6-9_BPM005628_Price_Sheet_Amendment_Three__3_Granite.xlsx

XLSX spreadsheet 356 KB Posted

Attached to
On-Call Pipelining and Drainage Repair Services
Solicitation number
BPM005628
Issued by
Arizona

About this file

This is a price sheet amendment for on-call pipelining and drainage repair services for the Arizona Department of Transportation (ADOT), covering seven geographic districts: Central, Northcentral, Northeast, Northwest, Southwest, Southcentral, and Southeast. The document outlines line items for HDPE pipe (circular and oval configurations ranging from 12 inches to 78 inches in diameter), drainage work including bank protection and rail bank protection, jetting and drilling services, hydrovac services, robotic inspection and camera work, emergency labor, and traffic control equipment and personnel. Estimated annual quantities vary significantly by district, with larger quantities concentrated in specific pipe sizes and service categories within each region. The price sheet establishes not-to-exceed unit prices for each line item, allowing offerors flexibility to bid on individual districts rather than requiring participation across all geographic areas.

Pricing is structured as not-to-exceed unit prices applied to estimated annual quantities, with costs varying by district based on anticipated service volumes. HDPE pipe pricing ranges from $122.00 per linear foot for 12-inch circular pipe to $1,965.00 per linear foot for 78-inch oval pipe. Support services such as certified civilian flaggers are priced at $85.00 per hour, DPS law enforcement at $105.00 per hour, and mobilization costs at $65.00 per mile. The amendment reflects procurement for ongoing, as-needed services with district-specific requirements, enabling ADOT to adjust service levels based on actual operational needs throughout the contract term while maintaining cost control through established unit price limits.

View the file

Other files

File Type Posted
BPM005628_Pre-Solicitation_Documents.pdf PDF
BPM005628_Solicitation_Amendment_Summary_Five__5_.pdf PDF
BPM005628_Solicitation_Amendment_Summary_One__1_.pdf PDF
6-Operations Capacity.pdf PDF
6-Company History.pdf PDF
6-Method of Approach - Pipe.pdf PDF
6-2_BPM005628_Boycott_of_Israel_Disclosure.pdf PDF
6-1_BPM005628_Offer_and_Acceptance.pdf PDF
6-Project Team .pdf PDF
SWSW Mob Cost Breakdown 12.4.23.pdf PDF
BPM005628 Revised Price Sheet Southwest Siteworks 12.4.23.xlsx XLSX spreadsheet
6-[On-Call Pipelining and Drainage Repair Services] 5 BPM005628 References.pdf PDF
Equipment List 11.20.23.pdf PDF
Method of Approach Pipe 11.20.23.pdf PDF
BPM005628 Revised Price Sheet 11.20.23.xlsx XLSX spreadsheet
6-[On-Call Pipelining and Drainage Repair Services] 3 BPM005628 SPO Form 205 - Forced Labor of Ethnic Uyghurs Ban.pdf PDF
6-Method of Approach Pipe_1.pdf PDF
BPM005628_Solicitation_Amendment_Summary_Three__3_.pdf PDF
6-Project Team.pdf PDF
Equipment Write up - Combined 11.20.23.pdf PDF
6-Method of Approach - Remote Areas.pdf PDF
BPM005628 Summary of Negotiations - GCC 12.1.23.pdf PDF
BPM005628 Revised Price Sheet GCC 12.1.23.xlsx XLSX spreadsheet
6-5_BPM005628_References.pdf PDF
BPM005628 Request for BAFO - GCC 12.11.23.pdf PDF
6-3_BPM005628_SPO_Form_205_-_Forced_Labor_of_Ethnic_Uyghurs_Ban.pdf PDF
6-6_BPM005628_Confidentiality_and_Trade_Secrets.pdf PDF
6-8_BPM005628_Price_Increase_Percentages.pdf PDF
BPM005628 Revised Price Sheet Southwest Siteworks 12.12.23.xlsx XLSX spreadsheet
Mobilization Narrative 12.4.23.pdf PDF
BPM005628 Summary of Negotiations - SWSW.pdf PDF
BPM005628 Summary of Negotiations - SWSW 11.20.23.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 2 BPM005628 Boycott of Israel Disclosure.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 4 BPM005628 Subcontractors and Suppliers.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 6 BPM005628 Confidentiality and Trade Secrets.pdf PDF
BPM005628_Solicitation_Amendment_Summary_Two__2_.pdf PDF
BPM005628_Solicitation_Requirements_per_Amendment_Two__2_.pdf PDF
BPM005628_Solicitation_Amendment_Summary_Four__4_.pdf PDF
BPM005628_Award_Documents.pdf PDF
BPM005628_Solicitation_Instructions.pdf PDF
Method of Approach - Drainage Excavation 11.20.23.pdf PDF
BPM005628 Revised Price Sheet_GCC 11.20.23.xlsx XLSX spreadsheet
BPM005628 Revised Price Sheet GCC 12.11.23.xlsx XLSX spreadsheet
6-Experience in Remote Areas.pdf PDF
6-4_BPM005628_Subcontractors_and_Suppliers.pdf PDF
6-Ordering and Maintaining Materials.pdf PDF
6-Method of Approach Pipe.pdf PDF
Method of Approach Drainage Excavation 11.20.23.pdf PDF
Experience in Remote Areas 11.20.23.pdf PDF
6-Method of Approach Remote Areas.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Central District Attachment 9 Price Sheet

Offerors are not required to bid on every District. Enter the Not to Exceed Unit Price in column F for all line items in that District.
ITEM NO.DESCRIPTIONANNUAL Est. Qty.Unit of MeasureEstimated Annual QuantitiesNot to Exceed Unit Price
1HDPE - Circular, 12"350LF40$122.00
2HDPE - Oval, 12"275LF0$375.00
3HDPE - Circular, 15"350LF40$150.00
4HDPE - Oval, 15"275LF20$600.00
5HDPE - Circular, 18"350LF150$200.00
6HDPE - Oval, 18"275LF20$425.00
7HDPE - Circular, 21"350LF100$250.00
8HDPE - Oval, 21"275LF20$565.00
9HDPE - Circular, 24"950LF240$300.00
10HDPE – Oval, 24"500LF20$500.00
11HDPE - Circular, 27"350LF240$325.00
12HDPE - Oval, 27"275LF20$570.00
13HDPE - Circular, 30"650LF300$375.00
14HDPE - Oval, 30"425LF20$670.00
15HDPE - Circular, 33"350LF240$395.00
16HDPE - Oval, 33"275LF20$675.00
17HDPE - Circular, 36"500LF240$475.00
18HDPE - Oval, 36"350LF20$790.00
19HDPE - Circular, 39"350LF240$480.00
20HDPE - Oval, 39"275LF20$1,060.00
21HDPE - Circular, 42"950LF240$595.00
22HDPE - Oval, 42"500LF20$1,250.00
23HDPE - Circular, 48"500LF240$755.00
24HDPE - Oval, 48"350LF20$1,265.00
25HDPE - Circular, 54"350LF120$890.00
26HDPE - Oval, 54"275LF0$1,800.00
27HDPE - Circular, 60"350LF0$895.00
28HDPE - Oval, 60"320LF0$1,810.00
29HDPE - Circular, 66"350LF80$1,210.00
30HDPE - Oval, 66"275LF0$1,780.00
31HDPE - Circular, 72"350LF80$1,195.00
32HDPE - Oval, 72"275LF0$1,870.00
33HDPE - Circular, 78"350LF80$1,280.00
34HDPE - Oval, 78"275LF0$1,965.00
35Drainage Work - Bank Protection, Dumped Rip RapCY100$380.00
36Drainage Work - Bank Protection, Wire Tied Rip RapCY100$515.00
37Drainage Work - Bank Protection, Soil-CementCY100$1,330.00
38Drainage Work - Rail Bank Protection, Drainage Ways, Type 1, 2, and 3LF20$870.00
39Drainage Work - Rail Bank Protection, Rail Bank Protection at Abutments, Type 4, 5, and 6LF20$690.00
40Drainage Work - Rail Bank Protection, Drainage Ways, Type 7, 8, and 9LF20$520.00
41Drainage Work - Jetting6HR160$400.00
42Drainage Work - Drilling20FT0$65.00
43Drainage Work - Drainage Excavation550CY250$26.00
44Drainage Work - Regrading cut ditch, resulting with no surplus materialLF250$4.00
45Drainage Work - Regrading cut ditch, resulting with surplus material to haulLF250$25.00
46Hydrovac Services150HR160$540.00
47Robotic Inspection Crawler CCTV CameraHourHR40$295.00
48Emergency Call Out LaborHR40$240.00
49Traffic Cones , 28”(height) Reflectorized350ED300$9.00
50Flashing Arrow Panel45ED5$48.00
51Signs over 36” (High Intensity Reflective Sheeting)65ED12$10.00
52Sign Stand (Spring Type)65ED12$10.00
53Pilot Vehicle with Driver65HR40$80.00
54Variable Message Board45ED5$85.00
55Type II Barricades120ED40$10.00
56Warning Lights, Type A90ED40$9.00
57Warning Lights, Type B60ED40$11.00
58Warning Lights, Type C60ED40$8.00
59Vertical Panels150ED80$9.00
60Flag Type High Level Warning Device50ED12$9.00
61Certified Civilian Flaggers100HR80$85.00
62DPS Law Enforcement Officers and Vehicles20HR40$105.00
63Off-Duty uniformed Local Law Enforcement Officer and vehicle20HR40$125.00
64Light Plant, day is 8 hoursDay2$220.00
65Mobilization - Central DistrictMile150$65.00

Northcentral District Attachment 9 Price Sheet

Offerors are not required to bid on every District. Enter the Not to Exceed Unit Price in column F for all line items in that District.
ITEM NO.DESCRIPTIONANNUAL Est. Qty.Unit of MeasureEstimated Annual QuantitiesNot to Exceed for Unit Price
1HDPE - Circular, 12"350LF80$122.00
2HDPE - Oval, 12"275LF0$375.00
3HDPE - Circular, 15"350LF80$150.00
4HDPE - Oval, 15"275LF0$600.00
5HDPE - Circular, 18"350LF160$200.00
6HDPE - Oval, 18"275LF0$425.00
7HDPE - Circular, 21"350LF160$250.00
8HDPE - Oval, 21"275LF80$565.00
9HDPE - Circular, 24"950LF240$300.00
10HDPE – Oval, 24"500LF80$500.00
11HDPE - Circular, 27"350LF240$325.00
12HDPE - Oval, 27"275LF80$570.00
13HDPE - Circular, 30"650LF320$375.00
14HDPE - Oval, 30"425LF80$670.00
15HDPE - Circular, 33"350LF240$395.00
16HDPE - Oval, 33"275LF80$675.00
17HDPE - Circular, 36"500LF240$475.00
18HDPE - Oval, 36"350LF80$790.00
19HDPE - Circular, 39"350LF240$480.00
20HDPE - Oval, 39"275LF80$1,060.00
21HDPE - Circular, 42"950LF240$595.00
22HDPE - Oval, 42"500LF0$1,250.00
23HDPE - Circular, 48"500LF240$755.00
24HDPE - Oval, 48"350LF0$1,265.00
25HDPE - Circular, 54"350LF160$890.00
26HDPE - Oval, 54"275LF0$1,800.00
27HDPE - Circular, 60"350LF80$895.00
28HDPE - Oval, 60"320LF0$1,810.00
29HDPE - Circular, 66"350LF80$1,210.00
30HDPE - Oval, 66"275LF0$1,780.00
31HDPE - Circular, 72"350LF80$1,195.00
32HDPE - Oval, 72"275LF0$1,870.00
33HDPE - Circular, 78"350LF80$1,280.00
34HDPE - Oval, 78"275LF0$1,965.00
35Drainage Work - Bank Protection, Dumped Rip RapCY500$380.00
36Drainage Work - Bank Protection, Wire Tied Rip RapCY125$515.00
37Drainage Work - Bank Protection, Soil-CementCY125$1,330.00
38Drainage Work - Rail Bank Protection, Drainage Ways, Type 1, 2, and 3LF500$870.00
39Drainage Work - Rail Bank Protection, Rail Bank Protection at Abutments, Type 4, 5, and 6LF500$690.00
40Drainage Work - Rail Bank Protection, Drainage Ways, Type 7, 8, and 9LF500$520.00
41Drainage Work - Jetting6HR30$400.00
42Drainage Work - Drilling20FT300$65.00
43Drainage Work - Drainage Excavation550CY300$26.00
44Drainage Work - Regrading cut ditch, resulting with no surplus materialLF6,000$4.00
45Drainage Work - Regrading cut ditch, resulting with surplus material to haulLF6,000$25.00
46Hydrovac Services150HR120$540.00
47Robotic Inspection Crawler CCTV CameraHourHR40$295.00
48Emergency Call Out LaborHR40$240.00
49Traffic Cones , 28”(height) Reflectorized350ED200$9.00
50Flashing Arrow Panel45ED2$48.00
51Signs over 36” (High Intensity Reflective Sheeting)65ED12$10.00
52Sign Stand (Spring Type)65ED12$10.00
53Pilot Vehicle with Driver65HR40$80.00
54Variable Message Board45ED2$85.00
55Type II Barricades120ED20$10.00
56Warning Lights, Type A90ED20$9.00
57Warning Lights, Type B60ED20$11.00
58Warning Lights, Type C60ED20$8.00
59Vertical Panels150ED40$9.00
60Flag Type High Level Warning Device50ED12$9.00
61Certified Civilian Flaggers100HR80$85.00
62DPS Law Enforcement Officers and Vehicles20HR40$105.00
63Off-Duty uniformed Local Law Enforcement Officer and vehicle20HR40$125.00
64Light Plant, day is 8 hoursDay2$220.00
65Mobilization - Northcentral DistrictMile1,800$65.00

Northeast District Attachment 9 Price Sheet

Offerors are not required to bid on every District. Enter the Not to Exceed Unit Price in column F for all line items in that District.
ITEM NO.DESCRIPTIONANNUAL Est. Qty.Unit of MeasureNortheast DistrictNot to Exceed for Unit Price
1HDPE - Circular, 12"350LF120$122.00
2HDPE - Oval, 12"275LF0$375.00
3HDPE - Circular, 15"350LF0$150.00
4HDPE - Oval, 15"275LF0$600.00
5HDPE - Circular, 18"350LF160$200.00
6HDPE - Oval, 18"275LF0$425.00
7HDPE - Circular, 21"350LF0$250.00
8HDPE - Oval, 21"275LF0$565.00
9HDPE - Circular, 24"950LF800$300.00
10HDPE – Oval, 24"500LF120$500.00
11HDPE - Circular, 27"350LF40$325.00
12HDPE - Oval, 27"275LF0$570.00
13HDPE - Circular, 30"650LF120$375.00
14HDPE - Oval, 30"425LF40$670.00
15HDPE - Circular, 33"350LF0$395.00
16HDPE - Oval, 33"275LF0$675.00
17HDPE - Circular, 36"500LF40$475.00
18HDPE - Oval, 36"350LF40$790.00
19HDPE - Circular, 39"350LF0$480.00
20HDPE - Oval, 39"275LF0$1,060.00
21HDPE - Circular, 42"950LF0$595.00
22HDPE - Oval, 42"500LF0$1,250.00
23HDPE - Circular, 48"500LF80$755.00
24HDPE - Oval, 48"350LF80$1,265.00
25HDPE - Circular, 54"350LF0$890.00
26HDPE - Oval, 54"275LF0$1,800.00
27HDPE - Circular, 60"350LF120$895.00
28HDPE - Oval, 60"320LF0$1,810.00
29HDPE - Circular, 66"350LF80$1,210.00
30HDPE - Oval, 66"275LF0$1,780.00
31HDPE - Circular, 72"350LF80$1,195.00
32HDPE - Oval, 72"275LF0$1,870.00
33HDPE - Circular, 78"350LF80$1,280.00
34HDPE - Oval, 78"275LF0$1,965.00
35Drainage Work - Bank Protection, Dumped Rip RapCY250$380.00
36Drainage Work - Bank Protection, Wire Tied Rip RapCY125$515.00
37Drainage Work - Bank Protection, Soil-CementCY125$1,330.00
38Drainage Work - Rail Bank Protection, Drainage Ways, Type 1, 2, and 3LF1$870.00
39Drainage Work - Rail Bank Protection, Rail Bank Protection at Abutments, Type 4, 5, and 6LF1$690.00
40Drainage Work - Rail Bank Protection, Drainage Ways, Type 7, 8, and 9LF1$520.00
41Drainage Work - Jetting6HR80$400.00
42Drainage Work - Drilling20FT400$65.00
43Drainage Work - Drainage Excavation550CY450$26.00
44Drainage Work - Regrading cut ditch, resulting with no surplus materialLF1$4.00
45Drainage Work - Regrading cut ditch, resulting with surplus material to haulLF1$25.00
46Hydrovac Services150HR120$540.00
47Robotic Inspection Crawler CCTV CameraHourHR4$295.00
48Emergency Call Out LaborHR40$240.00
49Traffic Cones , 28”(height) Reflectorized350ED20$9.00
50Flashing Arrow Panel45ED2$48.00
51Signs over 36” (High Intensity Reflective Sheeting)65ED12$10.00
52Sign Stand (Spring Type)65ED12$10.00
53Pilot Vehicle with Driver65HR40$80.00
54Variable Message Board45ED2$85.00
55Type II Barricades120ED20$10.00
56Warning Lights, Type A90ED20$9.00
57Warning Lights, Type B60ED20$11.00
58Warning Lights, Type C60ED20$8.00
59Vertical Panels150ED40$9.00
60Flag Type High Level Warning Device50ED12$9.00
61Certified Civilian Flaggers100HR80$85.00
62DPS Law Enforcement Officers and Vehicles20HR40$105.00
63Off-Duty uniformed Local Law Enforcement Officer and vehicle20HR40$125.00
64Light Plant, day is 8 hoursDay2$220.00
65Mobilization - Northeast DistrictMile3,000$65.00

Northwest District Attachment 9 Price Sheet

Offerors are not required to bid on every District. Enter the Not to Exceed Unit Price in column F for all line items in that District.
ITEM NO.DESCRIPTIONANNUAL Est. Qty.Unit of MeasureNorthwest DistrictNot to Exceed for Unit Price
1HDPE - Circular, 12"350LF120$122.00
2HDPE - Oval, 12"275LF120$375.00
3HDPE - Circular, 15"350LF0$150.00
4HDPE - Oval, 15"275LF0$600.00
5HDPE - Circular, 18"350LF160$200.00
6HDPE - Oval, 18"275LF0$425.00
7HDPE - Circular, 21"350LF100$250.00
8HDPE - Oval, 21"275LF100$565.00
9HDPE - Circular, 24"950LF160$300.00
10HDPE – Oval, 24"500LF100$500.00
11HDPE - Circular, 27"350LF0$325.00
12HDPE - Oval, 27"275LF0$570.00
13HDPE - Circular, 30"650LF100$375.00
14HDPE - Oval, 30"425LF50$670.00
15HDPE - Circular, 33"350LF100$395.00
16HDPE - Oval, 33"275LF100$675.00
17HDPE - Circular, 36"500LF100$475.00
18HDPE - Oval, 36"350LF100$790.00
19HDPE - Circular, 39"350LF100$480.00
20HDPE - Oval, 39"275LF0$1,060.00
21HDPE - Circular, 42"950LF100$595.00
22HDPE - Oval, 42"500LF0$1,250.00
23HDPE - Circular, 48"500LF100$755.00
24HDPE - Oval, 48"350LF0$1,265.00
25HDPE - Circular, 54"350LF100$890.00
26HDPE - Oval, 54"275LF0$1,800.00
27HDPE - Circular, 60"350LF80$895.00
28HDPE - Oval, 60"320LF0$1,810.00
29HDPE - Circular, 66"350LF80$1,210.00
30HDPE - Oval, 66"275LF0$1,780.00
31HDPE - Circular, 72"350LF80$1,195.00
32HDPE - Oval, 72"275LF0$1,870.00
33HDPE - Circular, 78"350LF80$1,280.00
34HDPE - Oval, 78"275LF0$1,965.00
35Drainage Work - Bank Protection, Dumped Rip RapCY200$380.00
36Drainage Work - Bank Protection, Wire Tied Rip RapCY100$515.00
37Drainage Work - Bank Protection, Soil-CementCY100$1,330.00
38Drainage Work - Rail Bank Protection, Drainage Ways, Type 1, 2, and 3LF1,000$870.00
39Drainage Work - Rail Bank Protection, Rail Bank Protection at Abutments, Type 4, 5, and 6LF1,000$690.00
40Drainage Work - Rail Bank Protection, Drainage Ways, Type 7, 8, and 9LF1,000$520.00
41Drainage Work - Jetting6HR80$400.00
42Drainage Work - Drilling20FT250$65.00
43Drainage Work - Drainage Excavation550CY200$26.00
44Drainage Work - Regrading cut ditch, resulting with no surplus materialLF10,560$4.00
45Drainage Work - Regrading cut ditch, resulting with surplus material to haulLF5,280$25.00
46Hydrovac Services150HR80$540.00
47Robotic Inspection Crawler CCTV CameraHourHR4$295.00
48Emergency Call Out LaborHR40$240.00
49Traffic Cones , 28”(height) Reflectorized350ED52$9.00
50Flashing Arrow Panel45ED2$48.00
51Signs over 36” (High Intensity Reflective Sheeting)65ED12$10.00
52Sign Stand (Spring Type)65ED12$10.00
53Pilot Vehicle with Driver65HR40$80.00
54Variable Message Board45ED2$85.00
55Type II Barricades120ED20$10.00
56Warning Lights, Type A90ED20$9.00
57Warning Lights, Type B60ED20$11.00
58Warning Lights, Type C60ED20$8.00
59Vertical Panels150ED40$9.00
60Flag Type High Level Warning Device50ED12$9.00
61Certified Civilian Flaggers100HR40$85.00
62DPS Law Enforcement Officers and Vehicles20HR40$105.00
63Off-Duty uniformed Local Law Enforcement Officer and vehicle20HR40$125.00
64Light Plant, day is 8 hoursDay2$220.00
65Mobilization - Northwest DistrictMile260$65.00

Southwest District Attachment 9 Price Sheet

Offerors are not required to bid on every District. Enter the Not to Exceed Unit Price in column F for all line items in that District.
ITEM NO.DESCRIPTIONANNUAL Est. Qty.Unit of MeasureSouthwest DistrictNot to Exceed for Unit Price
1HDPE - Circular, 12"350LF0$122.00
2HDPE - Oval, 12"275LF0$375.00
3HDPE - Circular, 15"350LF0$150.00
4HDPE - Oval, 15"275LF0$600.00
5HDPE - Circular, 18"350LF200$200.00
6HDPE - Oval, 18"275LF100$425.00
7HDPE - Circular, 21"350LF0$250.00
8HDPE - Oval, 21"275LF0$565.00
9HDPE - Circular, 24"950LF240$300.00
10HDPE – Oval, 24"500LF100$500.00
11HDPE - Circular, 27"350LF240$325.00
12HDPE - Oval, 27"275LF100$570.00
13HDPE - Circular, 30"650LF240$375.00
14HDPE - Oval, 30"425LF100$670.00
15HDPE - Circular, 33"350LF240$395.00
16HDPE - Oval, 33"275LF100$675.00
17HDPE - Circular, 36"500LF240$475.00
18HDPE - Oval, 36"350LF100$790.00
19HDPE - Circular, 39"350LF240$480.00
20HDPE - Oval, 39"275LF100$1,060.00
21HDPE - Circular, 42"950LF240$595.00
22HDPE - Oval, 42"500LF100$1,250.00
23HDPE - Circular, 48"500LF240$755.00
24HDPE - Oval, 48"350LF100$1,265.00
25HDPE - Circular, 54"350LF240$890.00
26HDPE - Oval, 54"275LF100$1,800.00
27HDPE - Circular, 60"350LF240$895.00
28HDPE - Oval, 60"320LF100$1,810.00
29HDPE - Circular, 66"350LF240$1,210.00
30HDPE - Oval, 66"275LF100$1,780.00
31HDPE - Circular, 72"350LF240$1,195.00
32HDPE - Oval, 72"275LF100$1,870.00
33HDPE - Circular, 78"350LF240$1,280.00
34HDPE - Oval, 78"275LF100$1,965.00
35Drainage Work - Bank Protection, Dumped Rip RapCY475$380.00
36Drainage Work - Bank Protection, Wire Tied Rip RapCY100$515.00
37Drainage Work - Bank Protection, Soil-CementCY100$1,330.00
38Drainage Work - Rail Bank Protection, Drainage Ways, Type 1, 2, and 3LF100$870.00
39Drainage Work - Rail Bank Protection, Rail Bank Protection at Abutments, Type 4, 5, and 6LF100$690.00
40Drainage Work - Rail Bank Protection, Drainage Ways, Type 7, 8, and 9LF100$520.00
41Drainage Work - Jetting6HR40$400.00
42Drainage Work - Drilling20FT300$65.00
43Drainage Work - Drainage Excavation550CY250$26.00
44Drainage Work - Regrading cut ditch, resulting with no surplus materialLF250$4.00
45Drainage Work - Regrading cut ditch, resulting with surplus material to haulLF500$25.00
46Hydrovac Services150HR120$540.00
47Robotic Inspection Crawler CCTV CameraHourHR6$295.00
48Emergency Call Out LaborHR40$240.00
49Traffic Cones , 28”(height) Reflectorized350ED200$9.00
50Flashing Arrow Panel45ED4$48.00
51Signs over 36” (High Intensity Reflective Sheeting)65ED24$10.00
52Sign Stand (Spring Type)65ED24$10.00
53Pilot Vehicle with Driver65HR40$80.00
54Variable Message Board45ED20$85.00
55Type II Barricades120ED2$10.00
56Warning Lights, Type A90ED20$9.00
57Warning Lights, Type B60ED20$11.00
58Warning Lights, Type C60ED20$8.00
59Vertical Panels150ED40$9.00
60Flag Type High Level Warning Device50ED10$9.00
61Certified Civilian Flaggers100HR80$85.00
62DPS Law Enforcement Officers and Vehicles20HR40$105.00
63Off-Duty uniformed Local Law Enforcement Officer and vehicle20HR40$125.00
64Light Plant, day is 8 hoursDay4$220.00
65Mobilization - Southwest DistrictMile280$65.00

Southcentral District Attachment 9 Price Sheet

Offerors are not required to bid on every District. Enter the Not to Exceed Unit Price in column F for all line items in that District.
ITEM NO.DESCRIPTIONANNUAL Est. Qty.Unit of MeasureSouthcentral DistrictNot to Exceed for Unit Price
1HDPE - Circular, 12"350LF0$122.00
2HDPE - Oval, 12"275LF0$375.00
3HDPE - Circular, 15"350LF0$150.00
4HDPE - Oval, 15"275LF0$600.00
5HDPE - Circular, 18"350LF100$200.00
6HDPE - Oval, 18"275LF0$425.00
7HDPE - Circular, 21"350LF0$250.00
8HDPE - Oval, 21"275LF0$565.00
9HDPE - Circular, 24"950LF120$300.00
10HDPE – Oval, 24"500LF0$500.00
11HDPE - Circular, 27"350LF0$325.00
12HDPE - Oval, 27"275LF0$570.00
13HDPE - Circular, 30"650LF100$375.00
14HDPE - Oval, 30"425LF0$670.00
15HDPE - Circular, 33"350LF0$395.00
16HDPE - Oval, 33"275LF0$675.00
17HDPE - Circular, 36"500LF100$475.00
18HDPE - Oval, 36"350LF0$790.00
19HDPE - Circular, 39"350LF0$480.00
20HDPE - Oval, 39"275LF0$1,060.00
21HDPE - Circular, 42"950LF0$595.00
22HDPE - Oval, 42"500LF0$1,250.00
23HDPE - Circular, 48"500LF120$755.00
24HDPE - Oval, 48"350LF0$1,265.00
25HDPE - Circular, 54"350LF0$890.00
26HDPE - Oval, 54"275LF0$1,800.00
27HDPE - Circular, 60"350LF100$895.00
28HDPE - Oval, 60"320LF0$1,810.00
29HDPE - Circular, 66"350LF0$1,210.00
30HDPE - Oval, 66"275LF0$1,780.00
31HDPE - Circular, 72"350LF0$1,195.00
32HDPE - Oval, 72"275LF0$1,870.00
33HDPE - Circular, 78"350LF0$1,280.00
34HDPE - Oval, 78"275LF0$1,965.00
35Drainage Work - Bank Protection, Dumped Rip RapCY200$380.00
36Drainage Work - Bank Protection, Wire Tied Rip RapCY100$515.00
37Drainage Work - Bank Protection, Soil-CementCY100$1,330.00
38Drainage Work - Rail Bank Protection, Drainage Ways, Type 1, 2, and 3LF60$870.00
39Drainage Work - Rail Bank Protection, Rail Bank Protection at Abutments, Type 4, 5, and 6LF60$690.00
40Drainage Work - Rail Bank Protection, Drainage Ways, Type 7, 8, and 9LF60$520.00
41Drainage Work - Jetting6HR40$400.00
42Drainage Work - Drilling20FT300$65.00
43Drainage Work - Drainage Excavation550CY300$26.00
44Drainage Work - Regrading cut ditch, resulting with no surplus materialLF250$4.00
45Drainage Work - Regrading cut ditch, resulting with surplus material to haulLF250$25.00
46Hydrovac Services150HR120$540.00
47Robotic Inspection Crawler CCTV CameraHourHR3$295.00
48Emergency Call Out LaborHR40$240.00
49Traffic Cones , 28”(height) Reflectorized350ED40$9.00
50Flashing Arrow Panel45ED2$48.00
51Signs over 36” (High Intensity Reflective Sheeting)65ED12$10.00
52Sign Stand (Spring Type)65ED12$10.00
53Pilot Vehicle with Driver65HR40$80.00
54Variable Message Board45ED2$85.00
55Type II Barricades120ED20$10.00
56Warning Lights, Type A90ED20$9.00
57Warning Lights, Type B60ED20$11.00
58Warning Lights, Type C60ED20$8.00
59Vertical Panels150ED40$9.00
60Flag Type High Level Warning Device50ED12$9.00
61Certified Civilian Flaggers100HR80$85.00
62DPS Law Enforcement Officers and Vehicles20HR40$105.00
63Off-Duty uniformed Local Law Enforcement Officer and vehicle20HR40$125.00
64Light Plant, day is 8 hoursDay8$220.00
65Mobilization - Southcentral DistrictMile280$65.00

Southeast District Attachment 9 Price Sheet

Offerors are not required to bid on every District. Enter the Not to Exceed Unit Price in column F for all line items in that District.
ITEM NO.DESCRIPTIONANNUAL Est. Qty.Unit of MeasureSoutheast DistrictNot to Exceed for Unit Price
1HDPE - Circular, 12"350LF0$122.00
2HDPE - Oval, 12"275LF0$375.00
3HDPE - Circular, 15"350LF0$150.00
4HDPE - Oval, 15"275LF0$600.00
5HDPE - Circular, 18"350LF520$200.00
6HDPE - Oval, 18"275LF100$425.00
7HDPE - Circular, 21"350LF0$250.00
8HDPE - Oval, 21"275LF0$565.00
9HDPE - Circular, 24"950LF440$300.00
10HDPE – Oval, 24"500LF100$500.00
11HDPE - Circular, 27"350LF0$325.00
12HDPE - Oval, 27"275LF0$570.00
13HDPE - Circular, 30"650LF120$375.00
14HDPE - Oval, 30"425LF40$670.00
15HDPE - Circular, 33"350LF0$395.00
16HDPE - Oval, 33"275LF0$675.00
17HDPE - Circular, 36"500LF150$475.00
18HDPE - Oval, 36"350LF150$790.00
19HDPE - Circular, 39"350LF0$480.00
20HDPE - Oval, 39"275LF0$1,060.00
21HDPE - Circular, 42"950LF140$595.00
22HDPE - Oval, 42"500LF0$1,250.00
23HDPE - Circular, 48"500LF140$755.00
24HDPE - Oval, 48"350LF0$1,265.00
25HDPE - Circular, 54"350LF160$890.00
26HDPE - Oval, 54"275LF0$1,800.00
27HDPE - Circular, 60"350LF140$895.00
28HDPE - Oval, 60"320LF0$1,810.00
29HDPE - Circular, 66"350LF0$1,210.00
30HDPE - Oval, 66"275LF0$1,780.00
31HDPE - Circular, 72"350LF40$1,195.00
32HDPE - Oval, 72"275LF0$1,870.00
33HDPE - Circular, 78"350LF0$1,280.00
34HDPE - Oval, 78"275LF0$1,965.00
35Drainage Work - Bank Protection, Dumped Rip RapCY400$380.00
36Drainage Work - Bank Protection, Wire Tied Rip RapCY200$515.00
37Drainage Work - Bank Protection, Soil-CementCY300$1,330.00
38Drainage Work - Rail Bank Protection, Drainage Ways, Type 1, 2, and 3LF1$870.00
39Drainage Work - Rail Bank Protection, Rail Bank Protection at Abutments, Type 4, 5, and 6LF1$690.00
40Drainage Work - Rail Bank Protection, Drainage Ways, Type 7, 8, and 9LF1$520.00
41Drainage Work - Jetting6HR30$400.00
42Drainage Work - Drilling20FT300$65.00
43Drainage Work - Drainage Excavation550CY300$26.00
44Drainage Work - Regrading cut ditch, resulting with no surplus materialLF250$4.00
45Drainage Work - Regrading cut ditch, resulting with surplus material to haulLF250$25.00
46Hydrovac Services150HR120$540.00
47Robotic Inspection Crawler CCTV CameraHourHR3$295.00
48Emergency Call Out LaborHR0$240.00
49Traffic Cones , 28”(height) Reflectorized350ED250$9.00
50Flashing Arrow Panel45ED2$48.00
51Signs over 36” (High Intensity Reflective Sheeting)65ED12$10.00
52Sign Stand (Spring Type)65ED12$10.00
53Pilot Vehicle with Driver65HR40$80.00
54Variable Message Board45ED2$85.00
55Type II Barricades120ED20$10.00
56Warning Lights, Type A90ED20$9.00
57Warning Lights, Type B60ED20$11.00
58Warning Lights, Type C60ED20$8.00
59Vertical Panels150ED40$9.00
60Flag Type High Level Warning Device50ED10$9.00
61Certified Civilian Flaggers100HR80$85.00
62DPS Law Enforcement Officers and Vehicles20HR40$105.00
63Off-Duty uniformed Local Law Enforcement Officer and vehicle20HR40$125.00
64Light Plant, day is 8 hoursDay2$220.00
65Mobilization - Southeast DistrictMile250$65.00