE
EXISTING OR NEW STRUCTURE AND SAFELY REMOVE SAME AFTER
COMPLETION.
THE CONTRACTOR IS HELD RESPONSIBLE FOR PROTECTION OF
PERSONNEL AND EQUIPMENT DURING THE COURSE OF OPERATIONS
ACCORDING TO CURRENT SAFETY REGULATIONS.
THE CONTRACTOR SHALL SUBMIT COPIES OF SHOP DRAWINGS OF ALL
NEW WORK TO THE ENGINEER OF RECORD FOR REVIEW.
THE CONTRACTOR SHALL REPAIR ALL EXISTING WORK WHICH HAS
BEEN DAMAGED BY THE CONSTRUCTION OPERATIONS AND REMOVE
ALL DEBRIS FROM THE SITE AFTER COMPLETION OF THE PROJECT.
THE CAPACITY OF SUPPORTING STRUCTURE SHALL BE VERIFIED PRIOR
TO LOADING WITH CONSTRUCTION MATERIAL AND CONSTRUCTION
EQUIPMENT.
THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL
EQUIPMENT AND OPENING FRAMING WITH THE ACTUAL PURCHASED
EQUIPMENT.
CONTRACTOR TO FOLLOW MANUFACTURERS RECOMMENDED
SPECIFICATION AND INSTALLATION PROCEDURES. IF THE
MANUFACTURER RECOMMENDATIONS CONFLICT WITH THE CONTRACT
DOCUMENTS, CONTRACTOR SHALL NOTIFY THE ARCHITECT/ENGINEER
OF RECORD TO RESOLVE DISCREPANCIES.
FIELD CUTTING AND NOTCHING OF NEW OR EXISTING STRUCTURAL
MEMBERS IS NOT PERMITTED BY OTHER TRADES WITHOUT APPROVAL
FROM THE ENGINEER OF RECORD ON A CASE-BY-CASE BASIS.
CONCRETE CONSTRUCTION NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
ALL DETAILING, FABRICATION AND PLACING OF REINFORCING
BARS, UNLESS NOTED OTHERWISE, SHALL FOLLOW THE LATEST
EDITION ACI DETAILING MANUAL, DETAILS AND DETAILING OF
CONCRETE REINFORCEMENT, ACI MANUAL OF ENGINEERING
AND PLACING DRAWINGS FOR REINFORCED CONCRETE
STRUCTURES, ACI SPECIFICATIONS FOR STRUCTURAL
CONCRETE FOR BUILDINGS AND THE PROVISIONS OF ACI
"BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE"
(ACI 318-APPLICABLE EDITION).
UNLESS NOTED OTHERWISE, LAP SPLICES OR EMBEDMENT
LENGTHS SHALL CONFORM TO ACI REQUIREMENTS FOR CLASS B
SPLICES. REFER TO REINFORCEMENT LAP LENGTH SCHEDULE.
UNLESS NOTED OTHERWISE, CONCRETE COVER OVER STEEL
REINFORCEMENT SHALL CONFORM TO MINIMUM REQUIRED BY
ACI 318-APPLICABLE EDITION.
AT INTERSECTING FOUNDATIONS AND WALLS EXTEND ALL
HORIZONTAL REINFORCING OF THE INTERSECTING MEMBER
BEYOND THE POINT OF INTERSECTION TO THE OPPOSITE FACE
AND BEND TO A STANDARD 90 DEGREE HOOK, OR PROVIDE
BENT DOWELS OF EQUAL SIZE AND SPACING AND LAP AS
REQUIRED BY NOTE 2 (BUT NOT LESS THAN 24") IN EACH
DIRECTION. REFER TO TYPICAL CONCRETE PLAN DETAIL.
TOP STEEL REINFORCING OF CONT FOOTINGS SHALL PASS
THROUGH THE CONFINED CORE OF THE COLUMN FOOTING.
BOTTOM STEEL REINFORCING OF FOOTINGS SHALL PASS
THROUGH THE CONFINED CORE OF THE COLUMN FOOTING.
FOOTING TIE/STIRRUPS SHALL START WITHIN 3" OF FACE OF
COLUMN FOOTING.
ALL REINFORCING SHALL BE SUPPORTED FROM THE INTERIOR
OF THE CONCRETE ELEMENTS. PROVIDE ALL STANDS
REQUIRED TO ADEQUATELY HOLD REINFORCEMENT IN PLACE
DURING CONCRETE PLACEMENT.
HARD FORM SIDES OF ALL GRADE BEAMS IN CONTACT WITH
EARTH TO ENSURE MINIMAL FRICTION AT THE INTERFACE TO
ALLOW FOR VERTICAL SOIL MOVEMENT.
A SINGLE CONCRETE POUR SHALL NOT EXCEED 100 FEET FOR
GRADE BEAMS AND WALLS NOR 50 FEET FOR TRENCHES.
CONSTRUCTION JOINTS SHALL BE LOCATED BETWEEN 1/4
POINT AND 1/3 POINT OF A SPAN, WHERE A SPAN IS ASSUMED
TO BE THE COLUMN SPACING. REFER BULKHEAD DETAIL.
PROVIDE SLEEVES IN FOOTINGS, BEAMS, SLABS AND WALLS
FOR ALL PENETRATIONS (DO NOT DRILL). LOCATIONS MUST BE
APPROVED BY ARCHITECT-ENGINEER. PIPE PENETRATIONS
THROUGH FOOTINGS SHALL NOT INTERRUPT THE LONGITUDINAL
REINFORCEMENT OF THE GRADE BEAMS.
POST INSTALLED DOWELS INTO CONCRETE SHALL UTILIZE A
DRILLED AND EPOXIED SYSTEM, UNLESS NOTED OTHERWISE.
SUBSTITUTION REQUESTS SHALL PROVIDE CALCULATIONS AND
DEMONSTRATE PRODUCT APPLICABILITY BY ICC ESR SHOWING
COMPLIANCE WITH THE RELEVANT BUILDING CODE FOR SEISMIC
USE, LOAD RESISTANCE, INSTALLATION CATEGORY, AND ANY
OTHER RELEVANT PROJECT CONDITIONS.
UNLESS NOTED OTHERWISE ON ARCHITECTURAL DRAWINGS,
PROVIDE 3/4" CHAMFER ON ALL EXPOSED CONCRETE EDGES.
PROVIDE CONCRETE EQUIPMENT PADS OF SIZE REQUIRED FOR
EQUIPMENT FURNISHED. SEE MECHANICAL AND ELECTRICAL
DRAWINGS FOR NUMBER, SIZE AND LOCATION OF SUCH PADS
ON THE FLOOR SLAB UNLESS OTHERWISE SHOWN. MINIMUM
THICKNESS SHALL BE 4". MINIMUM REINFORCING SHALL BE #4
BARS AT 12" ON CENTER EACH WAY. TOOLED OR CHAMFERED
EDGES SHALL BE PROVIDED AT ALL MECHANICAL PADS.
THE SIZE AND LOCATION OF ALL EQUIPMENT PADS, FLOOR PITS,
TRENCH DRAINS AND OPENINGS FOR ALL DUCTS AND PIPES
THROUGH FLOOR SLABS AND FOOTINGS SHALL BE VERIFIED
WITH THE MECHANICAL AND ELECTRICAL CONTRACTORS
REQUIREMENTS PRIOR TO PLACEMENT.
ALL JOINTS IN PITS AND TRENCHES SHALL BE KEYED.
WATERSTOPS SHALL BE INSTALLED IN ALL CONSTRUCTION
JOINTS. ALL PITS AND TRENCHES SHALL BE WATER-PROOFED.
ALL CONCRETE SLAB ACCESSORIES (TRENCHES, GRATING,
EMBEDDED ITEMS, ETC.) SHALL BE DESIGNED FOR THE UNIFORM
AND CONCENTRATED LIVE LOADS INDICATED IN THE DESIGN
CRITERIA.
LOCALLY SLOPE THE SLAB TO FLOOR DRAINS WITH AN 18"
RADIUS AROUND THE DRAIN BODY. REFER PLUMBING FOR
ADDITIONAL FLOOR DRAIN INFORMATION.
REFER TO THE PLUMBING SPECIFICATIONS FOR THE USE OF
SLEEVES AND SEALANTS AT PLUMBING PENETRATIONS
THROUGH THE STRUCTURALLY SUSPENDED SLAB.
STEEL DECK & JOISTS NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
AT ROOF LEVELS, THE DECK SHALL BE ATTACHED TO SUPPORTS
AS DEFINED IN PLAN NOTES.
ALL STEEL DECK SHALL SPAN A MINIMUM OF (3) SPANS IN THE
DIRECTION SHOWN ON THE FRAMING PLANS.
ROOF STEEL DECK SHALL CONSIST OF 18 GAGE, 1 1/2 INCH WIDE
RIB GALVANIZED DECKING (TYPE B) WITH RIB SPACING AT 6
INCHES ON CENTER. PROPERTIES SHALL MEET OR EXCEED THE
SDI SPECIFIED MINIMUM.
THE JOIST MANUFACTURER AND ERECTOR SHALL PROVIDE
ADDITIONAL BRIDGING DURING CONSTRUCTION SEQUENCING AS
REQUIRED BY THE CURRENT SJI SPECIFICATIONS AND OSHA
REQUIREMENTS.
JOIST MANUFACTURER TO PROVIDE BRIDGING AS REQUIRED
FOR ALL LOADING CONDITIONS.
BETWEEN PANEL POINTS OF STEEL JOISTS THE CHORD
MEMBERS SHALL SUPPORT 100 LB VERTICAL LOADS WITHOUT
REINFORCEMENT OF THE CHORD. OFF PANEL POINT LOADING IN
EXCESS OF 100 LBS WILL REQUIRE JOIST CHORD REINFORCING.
NO VERTICAL LOAD SHALL BE IMPOSED ON THE BRIDGING. NO
LOAD SHALL BE APPLIED TO A JOIST THAT EXCEEDS THE
CAPACITY OF THE JOIST.
JOISTS AND BRIDGING SHALL BE DESIGNED BY THE JOIST
MANUFACTURER FOR THE LOADS SHOWN IN THE DIAGRAMS,
NOTES AND SCHEDULES SHOWN IN THE STRUCTURAL
DRAWINGS.
JOIST TOP CHORD EXTENSIONS SHALL BE DESIGNED FOR THE
SAME GRAVITY LOADS AS THE REMAINDER OF THE JOIST.
BRIDGING ANGLES SHALL BE X-BRACED AT EACH END OF A ROW
OF BRIDGING AND AT ANY DISCONTINUITIES WITHIN THE ROW.
IN ADDITION TO THE ATTACHMENT AT SUPPORTING BEAMS AND
JOIST, THE SPECIFIED DECK ATTACHMENT APPLIES AT BENT
PLATES AND ANGLES IN CONTACT WITH THE DECK.
STEEL CONSTRUCTION NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
ALL STRUCTURAL STEEL SHALL BE DETAILED, FABRICATED, AND
ERECTED IN ACCORDANCE WITH THE APPLICABLE EDITIONS OF
THE AISC "CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS
AND BRIDGES" AND THE AISC "SPECIFICATION FOR STRUCTURAL
STEEL BUILDINGS", AND AS SUPPLEMENTED BY THESE GENERAL
NOTES IN ADDITION TO THE PROJECT SPECIFICATIONS.
THE STEEL CONTRACTOR SHALL FURNISH ERECTION BOLTS AS
REQUIRED FOR FIELD CONNECTIONS.
ALL BEAMS THAT ARE REQUIRED TO HAVE CAMBER SHALL BE
FABRICATED WITH CAMBERS UPWARD. BEAMS WITHOUT
SPECIFIED CAMBER SHALL BE FABRICATED SUCH THAT AFTER
ERECTION ANY CAMBER DUE TO ROLLING OR SHOP
FABRICATION IS UPWARD.
ALL SHOP AND FIELD WELDS SHALL BE MADE IN ACCORDANCE
WITH THE ANSI/AWS "D1.1 STRUCTURAL WELDING CODE -
STEEL", APPLICABLE EDITION.
UNLESS NOTED OTHERWISE, ALL BOLTS SHALL BE ASTM A325-N
WITH SUITABLE WASHERS AND NUTS.
SUBSTITUTION OF EXPANSION ANCHORS FOR EMBEDDED
ANCHORS SHOWN ON THE DRAWING WILL NOT BE PERMITTED.
CUTS, HOLES, COPING, ETC. REQUIRED FOR WORK OF OTHER
TRADES SHALL BE SHOWN ON THE SHOP DRAWINGS AND MADE
IN THE SHOP. CUTS OR BURNING OF HOLES IN STRUCTURAL
STEEL MEMBERS IN THE FIELD WILL NOT BE PERMITTED.
THE ERECTION CONTRACTOR SHALL SURVEY ANCHOR RODS
AND REPORT ANY DISCREPANCIES FROM THE CONTRACT
DOCUMENTS TO THE ARCHITECT-ENGINEER. ALL CORRECTIONS
TO WORK MUST BE APPROVED IN WRITING BY THE ARCHITECT-
ENGINEER PRIOR TO THE START OF ERECTION.
ALL STRUCTURAL STEEL EMBEDDED IN CONCRETE, SHALL BE
HOT-DIPPED GALVANIZED, UNLESS NOTED OTHERWISE.
ANCHOR RODS, BASE PLATES, AND THE BOTTOMS OF COLUMNS
WITHIN THE BLOCKOUT CONCRETE DO NOT REQUIRE HOT-DIP
GALVANIZING.
ALL ADDITIONAL FRAMING REQUIRED TO SUPPORT OR BRACE
MECHANICAL OR ELECTRICAL EQUIPMENT OR PIPING NOT
SHOWN ON THE STRUCTURAL DRAWINGS SHALL BE SUPPLIED
BY THE MECHANICAL OR ELECTRICAL CONTRACTOR AT NO
ADDITIONAL COST TO THE OWNER.
REINFORCED MASONRY NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
ALL CMU SHALL BE 1 OR 2-CELL BLOCK.
MASONRY DESIGN STRENGTH, f ’m = 2,000 PSI.
MINIMUM MORTAR COMPRESSIVE STRENGTH SHALL BE 2,000 PSI
AT 28 DAYS.
CELLS WHICH CONTAIN REINFORCING STEEL SHALL BE FILLED
SOLIDLY WITH 2,000 PSI COARSE GROUT MEETING THE
REQUIREMENTS OF ASTM C476.
VERTICAL CELLS TO BE FILLED SHALL HAVE VERTICAL
ALIGNMENT SUFFICIENT TO MAINTAIN A CLEAR UNOBSTRUCTED
CONTINUOUS VERTICAL CELL NOT LESS THAN 2 INCHES BY 3
INCHES IN PLAN DIMENSION.
SLAB DOWELS SHALL BE INSTALLED PER THE CMU DETAILS.
LOCATION OF CONTROL JOINTS SHALL BE AS SHOWN ON CMU
ELEVATION SHEETS AND DETAILS OF CONTROL JOINTS SHALL
BE AS SHOWN, REFER TO TYPICAL MASONRY DETAILS.
REFER TO ARCHITECTURAL DRAWINGS FOR ALL CMU WALL
INFORMATION NOT SHOWN IN STRUCTURAL.
VERTICAL WALL REINFORCING SHALL USE #5 BARS AT 32 INCHES
ON CENTER. VERTICAL REINFORCING SHALL EXTEND
CONTINUOUSLY FROM THE TOP OF THE SLAB TO EMBED AT
LEAST 6 INCHES INTO FLOOR OR ROOF DIAPHRAGM BOND BEAM.
LAP SPLICES OF 60 BAR DIAMETERS ARE REQUIRED.
DIAPHRAGM BOND BEAMS SHALL BE DEFINED AS THE BOND
BEAM AT THE FLOOR/ROOF LEVEL OR WHERE ANGLE KICKERS
ARE PROVIDED.
BOND BEAM REINFORCING SHALL USE (2)-#4 BARS AND SHALL
RUN CONTINUOUS THROUGHOUT. CORNER BARS SHALL BE
PROVIDED AND LAP SPLICES OF 40 BAR DIAMETERS ARE
REQUIRED. BOND BEAMS SHALL EXIST AT THE BOTTOM, TOP,
AND INTERMEDIATE (EVERY 6TH COURSE OR CLOSER PER
DETAILS). COORDINATE WITH ARCHITECTURAL REQUIREMENTS.
AN ADDITIONAL VERTICAL BAR OF THE SAME SIZE AND LENGTH
AS THE NORMAL REINFORCING BAR SHALL BE PLACED:
A. ON EACH SIDE OF CONTROL JOINTS
B. AT ALL WALL INTERSECTIONS OF EXTERIOR WALLS
C. AT ALL DISCONTINUOUS EDGES
D. AT ALL DOOR AND WINDOW JAMBS
E. AS SHOWN ON STRUCTURAL DRAWINGS
THE ONLY OPENING IN CMU WALLS NEEDED IS THAT FOR AN
HVAC DUCT. AT THAT LOCATION USE A STANDARD BOND BEAM
WITH (2)-#4 AS A LINTEL.
POST-INSTALLED DOWEL OR ANCHOR APPLICATIONS INTO
GROUTED MASONRY CELLS SHALL UTILIZE A DRILLED AND
EPOXIED SYSTEM, UNLESS NOTED OTHERWISE. SUBSTITUTION
REQUESTS SHALL PROVIDE CALCULATIONS AND DEMONSTRATE
PRODUCT APPLICABILITY BY ICC ESR SHOWING COMPLIANCE
WITH THE RELEVANT BUILDING CODE FOR SEISMIC USE, LOAD
RESISTANCE, INSTALLATION CATEGORY, AND ANY OTHER
RELEVANT PROJECT CONDITIONS.
SOILS/FOUNDATION NOTES
1.
2.
3.
4.
5.
FOUNDATION RECOMMENDATIONS ARE BASED ON THE
GEOTECHNICAL REPORT PREPARED BY ROCK ENGINEERING
AND TESTING LABORATORY, INC. DATED MAY 29, 2019 FOR
PROPOSED MISSION TRAINING CENTER JBSA LACKLAND -
KELLY FIELD ANNEX, SAN ANTONIO, TEXAS, PROJECT
NO.:219148.
ALLOWABLE UNDERREAMED DRILLED PIER FOUNDATION
CAPACITY (21 FT BELOW EXISTING GRADE):
END BEARING ………………………………..10,500 PSF
FLOOR SLABS AND GRADE BEAMS SHALL BE CONSTRUCTED
ON 12" VOID FORMS. THE BUILDING SLAB SHALL BE PLACED
OVER A VAPOR RETARDER AS SPECIFIED IN THE
SPECIFICATIONS.
AFTER EXCAVATING, GRADE BEAMS SHOULD BE INSPECTED
AND CONCRETE PLACED AS QUICKLY AS POSSIBLE TO AVOID
EXPOSURE TO WETTING AND DRYING.
WATER SHOULD NOT BE ALLOWED TO COLLECT IN THE
EXCAVATIONS OR NEAR THE FOUNDATIONS AND FLOOR SLAB
AREAS OF THE BUILDINGS DURING CONSTRUCTION.
POST-INSTALLED ANCHOR NOTES
1.
2.
3.
POST-INSTALLED ANCHORS SHALL ONLY BE USED WHERE
SPECIFIED ON THE DRAWINGS. CONTRACTOR SHALL OBTAIN
APPROVAL FROM ENGINEER OF RECORD (EOR) PRIOR TO USING
POST-INSTALLED ANCHORS FOR MISSING OR MISPLACED
ANCHORS.
CARE SHALL BE GIVEN TO AVOID CONFLICTS WITH EXISTING
REINFORCING WHEN DRILLING HOLES. HOLES SHALL BE DRILLED
AND CLEANED PER THE MANUFACTURER'S INSTRUCTIONS.
ANCHORS SHALL BE INSTALLED PER THE MANUFACTURER'S
INSTALLATION INSTRUCTIONS AT NOT LESS THAN MINIMUM
EDGE DISTANCES AND/OR SPACINGS INDICATED IN THE
MANUFACTURER'S LITERATURE.
SPECIAL INSPECTION SHALL BE PROVIDED FOR ALL ADHESIVE
AND MECHANICAL ANCHOR INSTALLATIONS AS REQUIRED BY
THE EOR. INDEPENDENT ON-SITE PROOF LOAD TESTING SHALL
BE PERFORMED AS REQUIRED BY THE EOR. CONTACT EOR FOR
NUMBER OF ANCHORS REQUIRED TO BE TESTED AND REQUIRED
PROOF LOAD MAGNITUDE.
COLD-FORMED FRAMING NOTES:
1.
2.
COLD-FORMED FRAMING SHALL CONFORM WITH THE NORTH
AMERICAN SPECIFICATION FOR THE DESIGN OF COLD-FORMED
STEEL STRUCTURAL MEMBERS AISI S100-2007.
COLD-FORMED METAL FRAMING SHALL BE 16 GA MINIMUM
THICKNESS.
5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
Frankfurt-Short-Bruza Associates,P.C.
D
SHEET NUMBER:
ISSUE DATE:
SHEET TITLE:
PROJECT NUMBER:
PROJECT INFORMATION:
REVISION HISTORY:
DATEDESCRIPTION
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT MANAGER:
C
B
A
D
C
B
A
54321
20190310
NDM
Jo in t B as e S an A nt on io
JB
SA
Ke lly A nn ex , T ex as
Te xa s Ai r N at io na l G ua rd 9t h
FW
F- M iss io n Tr ain in g Ce nt er (M
TC
C :\U sers\nolm stead\D ocum ents\90310_Stru_nolm steadFK74B.rvt 09/13/24 16:34:03
15 AUGUST 2024
GENERAL NOTES
S-001
BJW
CGH
CGH
1 Addendum 02 09/16/2024