Atch_3_AF_Form__66_Submittals_B916.pdf

Air Force Form PDF 26 KB Posted

Attached to
Repair Synthetic Slate Roof B916
Solicitation number
FA461318R0010
Issued by

About this file

AF Form 66 Submittals

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

File Type Posted
RFP_SF_1442_B916_Roof_Repair.pdf PDF
Atch_1_Combined_Specs.pdf PDF
Atch_4_WD_WY180023.pdf PDF
Atch_2_Drawings.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NUMBER

Page 66-1

TRGA 1053943 REPLACE ROOF BUILDING 916

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Number of Copies Required

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C E

R T

IF

IC

A T

IO

N

S

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

R E

P O

R T

S /P

E R

M

IT

S

Q U

A L

IF

IC

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C A

T A

L O

G D

A T

A

L

IT

E R

A T

U R

E

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

M A

N U

F A

C T

U R

E R

'S

E

C C

O M

E N

D A

T

IO

N S

D E

S

IG

N

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

D A

T E

R E

C E

IV

E

D I N

C O

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

E

N G

IN

E

E R

R E

T U

R N

S U

S P

E N

S E

D A

T E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR

NOTIFIED

C O

N T

R A

C T

O R

R E

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

AutoCAD As-Built Drawings

(Sec. 01000) 3 Prior to

Closeout

Pre-Final Inspection Report

(Sec. 01000)

Prior to

Closeout

Health and Safety Plan

(Sec. 01000)

Prior to

Use

Transfer & Acceptance of Mil. RP DD

Form 1354 (Sec. 01000 - 1.12)

Prior to

Closeout

Progress Schedule, AF Form 3064

(Sec. 01000 - 1.12) 2 Prior to

Start

6 Final Inspection Report (Sec. 01000) 2 Prior to

Closeout

Production or Delivery Problem Report

(Sec. 01000)

Same Day

Spill Prevention and Response Plan

(Sec. 01 01 00) 2 Prior to

Start

Roof Deck & Insulation System

(Sec. 07 22 00) 2 2 1 2 2 2 2 2 2 Prior to

Start

Synthetic Slate System

(Sec. 07 30 00) 2 2 1 2 2 2 2 2 2 Prior to

Start

Gutters and Downspouts

(Sec. 07 63 10) 2 2 1 2 2 2 2 2 2

Prior to

Start

SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NUMBER

Page 66-2

TRGA 1053943 REPLACE ROOF BUILDING 916

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Number of Copies Required

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C E

R T

IF

IC

A T

IO

N

S

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

R E

P O

R T

S /P

E R

M

IT

S

Q U

A L

IF

IC

A T

IO

N

S

M A

N U

F A

C T

U R

E R

'S W

A R

R A

N T

Y

C A

T A

L O

G D

A T

A

L

IT

E R

A T

U R

E

O P

E R

A T

IN

G

I N

S T

R U

C T

IO

N

S

M A

N U

F A

C T

U R

E

'S

E

C C

O M

E N

D A

T

IO

N S

D E

S

IG

N

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

D A

T E

R E

C E

IV

E

D I N

C O

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

E

N G

IN

E

E R

R E

T U

R N

S U

S P

E N

S E

D A

T E

S U

B M

IT

T

A L

N U

M B

E R

S

DATE CONTRACTOR

NOTIFIED

C O

N T

R A

C T

O R

R E

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

GPP Contractor Determination Form

(Sec. 01 01 00, para 12) 3 Prior to

Start

Solid Waste Diversion Documents

(Sec. 01 01 00, para 11)

Monthly, NLT 5th

Solid Waste Disposal & Recycling

Report (Sec. 01 01 00, para 11)

Monthly, NLT 5th

Initial & Updated Hazardous Material

Authorization Request

(Sec. 01 01 00, para 7)

3 Prior to

Use

Hazardous Material Usage/Storage

Report (Sec. 01 01 00, para 7) 3 Monthly, NLT 5th

Final Hazardous Material

Usage/Storage Report & Account

Closeout (Sec. 01 01 00, para 7)

Prior to

Closeout

Initial Hazardous Waste Manifest (Sec.

01 01 00, para 10)

Prior to removing

HW from

Base

Final Hazardous Waste Manifest (Sec.

01 01 00, para 10)

Prior to removing

HW from

Base

Initial Hazardous Material Tracking

Information (Sec. 01 01 00, para 7)

NLT 15

days prior to base entry with

HW

material

Hazardous Material Usage Report (only for contracts over 60 days) (Sec. 01 01

00, para 7)

Monthly, NLT 5th

Final Hazardous Material Usage Report

& Account Closeout (if applicable) (Sec.

01 01 00, para 7)

At

Contract

Closeout

File details come from the government source that posted it.