Response to Invitation to Negotiation - BPM005628 On-Call Pipelining 11.20.23.pdf
PDF 157 KB Posted
- Attached to
- On-Call Pipelining and Drainage Repair Services
- Solicitation number
- BPM005628
- Issued by
- Arizona
About this file
This is a response to an Invitation to Negotiation submitted by Granite Construction Company (GCC) to the State of Arizona Department of Transportation (ADOT) for the On-Call Pipelining and Drainage Repair Services contract BPM005628. Rachel Barrick, an Estimator at Granite Construction, submitted revised documentation on November 20, 2023, in response to the negotiation request. The submission included four attachments: a revised price sheet, equipment write-up documentation, and two separate method of approach documents addressing drainage excavation and pipe installation procedures.
The response package contained detailed technical and pricing information organized to address the specific requirements outlined in the invitation to negotiate. Granite Construction's submission included comprehensive equipment specifications, pricing schedules, and detailed methodology documentation for both drainage excavation and pipelining work. The company requested confirmation of receipt for the submitted materials and provided contact information for follow-up questions or clarifications regarding the proposal.
View the file
Other files
Show 40 more
Latest 50 of 66 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Danyelle Ellington <dellington@azdot.gov>
Response to Invitation to Negotiation – BPM005628 On-Call Pipelining and Drainage Repair Services
Barrick, Rachel <Rachel.Barrick@gcinc.com> Mon, Nov 20, 2023 at 2:41 PM To: "dellington@azdot.gov" <dellington@azdot.gov>
Good afternoon Danyelle, Attached please find the revised documents as listed below, if there are any questions, please let us know. Please verify receipt of this response.
BPM005628 Revised Price Sheet Equipment Write-up Method of Approach – Drainage Excavation Method of Approach – Pipe
Thank you, Rachel Barrick
Estimator
Mobile: 520-539-8948 graniteconstruction.com
4 attachments
BPM005628 Revised Price Sheet_GCC.xlsx 26K
Equipment Write up - Combined.pdf 224K
Method of Approach - Drainage Excavation.pdf 162K http://www.graniteconstruction.com/ https://www.facebook.com/graniteconstruction/ https://www.facebook.com/graniteconstruction/ https://www.linkedin.com/company/granite-construction/ https://www.linkedin.com/company/granite-construction/ https://twitter.com/Granite https://twitter.com/Granite https://www.instagram.com/graniteconstruction/ https://www.instagram.com/graniteconstruction/ https://www.youtube.com/c/GraniteConstructionIncorporated https://www.youtube.com/c/GraniteConstructionIncorporated https://www.tiktok.com/@granite_construction https://www.tiktok.com/@granite_construction https://mail.google.com/mail/u/0/?ui=2&ik=c3a3443fef&view=att&th=18beeaec6ee8af8a&attid=0.1&disp=attd&safe=1&zw https://mail.google.com/mail/u/0/?ui=2&ik=c3a3443fef&view=att&th=18beeaec6ee8af8a&attid=0.1&disp=attd&safe=1&zw https://mail.google.com/mail/u/0/?ui=2&ik=c3a3443fef&view=att&th=18beeaec6ee8af8a&attid=0.2&disp=attd&safe=1&zw https://mail.google.com/mail/u/0/?ui=2&ik=c3a3443fef&view=att&th=18beeaec6ee8af8a&attid=0.2&disp=attd&safe=1&zw https://mail.google.com/mail/u/0/?ui=2&ik=c3a3443fef&view=att&th=18beeaec6ee8af8a&attid=0.3&disp=attd&safe=1&zw https://mail.google.com/mail/u/0/?ui=2&ik=c3a3443fef&view=att&th=18beeaec6ee8af8a&attid=0.3&disp=attd&safe=1&zw
Method of Approach - Pipe.pdf 163K https://mail.google.com/mail/u/0/?ui=2&ik=c3a3443fef&view=att&th=18beeaec6ee8af8a&attid=0.4&disp=attd&safe=1&zw https://mail.google.com/mail/u/0/?ui=2&ik=c3a3443fef&view=att&th=18beeaec6ee8af8a&attid=0.4&disp=attd&safe=1&zw
File details come from the government source that posted it. Updated .