This is a mobilization narrative prepared by a contractor in response to an on-call pipelining and drainage repair services solicitation issued by the Arizona Department of Transportation (ADOT). The document addresses mobilization pricing for hypothetical projects across multiple districts within ADOT's service areas, noting that specific project scopes, locations, and existing conditions have not been defined. The contractor references previous experience with ADOT pipeline projects and indicates that mobilization pricing represents worst-case scenarios calculated from the closest distance to their office within each respective district. The narrative clarifies that pricing is all-inclusive and covers both mobilization and demobilization services for projects involving pipes, drainage items, and potential hydrovac requirements.

The contractor's mobilization cost estimates range from $1,500 to $5,000 per district depending on equipment requirements and whether hydrovac services are necessary. The narrative emphasizes that actual mobilization costs would decrease significantly if projects are located closer to the contractor's office or require less equipment than the worst-case scenario pricing reflects. The contractor presents both worst-case and best-case scenario costs for each district to provide ADOT with transparent pricing expectations while acknowledging the inherent uncertainty in pricing on-call services without defined project parameters.

View the file

Other files

File Type Posted
6-Method of Approach - Remote Areas.pdf PDF
BPM005628 Revised Price Sheet GCC 12.1.23.xlsx XLSX spreadsheet
6-9_BPM005628_Price_Sheet_Amendment_Three__3_Granite.xlsx XLSX spreadsheet
6-Method of Approach Pipe_1.pdf PDF
SWSW Mob Cost Breakdown 12.4.23.pdf PDF
6-Ordering and Maintaining Materials.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 6 BPM005628 Confidentiality and Trade Secrets.pdf PDF
BPM005628 Summary of Negotiations - SWSW.pdf PDF
6-8_BPM005628_Price_Increase_Percentages.pdf PDF
6-Method of Approach Remote Areas.pdf PDF
BPM005628_Solicitation_Amendment_Summary_Two__2_.pdf PDF
BPM005628 Revised Price Sheet GCC 12.11.23.xlsx XLSX spreadsheet
6-SWSW History.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 8 BPM005628 Price Increase Percentages.pdf PDF
6-Proposal # 1-prop_items.xls XLS spreadsheet
6-3_BPM005628_SPO_Form_205_-_Forced_Labor_of_Ethnic_Uyghurs_Ban.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 1 BPM005628 Offer and Acceptance.pdf PDF
Response BPM005628 Request for BAFO - GCC 12.11.23.pdf PDF
BPM005628_Solicitation_Instructions.pdf PDF
6-Method of Approach Pipe.pdf PDF
BPM005628 Request for BAFO - SWSW.pdf PDF
6-Odering and Maintaing Materials.pdf PDF
Response to Invitation to Negotiation - BPM005628 On-Call Pipelining 11.20.23.pdf PDF
Method of Approach - Pipe 11.20.23.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 7 BPM005628 Equipment List.pdf PDF
6-5_BPM005628_References.pdf PDF
Equipment Write up - Combined 11.20.23.pdf PDF
6-Project Team.pdf PDF
6-Method of Approach - Drainage Excavation.pdf PDF
BPM005628 Summary of Negotiations - Southwest Siteworks.pdf PDF
6-Financial Envelope-Proposal # 1-prop_answer.xls XLS spreadsheet
6-On-Call Pipelining and Drainage Repair Services 9 BPM005628 Price Sheet.pdf PDF
6-4_BPM005628_Subcontractors_and_Suppliers.pdf PDF
BPM005628_Solicitation_Amendment_Summary_Four__4_.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 2 BPM005628 Boycott of Israel Disclosure.pdf PDF
BPM005628_Solicitation_Amendment_Summary_Three__3_.pdf PDF
6-6_BPM005628_Confidentiality_and_Trade_Secrets.pdf PDF
BPM005628 Summary of Negotiations - SWSW 11.20.23.pdf PDF
BPM005628 Revised Price Sheet Southwest Siteworks 12.12.23.xlsx XLSX spreadsheet
6-[On-Call Pipelining and Drainage Repair Services] 4 BPM005628 Subcontractors and Suppliers.pdf PDF
BPM005628_Solicitation_Requirements_per_Amendment_Two__2_.pdf PDF
6-Experience in Remote Areas.pdf PDF
BPM005628 Revised Price Sheet_GCC 11.20.23.xlsx XLSX spreadsheet
Experience in Remote Areas 11.20.23.pdf PDF
BPM005628 Summary of Negotiations - GCC 12.1.23.pdf PDF
BPM005628 Request for BAFO - GCC 12.11.23.pdf PDF
6-Equipment - Combined.pdf PDF
BPM005628_Award_Documents.pdf PDF
BPM005628_Evaluation_Documents.pdf PDF
Method of Approach - Drainage Excavation 11.20.23.pdf PDF
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mobilization Breakdown

Being that this solicitation is a not to succeed pricing on hypothetical projects without a defined scope, location, or known existing conditions, the mobilization pricing per district is an estimate of the worst-case scenario at the closet distance in that district from our office.

If projects are further away and do not require a significant amount of equipment our mobilization price will greatly decrease. Attached is a breakdown of each district in question with a worst-case scenario cost as well as a best scenario cost. Please keep in mind per the contract documents, the provided pricing was to be all inclusive, so it is to cover not just mobilization, but also demobilization.

Standard Mobilization:

With SWSW previous ADOT pipeline experience, our district mobilization cost would range between $1500-$5000 depending on the equipment brought to the site and if the pipe required hydrovac. With that numerous pipes and drainage items would be completed under this mobilization.