6-9_BPM005628_Price_Sheet_Amendment_Three__3_Granite.xlsx
XLSX spreadsheet 356 KB Posted
- Attached to
- On-Call Pipelining and Drainage Repair Services
- Solicitation number
- BPM005628
- Issued by
- Arizona
About this file
This is a price sheet amendment for on-call pipelining and drainage repair services for the Arizona Department of Transportation (ADOT), covering seven geographic districts: Central, Northcentral, Northeast, Northwest, Southwest, Southcentral, and Southeast. The document outlines line items for HDPE pipe (circular and oval configurations ranging from 12 inches to 78 inches in diameter), drainage work including bank protection and rail bank protection, jetting and drilling services, hydrovac services, robotic inspection and camera work, emergency labor, and traffic control equipment and personnel. Estimated annual quantities vary significantly by district, with larger quantities concentrated in specific pipe sizes and service categories within each region. The price sheet establishes not-to-exceed unit prices for each line item, allowing offerors flexibility to bid on individual districts rather than requiring participation across all geographic areas.
Pricing is structured as not-to-exceed unit prices applied to estimated annual quantities, with costs varying by district based on anticipated service volumes. HDPE pipe pricing ranges from $122.00 per linear foot for 12-inch circular pipe to $1,965.00 per linear foot for 78-inch oval pipe. Support services such as certified civilian flaggers are priced at $85.00 per hour, DPS law enforcement at $105.00 per hour, and mobilization costs at $65.00 per mile. The amendment reflects procurement for ongoing, as-needed services with district-specific requirements, enabling ADOT to adjust service levels based on actual operational needs throughout the contract term while maintaining cost control through established unit price limits.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Central District Attachment 9 Price Sheet
| Offerors are not required to bid on every District. Enter the Not to Exceed Unit Price in column F for all line items in that District. | |||||
| ITEM NO. | DESCRIPTION | ANNUAL Est. Qty. | Unit of Measure | Estimated Annual Quantities | Not to Exceed Unit Price |
| 1 | HDPE - Circular, 12" | 350 | LF | 40 | $122.00 |
| 2 | HDPE - Oval, 12" | 275 | LF | 0 | $375.00 |
| 3 | HDPE - Circular, 15" | 350 | LF | 40 | $150.00 |
| 4 | HDPE - Oval, 15" | 275 | LF | 20 | $600.00 |
| 5 | HDPE - Circular, 18" | 350 | LF | 150 | $200.00 |
| 6 | HDPE - Oval, 18" | 275 | LF | 20 | $425.00 |
| 7 | HDPE - Circular, 21" | 350 | LF | 100 | $250.00 |
| 8 | HDPE - Oval, 21" | 275 | LF | 20 | $565.00 |
| 9 | HDPE - Circular, 24" | 950 | LF | 240 | $300.00 |
| 10 | HDPE – Oval, 24" | 500 | LF | 20 | $500.00 |
| 11 | HDPE - Circular, 27" | 350 | LF | 240 | $325.00 |
| 12 | HDPE - Oval, 27" | 275 | LF | 20 | $570.00 |
| 13 | HDPE - Circular, 30" | 650 | LF | 300 | $375.00 |
| 14 | HDPE - Oval, 30" | 425 | LF | 20 | $670.00 |
| 15 | HDPE - Circular, 33" | 350 | LF | 240 | $395.00 |
| 16 | HDPE - Oval, 33" | 275 | LF | 20 | $675.00 |
| 17 | HDPE - Circular, 36" | 500 | LF | 240 | $475.00 |
| 18 | HDPE - Oval, 36" | 350 | LF | 20 | $790.00 |
| 19 | HDPE - Circular, 39" | 350 | LF | 240 | $480.00 |
| 20 | HDPE - Oval, 39" | 275 | LF | 20 | $1,060.00 |
| 21 | HDPE - Circular, 42" | 950 | LF | 240 | $595.00 |
| 22 | HDPE - Oval, 42" | 500 | LF | 20 | $1,250.00 |
| 23 | HDPE - Circular, 48" | 500 | LF | 240 | $755.00 |
| 24 | HDPE - Oval, 48" | 350 | LF | 20 | $1,265.00 |
| 25 | HDPE - Circular, 54" | 350 | LF | 120 | $890.00 |
| 26 | HDPE - Oval, 54" | 275 | LF | 0 | $1,800.00 |
| 27 | HDPE - Circular, 60" | 350 | LF | 0 | $895.00 |
| 28 | HDPE - Oval, 60" | 320 | LF | 0 | $1,810.00 |
| 29 | HDPE - Circular, 66" | 350 | LF | 80 | $1,210.00 |
| 30 | HDPE - Oval, 66" | 275 | LF | 0 | $1,780.00 |
| 31 | HDPE - Circular, 72" | 350 | LF | 80 | $1,195.00 |
| 32 | HDPE - Oval, 72" | 275 | LF | 0 | $1,870.00 |
| 33 | HDPE - Circular, 78" | 350 | LF | 80 | $1,280.00 |
| 34 | HDPE - Oval, 78" | 275 | LF | 0 | $1,965.00 |
| 35 | Drainage Work - Bank Protection, Dumped Rip Rap | CY | 100 | $380.00 | |
| 36 | Drainage Work - Bank Protection, Wire Tied Rip Rap | CY | 100 | $515.00 | |
| 37 | Drainage Work - Bank Protection, Soil-Cement | CY | 100 | $1,330.00 | |
| 38 | Drainage Work - Rail Bank Protection, Drainage Ways, Type 1, 2, and 3 | LF | 20 | $870.00 | |
| 39 | Drainage Work - Rail Bank Protection, Rail Bank Protection at Abutments, Type 4, 5, and 6 | LF | 20 | $690.00 | |
| 40 | Drainage Work - Rail Bank Protection, Drainage Ways, Type 7, 8, and 9 | LF | 20 | $520.00 | |
| 41 | Drainage Work - Jetting | 6 | HR | 160 | $400.00 |
| 42 | Drainage Work - Drilling | 20 | FT | 0 | $65.00 |
| 43 | Drainage Work - Drainage Excavation | 550 | CY | 250 | $26.00 |
| 44 | Drainage Work - Regrading cut ditch, resulting with no surplus material | LF | 250 | $4.00 | |
| 45 | Drainage Work - Regrading cut ditch, resulting with surplus material to haul | LF | 250 | $25.00 | |
| 46 | Hydrovac Services | 150 | HR | 160 | $540.00 |
| 47 | Robotic Inspection Crawler CCTV Camera | Hour | HR | 40 | $295.00 |
| 48 | Emergency Call Out Labor | HR | 40 | $240.00 | |
| 49 | Traffic Cones , 28”(height) Reflectorized | 350 | ED | 300 | $9.00 |
| 50 | Flashing Arrow Panel | 45 | ED | 5 | $48.00 |
| 51 | Signs over 36” (High Intensity Reflective Sheeting) | 65 | ED | 12 | $10.00 |
| 52 | Sign Stand (Spring Type) | 65 | ED | 12 | $10.00 |
| 53 | Pilot Vehicle with Driver | 65 | HR | 40 | $80.00 |
| 54 | Variable Message Board | 45 | ED | 5 | $85.00 |
| 55 | Type II Barricades | 120 | ED | 40 | $10.00 |
| 56 | Warning Lights, Type A | 90 | ED | 40 | $9.00 |
| 57 | Warning Lights, Type B | 60 | ED | 40 | $11.00 |
| 58 | Warning Lights, Type C | 60 | ED | 40 | $8.00 |
| 59 | Vertical Panels | 150 | ED | 80 | $9.00 |
| 60 | Flag Type High Level Warning Device | 50 | ED | 12 | $9.00 |
| 61 | Certified Civilian Flaggers | 100 | HR | 80 | $85.00 |
| 62 | DPS Law Enforcement Officers and Vehicles | 20 | HR | 40 | $105.00 |
| 63 | Off-Duty uniformed Local Law Enforcement Officer and vehicle | 20 | HR | 40 | $125.00 |
| 64 | Light Plant, day is 8 hours | Day | 2 | $220.00 | |
| 65 | Mobilization - Central District | Mile | 150 | $65.00 |
Northcentral District Attachment 9 Price Sheet
| Offerors are not required to bid on every District. Enter the Not to Exceed Unit Price in column F for all line items in that District. | |||||
| ITEM NO. | DESCRIPTION | ANNUAL Est. Qty. | Unit of Measure | Estimated Annual Quantities | Not to Exceed for Unit Price |
| 1 | HDPE - Circular, 12" | 350 | LF | 80 | $122.00 |
| 2 | HDPE - Oval, 12" | 275 | LF | 0 | $375.00 |
| 3 | HDPE - Circular, 15" | 350 | LF | 80 | $150.00 |
| 4 | HDPE - Oval, 15" | 275 | LF | 0 | $600.00 |
| 5 | HDPE - Circular, 18" | 350 | LF | 160 | $200.00 |
| 6 | HDPE - Oval, 18" | 275 | LF | 0 | $425.00 |
| 7 | HDPE - Circular, 21" | 350 | LF | 160 | $250.00 |
| 8 | HDPE - Oval, 21" | 275 | LF | 80 | $565.00 |
| 9 | HDPE - Circular, 24" | 950 | LF | 240 | $300.00 |
| 10 | HDPE – Oval, 24" | 500 | LF | 80 | $500.00 |
| 11 | HDPE - Circular, 27" | 350 | LF | 240 | $325.00 |
| 12 | HDPE - Oval, 27" | 275 | LF | 80 | $570.00 |
| 13 | HDPE - Circular, 30" | 650 | LF | 320 | $375.00 |
| 14 | HDPE - Oval, 30" | 425 | LF | 80 | $670.00 |
| 15 | HDPE - Circular, 33" | 350 | LF | 240 | $395.00 |
| 16 | HDPE - Oval, 33" | 275 | LF | 80 | $675.00 |
| 17 | HDPE - Circular, 36" | 500 | LF | 240 | $475.00 |
| 18 | HDPE - Oval, 36" | 350 | LF | 80 | $790.00 |
| 19 | HDPE - Circular, 39" | 350 | LF | 240 | $480.00 |
| 20 | HDPE - Oval, 39" | 275 | LF | 80 | $1,060.00 |
| 21 | HDPE - Circular, 42" | 950 | LF | 240 | $595.00 |
| 22 | HDPE - Oval, 42" | 500 | LF | 0 | $1,250.00 |
| 23 | HDPE - Circular, 48" | 500 | LF | 240 | $755.00 |
| 24 | HDPE - Oval, 48" | 350 | LF | 0 | $1,265.00 |
| 25 | HDPE - Circular, 54" | 350 | LF | 160 | $890.00 |
| 26 | HDPE - Oval, 54" | 275 | LF | 0 | $1,800.00 |
| 27 | HDPE - Circular, 60" | 350 | LF | 80 | $895.00 |
| 28 | HDPE - Oval, 60" | 320 | LF | 0 | $1,810.00 |
| 29 | HDPE - Circular, 66" | 350 | LF | 80 | $1,210.00 |
| 30 | HDPE - Oval, 66" | 275 | LF | 0 | $1,780.00 |
| 31 | HDPE - Circular, 72" | 350 | LF | 80 | $1,195.00 |
| 32 | HDPE - Oval, 72" | 275 | LF | 0 | $1,870.00 |
| 33 | HDPE - Circular, 78" | 350 | LF | 80 | $1,280.00 |
| 34 | HDPE - Oval, 78" | 275 | LF | 0 | $1,965.00 |
| 35 | Drainage Work - Bank Protection, Dumped Rip Rap | CY | 500 | $380.00 | |
| 36 | Drainage Work - Bank Protection, Wire Tied Rip Rap | CY | 125 | $515.00 | |
| 37 | Drainage Work - Bank Protection, Soil-Cement | CY | 125 | $1,330.00 | |
| 38 | Drainage Work - Rail Bank Protection, Drainage Ways, Type 1, 2, and 3 | LF | 500 | $870.00 | |
| 39 | Drainage Work - Rail Bank Protection, Rail Bank Protection at Abutments, Type 4, 5, and 6 | LF | 500 | $690.00 | |
| 40 | Drainage Work - Rail Bank Protection, Drainage Ways, Type 7, 8, and 9 | LF | 500 | $520.00 | |
| 41 | Drainage Work - Jetting | 6 | HR | 30 | $400.00 |
| 42 | Drainage Work - Drilling | 20 | FT | 300 | $65.00 |
| 43 | Drainage Work - Drainage Excavation | 550 | CY | 300 | $26.00 |
| 44 | Drainage Work - Regrading cut ditch, resulting with no surplus material | LF | 6,000 | $4.00 | |
| 45 | Drainage Work - Regrading cut ditch, resulting with surplus material to haul | LF | 6,000 | $25.00 | |
| 46 | Hydrovac Services | 150 | HR | 120 | $540.00 |
| 47 | Robotic Inspection Crawler CCTV Camera | Hour | HR | 40 | $295.00 |
| 48 | Emergency Call Out Labor | HR | 40 | $240.00 | |
| 49 | Traffic Cones , 28”(height) Reflectorized | 350 | ED | 200 | $9.00 |
| 50 | Flashing Arrow Panel | 45 | ED | 2 | $48.00 |
| 51 | Signs over 36” (High Intensity Reflective Sheeting) | 65 | ED | 12 | $10.00 |
| 52 | Sign Stand (Spring Type) | 65 | ED | 12 | $10.00 |
| 53 | Pilot Vehicle with Driver | 65 | HR | 40 | $80.00 |
| 54 | Variable Message Board | 45 | ED | 2 | $85.00 |
| 55 | Type II Barricades | 120 | ED | 20 | $10.00 |
| 56 | Warning Lights, Type A | 90 | ED | 20 | $9.00 |
| 57 | Warning Lights, Type B | 60 | ED | 20 | $11.00 |
| 58 | Warning Lights, Type C | 60 | ED | 20 | $8.00 |
| 59 | Vertical Panels | 150 | ED | 40 | $9.00 |
| 60 | Flag Type High Level Warning Device | 50 | ED | 12 | $9.00 |
| 61 | Certified Civilian Flaggers | 100 | HR | 80 | $85.00 |
| 62 | DPS Law Enforcement Officers and Vehicles | 20 | HR | 40 | $105.00 |
| 63 | Off-Duty uniformed Local Law Enforcement Officer and vehicle | 20 | HR | 40 | $125.00 |
| 64 | Light Plant, day is 8 hours | Day | 2 | $220.00 | |
| 65 | Mobilization - Northcentral District | Mile | 1,800 | $65.00 |
Northeast District Attachment 9 Price Sheet
| Offerors are not required to bid on every District. Enter the Not to Exceed Unit Price in column F for all line items in that District. | |||||
| ITEM NO. | DESCRIPTION | ANNUAL Est. Qty. | Unit of Measure | Northeast District | Not to Exceed for Unit Price |
| 1 | HDPE - Circular, 12" | 350 | LF | 120 | $122.00 |
| 2 | HDPE - Oval, 12" | 275 | LF | 0 | $375.00 |
| 3 | HDPE - Circular, 15" | 350 | LF | 0 | $150.00 |
| 4 | HDPE - Oval, 15" | 275 | LF | 0 | $600.00 |
| 5 | HDPE - Circular, 18" | 350 | LF | 160 | $200.00 |
| 6 | HDPE - Oval, 18" | 275 | LF | 0 | $425.00 |
| 7 | HDPE - Circular, 21" | 350 | LF | 0 | $250.00 |
| 8 | HDPE - Oval, 21" | 275 | LF | 0 | $565.00 |
| 9 | HDPE - Circular, 24" | 950 | LF | 800 | $300.00 |
| 10 | HDPE – Oval, 24" | 500 | LF | 120 | $500.00 |
| 11 | HDPE - Circular, 27" | 350 | LF | 40 | $325.00 |
| 12 | HDPE - Oval, 27" | 275 | LF | 0 | $570.00 |
| 13 | HDPE - Circular, 30" | 650 | LF | 120 | $375.00 |
| 14 | HDPE - Oval, 30" | 425 | LF | 40 | $670.00 |
| 15 | HDPE - Circular, 33" | 350 | LF | 0 | $395.00 |
| 16 | HDPE - Oval, 33" | 275 | LF | 0 | $675.00 |
| 17 | HDPE - Circular, 36" | 500 | LF | 40 | $475.00 |
| 18 | HDPE - Oval, 36" | 350 | LF | 40 | $790.00 |
| 19 | HDPE - Circular, 39" | 350 | LF | 0 | $480.00 |
| 20 | HDPE - Oval, 39" | 275 | LF | 0 | $1,060.00 |
| 21 | HDPE - Circular, 42" | 950 | LF | 0 | $595.00 |
| 22 | HDPE - Oval, 42" | 500 | LF | 0 | $1,250.00 |
| 23 | HDPE - Circular, 48" | 500 | LF | 80 | $755.00 |
| 24 | HDPE - Oval, 48" | 350 | LF | 80 | $1,265.00 |
| 25 | HDPE - Circular, 54" | 350 | LF | 0 | $890.00 |
| 26 | HDPE - Oval, 54" | 275 | LF | 0 | $1,800.00 |
| 27 | HDPE - Circular, 60" | 350 | LF | 120 | $895.00 |
| 28 | HDPE - Oval, 60" | 320 | LF | 0 | $1,810.00 |
| 29 | HDPE - Circular, 66" | 350 | LF | 80 | $1,210.00 |
| 30 | HDPE - Oval, 66" | 275 | LF | 0 | $1,780.00 |
| 31 | HDPE - Circular, 72" | 350 | LF | 80 | $1,195.00 |
| 32 | HDPE - Oval, 72" | 275 | LF | 0 | $1,870.00 |
| 33 | HDPE - Circular, 78" | 350 | LF | 80 | $1,280.00 |
| 34 | HDPE - Oval, 78" | 275 | LF | 0 | $1,965.00 |
| 35 | Drainage Work - Bank Protection, Dumped Rip Rap | CY | 250 | $380.00 | |
| 36 | Drainage Work - Bank Protection, Wire Tied Rip Rap | CY | 125 | $515.00 | |
| 37 | Drainage Work - Bank Protection, Soil-Cement | CY | 125 | $1,330.00 | |
| 38 | Drainage Work - Rail Bank Protection, Drainage Ways, Type 1, 2, and 3 | LF | 1 | $870.00 | |
| 39 | Drainage Work - Rail Bank Protection, Rail Bank Protection at Abutments, Type 4, 5, and 6 | LF | 1 | $690.00 | |
| 40 | Drainage Work - Rail Bank Protection, Drainage Ways, Type 7, 8, and 9 | LF | 1 | $520.00 | |
| 41 | Drainage Work - Jetting | 6 | HR | 80 | $400.00 |
| 42 | Drainage Work - Drilling | 20 | FT | 400 | $65.00 |
| 43 | Drainage Work - Drainage Excavation | 550 | CY | 450 | $26.00 |
| 44 | Drainage Work - Regrading cut ditch, resulting with no surplus material | LF | 1 | $4.00 | |
| 45 | Drainage Work - Regrading cut ditch, resulting with surplus material to haul | LF | 1 | $25.00 | |
| 46 | Hydrovac Services | 150 | HR | 120 | $540.00 |
| 47 | Robotic Inspection Crawler CCTV Camera | Hour | HR | 4 | $295.00 |
| 48 | Emergency Call Out Labor | HR | 40 | $240.00 | |
| 49 | Traffic Cones , 28”(height) Reflectorized | 350 | ED | 20 | $9.00 |
| 50 | Flashing Arrow Panel | 45 | ED | 2 | $48.00 |
| 51 | Signs over 36” (High Intensity Reflective Sheeting) | 65 | ED | 12 | $10.00 |
| 52 | Sign Stand (Spring Type) | 65 | ED | 12 | $10.00 |
| 53 | Pilot Vehicle with Driver | 65 | HR | 40 | $80.00 |
| 54 | Variable Message Board | 45 | ED | 2 | $85.00 |
| 55 | Type II Barricades | 120 | ED | 20 | $10.00 |
| 56 | Warning Lights, Type A | 90 | ED | 20 | $9.00 |
| 57 | Warning Lights, Type B | 60 | ED | 20 | $11.00 |
| 58 | Warning Lights, Type C | 60 | ED | 20 | $8.00 |
| 59 | Vertical Panels | 150 | ED | 40 | $9.00 |
| 60 | Flag Type High Level Warning Device | 50 | ED | 12 | $9.00 |
| 61 | Certified Civilian Flaggers | 100 | HR | 80 | $85.00 |
| 62 | DPS Law Enforcement Officers and Vehicles | 20 | HR | 40 | $105.00 |
| 63 | Off-Duty uniformed Local Law Enforcement Officer and vehicle | 20 | HR | 40 | $125.00 |
| 64 | Light Plant, day is 8 hours | Day | 2 | $220.00 | |
| 65 | Mobilization - Northeast District | Mile | 3,000 | $65.00 |
Northwest District Attachment 9 Price Sheet
| Offerors are not required to bid on every District. Enter the Not to Exceed Unit Price in column F for all line items in that District. | |||||
| ITEM NO. | DESCRIPTION | ANNUAL Est. Qty. | Unit of Measure | Northwest District | Not to Exceed for Unit Price |
| 1 | HDPE - Circular, 12" | 350 | LF | 120 | $122.00 |
| 2 | HDPE - Oval, 12" | 275 | LF | 120 | $375.00 |
| 3 | HDPE - Circular, 15" | 350 | LF | 0 | $150.00 |
| 4 | HDPE - Oval, 15" | 275 | LF | 0 | $600.00 |
| 5 | HDPE - Circular, 18" | 350 | LF | 160 | $200.00 |
| 6 | HDPE - Oval, 18" | 275 | LF | 0 | $425.00 |
| 7 | HDPE - Circular, 21" | 350 | LF | 100 | $250.00 |
| 8 | HDPE - Oval, 21" | 275 | LF | 100 | $565.00 |
| 9 | HDPE - Circular, 24" | 950 | LF | 160 | $300.00 |
| 10 | HDPE – Oval, 24" | 500 | LF | 100 | $500.00 |
| 11 | HDPE - Circular, 27" | 350 | LF | 0 | $325.00 |
| 12 | HDPE - Oval, 27" | 275 | LF | 0 | $570.00 |
| 13 | HDPE - Circular, 30" | 650 | LF | 100 | $375.00 |
| 14 | HDPE - Oval, 30" | 425 | LF | 50 | $670.00 |
| 15 | HDPE - Circular, 33" | 350 | LF | 100 | $395.00 |
| 16 | HDPE - Oval, 33" | 275 | LF | 100 | $675.00 |
| 17 | HDPE - Circular, 36" | 500 | LF | 100 | $475.00 |
| 18 | HDPE - Oval, 36" | 350 | LF | 100 | $790.00 |
| 19 | HDPE - Circular, 39" | 350 | LF | 100 | $480.00 |
| 20 | HDPE - Oval, 39" | 275 | LF | 0 | $1,060.00 |
| 21 | HDPE - Circular, 42" | 950 | LF | 100 | $595.00 |
| 22 | HDPE - Oval, 42" | 500 | LF | 0 | $1,250.00 |
| 23 | HDPE - Circular, 48" | 500 | LF | 100 | $755.00 |
| 24 | HDPE - Oval, 48" | 350 | LF | 0 | $1,265.00 |
| 25 | HDPE - Circular, 54" | 350 | LF | 100 | $890.00 |
| 26 | HDPE - Oval, 54" | 275 | LF | 0 | $1,800.00 |
| 27 | HDPE - Circular, 60" | 350 | LF | 80 | $895.00 |
| 28 | HDPE - Oval, 60" | 320 | LF | 0 | $1,810.00 |
| 29 | HDPE - Circular, 66" | 350 | LF | 80 | $1,210.00 |
| 30 | HDPE - Oval, 66" | 275 | LF | 0 | $1,780.00 |
| 31 | HDPE - Circular, 72" | 350 | LF | 80 | $1,195.00 |
| 32 | HDPE - Oval, 72" | 275 | LF | 0 | $1,870.00 |
| 33 | HDPE - Circular, 78" | 350 | LF | 80 | $1,280.00 |
| 34 | HDPE - Oval, 78" | 275 | LF | 0 | $1,965.00 |
| 35 | Drainage Work - Bank Protection, Dumped Rip Rap | CY | 200 | $380.00 | |
| 36 | Drainage Work - Bank Protection, Wire Tied Rip Rap | CY | 100 | $515.00 | |
| 37 | Drainage Work - Bank Protection, Soil-Cement | CY | 100 | $1,330.00 | |
| 38 | Drainage Work - Rail Bank Protection, Drainage Ways, Type 1, 2, and 3 | LF | 1,000 | $870.00 | |
| 39 | Drainage Work - Rail Bank Protection, Rail Bank Protection at Abutments, Type 4, 5, and 6 | LF | 1,000 | $690.00 | |
| 40 | Drainage Work - Rail Bank Protection, Drainage Ways, Type 7, 8, and 9 | LF | 1,000 | $520.00 | |
| 41 | Drainage Work - Jetting | 6 | HR | 80 | $400.00 |
| 42 | Drainage Work - Drilling | 20 | FT | 250 | $65.00 |
| 43 | Drainage Work - Drainage Excavation | 550 | CY | 200 | $26.00 |
| 44 | Drainage Work - Regrading cut ditch, resulting with no surplus material | LF | 10,560 | $4.00 | |
| 45 | Drainage Work - Regrading cut ditch, resulting with surplus material to haul | LF | 5,280 | $25.00 | |
| 46 | Hydrovac Services | 150 | HR | 80 | $540.00 |
| 47 | Robotic Inspection Crawler CCTV Camera | Hour | HR | 4 | $295.00 |
| 48 | Emergency Call Out Labor | HR | 40 | $240.00 | |
| 49 | Traffic Cones , 28”(height) Reflectorized | 350 | ED | 52 | $9.00 |
| 50 | Flashing Arrow Panel | 45 | ED | 2 | $48.00 |
| 51 | Signs over 36” (High Intensity Reflective Sheeting) | 65 | ED | 12 | $10.00 |
| 52 | Sign Stand (Spring Type) | 65 | ED | 12 | $10.00 |
| 53 | Pilot Vehicle with Driver | 65 | HR | 40 | $80.00 |
| 54 | Variable Message Board | 45 | ED | 2 | $85.00 |
| 55 | Type II Barricades | 120 | ED | 20 | $10.00 |
| 56 | Warning Lights, Type A | 90 | ED | 20 | $9.00 |
| 57 | Warning Lights, Type B | 60 | ED | 20 | $11.00 |
| 58 | Warning Lights, Type C | 60 | ED | 20 | $8.00 |
| 59 | Vertical Panels | 150 | ED | 40 | $9.00 |
| 60 | Flag Type High Level Warning Device | 50 | ED | 12 | $9.00 |
| 61 | Certified Civilian Flaggers | 100 | HR | 40 | $85.00 |
| 62 | DPS Law Enforcement Officers and Vehicles | 20 | HR | 40 | $105.00 |
| 63 | Off-Duty uniformed Local Law Enforcement Officer and vehicle | 20 | HR | 40 | $125.00 |
| 64 | Light Plant, day is 8 hours | Day | 2 | $220.00 | |
| 65 | Mobilization - Northwest District | Mile | 260 | $65.00 |
Southwest District Attachment 9 Price Sheet
| Offerors are not required to bid on every District. Enter the Not to Exceed Unit Price in column F for all line items in that District. | |||||
| ITEM NO. | DESCRIPTION | ANNUAL Est. Qty. | Unit of Measure | Southwest District | Not to Exceed for Unit Price |
| 1 | HDPE - Circular, 12" | 350 | LF | 0 | $122.00 |
| 2 | HDPE - Oval, 12" | 275 | LF | 0 | $375.00 |
| 3 | HDPE - Circular, 15" | 350 | LF | 0 | $150.00 |
| 4 | HDPE - Oval, 15" | 275 | LF | 0 | $600.00 |
| 5 | HDPE - Circular, 18" | 350 | LF | 200 | $200.00 |
| 6 | HDPE - Oval, 18" | 275 | LF | 100 | $425.00 |
| 7 | HDPE - Circular, 21" | 350 | LF | 0 | $250.00 |
| 8 | HDPE - Oval, 21" | 275 | LF | 0 | $565.00 |
| 9 | HDPE - Circular, 24" | 950 | LF | 240 | $300.00 |
| 10 | HDPE – Oval, 24" | 500 | LF | 100 | $500.00 |
| 11 | HDPE - Circular, 27" | 350 | LF | 240 | $325.00 |
| 12 | HDPE - Oval, 27" | 275 | LF | 100 | $570.00 |
| 13 | HDPE - Circular, 30" | 650 | LF | 240 | $375.00 |
| 14 | HDPE - Oval, 30" | 425 | LF | 100 | $670.00 |
| 15 | HDPE - Circular, 33" | 350 | LF | 240 | $395.00 |
| 16 | HDPE - Oval, 33" | 275 | LF | 100 | $675.00 |
| 17 | HDPE - Circular, 36" | 500 | LF | 240 | $475.00 |
| 18 | HDPE - Oval, 36" | 350 | LF | 100 | $790.00 |
| 19 | HDPE - Circular, 39" | 350 | LF | 240 | $480.00 |
| 20 | HDPE - Oval, 39" | 275 | LF | 100 | $1,060.00 |
| 21 | HDPE - Circular, 42" | 950 | LF | 240 | $595.00 |
| 22 | HDPE - Oval, 42" | 500 | LF | 100 | $1,250.00 |
| 23 | HDPE - Circular, 48" | 500 | LF | 240 | $755.00 |
| 24 | HDPE - Oval, 48" | 350 | LF | 100 | $1,265.00 |
| 25 | HDPE - Circular, 54" | 350 | LF | 240 | $890.00 |
| 26 | HDPE - Oval, 54" | 275 | LF | 100 | $1,800.00 |
| 27 | HDPE - Circular, 60" | 350 | LF | 240 | $895.00 |
| 28 | HDPE - Oval, 60" | 320 | LF | 100 | $1,810.00 |
| 29 | HDPE - Circular, 66" | 350 | LF | 240 | $1,210.00 |
| 30 | HDPE - Oval, 66" | 275 | LF | 100 | $1,780.00 |
| 31 | HDPE - Circular, 72" | 350 | LF | 240 | $1,195.00 |
| 32 | HDPE - Oval, 72" | 275 | LF | 100 | $1,870.00 |
| 33 | HDPE - Circular, 78" | 350 | LF | 240 | $1,280.00 |
| 34 | HDPE - Oval, 78" | 275 | LF | 100 | $1,965.00 |
| 35 | Drainage Work - Bank Protection, Dumped Rip Rap | CY | 475 | $380.00 | |
| 36 | Drainage Work - Bank Protection, Wire Tied Rip Rap | CY | 100 | $515.00 | |
| 37 | Drainage Work - Bank Protection, Soil-Cement | CY | 100 | $1,330.00 | |
| 38 | Drainage Work - Rail Bank Protection, Drainage Ways, Type 1, 2, and 3 | LF | 100 | $870.00 | |
| 39 | Drainage Work - Rail Bank Protection, Rail Bank Protection at Abutments, Type 4, 5, and 6 | LF | 100 | $690.00 | |
| 40 | Drainage Work - Rail Bank Protection, Drainage Ways, Type 7, 8, and 9 | LF | 100 | $520.00 | |
| 41 | Drainage Work - Jetting | 6 | HR | 40 | $400.00 |
| 42 | Drainage Work - Drilling | 20 | FT | 300 | $65.00 |
| 43 | Drainage Work - Drainage Excavation | 550 | CY | 250 | $26.00 |
| 44 | Drainage Work - Regrading cut ditch, resulting with no surplus material | LF | 250 | $4.00 | |
| 45 | Drainage Work - Regrading cut ditch, resulting with surplus material to haul | LF | 500 | $25.00 | |
| 46 | Hydrovac Services | 150 | HR | 120 | $540.00 |
| 47 | Robotic Inspection Crawler CCTV Camera | Hour | HR | 6 | $295.00 |
| 48 | Emergency Call Out Labor | HR | 40 | $240.00 | |
| 49 | Traffic Cones , 28”(height) Reflectorized | 350 | ED | 200 | $9.00 |
| 50 | Flashing Arrow Panel | 45 | ED | 4 | $48.00 |
| 51 | Signs over 36” (High Intensity Reflective Sheeting) | 65 | ED | 24 | $10.00 |
| 52 | Sign Stand (Spring Type) | 65 | ED | 24 | $10.00 |
| 53 | Pilot Vehicle with Driver | 65 | HR | 40 | $80.00 |
| 54 | Variable Message Board | 45 | ED | 20 | $85.00 |
| 55 | Type II Barricades | 120 | ED | 2 | $10.00 |
| 56 | Warning Lights, Type A | 90 | ED | 20 | $9.00 |
| 57 | Warning Lights, Type B | 60 | ED | 20 | $11.00 |
| 58 | Warning Lights, Type C | 60 | ED | 20 | $8.00 |
| 59 | Vertical Panels | 150 | ED | 40 | $9.00 |
| 60 | Flag Type High Level Warning Device | 50 | ED | 10 | $9.00 |
| 61 | Certified Civilian Flaggers | 100 | HR | 80 | $85.00 |
| 62 | DPS Law Enforcement Officers and Vehicles | 20 | HR | 40 | $105.00 |
| 63 | Off-Duty uniformed Local Law Enforcement Officer and vehicle | 20 | HR | 40 | $125.00 |
| 64 | Light Plant, day is 8 hours | Day | 4 | $220.00 | |
| 65 | Mobilization - Southwest District | Mile | 280 | $65.00 |
Southcentral District Attachment 9 Price Sheet
| Offerors are not required to bid on every District. Enter the Not to Exceed Unit Price in column F for all line items in that District. | |||||
| ITEM NO. | DESCRIPTION | ANNUAL Est. Qty. | Unit of Measure | Southcentral District | Not to Exceed for Unit Price |
| 1 | HDPE - Circular, 12" | 350 | LF | 0 | $122.00 |
| 2 | HDPE - Oval, 12" | 275 | LF | 0 | $375.00 |
| 3 | HDPE - Circular, 15" | 350 | LF | 0 | $150.00 |
| 4 | HDPE - Oval, 15" | 275 | LF | 0 | $600.00 |
| 5 | HDPE - Circular, 18" | 350 | LF | 100 | $200.00 |
| 6 | HDPE - Oval, 18" | 275 | LF | 0 | $425.00 |
| 7 | HDPE - Circular, 21" | 350 | LF | 0 | $250.00 |
| 8 | HDPE - Oval, 21" | 275 | LF | 0 | $565.00 |
| 9 | HDPE - Circular, 24" | 950 | LF | 120 | $300.00 |
| 10 | HDPE – Oval, 24" | 500 | LF | 0 | $500.00 |
| 11 | HDPE - Circular, 27" | 350 | LF | 0 | $325.00 |
| 12 | HDPE - Oval, 27" | 275 | LF | 0 | $570.00 |
| 13 | HDPE - Circular, 30" | 650 | LF | 100 | $375.00 |
| 14 | HDPE - Oval, 30" | 425 | LF | 0 | $670.00 |
| 15 | HDPE - Circular, 33" | 350 | LF | 0 | $395.00 |
| 16 | HDPE - Oval, 33" | 275 | LF | 0 | $675.00 |
| 17 | HDPE - Circular, 36" | 500 | LF | 100 | $475.00 |
| 18 | HDPE - Oval, 36" | 350 | LF | 0 | $790.00 |
| 19 | HDPE - Circular, 39" | 350 | LF | 0 | $480.00 |
| 20 | HDPE - Oval, 39" | 275 | LF | 0 | $1,060.00 |
| 21 | HDPE - Circular, 42" | 950 | LF | 0 | $595.00 |
| 22 | HDPE - Oval, 42" | 500 | LF | 0 | $1,250.00 |
| 23 | HDPE - Circular, 48" | 500 | LF | 120 | $755.00 |
| 24 | HDPE - Oval, 48" | 350 | LF | 0 | $1,265.00 |
| 25 | HDPE - Circular, 54" | 350 | LF | 0 | $890.00 |
| 26 | HDPE - Oval, 54" | 275 | LF | 0 | $1,800.00 |
| 27 | HDPE - Circular, 60" | 350 | LF | 100 | $895.00 |
| 28 | HDPE - Oval, 60" | 320 | LF | 0 | $1,810.00 |
| 29 | HDPE - Circular, 66" | 350 | LF | 0 | $1,210.00 |
| 30 | HDPE - Oval, 66" | 275 | LF | 0 | $1,780.00 |
| 31 | HDPE - Circular, 72" | 350 | LF | 0 | $1,195.00 |
| 32 | HDPE - Oval, 72" | 275 | LF | 0 | $1,870.00 |
| 33 | HDPE - Circular, 78" | 350 | LF | 0 | $1,280.00 |
| 34 | HDPE - Oval, 78" | 275 | LF | 0 | $1,965.00 |
| 35 | Drainage Work - Bank Protection, Dumped Rip Rap | CY | 200 | $380.00 | |
| 36 | Drainage Work - Bank Protection, Wire Tied Rip Rap | CY | 100 | $515.00 | |
| 37 | Drainage Work - Bank Protection, Soil-Cement | CY | 100 | $1,330.00 | |
| 38 | Drainage Work - Rail Bank Protection, Drainage Ways, Type 1, 2, and 3 | LF | 60 | $870.00 | |
| 39 | Drainage Work - Rail Bank Protection, Rail Bank Protection at Abutments, Type 4, 5, and 6 | LF | 60 | $690.00 | |
| 40 | Drainage Work - Rail Bank Protection, Drainage Ways, Type 7, 8, and 9 | LF | 60 | $520.00 | |
| 41 | Drainage Work - Jetting | 6 | HR | 40 | $400.00 |
| 42 | Drainage Work - Drilling | 20 | FT | 300 | $65.00 |
| 43 | Drainage Work - Drainage Excavation | 550 | CY | 300 | $26.00 |
| 44 | Drainage Work - Regrading cut ditch, resulting with no surplus material | LF | 250 | $4.00 | |
| 45 | Drainage Work - Regrading cut ditch, resulting with surplus material to haul | LF | 250 | $25.00 | |
| 46 | Hydrovac Services | 150 | HR | 120 | $540.00 |
| 47 | Robotic Inspection Crawler CCTV Camera | Hour | HR | 3 | $295.00 |
| 48 | Emergency Call Out Labor | HR | 40 | $240.00 | |
| 49 | Traffic Cones , 28”(height) Reflectorized | 350 | ED | 40 | $9.00 |
| 50 | Flashing Arrow Panel | 45 | ED | 2 | $48.00 |
| 51 | Signs over 36” (High Intensity Reflective Sheeting) | 65 | ED | 12 | $10.00 |
| 52 | Sign Stand (Spring Type) | 65 | ED | 12 | $10.00 |
| 53 | Pilot Vehicle with Driver | 65 | HR | 40 | $80.00 |
| 54 | Variable Message Board | 45 | ED | 2 | $85.00 |
| 55 | Type II Barricades | 120 | ED | 20 | $10.00 |
| 56 | Warning Lights, Type A | 90 | ED | 20 | $9.00 |
| 57 | Warning Lights, Type B | 60 | ED | 20 | $11.00 |
| 58 | Warning Lights, Type C | 60 | ED | 20 | $8.00 |
| 59 | Vertical Panels | 150 | ED | 40 | $9.00 |
| 60 | Flag Type High Level Warning Device | 50 | ED | 12 | $9.00 |
| 61 | Certified Civilian Flaggers | 100 | HR | 80 | $85.00 |
| 62 | DPS Law Enforcement Officers and Vehicles | 20 | HR | 40 | $105.00 |
| 63 | Off-Duty uniformed Local Law Enforcement Officer and vehicle | 20 | HR | 40 | $125.00 |
| 64 | Light Plant, day is 8 hours | Day | 8 | $220.00 | |
| 65 | Mobilization - Southcentral District | Mile | 280 | $65.00 |
Southeast District Attachment 9 Price Sheet
| Offerors are not required to bid on every District. Enter the Not to Exceed Unit Price in column F for all line items in that District. | |||||
| ITEM NO. | DESCRIPTION | ANNUAL Est. Qty. | Unit of Measure | Southeast District | Not to Exceed for Unit Price |
| 1 | HDPE - Circular, 12" | 350 | LF | 0 | $122.00 |
| 2 | HDPE - Oval, 12" | 275 | LF | 0 | $375.00 |
| 3 | HDPE - Circular, 15" | 350 | LF | 0 | $150.00 |
| 4 | HDPE - Oval, 15" | 275 | LF | 0 | $600.00 |
| 5 | HDPE - Circular, 18" | 350 | LF | 520 | $200.00 |
| 6 | HDPE - Oval, 18" | 275 | LF | 100 | $425.00 |
| 7 | HDPE - Circular, 21" | 350 | LF | 0 | $250.00 |
| 8 | HDPE - Oval, 21" | 275 | LF | 0 | $565.00 |
| 9 | HDPE - Circular, 24" | 950 | LF | 440 | $300.00 |
| 10 | HDPE – Oval, 24" | 500 | LF | 100 | $500.00 |
| 11 | HDPE - Circular, 27" | 350 | LF | 0 | $325.00 |
| 12 | HDPE - Oval, 27" | 275 | LF | 0 | $570.00 |
| 13 | HDPE - Circular, 30" | 650 | LF | 120 | $375.00 |
| 14 | HDPE - Oval, 30" | 425 | LF | 40 | $670.00 |
| 15 | HDPE - Circular, 33" | 350 | LF | 0 | $395.00 |
| 16 | HDPE - Oval, 33" | 275 | LF | 0 | $675.00 |
| 17 | HDPE - Circular, 36" | 500 | LF | 150 | $475.00 |
| 18 | HDPE - Oval, 36" | 350 | LF | 150 | $790.00 |
| 19 | HDPE - Circular, 39" | 350 | LF | 0 | $480.00 |
| 20 | HDPE - Oval, 39" | 275 | LF | 0 | $1,060.00 |
| 21 | HDPE - Circular, 42" | 950 | LF | 140 | $595.00 |
| 22 | HDPE - Oval, 42" | 500 | LF | 0 | $1,250.00 |
| 23 | HDPE - Circular, 48" | 500 | LF | 140 | $755.00 |
| 24 | HDPE - Oval, 48" | 350 | LF | 0 | $1,265.00 |
| 25 | HDPE - Circular, 54" | 350 | LF | 160 | $890.00 |
| 26 | HDPE - Oval, 54" | 275 | LF | 0 | $1,800.00 |
| 27 | HDPE - Circular, 60" | 350 | LF | 140 | $895.00 |
| 28 | HDPE - Oval, 60" | 320 | LF | 0 | $1,810.00 |
| 29 | HDPE - Circular, 66" | 350 | LF | 0 | $1,210.00 |
| 30 | HDPE - Oval, 66" | 275 | LF | 0 | $1,780.00 |
| 31 | HDPE - Circular, 72" | 350 | LF | 40 | $1,195.00 |
| 32 | HDPE - Oval, 72" | 275 | LF | 0 | $1,870.00 |
| 33 | HDPE - Circular, 78" | 350 | LF | 0 | $1,280.00 |
| 34 | HDPE - Oval, 78" | 275 | LF | 0 | $1,965.00 |
| 35 | Drainage Work - Bank Protection, Dumped Rip Rap | CY | 400 | $380.00 | |
| 36 | Drainage Work - Bank Protection, Wire Tied Rip Rap | CY | 200 | $515.00 | |
| 37 | Drainage Work - Bank Protection, Soil-Cement | CY | 300 | $1,330.00 | |
| 38 | Drainage Work - Rail Bank Protection, Drainage Ways, Type 1, 2, and 3 | LF | 1 | $870.00 | |
| 39 | Drainage Work - Rail Bank Protection, Rail Bank Protection at Abutments, Type 4, 5, and 6 | LF | 1 | $690.00 | |
| 40 | Drainage Work - Rail Bank Protection, Drainage Ways, Type 7, 8, and 9 | LF | 1 | $520.00 | |
| 41 | Drainage Work - Jetting | 6 | HR | 30 | $400.00 |
| 42 | Drainage Work - Drilling | 20 | FT | 300 | $65.00 |
| 43 | Drainage Work - Drainage Excavation | 550 | CY | 300 | $26.00 |
| 44 | Drainage Work - Regrading cut ditch, resulting with no surplus material | LF | 250 | $4.00 | |
| 45 | Drainage Work - Regrading cut ditch, resulting with surplus material to haul | LF | 250 | $25.00 | |
| 46 | Hydrovac Services | 150 | HR | 120 | $540.00 |
| 47 | Robotic Inspection Crawler CCTV Camera | Hour | HR | 3 | $295.00 |
| 48 | Emergency Call Out Labor | HR | 0 | $240.00 | |
| 49 | Traffic Cones , 28”(height) Reflectorized | 350 | ED | 250 | $9.00 |
| 50 | Flashing Arrow Panel | 45 | ED | 2 | $48.00 |
| 51 | Signs over 36” (High Intensity Reflective Sheeting) | 65 | ED | 12 | $10.00 |
| 52 | Sign Stand (Spring Type) | 65 | ED | 12 | $10.00 |
| 53 | Pilot Vehicle with Driver | 65 | HR | 40 | $80.00 |
| 54 | Variable Message Board | 45 | ED | 2 | $85.00 |
| 55 | Type II Barricades | 120 | ED | 20 | $10.00 |
| 56 | Warning Lights, Type A | 90 | ED | 20 | $9.00 |
| 57 | Warning Lights, Type B | 60 | ED | 20 | $11.00 |
| 58 | Warning Lights, Type C | 60 | ED | 20 | $8.00 |
| 59 | Vertical Panels | 150 | ED | 40 | $9.00 |
| 60 | Flag Type High Level Warning Device | 50 | ED | 10 | $9.00 |
| 61 | Certified Civilian Flaggers | 100 | HR | 80 | $85.00 |
| 62 | DPS Law Enforcement Officers and Vehicles | 20 | HR | 40 | $105.00 |
| 63 | Off-Duty uniformed Local Law Enforcement Officer and vehicle | 20 | HR | 40 | $125.00 |
| 64 | Light Plant, day is 8 hours | Day | 2 | $220.00 | |
| 65 | Mobilization - Southeast District | Mile | 250 | $65.00 |