AF_Form_66.pdf
PDF 46 KB Posted
- Attached to
- Replace Apron Lights, Apron 1, LXEZ 13-2670-3
- Solicitation number
- FA5270-13-T-0043
About this file
AF Form 66
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_1_-_Recent _Relevant_Experience_Template.pdf | ||
| Attachment_2_-_Blank_AF_Form_3052.pdf | ||
| RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF FORM 66, Sep 86
PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:
FA5270-13-T-0043
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
APPROVED DIS-
APPROVED
GENERAL
REQUIREMENT
1 PERFORMANCE TIME 4
7 calendar days prior to start on-site work
PROGRESS SCHEDULES
AND REPORTS 4
7 calendar days prior to start on-site work
3 AS-BUILT DRAWINGS 4
7 days after final inspection
4 ENVIRONMENTAL
PROTECTION PLAN 4
7 calendar days prior to start on-site work
5 DISPOSAL CERTIFICATE 4 4
7 calendar days prior to start on-site work
C
ER
TI
FI
C A
TE
O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
F' R
R
EC
O M
M
EN
D A
TI
O
N
M A
N U
F' R
'S
IN
ST
R
U C
TI
O
N S
DATE
RECEIVED
IN CON-
TRACTING
DATE TO
CIVIL
ENGINEER-
ING
LXEZ 13-2670-3 REPLACE APRON LIGHTS, APRON 1
SCHEDULE OF MATERIAL SUBMITTALS
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
REQUIRED
SUB-
MISSION
DATE
After NTP or as
Indicated
RETURN
SUS-
PENSE
DATE
REMARKS
C A
TA
LO
G D
A
TA
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
St at em en ts
Te st
R ep or ts
/S ee
R eq
'ts
FOLLOW-
UP
DATE
CONTRACTOR
NOTIFIED CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
1041890068A Typewritten Text Attachment 3
AF FORM 66, Sep 86
PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:
FA5270-13-T-0043
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
APPROVED DIS-
APPROVEDC
ER
TI
FI
C
A
TE
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
F' R
R
EC
O M
M
EN
D A
TI
O
N
M A
N U
F' R
'S
IN
ST
R
U C
TI
O
N S
DATE
RECEIVED
IN CON-
TRACTING
DATE TO
CIVIL
ENGINEER-
ING
LXEZ 13-2670-3 REPLACE APRON LIGHTS, APRON 1
SCHEDULE OF MATERIAL SUBMITTALS
L I N E
N U M B E R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
REQUIRED
SUB-
MISSION
DATE
After NTP or as
Indicated
RETURN
SUS-
PENSE
DATE
REMARKS
C A
TA
LO
G D
A
TA
O
PE
R A
TI
N
G
IN
ST
R
U C
TI
O
N S
St at em en ts
Te st
R ep or ts
/S ee
R eq
'ts
FOLLOW-
UP
DATE
CONTRACTOR
NOTIFIED CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
6 SOLID WASTE WEIGHT
TICKETS/ MANIFEST 4 4
7 calendar days after occurred
LIGHT FIXTURES,
STADIUM TYPE 4
NLT 7
calendar days after NTP
WIRING, AWG, COPPER,
THHN AND CONDUIT
4 4
NLT 7
calendar days after NTP
LIGHTING PROTECTION
SYSTEM (LPS) 4 4
NLT 7
calendar days after NTP
10 NON-LED OBSTRUCTION
LIGHT 4 4
NLT 7
calendar days after NTP
Sheet1