BPM005628 Revised Price Sheet GCC 12.11.23.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- On-Call Pipelining and Drainage Repair Services
- Solicitation number
- BPM005628
- Issued by
- Arizona
About this file
Summary
This is a revised price sheet for on-call pipelining and drainage repair services issued by the Arizona Department of Transportation (ADOT). The document establishes unit pricing for a comprehensive range of high-density polyethylene (HDPE) pipe products in various configurations and sizes, along with associated drainage work, inspection services, traffic control, and mobilization costs. Line items include 34 HDPE pipe options ranging from 12 inches to 78 inches in diameter, available in both circular and oval configurations, with annual estimated quantities varying from 20 linear feet to 2,240 linear feet depending on pipe size and type. Additional services encompassed in the pricing schedule include drainage work such as rip rap installation, rail bank protection, jetting, drilling, and excavation; specialized services including hydrovac operations and robotic CCTV camera inspection; and comprehensive traffic control provisions featuring cones, warning signs, barricades, pilot vehicles, flaggers, and law enforcement support. Mobilization costs are itemized across seven geographic districts within Arizona, including Central, Northcentral, Northeast, Northwest, Southwest, Southcentral, and Southeast regions.
The pricing sheet reflects a statewide, on-call contracting structure with not-to-exceed unit prices established for each line item. HDPE pipe pricing ranges from $122.00 per linear foot for 12-inch circular pipe to $1,965.00 per linear foot for 78-inch oval pipe. Drainage work costs vary significantly based on service type, from $4.00 per linear foot for regrading cut ditches without surplus material to $1,330.00 per cubic yard for soil-cement bank protection. Labor-intensive services such as certified civilian flaggers are priced at $85.00 per hour, while specialized equipment operations such as hydrovac services are set at $540.00 per hour. Mobilization pricing is uniformly established at $65.00 per mile across all districts, with estimated annual quantities ranging from 150 miles in the Central District to 3,000 miles in the Northeast District.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statewide
| Line Item | Description | UOM (unit of Measure) | Statewide ANNUAL Estimated Quantities | Current Not-to-Exceed Unit Price | Revised Not-to-Exceed Unit Price |
| 1 | HDPE - Circular, 12" | L. Ft. | 360 | $122.00 | |
| 2 | HDPE - Oval, 12" | L. Ft. | 120 | $375.00 | |
| 3 | HDPE - Circular, 15" | L. Ft. | 120 | $150.00 | |
| 4 | HDPE - Oval, 15" | L. Ft. | 20 | $600.00 | |
| 5 | HDPE - Circular, 18" | L. Ft. | 1,450 | $200.00 | |
| 6 | HDPE - Oval, 18" | L. Ft. | 220 | $425.00 | |
| 7 | HDPE - Circular, 21" | L. Ft. | 360 | $250.00 | |
| 8 | HDPE - Oval, 21" | L. Ft. | 200 | $565.00 | |
| 9 | HDPE - Circular, 24" | L. Ft. | 2,240 | $300.00 | |
| 10 | HDPE – Oval, 24" | L. Ft. | 520 | $500.00 | |
| 11 | HDPE - Circular, 27" | L. Ft. | 760 | $325.00 | |
| 12 | HDPE - Oval, 27" | L. Ft. | 200 | $570.00 | |
| 13 | HDPE - Circular, 30" | L. Ft. | 1,300 | $375.00 | |
| 14 | HDPE - Oval, 30" | L. Ft. | 330 | $670.00 | |
| 15 | HDPE - Circular, 33" | L. Ft. | 820 | $395.00 | |
| 16 | HDPE - Oval, 33" | L. Ft. | 300 | $675.00 | |
| 17 | HDPE - Circular, 36" | L. Ft. | 1,110 | $475.00 | |
| 18 | HDPE - Oval, 36" | L. Ft. | 490 | $790.00 | |
| 19 | HDPE - Circular, 39" | L. Ft. | 820 | $480.00 | |
| 20 | HDPE - Oval, 39" | L. Ft. | 200 | $1,060.00 | |
| 21 | HDPE - Circular, 42" | L. Ft. | 960 | $595.00 | |
| 22 | HDPE - Oval, 42" | L. Ft. | 120 | $1,250.00 | |
| 23 | HDPE - Circular, 48" | L. Ft. | 1,160 | $755.00 | |
| 24 | HDPE - Oval, 48" | L. Ft. | 200 | $1,265.00 | |
| 25 | HDPE - Circular, 54" | L. Ft. | 780 | $890.00 | |
| 26 | HDPE - Oval, 54" | L. Ft. | 100 | $1,800.00 | |
| 27 | HDPE - Circular, 60" | L. Ft. | 760 | $895.00 | |
| 28 | HDPE - Oval, 60" | L. Ft. | 100 | $1,810.00 | |
| 29 | HDPE - Circular, 66" | L. Ft. | 560 | $1,210.00 | |
| 30 | HDPE - Oval, 66" | L. Ft. | 100 | $1,780.00 | |
| 31 | HDPE - Circular, 72" | L. Ft. | 600 | $1,195.00 | |
| 32 | HDPE - Oval, 72" | L. Ft. | 100 | $1,870.00 | |
| 33 | HDPE - Circular, 78" | L. Ft. | 560 | $1,280.00 | |
| 34 | HDPE - Oval, 78" | L. Ft. | 100 | $1,965.00 | |
| 35 | Drainage Work - Bank Protection, Dumped Rip Rap | CY | 2,125 | $380.00 | |
| 36 | Drainage Work - Bank Protection, Wire Tied Rip Rap | CY | 850 | $515.00 | |
| 37 | Drainage Work - Bank Protection, Soil-Cement | CY | 950 | $1,330.00 | |
| 38 | Drainage Work - Rail Bank Protection, Drainage Ways, Type 1, 2, and 3 | L. Ft. | 1,682 | $870.00 | |
| 39 | Drainage Work - Rail Bank Protection, Rail Bank Protection at Abutments, Type 4, 5, and 6 | L. Ft. | 1,682 | $690.00 | |
| 40 | Drainage Work - Rail Bank Protection, Drainage Ways, Type 7, 8, and 9 | L. Ft. | 1,682 | $520.00 | |
| 41 | Drainage Work - Jetting | Hr. | 460 | $400.00 | |
| 42 | Drainage Work - Drilling | Ft. | 1,850 | $65.00 | |
| 43 | Drainage Work - Drainage Excavation | CY | 2,050 | $26.00 | |
| 44 | Drainage Work - Regrading cut ditch, resulting with no surplus material | L. Ft. | 17,561 | $4.00 | |
| 45 | Drainage Work - Regrading cut ditch, resulting with surplus material to haul | L. Ft. | 12,531 | $25.00 | |
| 46 | Hydrovac Services | Hour | 840 | $540.00 | |
| 47 | Robotic Inspection Crawler CCTV Camera | Hour | 100 | $295.00 | |
| 48 | Emergency Call Out Labor | Hour | 240 | $240.00 | |
| 49 | Traffic Cones , 28”(height) Reflectorized | EACH-DAY | 1,062 | $9.00 | |
| 50 | Flashing Arrow Panel | EACH DAY | 19 | $48.00 | |
| 51 | Signs over 36” (High Intensity Reflective Sheeting) | EACH-DAY | 96 | $10.00 | |
| 52 | Sign Stand (Spring Type) | EACH-DAY | 96 | $10.00 | |
| 53 | Pilot Vehicle with Driver | HR | 280 | $80.00 | |
| 54 | Variable Message Board | EACH DAY | 35 | $85.00 | |
| 55 | Type II Barricades | EACH-DAY | 142 | $10.00 | |
| 56 | Warning Lights, Type A | EACH-DAY | 160 | $9.00 | |
| 57 | Warning Lights, Type B | EACH-DAY | 160 | $11.00 | |
| 58 | Warning Lights, Type C | EACH-DAY | 160 | $8.00 | |
| 59 | Vertical Panels | EACH-DAY | 320 | $9.00 | |
| 60 | Flag Type High Level Warning Device | EACH-DAY | 80 | $9.00 | |
| 61 | Certified Civilian Flaggers | HR | 520 | $85.00 | |
| 62 | DPS Law Enforcement Officers and Vehicles | HR | 280 | $105.00 | |
| 63 | Off-Duty uniformed Local Law Enforcement Officer and vehicle | HR | 280 | $125.00 | |
| 64 | Light Plant, day is 8 hours | Day | 22 | $220.00 | |
| 65 | Mobilization - Central District | Mile | 150 | $65.00 | |
| 66 | Mobilization - Northcentral District | Mile | 1,800 | $65.00 | |
| 67 | Mobilization - Northeast District | Mile | 3,000 | $65.00 | |
| 68 | Mobilization - Northwest District | Mile | 260 | $65.00 | |
| 69 | Mobilization - Southwest District | Mile | 280 | $65.00 | |
| 70 | Mobilization - Southcentral District | Mile | 280 | $65.00 | |
| 71 | Mobilization - Southeast District | Mile | 250 | $65.00 |