This is a project team capacity document for the Arizona Department of Transportation's (ADOT) On-Call Pipelining and Drainage Repair Services contract (BPM005628). The document outlines the offeror's dedicated project team, staffing capacity, and key personnel experience for managing pipelining and drainage repair work throughout Arizona. The primary point of contact will be Danny Hoback, Project Manager/Estimator, supported by regional staff consisting of over 12 estimators, 30 project management professionals, and 360 craft personnel in Arizona. The project team includes Rafael Frisby as Underground Superintendent and Andres Amparano as Underground Foreman. The document demonstrates the offeror's ability to dedicate multiple crews to task orders as needed, with flexible staffing arrangements based on the scope and volume of work required under the Master Agreement.
The document emphasizes the extensive qualifications and relevant experience of key personnel. Danny Hoback brings 43 years with the firm and serves as the primary estimator on all ADOT pipelining projects, with additional experience on City of Tucson and Pima County work; he has managed ADOT pipelining contracts valued between $2.3 million and $4.4 million annually from 2019 through 2022, all completed on time and within budget. Rafael Frisby, with 16 years in heavy civil construction and currently serving as Arizona Region Underground Superintendent, holds certifications in CPR/First Aid, MSHA, and Confined Space, with proven experience managing the same 2020-2022 ADOT pipelining contracts. Andres Amparano, holding 18 years of industry experience and 9 years with the firm, possesses CPR/First Aid, MSHA, and Class A CDL certifications, with substantial experience on major projects including Downtown Links Phase III CMAR ($55.5M) and Tucson Airport Authority DBB1 ($27.8M). All three key personnel are certified in CPR/First Aid and carry relevant safety and operational certifications.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAPACITY
ADOT Procurement - On-Call Pipelining and Drainage Repair Services (BPM005628)
In one page or less, Offerors shall list the project team who will be committed to any resulting contract(s), along with their individual responsibilities. Also, how many crews would the offeror have dedicated to any resultant contract.
Demonstrate the experience your On-Site Supervisors have. No more than one page may be submitted for each on-site supervisor.
Danny Hoback, Project Manager/Estimator will be dedicated to this project and will be the main point of contact for ADOT. If additional management or estimating resources are needed to meet the needs of the task order, he will be supported by our regional staff. Granite maintains over 12 estimators, 30 project management professionals, and 360 craft in Arizona. This allows for flexible staffing depending on the number of task orders and scope of work throughout the course of this Master Agreement.
Project Team
Danny Hoback
PROJECT
MANAGER/ESTIMATOR
Rafael Frisby
SUPERINTENDENT
Andres Amparano
FOREMAN
MATERIAL
SUPPLIERS AND
SUBCONTRACTORS
Estimator/Project Manager
Danny Hoback will serve as the Estimator/Project Manager and will be ADOT’s main point of contact.
Unique Qualifications - Over the past several years, Danny has been the main Estimator on all of ADOT’s Pipelining Projects, he has also worked closely for City of Tucson, and Pima County.
Industry Certifications - First Aid/CPR Certified
Years with Firm - 43 years
Experience -
SR 77 Pavement Rehabilitation, Tucson, AZ Superintendent, $34.4M. The project scope includes repaving 11 miles of roadway, drainage improvements, utility relocations, installation of new storm drain system, and new ADA approved ramps, sidewalk, and driveways between River & Magee Roads and between I-10/Miracle Mile and River Road. Additionally, the work includes new LED streetlights and signal and intersection improvements between River and Ina Roads, and the addition of new dual left turn lanes to the intersection of Magee and Oracle Roads
AZ Pipelining 2022, AZ Statewide Estimator/Project Manager, $2.6M, Managed the construction and administration on the 2022 ADOT pipelining contract. The project consisted of hydrovacing, lining pipes, grouting and erosion control for the state of Arizona. The contract value was just over $2.6 million dollars. This project was able to be completed on time and within budget.
AZ Pipelining 2021, AZ Statewide Estimator/Project Manager, $3M, Managed the construction and administration on the 2021 ADOT pipelining contract. The project consisted of hydrovacing, lining pipes, grouting and erosion control for the state of Arizona. The contract value was just over $3 million dollars. This project was able to be completed on time and within budget.
AZ Pipelining 2020, AZ Statewide Estimator/Project Manager, $4.4M, Managed the construction and administration on the 2020 ADOT pipelining contract. The project consisted of hydrovacing, lining pipes, grouting and erosion control for the state of Arizona. The contract value was just over $4.4 million dollars. This project was able to be completed on time and within budget.
AZ Pipelining 2019, AZ Statewide Estimator/Project Manager, $2.3M, Supervised the construction and field operations on the 2019 ADOT pipelining contract. The project consisted of hydrovacing, lining pipes, grouting, and erosion control for the state of Arizona. The contract value was just over $2.3 million dollars. Danny and his team were able to complete the project on time and within budget.
Underground Superintendent
Rafael Frisby will serve as the Underground Superintendent on this project and will help manage the project crew.
Unique Qualifications - Rafael has 16 years of experience in the heavy civil construction industry. His project experience includes drainage/utility/pipeline, multi-use paths, road/highway and expansions projects.
Industry Certifications - CPR/First Aid Certified, MSHA, Confined Space Certification, Safety Competent Person
Years with Firm - 16 years
Experience -
Arizona Region Underground Superintendent 2023 In this role Rafael is responsible for all underground operations in Southern Arizona. He is responsible for coordinating crews, equipment, and resources for the Southern Arizona operations. His crews have worked on nine projects throughout southern Arizona completing the underground and drainage excavation scopes of work.
AZ Pipelining 2022, AZ Statewide Superintendent, $2.6M, Managed the construction and administration on the 2022 ADOT pipelining contract. The project consisted of hydrovacing, lining pipes, grouting and erosion control for the state of Arizona. The contract value was just over $2.6 million dollars. This project was able to be completed on time and within budget.
AZ Pipelining 2021, AZ Statewide Superintendent, $3M, Managed the construction and administration on the 2021 ADOT pipelining contract. The project consisted of hydrovacing, lining pipes, grouting and erosion control for the state of Arizona. The contract value was just over $3 million dollars. This project was able to be completed on time and within budget.
TAA, DBB1, Tucson, AZ Superintendent, $27.8M. The ASE program will transition the airfield at TUS into a new era of safety and provide redundancy with a second parallel runway that will serve the Southern Arizona region for decades to come. The DBB1 project represents a key phase of the ASE program and will expand access for the Air National Guard and other fixed-base operations on the southwest side of the airfield.
Scope of work includes the construction of the new bypass taxiway including pavement removal, earthwork, electrical, drainage, pavement markings, and landscaping. Granite’s Swan Plant, which is adjacent to property owned by TAA and within five miles of the airport, will provide approximately 45,000 tons of hot mix asphalt, and 90,000 tons of aggregate base course.
AZ Pipelining 2020, AZ Statewide Superintendent, $4.4M, Managed the construction and administration on the 2020 ADOT pipelining contract. The project consisted of hydrovacing, lining pipes, grouting and erosion control for the state of Arizona. The contract value was just over $4.4 million dollars. This project was able to be completed on time and within budget.
Underground Foreman
Andres Amparano will serve as the Underground Foreman. His main objective will be to ensure safety, while delivering a project of superior quality, on time and within budget.
Unique Qualifications - Andres has 18 years of experience in the heavy civil construction industry. His project experience includes drainage/utility/pipeline, multi-use paths, road/highway and expansions projects.
Industry Certifications - CPR/First Aid Certified, MSHA, Class A CDL
Years with Firm - 9 years
Experience -
AZ Pipelining 2022, AZ Statewide Foreman, $2.6M, Managed the construction and administration on the 2022 ADOT pipelining contract.
The project consisted of hydrovacing, lining pipes, grouting and erosion control for the state of Arizona.
The contract value was just over $2.6 million dollars. This project was able to be completed on time and within budget.
AZ Pipelining 2021, AZ Statewide Foreman, $3M, Managed the construction and administration on the 2021 ADOT pipelining contract.
The project consisted of hydrovacing, lining pipes, grouting and erosion control for the state of Arizona.
The contract value was just over $3 million dollars. This project was able to be completed on time and within budget.
Downtown Links Phase III CMAR, Tucson AZ Foreman, $55.5M, CMAR. This project is currently in construction providing a new four-lane dived roadway through downtown Tucson, connecting Aviation Parkway with Interstate 10. The project starts south of the existing Broadway Boulevard intersection at Aviation Parkway and creates a new roadway alignment northwest to 6th Street. The new four-lane roadway alignment runs adjacent to the Union Pacific Railroad (UPRR) before meandering through a dense historic district of downtown where it ultimately plunges 30 ft under an active UPRR section of doubletrack freight rail. The project scope includes dry utilities, storm drain water, new drainage facilities centered around a double barrel 10 ft x 12 ft RCBC, significant improvements to large diameter sewer and water systems, relocation of critical national communications facilities in the UPRR right-of-way, upgrades to multiple railroad crossings, multiple signalized intersections, and a variety of multi-model features. Andres was responsible for, and assisting in, maintaining project controls to provide the team with timely cost, productivity, quality, and schedule information, as needed for efficient resource management and planning.
TAA, DBB1, Tucson, AZ Foreman, $27.8M. The DBB1 project represents a key phase of the ASE program and will expand access for the Air National Guard and other fixed-base operations on the southwest side of the airfield.
Scope of work includes storm drain, HDPE, 16” ductile iron water pipe, CMP, RCP, the construction of a new bypass taxiway including pavement removal, earthwork, electrical, drainage, pavement markings, and landscaping. Granite’s Swan Plant, which is adjacent to property owned by TAA and within five miles of the airport, will provide approximately 45,000 tons of hot mix asphalt, and 90,000 tons of aggregate base course.