SOW Attachment 1 - AF Form 66 B901 50 ton air-cooled chiller repairs.xlsx

XLSX spreadsheet 35 KB Posted

Attached to
B901 Chiller Repair
Solicitation number
24-034
Issued by

About this file

The document provided is the Schedule of Material Submittals for a capital project to repair a 50-ton air-cooled chiller at Building 901. It lists various submittal requirements for the contractor, including an Accident Prevention Plan, Dumpster Location, Warranties, Parking and Storage Area, Work Clearance Request, Planned Outages, Disposition of Waste Materials, Environmental Hazardous Waste Record, Hazardous Materials Safety Data Sheets, Air Emissions Report, Construction Waste Management Form, and Parts and Materials. The submission deadlines and approval requirements are specified for each submittal.

The related federal contract opportunity is for the repair of the 50-ton air-cooled Carrier chiller at Building 901, located at Goodfellow Air Force Base in Texas. The solicitation is being issued by the 17th Contracting Squadron and includes replacing specific chiller components. The contract will be a Firm Fixed-Price award to the responsible offeror whose proposal conforms to the requirements and is most advantageous to the government. The Period of Performance is 30 days after date of award. The acquisition is set aside for 100% Total Small Business.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIAL SUBMITTALSCAPITAL PROJECT:PROJECT TITLE: B901 50 tn air-cooled chiller repairsSOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY THE PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL (Ref spec & para no.)CERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYOPERATING INSTRUCTIONSSEE PARA ON COPIESOTHERS AS SPECIFIEDREQUIRED SUBMISSION DATEDATE RECEIVED IN CON-TRACTINGDATE TO CIVIL ENGINEER-INGRETURN SUSPENSE DATEFOLLOW UPDATE CONTRACTOR NOTIFIEDCONTRACT-TOR RE-SUBMITTALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
2Part 1, 1.7.1 Accident Prevention Plan4(e)FIO
3Part 1, 1.9.4 Dumpster Location4(c)GA
4Part 1, 1.12 Warranties4(b)GA
5Part 1, 1.13.1 Parking and Storage Area4(c)GA
6Part 1, 1.14.1.1 Work Clearance Request, AF Form 1034(e)GA
7Part 1, 1.14.2 Planned Outages414 Days Prior (d)GA
8Part 1, 1.15, Disposition of Waste Materials4(b)FIO
9Part 2, 2.2, Environmental Hazardous Waste Record4(a)GA
Part 2, 2.4.1, Certificate certifing no asbestos was used in construction4(b)FIO
8Part 2, 2.5, Hazardous Materials, SDS4(c)GA
9Part 2, 2.8, Air Emissions Report4Monthly (d)FIO
10Part 2, 2.9, Construction Waste Management Form Submittal4(d)GA
11Part 2, 2.11.2.2 Construction Product minimums4(d)GA
Part 3, 3.4, Parts and Materials4(e)GA
12Part 4, 4.3 Daily Reports4(d)GA
AF Form 66
When applicable:
(a) As soon as possible but in no case later than 45 calendar days after NTP
(b) Prior to Final Inspection
(c) Prior to Use.
(d) As Required.
(e) Prior to Start of Construction

PAGE &P OF &N

FORM66.xls