AF_Form_66.pdf

PDF 46 KB Posted

Attached to
Replace Apron Lights, Apron 1, LXEZ 13-2670-3
Solicitation number
FA5270-13-T-0043
Issued by

About this file

AF Form 66

View the file

Other files

File Type Posted
Attachment_1_-_Recent _Relevant_Experience_Template.pdf PDF
Attachment_2_-_Blank_AF_Form_3052.pdf PDF
RFP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF FORM 66, Sep 86

PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:

FA5270-13-T-0043

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

APPROVED DIS-

APPROVED

GENERAL

REQUIREMENT

1 PERFORMANCE TIME 4

7 calendar days prior to start on-site work

PROGRESS SCHEDULES

AND REPORTS 4

7 calendar days prior to start on-site work

3 AS-BUILT DRAWINGS 4

7 days after final inspection

4 ENVIRONMENTAL

PROTECTION PLAN 4

7 calendar days prior to start on-site work

5 DISPOSAL CERTIFICATE 4 4

7 calendar days prior to start on-site work

C

ER

TI

FI

C A

TE

O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

F' R

R

EC

O M

M

EN

D A

TI

O

N

M A

N U

F' R

'S

IN

ST

R

U C

TI

O

N S

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

LXEZ 13-2670-3 REPLACE APRON LIGHTS, APRON 1

SCHEDULE OF MATERIAL SUBMITTALS

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

REQUIRED

SUB-

MISSION

DATE

After NTP or as

Indicated

RETURN

SUS-

PENSE

DATE

REMARKS

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

St at em en ts

Te st

R ep or ts

/S ee

R eq

'ts

FOLLOW-

UP

DATE

CONTRACTOR

NOTIFIED CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

1041890068A Typewritten Text Attachment 3

AF FORM 66, Sep 86

PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:

FA5270-13-T-0043

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

APPROVED DIS-

APPROVEDC

ER

TI

FI

C

A

TE

O F

C O

M

PL

IA

N

C E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

F' R

R

EC

O M

M

EN

D A

TI

O

N

M A

N U

F' R

'S

IN

ST

R

U C

TI

O

N S

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

LXEZ 13-2670-3 REPLACE APRON LIGHTS, APRON 1

SCHEDULE OF MATERIAL SUBMITTALS

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

REQUIRED

SUB-

MISSION

DATE

After NTP or as

Indicated

RETURN

SUS-

PENSE

DATE

REMARKS

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

St at em en ts

Te st

R ep or ts

/S ee

R eq

'ts

FOLLOW-

UP

DATE

CONTRACTOR

NOTIFIED CONTRACTOR

RESUBMITTAL

FINAL

APPROVAL

6 SOLID WASTE WEIGHT

TICKETS/ MANIFEST 4 4

7 calendar days after occurred

LIGHT FIXTURES,

STADIUM TYPE 4

NLT 7

calendar days after NTP

WIRING, AWG, COPPER,

THHN AND CONDUIT

4 4

NLT 7

calendar days after NTP

LIGHTING PROTECTION

SYSTEM (LPS) 4 4

NLT 7

calendar days after NTP

10 NON-LED OBSTRUCTION

LIGHT 4 4

NLT 7

calendar days after NTP