This document is an equipment write-up and capacity narrative submitted by Granite Construction in response to the Arizona Department of Transportation's (ADOT) solicitation for On-Call Pipelining and Drainage Repair Services (BPM005628). The submission demonstrates the offeror's capacity to service multiple concurrent jobs across various locations throughout Arizona. Granite commits to dedicating as many crews and equipment units as necessary to meet ADOT's service and quality expectations, leveraging their established presence with multiple active projects statewide, flexible workforce capabilities including extended and off-peak hour operations, and strong relationships with qualified subcontractors and suppliers. The company indicates capacity to rapidly mobilize crews and equipment to remote locations and reallocate resources across project sites as needed without adverse schedule impacts.

Granite's resource allocation includes over 360 craft personnel, 429 pieces of heavy equipment, and 100 salary management and support staff operating within Arizona, organized into over 20 separate crews qualified to perform contract work. The equipment list submitted identifies owned assets including pickup trucks, flatbed trucks, semi-tractors, water trucks, mechanic trucks, sweepers, grout pumps, loaders, excavators, compactors, wheel loaders, bulldozers, skid steer loaders, and telehandlers, with quantities ranging from one to eight units per equipment type. Additional equipment is available through rental agreements with national equipment rental companies and subcontractor relationships, ensuring capability to simultaneously service multiple sites. The company emphasizes that the submitted equipment list is not all-encompassing and represents only a portion of available resources accessible through Granite's national operations and established vendor relationships.

View the file

Other files

File Type Posted
BPM005628_Solicitation_Amendment_Summary_Two__2_.pdf PDF
BPM005628_Solicitation_Requirements_per_Amendment_Two__2_.pdf PDF
BPM005628_Solicitation_Amendment_Summary_Four__4_.pdf PDF
BPM005628_Award_Documents.pdf PDF
BPM005628_Solicitation_Instructions.pdf PDF
Method of Approach - Drainage Excavation 11.20.23.pdf PDF
BPM005628 Revised Price Sheet_GCC 11.20.23.xlsx XLSX spreadsheet
BPM005628 Revised Price Sheet GCC 12.11.23.xlsx XLSX spreadsheet
6-Experience in Remote Areas.pdf PDF
6-4_BPM005628_Subcontractors_and_Suppliers.pdf PDF
6-Ordering and Maintaining Materials.pdf PDF
6-Method of Approach Pipe.pdf PDF
Method of Approach Drainage Excavation 11.20.23.pdf PDF
Experience in Remote Areas 11.20.23.pdf PDF
6-Method of Approach Remote Areas.pdf PDF
BPM005628_Pre-Solicitation_Documents.pdf PDF
BPM005628_Solicitation_Amendment_Summary_Five__5_.pdf PDF
BPM005628_Solicitation_Amendment_Summary_One__1_.pdf PDF
6-Operations Capacity.pdf PDF
6-Company History.pdf PDF
6-Method of Approach - Pipe.pdf PDF
6-2_BPM005628_Boycott_of_Israel_Disclosure.pdf PDF
6-9_BPM005628_Price_Sheet_Amendment_Three__3_Granite.xlsx XLSX spreadsheet
6-1_BPM005628_Offer_and_Acceptance.pdf PDF
6-Project Team .pdf PDF
SWSW Mob Cost Breakdown 12.4.23.pdf PDF
BPM005628 Revised Price Sheet Southwest Siteworks 12.4.23.xlsx XLSX spreadsheet
6-[On-Call Pipelining and Drainage Repair Services] 5 BPM005628 References.pdf PDF
Equipment List 11.20.23.pdf PDF
Method of Approach Pipe 11.20.23.pdf PDF
BPM005628 Revised Price Sheet 11.20.23.xlsx XLSX spreadsheet
6-[On-Call Pipelining and Drainage Repair Services] 3 BPM005628 SPO Form 205 - Forced Labor of Ethnic Uyghurs Ban.pdf PDF
6-Method of Approach Pipe_1.pdf PDF
BPM005628_Solicitation_Amendment_Summary_Three__3_.pdf PDF
6-Project Team.pdf PDF
6-Method of Approach - Remote Areas.pdf PDF
BPM005628 Summary of Negotiations - GCC 12.1.23.pdf PDF
BPM005628 Revised Price Sheet GCC 12.1.23.xlsx XLSX spreadsheet
6-5_BPM005628_References.pdf PDF
BPM005628 Request for BAFO - GCC 12.11.23.pdf PDF
6-3_BPM005628_SPO_Form_205_-_Forced_Labor_of_Ethnic_Uyghurs_Ban.pdf PDF
6-6_BPM005628_Confidentiality_and_Trade_Secrets.pdf PDF
6-8_BPM005628_Price_Increase_Percentages.pdf PDF
BPM005628 Revised Price Sheet Southwest Siteworks 12.12.23.xlsx XLSX spreadsheet
Mobilization Narrative 12.4.23.pdf PDF
BPM005628 Summary of Negotiations - SWSW.pdf PDF
BPM005628 Summary of Negotiations - SWSW 11.20.23.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 2 BPM005628 Boycott of Israel Disclosure.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 4 BPM005628 Subcontractors and Suppliers.pdf PDF
6-[On-Call Pipelining and Drainage Repair Services] 6 BPM005628 Confidentiality and Trade Secrets.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CAPACITY

ADOT Procurement - On-Call Pipelining and Drainage Repair Services (BPM005628)

Provide a narrative demonstrating the offeror’s approach to assuring their capacity to service multiple jobs in several different areas. How many units of equipment will be dedicated to the contract? Do you have the capabilities to handle multiple site task orders?

We are committed to delivering quality work in a timely manner under this master agreement. That commitment will not waiver over time or when we pick up outside work; the Department is a priority for us. We have demonstrated this commitment on prior Pipeline agreements by adding crews and utilizing qualified subcontractors when necessary to serve the Department’s needs. We will dedicate as many crews and as much equipment to the contract as needed to provide the service and quality the Department expects and deserves.

Granite has several projects active throughout Arizona on any given day with crews and equipment capable of performing the work required within the contract. Our local, daily presence allows us to provide the right equipment and manpower to efficiently respond to ADOT’s urgent needs. Additionally, our workforce is accustomed to working extended schedules, off-peak hours, and weekends. This gives our operation maximum flexibility to service this project. When an urgent matter arises, we can reallocate materials, equipment, and manpower without suffering adverse schedule implications on this or other projects.

To respond to multiple projects with varied locations and site conditions, we not only rely on our in-house capabilities, but also our strong relationships with trusted subcontractors and suppliers. We are accustomed to working in remote locations of the state and we are prepared to quickly mobilize our crews and equipment if the need arises. In the event a singular piece of equipment is required on multiple project worksites at the same time; Granite will assess the situation and determine the best course of action.

Granite has over 360 craft personnel, 429 pieces of heavy equipment, and 100 salary management and support staff within Arizona. We have over 20 separate crews proficient at performing the work covered by this contract. These resources give us the capacity to service multiple jobs throughout the state, at the same time.

The equipment list submitted with our proposal is not an all-encompassing list. As a national company, Granite has internal and external resources that can be relied upon to perform work simultaneously at multiple sites.

Whether it be obtaining equipment from another Granite location, utilizing our Master rental agreements with national equipment rental companies, or calling upon one of our long-standing relationships with subcontractors and suppliers in Arizona, Granite will have the equipment to complete the task order.

Procurement

ATTACHMENT 7

EQUIPMENT LIST

Solicitation No: BPM005628 Available online at https://app.az.gov

Rev. 09/2022

List all equipment (owned, leased, rented, etc.) which will be used in the performance of services under a resultant contract.

(Be specific and attach additional page(s) as needed.)

Qty Model Year Manufacturer Make/Model Description Purchase

Date Owned/Leased/

Rented

5 + Various Ford F-150 ½ Ton Pickup 2x4 Various Owned

5 + Various Ford F-250 ¾ Ton Pickup 2x4 Various Owned

2 2018 Ford F-550 1.25 Ton Flatbed Truck 4x4 2018 Owned

3 Various Peterbilt 379 Semi-Tractor Various Owned

2 Various Cozad 35T Low bed transport Trailer Various Owned

3 Various Peterbilt 3600 Gallon Water Truck Various Owned

2 Various Peterbilt 330 Mechanic Truck Various Owned

2 2019 Broce Kick Broom Sweeper 2019 Owned

1 2004 Reed A30HP Grout Pump 2017 Owned

3 Various CAT 426 Loader/Backhoe Various Owned

2 2018 Diamond C Gooseneck Equipment Trailers 2018 Owned

7 Various CAT 305 -336 Excavators Various Owned

1 2006 CAT CP433 Vibratory Compactor 2006 Owned

8 Various CAT 926 - 950 Wheel Loaders Various Owned

2 2021 CAT D6 Bulldozer 2022 Owned

2 2020 CAT 226D Skid Steer Loaders 2020 Owned

2 Various CAT 1255 Telehandler/Reach Fork Various Rented

1 2021 CAT TH357D Telehandler with Bucket N/A Rented

1 2020 Track-O M48 Remote Control Skid Steer N/A Rented

1 2021 CAT 336 Excavator with 5000# Hammer N/A Rented

1 2020 Badger Custom Jetting Truck N/A Subcontracted

1 2020 Badger Custom Vacuum Truck N/A Subcontracted https://app.az.gov/