About this file

Award Documents for On-Call Pipelining and Drainage Repair Services

This is an award document from the Arizona Department of Transportation (ADOT) for On-Call Pipelining and Drainage Repair Services under solicitation BPM005628. Two contractors were awarded contracts under this solicitation: Granite Construction Company (Contract No. CTR069178) and Southwest Siteworks LLC (Contract No. CTR069179). Both contracts became effective on December 20, 2023. The solicitation was issued pursuant to the Arizona Procurement Code, A.R.S. 41-2501 et seq. Prior to commencing work, both contractors are required to submit verified insurance documentation, including a completed Contract Insurance Checklist, no later than December 26, 2023. Contractors are cautioned not to begin billable work or provide materials or services until receiving a purchase order document from the state.

The required insurance documentation includes certificates of insurance naming the State of Arizona/ADOT as certificate holder, general liability coverage with additional insured and waiver of subrogation endorsements, auto liability coverage, and worker's compensation with waiver of subrogation endorsement. Additional insurance requirements may include contractor's pollution liability, professional liability, and specialized coverages such as network security and cyber liability, depending on work scope. All required insurance documents and the completed checklist must be submitted to Danyelle Ellington, Procurement Officer, at dellington@azdot.gov. No specific pricing terms, funding amounts, or contract duration information is provided in the award documents.

View the file

Other files

File Type Posted
BPM005628_Solicitation_Amendment_Summary_Two__2_.pdf PDF
BPM005628_Solicitation_Requirements_per_Amendment_Two__2_.pdf PDF
BPM005628_Solicitation_Amendment_Summary_Four__4_.pdf PDF
BPM005628_Solicitation_Instructions.pdf PDF
Method of Approach - Drainage Excavation 11.20.23.pdf PDF
BPM005628 Revised Price Sheet_GCC 11.20.23.xlsx XLSX spreadsheet
BPM005628 Revised Price Sheet GCC 12.11.23.xlsx XLSX spreadsheet
6-Experience in Remote Areas.pdf PDF
6-4_BPM005628_Subcontractors_and_Suppliers.pdf PDF
6-Ordering and Maintaining Materials.pdf PDF
6-Method of Approach Pipe.pdf PDF
Method of Approach Drainage Excavation 11.20.23.pdf PDF
Experience in Remote Areas 11.20.23.pdf PDF
6-Method of Approach Remote Areas.pdf PDF
BPM005628_Solicitation_Amendment_Summary_Three__3_.pdf PDF
6-Project Team.pdf PDF
Equipment Write up - Combined 11.20.23.pdf PDF
6-Method of Approach - Remote Areas.pdf PDF
BPM005628 Summary of Negotiations - GCC 12.1.23.pdf PDF
BPM005628 Revised Price Sheet GCC 12.1.23.xlsx XLSX spreadsheet
6-5_BPM005628_References.pdf PDF
BPM005628 Request for BAFO - GCC 12.11.23.pdf PDF
6-3_BPM005628_SPO_Form_205_-_Forced_Labor_of_Ethnic_Uyghurs_Ban.pdf PDF
6-6_BPM005628_Confidentiality_and_Trade_Secrets.pdf PDF
6-8_BPM005628_Price_Increase_Percentages.pdf PDF
BPM005628 Revised Price Sheet Southwest Siteworks 12.12.23.xlsx XLSX spreadsheet
Mobilization Narrative 12.4.23.pdf PDF
BPM005628 Summary of Negotiations - SWSW.pdf PDF
BPM005628 Summary of Negotiations - SWSW 11.20.23.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 2 BPM005628 Boycott of Israel Disclosure.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 4 BPM005628 Subcontractors and Suppliers.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 6 BPM005628 Confidentiality and Trade Secrets.pdf PDF
BPM005628_Pre-Solicitation_Documents.pdf PDF
BPM005628_Solicitation_Amendment_Summary_Five__5_.pdf PDF
BPM005628_Solicitation_Amendment_Summary_One__1_.pdf PDF
6-Operations Capacity.pdf PDF
6-Company History.pdf PDF
6-Method of Approach - Pipe.pdf PDF
6-2_BPM005628_Boycott_of_Israel_Disclosure.pdf PDF
6-9_BPM005628_Price_Sheet_Amendment_Three__3_Granite.xlsx XLSX spreadsheet
6-1_BPM005628_Offer_and_Acceptance.pdf PDF
6-Project Team .pdf PDF
SWSW Mob Cost Breakdown 12.4.23.pdf PDF
BPM005628 Revised Price Sheet Southwest Siteworks 12.4.23.xlsx XLSX spreadsheet
6-[On-Call Pipelining and Drainage Repair Services] 5 BPM005628 References.pdf PDF
Equipment List 11.20.23.pdf PDF
Method of Approach Pipe 11.20.23.pdf PDF
BPM005628 Revised Price Sheet 11.20.23.xlsx XLSX spreadsheet
6-[On-Call Pipelining and Drainage Repair Services] 3 BPM005628 SPO Form 205 - Forced Labor of Ethnic Uyghurs Ban.pdf PDF
6-Method of Approach Pipe_1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Our True North: Safely Home

ARIZONA DEPARTMENT OF TRANSPORTATION

1655 W. Jackson St. | MD 100P | Phoenix, AZ 85007 | azdot.gov

Rev. 08/2023

Procurement Katie Hobbs, Governor Jennifer Toth, Director

December 20, 2023

Todd A. Hill VP, Arizona Region Granite Construction Company 4115 E. Illinois Street Tucson, AZ 85714

Subject: Award of Contract No. CTR069178

Dear Mr. Hill:

Please be advised that your company has been awarded the contract for On-Call Pipelining and Drainage Repair Services in solicitation BPM005628. The executed Offer and Acceptance is attached. The contract is effective December 20, 2023.

The Contract requires verification of insurance be provided prior to commencement of work. Therefore, insurance document(s) must be submitted in accordance with the requirements stated in the Contract’s Special Terms and Conditions, paragraph 16, Insurance Requirements.

The attached Contract Insurance Checklist is provided to help ensure that all required forms and endorsements are submitted. The required forms, endorsements and completed checklist must be received no later than December 26, 2023. These documents must be e-mailed to me at dellington@azdot.gov.

If you have any questions regarding this contract, please contact me at (602) 712- 8519 or via email.

Sincerely, Danyelle Ellington Procurement Officer

Cc: File

Enclosures (2)

DocuSign Envelope ID: BFF0E624-328C-4597-8A86-878427424C7D

Procurement

ATTACHMENT 1

OFFER AND ACCEPTANCE

Solicitation No: BPM005628 Available online at https://app.az.gov

Rev 09/2022

OFFER

TO THE STATE OF ARIZONA:

The undersigned hereby offers and agrees to perform in compliance with all terms, conditions, specifications and amendments of this solicitation and any written exceptions in the offer. Signature also acknowledges receipt of all pages indicated in the Table of Contents.

Offeror (Company) Name Signature of Person Authorized to Sign Offer

Address Printed Name Date

City State Zip Title

Email Address Phone Number

Company Email Address Fax Number

By signature in the Offer section above, the Offeror certifies that the submission of the Offer did not involve collusion or other anticompetitive practices.

ACCEPTANCE OF OFFER (FOR DEPARTMENT USE ONLY)

The Contractor is now bound to perform based upon Contract Number _________________________________including all terms, conditions, specifications, amendments, etc., and the Contractor's offer as accepted by the state.

The Contractor is hereby cautioned not to commence any billable work or provide any material, service or construction under this contract until contractor receives a purchase order document.

State of Arizona

Effective this day of 20

Procurement Officer Awarded Date of Person Authorized to Sign Offer

@gcinc.com

10/ /2023

Granite Construction Company

4115 E. Illinois Street

Tucson AZ 85714

Todd A. Hill

VP, Arizona Region

N/Aazestimatingmembers@gcinc.com

520.539.8948

DocuSign Envelope ID: DAA57ECC-CE28-4E35-B748-1365FBA94C0A

December

12/20/2023

20 23

CTR069178

Rev. 08/2023

Risk Management

ADOT PROCUREMENT CONTRACT INSURANCE CHECKLIST

Instructions: This checklist is a tool provided to assist in expediting the review of the required insurance documents as outlined in the Special Terms and Conditions of your contract. This checklist is intended to clearly outline the required insurance documents that need to be added to your contract before orders can be placed. It is recommended that you provide this checklist and a copy of your ADOT contract to your insurance broker or agent. After your insurance broker or agent provides the required items identified below, check the box in the “Included” column for each document. Once this is completed, forward this checklist and the required documents to the Procurement Officer as indicated in your award letter.

Required Description of Insurance Requirement Included

Certificate of Insurance

Certificate of Insurance to include:

Certificate Holder to read: The State of Arizona/ADOT, 206 S. 17th Ave, Phoenix, AZ 85007

Description of Operations: Must state that the insurance applies to any and all work performed for or on behalf of the State of Arizona/ADOT

General Liability

☒ Additional Insured Endorsement for Ongoing Operations ☐

☐ Additional Insured Endorsement for Completed Operations (Construction only) ☐

☒ Waiver of Subrogation Endorsement or Policy Verbiage ☐

☒ Primary and Noncontributory Endorsement ☐

Auto Liability

☒ Additional Insured Endorsement ☐

☒ Waiver of Subrogation Endorsement ☐

☐ Coverage provided for hazardous material transportation (if applicable) ☐

Worker’s Compensation

☒ Waiver of Subrogation Endorsement ☐

Professional Liability (if applicable)

☒ Policy limit meets contract requirements ☐

Contractor’s Pollution Liability (if applicable)

☐ Includes coverage for pollution losses arising out of completed operations ☐

☐ Additional Insured Endorsement ☐

☐ Waiver of Subrogation Endorsement ☐

☐ Primary and Noncontributory Endorsement ☐

Professional Environmental Liability (if applicable)

☐ Policy limit meets contract requirements ☐

Other Required Insurance (if applicable)

☐ Technology Errors and Omissions (no endorsements required) ☐

☐ Network Security (Cyber) and Privacy Liability (additional insured, waiver of subrogation, primary and noncontributory endorsements are required)

☐ Media Liability Coverage (no endorsements required) ☐

☐ Commercial Crime Policy or Blanket Fidelity Bond (loss payee endorsement is required) ☐

☐ Aviation/Aircraft Liability (endorsements to be determined by ADOT Risk as applicable) ☐

☐ Installation Floater (additional insured, loss payee, waiver of subrogation, primary and noncontributory endorsements are required)

☐ Builder’s Risk (additional insured, loss payee, and waiver of subrogation endorsements are required)

☐ Other:__________________________________ ☐

DocuSign Envelope ID: BFF0E624-328C-4597-8A86-878427424C7D

Our True North: Safely Home

ARIZONA DEPARTMENT OF TRANSPORTATION

1655 W. Jackson St. | MD 100P | Phoenix, AZ 85007 | azdot.gov

Rev. 08/2023

Procurement Katie Hobbs, Governor Jennifer Toth, Director

December 20, 2023

Jacob Buckley President Southwest Siteworks LLC 6727 N Silverbell Rd.

Tucson, AZ 85743

Subject: Award of Contract No. CTR069179

Dear Mr. Buckley:

Please be advised that your company has been awarded the contract for On-Call Pipelining and Drainage Repair Services in solicitation BPM005628. The executed Offer and Acceptance is attached. The contract is effective December 20, 2023.

The Contract requires verification of insurance be provided prior to commencement of work. Therefore, insurance document(s) must be submitted in accordance with the requirements stated in the Contract’s Special Terms and Conditions, paragraph 16, Insurance Requirements.

The attached Contract Insurance Checklist is provided to help ensure that all required forms and endorsements are submitted. The required forms, endorsements and completed checklist must be received no later than December 26, 2023. These documents must be e-mailed to me at dellington@azdot.gov.

If you have any questions regarding this contract, please contact me at (602) 712- 8519 or via email.

Sincerely, Danyelle Ellington Procurement Officer

Cc: File

Enclosures (2)

DocuSign Envelope ID: 52A60C58-F603-446B-84FC-A355F293DD5A

Procurement

ATTACHMENT 1

OFFER AND ACCEPTANCE

Solicitation No: BPM005628 Available online at https://app.az.gov

Rev 09/2022

OFFER

TO THE STATE OF ARIZONA:

The undersigned hereby offers and agrees to perform in compliance with all terms, conditions, specifications and amendments of this solicitation and any written exceptions in the offer. Signature also acknowledges receipt of all pages indicated in the Table of Contents.

Offeror (Company) Name Signature of Person Authorized to Sign Offer

Address Printed Name Date

City State Zip Title

Email Address Phone Number

Company Email Address Fax Number

By signature in the Offer section above, the Offeror certifies that the submission of the Offer did not involve collusion or other anticompetitive practices.

ACCEPTANCE OF OFFER (FOR DEPARTMENT USE ONLY)

The Contractor is now bound to perform based upon Contract Number _________________________________including all terms, conditions, specifications, amendments, etc., and the Contractor's offer as accepted by the state.

The Contractor is hereby cautioned not to commence any billable work or provide any material, service or construction under this contract until contractor receives a purchase order document.

State of Arizona

Effective this day of 20

Procurement Officer Awarded Date

Southwest Siteworks LLC

6727 N Silverbell RD

Tucson AZ 85743 jakebuckley@southwestsiteworks.com info@southwestsiteworks.com

Jacob Buckley 9/31/23

President

520-904-2456

DocuSign Envelope ID: 7008D7DA-B202-4CB5-A918-AF9F18747F5A

December

12/20/2023

CTR069179

https://app.az.gov/

Rev. 08/2023

Risk Management

ADOT PROCUREMENT CONTRACT INSURANCE CHECKLIST

Instructions: This checklist is a tool provided to assist in expediting the review of the required insurance documents as outlined in the Special Terms and Conditions of your contract. This checklist is intended to clearly outline the required insurance documents that need to be added to your contract before orders can be placed. It is recommended that you provide this checklist and a copy of your ADOT contract to your insurance broker or agent. After your insurance broker or agent provides the required items identified below, check the box in the “Included” column for each document. Once this is completed, forward this checklist and the required documents to the Procurement Officer as indicated in your award letter.

Required Description of Insurance Requirement Included

Certificate of Insurance

Certificate of Insurance to include:

Certificate Holder to read: The State of Arizona/ADOT, 206 S. 17th Ave, Phoenix, AZ 85007

Description of Operations: Must state that the insurance applies to any and all work performed for or on behalf of the State of Arizona/ADOT

General Liability

☒ Additional Insured Endorsement for Ongoing Operations ☐

☐ Additional Insured Endorsement for Completed Operations (Construction only) ☐

☒ Waiver of Subrogation Endorsement or Policy Verbiage ☐

☒ Primary and Noncontributory Endorsement ☐

Auto Liability

☒ Additional Insured Endorsement ☐

☒ Waiver of Subrogation Endorsement ☐

☐ Coverage provided for hazardous material transportation (if applicable) ☐

Worker’s Compensation

☒ Waiver of Subrogation Endorsement ☐

Professional Liability (if applicable)

☒ Policy limit meets contract requirements ☐

Contractor’s Pollution Liability (if applicable)

☐ Includes coverage for pollution losses arising out of completed operations ☐

☐ Additional Insured Endorsement ☐

☐ Waiver of Subrogation Endorsement ☐

☐ Primary and Noncontributory Endorsement ☐

Professional Environmental Liability (if applicable)

☐ Policy limit meets contract requirements ☐

Other Required Insurance (if applicable)

☐ Technology Errors and Omissions (no endorsements required) ☐

☐ Network Security (Cyber) and Privacy Liability (additional insured, waiver of subrogation, primary and noncontributory endorsements are required)

☐ Media Liability Coverage (no endorsements required) ☐

☐ Commercial Crime Policy or Blanket Fidelity Bond (loss payee endorsement is required) ☐

☐ Aviation/Aircraft Liability (endorsements to be determined by ADOT Risk as applicable) ☐

☐ Installation Floater (additional insured, loss payee, waiver of subrogation, primary and noncontributory endorsements are required)

☐ Builder’s Risk (additional insured, loss payee, and waiver of subrogation endorsements are required)

☐ Other:__________________________________ ☐

DocuSign Envelope ID: 52A60C58-F603-446B-84FC-A355F293DD5A

BPM005628 Award Letter - Granite Construction Company
BPM005628 Award Letter Granite.pdf
6-1_BPM005628_Offer_and_Acceptance Granite
BPM005628 Award Letter Granite
BPM005628 Award Letter - Southwest Siteworks LLC
BPM005628 Award Letter SWSW.pdf
BPM005628 Offer and Acceptance SWSW
BPM005628 Award Letter SWSW

File details come from the government source that posted it. Updated .