BPM005628 Revised Price Sheet GCC 12.1.23.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- On-Call Pipelining and Drainage Repair Services
- Solicitation number
- BPM005628
- Issued by
- Arizona
About this file
This is a revised price sheet for On-Call Pipelining and Drainage Repair Services contracted by the State of Arizona Department of Transportation. The document establishes unit pricing for a comprehensive range of materials and services required for statewide drainage and pipeline maintenance across seven geographic districts: Central, Northcentral, Northeast, Northwest, Southwest, Southcentral, and Southeast. The scope includes High-Density Polyethylene (HDPE) pipe in circular and oval configurations ranging from 12 inches to 78 inches in diameter, with annual estimated quantities varying from 20 linear feet to 2,240 linear feet depending on pipe specifications. Additional services encompass drainage work including rip rap installation, soil-cement applications, rail bank protection, jetting, drilling, and excavation, as well as specialized services such as hydrovac operations, robotic CCTV inspection, and emergency call-out labor.
The pricing structure establishes not-to-exceed unit rates for all line items, with HDPE pipe pricing ranging from $122.00 per linear foot for 12-inch circular pipe to $1,965.00 per linear foot for 78-inch oval pipe. Ancillary services include traffic control measures such as cones, barricades, warning lights, and variable message boards, along with personnel costs for flaggers, law enforcement officers, and equipment operators. Mobilization costs are standardized at $65.00 per mile across all seven districts with varying annual mileage estimates ranging from 150 miles in the Central District to 3,000 miles in the Northeast District. The document reflects a revised pricing structure, indicating negotiation or adjustment from an earlier version, with all costs presented on a per-unit basis to enable transparent cost calculation based on actual project consumption statewide.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statewide
| Line Item | Description | UOM (unit of Measure) | Statewide ANNUAL Estimated Quantities | Current Not-to-Exceed Unit Price | Revised Not-to-Exceed Unit Price |
| 1 | HDPE - Circular, 12" | L. Ft. | 360 | $122.00 | |
| 2 | HDPE - Oval, 12" | L. Ft. | 120 | $375.00 | |
| 3 | HDPE - Circular, 15" | L. Ft. | 120 | $150.00 | |
| 4 | HDPE - Oval, 15" | L. Ft. | 20 | $600.00 | |
| 5 | HDPE - Circular, 18" | L. Ft. | 1,450 | $200.00 | |
| 6 | HDPE - Oval, 18" | L. Ft. | 220 | $425.00 | |
| 7 | HDPE - Circular, 21" | L. Ft. | 360 | $250.00 | |
| 8 | HDPE - Oval, 21" | L. Ft. | 200 | $565.00 | |
| 9 | HDPE - Circular, 24" | L. Ft. | 2,240 | $300.00 | |
| 10 | HDPE – Oval, 24" | L. Ft. | 520 | $500.00 | |
| 11 | HDPE - Circular, 27" | L. Ft. | 760 | $325.00 | |
| 12 | HDPE - Oval, 27" | L. Ft. | 200 | $570.00 | |
| 13 | HDPE - Circular, 30" | L. Ft. | 1,300 | $375.00 | |
| 14 | HDPE - Oval, 30" | L. Ft. | 330 | $670.00 | |
| 15 | HDPE - Circular, 33" | L. Ft. | 820 | $395.00 | |
| 16 | HDPE - Oval, 33" | L. Ft. | 300 | $675.00 | |
| 17 | HDPE - Circular, 36" | L. Ft. | 1,110 | $475.00 | |
| 18 | HDPE - Oval, 36" | L. Ft. | 490 | $790.00 | |
| 19 | HDPE - Circular, 39" | L. Ft. | 820 | $480.00 | |
| 20 | HDPE - Oval, 39" | L. Ft. | 200 | $1,060.00 | |
| 21 | HDPE - Circular, 42" | L. Ft. | 960 | $595.00 | |
| 22 | HDPE - Oval, 42" | L. Ft. | 120 | $1,250.00 | |
| 23 | HDPE - Circular, 48" | L. Ft. | 1,160 | $755.00 | |
| 24 | HDPE - Oval, 48" | L. Ft. | 200 | $1,265.00 | |
| 25 | HDPE - Circular, 54" | L. Ft. | 780 | $890.00 | |
| 26 | HDPE - Oval, 54" | L. Ft. | 100 | $1,800.00 | |
| 27 | HDPE - Circular, 60" | L. Ft. | 760 | $895.00 | |
| 28 | HDPE - Oval, 60" | L. Ft. | 100 | $1,810.00 | |
| 29 | HDPE - Circular, 66" | L. Ft. | 560 | $1,210.00 | |
| 30 | HDPE - Oval, 66" | L. Ft. | 100 | $1,780.00 | |
| 31 | HDPE - Circular, 72" | L. Ft. | 600 | $1,195.00 | |
| 32 | HDPE - Oval, 72" | L. Ft. | 100 | $1,870.00 | |
| 33 | HDPE - Circular, 78" | L. Ft. | 560 | $1,280.00 | |
| 34 | HDPE - Oval, 78" | L. Ft. | 100 | $1,965.00 | |
| 35 | Drainage Work - Bank Protection, Dumped Rip Rap | CY | 2,125 | $380.00 | |
| 36 | Drainage Work - Bank Protection, Wire Tied Rip Rap | CY | 850 | $515.00 | |
| 37 | Drainage Work - Bank Protection, Soil-Cement | CY | 950 | $1,330.00 | |
| 38 | Drainage Work - Rail Bank Protection, Drainage Ways, Type 1, 2, and 3 | L. Ft. | 1,682 | $870.00 | |
| 39 | Drainage Work - Rail Bank Protection, Rail Bank Protection at Abutments, Type 4, 5, and 6 | L. Ft. | 1,682 | $690.00 | |
| 40 | Drainage Work - Rail Bank Protection, Drainage Ways, Type 7, 8, and 9 | L. Ft. | 1,682 | $520.00 | |
| 41 | Drainage Work - Jetting | Hr. | 460 | $400.00 | |
| 42 | Drainage Work - Drilling | Ft. | 1,850 | $65.00 | |
| 43 | Drainage Work - Drainage Excavation | CY | 2,050 | $26.00 | |
| 44 | Drainage Work - Regrading cut ditch, resulting with no surplus material | L. Ft. | 17,561 | $4.00 | |
| 45 | Drainage Work - Regrading cut ditch, resulting with surplus material to haul | L. Ft. | 12,531 | $25.00 | |
| 46 | Hydrovac Services | Hour | 840 | $540.00 | |
| 47 | Robotic Inspection Crawler CCTV Camera | Hour | 100 | $295.00 | |
| 48 | Emergency Call Out Labor | Hour | 240 | $240.00 | |
| 49 | Traffic Cones , 28”(height) Reflectorized | EACH-DAY | 1,062 | $9.00 | |
| 50 | Flashing Arrow Panel | EACH DAY | 19 | $48.00 | |
| 51 | Signs over 36” (High Intensity Reflective Sheeting) | EACH-DAY | 96 | $10.00 | |
| 52 | Sign Stand (Spring Type) | EACH-DAY | 96 | $10.00 | |
| 53 | Pilot Vehicle with Driver | HR | 280 | $80.00 | |
| 54 | Variable Message Board | EACH DAY | 35 | $85.00 | |
| 55 | Type II Barricades | EACH-DAY | 142 | $10.00 | |
| 56 | Warning Lights, Type A | EACH-DAY | 160 | $9.00 | |
| 57 | Warning Lights, Type B | EACH-DAY | 160 | $11.00 | |
| 58 | Warning Lights, Type C | EACH-DAY | 160 | $8.00 | |
| 59 | Vertical Panels | EACH-DAY | 320 | $9.00 | |
| 60 | Flag Type High Level Warning Device | EACH-DAY | 80 | $9.00 | |
| 61 | Certified Civilian Flaggers | HR | 520 | $85.00 | |
| 62 | DPS Law Enforcement Officers and Vehicles | HR | 280 | $105.00 | |
| 63 | Off-Duty uniformed Local Law Enforcement Officer and vehicle | HR | 280 | $125.00 | |
| 64 | Light Plant, day is 8 hours | Day | 22 | $220.00 | |
| 65 | Mobilization - Central District | Mile | 150 | $65.00 | |
| 66 | Mobilization - Northcentral District | Mile | 1,800 | $65.00 | |
| 67 | Mobilization - Northeast District | Mile | 3,000 | $65.00 | |
| 68 | Mobilization - Northwest District | Mile | 260 | $65.00 | |
| 69 | Mobilization - Southwest District | Mile | 280 | $65.00 | |
| 70 | Mobilization - Southcentral District | Mile | 280 | $65.00 | |
| 71 | Mobilization - Southeast District | Mile | 250 | $65.00 |