Atch__5_-_Blank_Sample_AF_Form_3052.xls

XLS spreadsheet 41 KB Posted

Attached to
CEMACC II Federal contract opportunity
Solicitation number
FA8501-19-B-A001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This document provides details on a federal indefinite-delivery indefinite-quantity construction contract opportunity with the Department of the Air Force Materiel Command Lifecycle Management Center at Robins Air Force Base. The CEMACC II contract will provide for design-build and design-bid-build construction projects specific to Robins Air Force Base through individual task orders over a one year base period and four one-year options, with an estimated total value of $95 million distributed across multiple awardees. Work will include new construction, alteration, repair, and specialty construction of buildings, structures, roads, airfields, grounds, roofs, utilities, and hazardous material remediation. Contractors must be capable of securing $3.8 million in bid bonds and performing bonds up to the full value of individual task orders over $35,000. The opportunity is restricted to qualified SDVOSB firms registered in the System for Award Management. Task order values will typically range from $250,000 to $3,000,000.

Atch #5 Blank Sample AF Form 3052

View the file

Other files for this federal contract opportunity

Other files attached to CEMACC II, newest first.
File Type Posted
Post_Award_Synopsis.docx DOCX document
Construction_Abstracts.pdf PDF
S11_Layout1.pdf PDF
A02-Layout1.pdf PDF
A04-Layout1.pdf PDF
A11_Layout1.pdf PDF
A14_Layout1.pdf PDF
M09-Layout1.pdf PDF
A13_Layout1.pdf PDF
M07-Layout1.pdf PDF
RFI__3_Final.docx DOCX document
Solicitation_Amendment_FA850119BA0010001_SF_30.pdf PDF
Photo_1.JPG JPG image
IMG_7174.JPG JPG image
Photo_4.JPG JPG image
Photo_5.JPG JPG image
Photo_7.JPG JPG image
Photo_3.JPG JPG image
Photo_8.JPG JPG image
Pre-Proposal_Conference_Briefing-FINAL__4_Aug_19.ppt PPT presentation
Site_Visit_Attendee_List_-_Final.pdf PDF
2019-07-31_UHHZ130375_-_Combined_Specifications_(Updated).pdf PDF
2019-07-31_UHHZ130375_Corrected_Final_Drawings_(Updated).pdf PDF
RFI__2.docx DOCX document
Notice_to_Bidders__4.docx DOCX document
UHHZ130375_-_Revision_No_2_(Addendum_20190718).pdf PDF
RFI__1.docx DOCX document
Notice_to_Bidders__3_Site_Visit.docx DOCX document
Notice_to_Bidders__2.pdf PDF
Appendix_C_1080274.pdf PDF
Solicitation_-_FA850119BA001.pdf PDF
Notice_to_Bidders__1.pdf PDF
Demonstration_Project_Attachment_4_Bid_Schedule.docx DOCX document
Demonstration_Project_Attachment_1_Specifications.pdf PDF
CEMACC_SOW_dated_15_April_2019.pdf PDF
Atch__4_-_Robins_AFB_Asbestos_Management_Plan_-_January_2015.pdf PDF
Atch__15_-_AF_Form_2586_Flightline_Driving_Request.pdf PDF
Davis_Bacon_Wage_Determination.pdf PDF
Atch__3_-_Robins_AFB_Division_1_Specs.pdf PDF
Atch__7_-_BLANK_SAMPLE_AF_Form_3065.xlsx XLSX spreadsheet
Demonstration_Project_Attachment_2_Addendum_1_dated_April_15_2019.pdf PDF
Atch__9_-_Master_Utility_Outage.pdf PDF
Atch__6_-_BLANK_SAMPLE_AF_Form_3064.xlsx XLSX spreadsheet
Atch__8_-_AF_Form_3000.pdf PDF
Atch__2_-_PROCEDURAL_GUIDE_FOR_DESIGNERS_INCLUDING_AE_FIRMS_29_May_15.pdf PDF
Atch__13_-_AFMAN_31-116_Motor_Vehicle_Traffic_Supervision.pdf PDF
Atch__11_-_Form_911,_xx__Design,_Discipline_Review.docx DOCX document
Demonstration_Project_Attachment_3_Corrected_Final_Drawings.pdf PDF
Atch__14_-_AFMAN_32-1084_Civil_Engineering_Facility_Requirements.pdf PDF
Sample_Bid_Bond_dated_June_24,_2019.pdf PDF
Show all 50

CEMACC II has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gen Cond 2

CONSTRUCTION COST ESTIMATE BREAKDOWNPage 1
CONTRACTOR:GOVERNMENT ESTIMATEADDRESS
CONTRACT FOR:
PROJECT NUMBER:
Discipline/Item #/Option#:WORK LOCATIONRobins Air Force Base
Material Tax:Labor Burden:*Overhead:*Profit:
UNITMATERIAL COSTLABOR COSTOTHER
LINEOFPERMAN-HOURSAVERAGEDIRECTLINE
NO.ITEMMEASUREQUANTITYUNITTOTALMAN-DAYSRATETOTALCOSTSTOTAL
GENERAL CONDITIONS (PRIME CONTRACTOR)*
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
23.0
24.0
25.0
*NOTE: ITEMS ABOVE DO NOT SHOW LATEST MARKET PRICES, BUT THEY ARE GIVEN TO ENSURE THE DESIGNERS CONSIDER THEM ON EACH PROJECT. Edit/Delete for your Project.$0$0$0$0
Sales Tax$0Labor Burden$0
Subtotal$0Subtotal$0$0.00$0
OverHead$0
SubTotal$0
Profit$0
P&P Bonds
Grand Total$0
AF Form 3052 Gen Conditions Page 1

&L&D &T&C&F

File details come from the government source that posted it. Updated .