About this file

This is an attachment to a solicitation document issued by the State of Arizona Department of Transportation (ADOT) for On-Call Pipelining and Drainage Repair Services under Solicitation No. BPM005553. The attachment specifically addresses price increase percentages that offerors may request during contract renewal periods if ADOT exercises its renewal options. The contract structure includes four potential renewal periods, with offerors required to specify their maximum price increase percentage for each renewal period at the time of bid submission.

The pricing mechanism requires offerors to understand that each renewal period's increase percentage is calculated against the original contract price rather than the immediately preceding year's price. For example, if an offeror requests a 2% increase for each renewal period, the submission should reflect 2%, 4%, 6%, and 8% for the first through fourth renewal periods respectively, resulting in maximum contract prices of $102.00, $104.00, $106.00, and $108.00 on a $100.00 original contract price. The document emphasizes that the State of Arizona does not automatically grant price increases upon renewal and that documentation supporting the need for any requested increase must be provided at the time of renewal. If offerors fail to provide price increase percentages in the attachment, contract prices will remain unchanged from the original contract term.

View the file

Other files

File Type Posted
6-Method of Approach - Remote Areas.pdf PDF
BPM005628 Revised Price Sheet GCC 12.1.23.xlsx XLSX spreadsheet
6-9_BPM005628_Price_Sheet_Amendment_Three__3_Granite.xlsx XLSX spreadsheet
6-Method of Approach Pipe_1.pdf PDF
SWSW Mob Cost Breakdown 12.4.23.pdf PDF
6-Ordering and Maintaining Materials.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 6 BPM005628 Confidentiality and Trade Secrets.pdf PDF
BPM005628 Summary of Negotiations - SWSW.pdf PDF
6-8_BPM005628_Price_Increase_Percentages.pdf PDF
6-Method of Approach Remote Areas.pdf PDF
BPM005628_Solicitation_Amendment_Summary_Two__2_.pdf PDF
BPM005628 Revised Price Sheet GCC 12.11.23.xlsx XLSX spreadsheet
6-SWSW History.pdf PDF
6-Proposal # 1-prop_items.xls XLS spreadsheet
6-3_BPM005628_SPO_Form_205_-_Forced_Labor_of_Ethnic_Uyghurs_Ban.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 1 BPM005628 Offer and Acceptance.pdf PDF
Response BPM005628 Request for BAFO - GCC 12.11.23.pdf PDF
BPM005628_Solicitation_Instructions.pdf PDF
6-Method of Approach Pipe.pdf PDF
BPM005628 Request for BAFO - SWSW.pdf PDF
6-Odering and Maintaing Materials.pdf PDF
Response to Invitation to Negotiation - BPM005628 On-Call Pipelining 11.20.23.pdf PDF
Method of Approach - Pipe 11.20.23.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 7 BPM005628 Equipment List.pdf PDF
Mobilization Narrative 12.4.23.pdf PDF
6-5_BPM005628_References.pdf PDF
Equipment Write up - Combined 11.20.23.pdf PDF
6-Project Team.pdf PDF
6-Method of Approach - Drainage Excavation.pdf PDF
BPM005628 Summary of Negotiations - Southwest Siteworks.pdf PDF
6-Financial Envelope-Proposal # 1-prop_answer.xls XLS spreadsheet
6-On-Call Pipelining and Drainage Repair Services 9 BPM005628 Price Sheet.pdf PDF
6-4_BPM005628_Subcontractors_and_Suppliers.pdf PDF
BPM005628_Solicitation_Amendment_Summary_Four__4_.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 2 BPM005628 Boycott of Israel Disclosure.pdf PDF
BPM005628_Solicitation_Amendment_Summary_Three__3_.pdf PDF
6-6_BPM005628_Confidentiality_and_Trade_Secrets.pdf PDF
BPM005628 Summary of Negotiations - SWSW 11.20.23.pdf PDF
BPM005628 Revised Price Sheet Southwest Siteworks 12.12.23.xlsx XLSX spreadsheet
6-[On-Call Pipelining and Drainage Repair Services] 4 BPM005628 Subcontractors and Suppliers.pdf PDF
BPM005628_Solicitation_Requirements_per_Amendment_Two__2_.pdf PDF
6-Experience in Remote Areas.pdf PDF
BPM005628 Revised Price Sheet_GCC 11.20.23.xlsx XLSX spreadsheet
Experience in Remote Areas 11.20.23.pdf PDF
BPM005628 Summary of Negotiations - GCC 12.1.23.pdf PDF
BPM005628 Request for BAFO - GCC 12.11.23.pdf PDF
6-Equipment - Combined.pdf PDF
BPM005628_Award_Documents.pdf PDF
BPM005628_Evaluation_Documents.pdf PDF
Method of Approach - Drainage Excavation 11.20.23.pdf PDF
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Procurement

ATTACHMENT 8

PRICE INCREASE PERCENTAGES

Solicitation No: BPM005553 Available online at https://appstate.az.gov/

Rev. 09/2022

The offeror should use the space below to identify the maximum price increase percentage that they may want to request at the time of renewal if ADOT exercises its option per the applicable provisions under any resultant contract(s).

1st Renewal Period ___________________% Maximum Increase

2nd Renewal Period ___________________% Maximum Increase

3rd Renewal Period ___________________% Maximum Increase

4th Renewal Period ___________________% Maximum Increase

The offeror is cautioned that each renewal period’s increase percentage shall be computed against the ORIGINAL contract price. If information is not provided in the space above, prices shall remain the same as the original contract term. Please see the following example for further clarification.

Example: If the offeror anticipates requesting a 2% increase at each renewal period per Special Terms and Conditions, they should enter 2%, 4%, 6%, and 8% in the attachment.

Each percentage increase is calculated using the original contract price. See example in table below.

Renewal Period

% Maximum Increase from Attachment

Original Contract

Price

Maximum Increase Allowed

Maximum Contract

Price 1 2% $100.00 $2.00 $102.00 2 4% $100.00 $4.00 $104.00 3 6% $100.00 $6.00 $106.00 4 8% $100.00 $8.00 $108.00