Atch_3_AF_Form__66_Submittals_B916.pdf
Air Force Form PDF 26 KB Posted
- Attached to
- Repair Synthetic Slate Roof B916
- Solicitation number
- FA461318R0010
About this file
AF Form 66 Submittals
View the file
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
| File | Type | Posted |
|---|---|---|
| RFP_SF_1442_B916_Roof_Repair.pdf | ||
| Atch_1_Combined_Specs.pdf | ||
| Atch_4_WD_WY180023.pdf | ||
| Atch_2_Drawings.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NUMBER
Page 66-1
TRGA 1053943 REPLACE ROOF BUILDING 916
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Number of Copies Required
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
S
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
R E
P O
R T
S /P
E R
M
IT
S
Q U
A L
IF
IC
A T
IO
N
S
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
C A
T A
L O
G D
A T
A
L
IT
E R
A T
U R
E
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
M A
N U
F A
C T
U R
E R
'S
E
C C
O M
E N
D A
T
IO
N S
D E
S
IG
N
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
DATE CONTRACTOR
NOTIFIED
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPROVED
AutoCAD As-Built Drawings
(Sec. 01000) 3 Prior to
Closeout
Pre-Final Inspection Report
(Sec. 01000)
Prior to
Closeout
Health and Safety Plan
(Sec. 01000)
Prior to
Use
Transfer & Acceptance of Mil. RP DD
Form 1354 (Sec. 01000 - 1.12)
Prior to
Closeout
Progress Schedule, AF Form 3064
(Sec. 01000 - 1.12) 2 Prior to
Start
6 Final Inspection Report (Sec. 01000) 2 Prior to
Closeout
Production or Delivery Problem Report
(Sec. 01000)
Same Day
Spill Prevention and Response Plan
(Sec. 01 01 00) 2 Prior to
Start
Roof Deck & Insulation System
(Sec. 07 22 00) 2 2 1 2 2 2 2 2 2 Prior to
Start
Synthetic Slate System
(Sec. 07 30 00) 2 2 1 2 2 2 2 2 2 Prior to
Start
Gutters and Downspouts
(Sec. 07 63 10) 2 2 1 2 2 2 2 2 2
Prior to
Start
SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NUMBER
Page 66-2
TRGA 1053943 REPLACE ROOF BUILDING 916
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Number of Copies Required
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
S
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
R E
P O
R T
S /P
E R
M
IT
S
Q U
A L
IF
IC
A T
IO
N
S
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
C A
T A
L O
G D
A T
A
L
IT
E R
A T
U R
E
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
M A
N U
F A
C T
U R
E
'S
E
C C
O M
E N
D A
T
IO
N S
D E
S
IG
N
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
D A
T E
R E
C E
IV
E
D I N
C O
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
R E
T U
R N
S U
S P
E N
S E
D A
T E
S U
B M
IT
T
A L
N U
M B
E R
S
DATE CONTRACTOR
NOTIFIED
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPROVED
GPP Contractor Determination Form
(Sec. 01 01 00, para 12) 3 Prior to
Start
Solid Waste Diversion Documents
(Sec. 01 01 00, para 11)
Monthly, NLT 5th
Solid Waste Disposal & Recycling
Report (Sec. 01 01 00, para 11)
Monthly, NLT 5th
Initial & Updated Hazardous Material
Authorization Request
(Sec. 01 01 00, para 7)
3 Prior to
Use
Hazardous Material Usage/Storage
Report (Sec. 01 01 00, para 7) 3 Monthly, NLT 5th
Final Hazardous Material
Usage/Storage Report & Account
Closeout (Sec. 01 01 00, para 7)
Prior to
Closeout
Initial Hazardous Waste Manifest (Sec.
01 01 00, para 10)
Prior to removing
HW from
Base
Final Hazardous Waste Manifest (Sec.
01 01 00, para 10)
Prior to removing
HW from
Base
Initial Hazardous Material Tracking
Information (Sec. 01 01 00, para 7)
NLT 15
days prior to base entry with
HW
material
Hazardous Material Usage Report (only for contracts over 60 days) (Sec. 01 01
00, para 7)
Monthly, NLT 5th
Final Hazardous Material Usage Report
& Account Closeout (if applicable) (Sec.
01 01 00, para 7)
At
Contract
Closeout