BPM005628 Revised Price Sheet Southwest Siteworks 12.12.23.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
On-Call Pipelining and Drainage Repair Services
Solicitation number
BPM005628
Issued by
Arizona

About this file

This is a revised price sheet for On-Call Pipelining and Drainage Repair Services submitted by Southwest Siteworks for the State of Arizona Department of Transportation (ADOT). The price sheet establishes not-to-exceed unit prices for a comprehensive array of drainage and pipelining materials and services across Arizona's seven transportation districts. Line items encompass HDPE pipe in circular and oval configurations ranging from 12 inches to 78 inches in diameter, with annual estimated quantities varying from 20 to 3,000 linear feet depending on size and type. Additional services include drainage work such as bank protection with dumped rip rap, wire-tied rip rap, and soil-cement applications; rail bank protection at drainage ways and abutments; jetting, drilling, and drainage excavation; hydrovac services; and robotic inspection crawler CCTV camera services. Traffic control and safety items are included, such as traffic cones, flashing arrow panels, signs, barricades, warning lights, and certified civilian flaggers. Mobilization costs are stratified by district, ranging from the Central District at $150 per mile to the Southcentral District at $300 per mile.

All current and revised not-to-exceed unit prices in the price sheet remain unchanged from the original submission, indicating no price adjustments in this revision. HDPE circular pipes range in price from $300 to $1,100 per linear foot, while oval configurations range from $400 to $1,400 per linear foot, with pricing generally increasing with diameter. Drainage work services vary significantly, with dumped rip rap at $1,000 per cubic yard, wire-tied rip rap at $1,500 per cubic yard, and soil-cement at $2,000 per cubic yard. Labor-intensive services such as hydrovac services are priced at $650 per hour, emergency call-out labor at $150 per hour, and certified civilian flaggers at $36 per hour. This on-call contract structure allows ADOT to procure these services as needed across its statewide operations without requiring individual competitive procurements for each project.

View the file

Other files

File Type Posted
6-Method of Approach - Remote Areas.pdf PDF
BPM005628 Revised Price Sheet GCC 12.1.23.xlsx XLSX spreadsheet
6-9_BPM005628_Price_Sheet_Amendment_Three__3_Granite.xlsx XLSX spreadsheet
6-Method of Approach Pipe_1.pdf PDF
SWSW Mob Cost Breakdown 12.4.23.pdf PDF
6-Ordering and Maintaining Materials.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 6 BPM005628 Confidentiality and Trade Secrets.pdf PDF
BPM005628 Summary of Negotiations - SWSW.pdf PDF
6-8_BPM005628_Price_Increase_Percentages.pdf PDF
6-Method of Approach Remote Areas.pdf PDF
BPM005628_Solicitation_Amendment_Summary_Two__2_.pdf PDF
BPM005628 Revised Price Sheet GCC 12.11.23.xlsx XLSX spreadsheet
6-SWSW History.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 8 BPM005628 Price Increase Percentages.pdf PDF
6-Proposal # 1-prop_items.xls XLS spreadsheet
6-3_BPM005628_SPO_Form_205_-_Forced_Labor_of_Ethnic_Uyghurs_Ban.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 1 BPM005628 Offer and Acceptance.pdf PDF
Response BPM005628 Request for BAFO - GCC 12.11.23.pdf PDF
BPM005628_Solicitation_Instructions.pdf PDF
6-Method of Approach Pipe.pdf PDF
BPM005628 Request for BAFO - SWSW.pdf PDF
6-Odering and Maintaing Materials.pdf PDF
Response to Invitation to Negotiation - BPM005628 On-Call Pipelining 11.20.23.pdf PDF
Method of Approach - Pipe 11.20.23.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 7 BPM005628 Equipment List.pdf PDF
Mobilization Narrative 12.4.23.pdf PDF
6-5_BPM005628_References.pdf PDF
Equipment Write up - Combined 11.20.23.pdf PDF
6-Project Team.pdf PDF
6-Method of Approach - Drainage Excavation.pdf PDF
BPM005628 Summary of Negotiations - Southwest Siteworks.pdf PDF
6-Financial Envelope-Proposal # 1-prop_answer.xls XLS spreadsheet
6-On-Call Pipelining and Drainage Repair Services 9 BPM005628 Price Sheet.pdf PDF
6-4_BPM005628_Subcontractors_and_Suppliers.pdf PDF
BPM005628_Solicitation_Amendment_Summary_Four__4_.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 2 BPM005628 Boycott of Israel Disclosure.pdf PDF
BPM005628_Solicitation_Amendment_Summary_Three__3_.pdf PDF
6-6_BPM005628_Confidentiality_and_Trade_Secrets.pdf PDF
BPM005628 Summary of Negotiations - SWSW 11.20.23.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 4 BPM005628 Subcontractors and Suppliers.pdf PDF
BPM005628_Solicitation_Requirements_per_Amendment_Two__2_.pdf PDF
6-Experience in Remote Areas.pdf PDF
BPM005628 Revised Price Sheet_GCC 11.20.23.xlsx XLSX spreadsheet
Experience in Remote Areas 11.20.23.pdf PDF
BPM005628 Summary of Negotiations - GCC 12.1.23.pdf PDF
BPM005628 Request for BAFO - GCC 12.11.23.pdf PDF
6-Equipment - Combined.pdf PDF
BPM005628_Award_Documents.pdf PDF
BPM005628_Evaluation_Documents.pdf PDF
Method of Approach - Drainage Excavation 11.20.23.pdf PDF
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statewide

Line ItemDescriptionUOM (unit of Measure)Statewide ANNUAL Estimated QuantitiesCurrent Not-to-Exceed Unit PriceRevised Not-to-Exceed Unit Price
1HDPE - Circular, 12"L. Ft.360$300.00$300.00
2HDPE - Oval, 12"L. Ft.120$400.00$400.00
3HDPE - Circular, 15"L. Ft.120$350.00$350.00
4HDPE - Oval, 15"L. Ft.20$500.00$500.00
5HDPE - Circular, 18"L. Ft.1,450$350.00$350.00
6HDPE - Oval, 18"L. Ft.220$450.00$450.00
7HDPE - Circular, 21"L. Ft.360$350.00$350.00
8HDPE - Oval, 21"L. Ft.200$450.00$450.00
9HDPE - Circular, 24"L. Ft.2,240$350.00$350.00
10HDPE – Oval, 24"L. Ft.520$450.00$450.00
11HDPE - Circular, 27"L. Ft.760$400.00$400.00
12HDPE - Oval, 27"L. Ft.200$500.00$500.00
13HDPE - Circular, 30"L. Ft.1,300$400.00$400.00
14HDPE - Oval, 30"L. Ft.330$500.00$500.00
15HDPE - Circular, 33"L. Ft.820$450.00$450.00
16HDPE - Oval, 33"L. Ft.300$550.00$550.00
17HDPE - Circular, 36"L. Ft.1,110$450.00$450.00
18HDPE - Oval, 36"L. Ft.490$550.00$550.00
19HDPE - Circular, 39"L. Ft.820$500.00$500.00
20HDPE - Oval, 39"L. Ft.200$600.00$600.00
21HDPE - Circular, 42"L. Ft.960$650.00$650.00
22HDPE - Oval, 42"L. Ft.120$750.00$750.00
23HDPE - Circular, 48"L. Ft.1,160$700.00$700.00
24HDPE - Oval, 48"L. Ft.200$800.00$800.00
25HDPE - Circular, 54"L. Ft.780$750.00$750.00
26HDPE - Oval, 54"L. Ft.100$850.00$850.00
27HDPE - Circular, 60"L. Ft.760$800.00$800.00
28HDPE - Oval, 60"L. Ft.100$900.00$900.00
29HDPE - Circular, 66"L. Ft.560$1,050.00$1,050.00
30HDPE - Oval, 66"L. Ft.100$1,200.00$1,200.00
31HDPE - Circular, 72"L. Ft.600$1,100.00$1,100.00
32HDPE - Oval, 72"L. Ft.100$1,300.00$1,300.00
33HDPE - Circular, 78"L. Ft.560$1,200.00$1,200.00
34HDPE - Oval, 78"L. Ft.100$1,400.00$1,400.00
35Drainage Work - Bank Protection, Dumped Rip RapCY2,125$1,000.00$1,000.00
36Drainage Work - Bank Protection, Wire Tied Rip RapCY850$1,500.00$1,500.00
37Drainage Work - Bank Protection, Soil-CementCY950$2,000.00$2,000.00
38Drainage Work - Rail Bank Protection, Drainage Ways, Type 1, 2, and 3L. Ft.1,682$1,000.00$1,000.00
39Drainage Work - Rail Bank Protection, Rail Bank Protection at Abutments, Type 4, 5, and 6L. Ft.1,682$1,500.00$1,500.00
40Drainage Work - Rail Bank Protection, Drainage Ways, Type 7, 8, and 9L. Ft.1,682$650.00$650.00
41Drainage Work - JettingHr.460$130.00$130.00
42Drainage Work - DrillingFt.1,850$150.00$150.00
43Drainage Work - Drainage ExcavationCY2,050$100.00$100.00
44Drainage Work - Regrading cut ditch, resulting with no surplus materialL. Ft.17,561$10.00$10.00
45Drainage Work - Regrading cut ditch, resulting with surplus material to haulL. Ft.12,531$26.00$26.00
46Hydrovac ServicesHour840$650.00$650.00
47Robotic Inspection Crawler CCTV CameraHour100$150.00$150.00
48Emergency Call Out LaborHour240$150.00$150.00
49Traffic Cones , 28”(height) ReflectorizedEACH-DAY1,062$1.00$1.00
50Flashing Arrow PanelEACH DAY19$50.00$50.00
51Signs over 36” (High Intensity Reflective Sheeting)EACH-DAY96$6.00$6.00
52Sign Stand (Spring Type)EACH-DAY96$2.00$2.00
53Pilot Vehicle with DriverHR280$60.00$60.00
54Variable Message BoardEACH DAY35$50.00$50.00
55Type II BarricadesEACH-DAY142$0.50$0.50
56Warning Lights, Type AEACH-DAY160$0.50$0.50
57Warning Lights, Type BEACH-DAY160$2.00$2.00
58Warning Lights, Type CEACH-DAY160$0.50$0.50
59Vertical PanelsEACH-DAY320$0.50$0.50
60Flag Type High Level Warning DeviceEACH-DAY80$9.00$9.00
61Certified Civilian FlaggersHR520$36.00$36.00
62DPS Law Enforcement Officers and VehiclesHR280$100.00$100.00
63Off-Duty uniformed Local Law Enforcement Officer and vehicleHR280$100.00$100.00
64Light Plant, day is 8 hoursDay22$50.00$50.00
65Mobilization - Central DistrictMile150$150.00$150.00
66Mobilization - Northcentral DistrictMile1,800$70.00$70.00
67Mobilization - Northeast DistrictMile3,000$70.00$70.00
68Mobilization - Northwest DistrictMile260$70.00$70.00
69Mobilization - Southwest DistrictMile280$175.00$175.00
70Mobilization - Southcentral DistrictMile280$300.00$300.00
71Mobilization - Southeast DistrictMile250$175.00$175.00