6-Odering and Maintaing Materials.pdf
PDF 94 KB Posted
- Attached to
- On-Call Pipelining and Drainage Repair Services
- Solicitation number
- BPM005628
- Issued by
- Arizona
About this file
This document is a material procurement and supply plan submitted by SWSW for On-Call Pipelining and Drainage Repair Services with the State of Arizona Department of Transportation. The plan outlines SWSW's approach to seamless preconstruction project planning and material procurement to support drainage repair operations. Upon task order approval and notice to proceed, SWSW commits to immediately ordering all required materials and scheduling jobsite delivery as needed. The contractor has established relationships with key suppliers, particularly Snaptite for non-stock pipe materials, which enables expedited delivery of long lead items. SWSW maintains stockpiled materials at company yards including 4-6 inch rip rap, aggregate base, stormwater best management practice components, and gabion basket materials to support small drainage repairs without schedule delays.
SWSW will provide all material certifications to the State upon contract award to prevent project delays. For projects requiring materials beyond SWSW's existing inventory or when larger quantities are needed, the contractor will leverage established relationships with top aggregate and materials suppliers throughout Arizona to expedite deliveries. This dual approach—utilizing in-stock inventory for routine repairs and mobilizing preferred vendor networks for specialized or high-volume requirements—demonstrates SWSW's commitment to maintaining schedule efficiency and operational continuity throughout the contract term.
View the file
Other files
Show 40 more
Latest 50 of 66 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ordering and Maintaining Materials
SWSW takes pride in preconstruction project planning to create a seamless operation during construction. A key component of this is material procurement. For this project SWSW will provide the state with all material certifications upon contract award to prevent any schedule delays. Upon a task order approval and a notice to proceed, SWSW will immediately order all required materials and schedule jobsite delivery as needed. For long lead items such as non-stock pipe, SWSW will work closely with Snaptite to expedite all materials. Being that SWSW is a preferred installer of Snaptite, SWSW can leverage our relationship to expedite all non-stock pipe orders, which will allow for much faster delivery.
Many small drainage repairs can be performed with the materials that SWSW has in stock at our yards, or at our preferred vendors yards. This includes stockpiled 4-6” rip rap, aggregate base, Storm Water BMP’s, and gabion basket materials. If materials are not available at SWSW’s yards or a larger quantity is needed, SWSW will utilize our relationships with the top aggregate and materials suppliers across the state, to expedite material deliveries.