SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 17 PAGES
Repair HVAC BEQ's Bldg. 2407 & 2408
01 11 00 SD-01 Preconstruction Submittals GUtility Outage Requests GRoad Closure Requests GAir Force Work Clearance Permit GContractor's Proposed Laydown
Area Plan 01 14 00 SD-01 Preconstruction Submittals
1.2.1.1 GList of Contact Personnel
01 30 00 SD-01 Preconstruction Submittals
1.2 GView Location Map
1.3 GProgress and Completion
Pictures GResume for Superintendent
01 32 16.00 20 SD-01 Preconstruction Submittals
1.2 GQualifications
1.3.1 GBaseline Project Schedule
1.4.1 GInitial Contract Progress Report
(AF IMT 3065)
1.4.2 GInitial Contract Progress
Schedule (AF IMT 3064) SD-07 Certificates
GMonthly Project Schedule Update GBi-Weekly Contract Progress
Reports (AF IMT 3065)
1.4.2 GMonthly Contract Progress
Schedule (AF IMT 3064)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 17 PAGES
01 33 00 SD-01 Preconstruction Submittals
1.7 GSubmittal register
01 35 26 SD-01 Preconstruction Submittals
1.6 GAccident Prevention Plan (APP)
1.7 GActivity Hazard Analysis (AHA)
1.6.1 GCrane Critical Lift Plan
1.5.1.2 GCrane Operators
SD-06 Test Reports 1.11Notifications and Reports
1.11.2 GAccident Reports
1.11.3Crane Reports
SD-07 Certificates 1.8Confined Space Entry Permit 1.8Hot work permit
License Certificates 01 45 00 SD-01 Preconstruction Submittals
1.6.1 GConstruction Quality Control (QC)
Plan
01 45 35 SD-07 Certificates
1.5 GSpecial Inspector
1.4 GSpecial Inspection Quality
Control Plan 01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
01 50 10 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 17 PAGES
01 50 10 1.4.1 GMaterial Safety Data Sheet
(MSDS)
SD-06 Test Reports
1.8 GMonthly Green Procurement
Report
1.8 GAnnual Green Procurement
Report
1.3 GMonthly Recycling Report
GAnnual Recycling Report 01 54 00 SD-03 Product Data
Affirmative Procurement Reporting Form
Proposed environmentally preferred products.
01 57 20 SD-01 Preconstruction Submittals GConstruction Waste Management
Plan 01 57 50 SD-01 Preconstruction Submittals
1.7.1 GPreconstruction Survey
1.7.6 GRegulatory Notifications
1.5 GEnvironmental Protection Plan
1.6 GDirt and Dust Control Plan
SD-06 Test Reports 3.9.2Disposal Requirements 1.7.7Erosion and Sediment Control
Inspection Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 17 PAGES
01 57 50 3.4Erosion and Sediment Control Inspection Reports
Storm Water Inspection Reports for General Permit
1.7.8 GSolid Waste Disposal Report
SD-07 Certificates
1.7.5 GContractor 40 CFR employee
training records
SD-11 Closeout Submittals
3.4.2 GStorm Water Pollution Prevention
Plan compliance notebook 1.7.3Waste Determination
Documentation 1.7.4Disposal Documentation for
Hazardous and Regulated Waste 1.7.5Contractor 40 CFR Employee
Training Records 1.7.2Solid Waste Disposal Permit 1.7.8Solid Waste Disposal Report
Hazardous Waste/Debris Management
01 78 00 SD-03 Product Data
1.5.1 GWarranty Management Plan
1.5.4 GWarranty Tags
1.4Spare Parts Data
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 17 PAGES
01 78 00 1.5.1Instructions SD-10 Operation and Maintenance Data
3.7Operation and Maintenance Manuals
Condition Monitoring (Predictive Testing
Inspection Posted Instructions
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
GRecord Drawings As-Built Record of Equipment and Materials
Final Approved Shop Drawings Construction Contract Specifications
GInterim DD Form 1354 GChecklist for DD Form 1354
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
GDeconstruction Plan 1.10Existing Conditions
SD-07 Certificates
1.6 GNotification
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 17 PAGES
02 41 00 3.2.2Receipts 07 60 00 SD-02 Shop Drawings
3.1.7 GCovering on flat, sloped, or
curved surfaces
SD-11 Closeout Submittals 3.5Quality Control Plan
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping System
SD-03 Product Data
2.2 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SD-07 Certificates 2.2Firestopping Materials
1.5.1 GInstaller Qualifications
07 92 00 SD-03 Product Data
2.1 GSealants
2.2 GPrimers
2.3 GBond breakers
2.4 GBackstops
SD-07 Certificates
3.3.6 GSealant
08 91 00 SD-02 Shop Drawings
1.4 GWall louvers
1.5 GWall louvers
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 17 PAGES
08 91 00 2.2 GMetal Wall Louvers SD-04 Samples
1.4 GWall louvers
1.5 GWall louvers
21 13 13.00 20 SD-02 Shop Drawings
1.4.2 GShop Drawings
SD-03 Product Data
2.1.1 GPipe
2.1.1 GFittings
2.1.4 GSprinklers
2.1.5 GPipe hangers and supports
2.1.1 GMechanical couplings
2.1.5 GSeismic Bracing
SD-06 Test Reports
3.4 Grequest to schedule Preliminary
Tests
3.4 GPreliminary Test Report
3.5 Grequest to schedule Final
Acceptance Test
3.5 GFinal Acceptance Test Report
SD-07 Certificates
3.1 GInspection by Fire Protection
Engineer
1.4.1 GFire Protection Engineer
1.4.2 GSprinkler System Installer
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 17 PAGES
21 13 13.00 20 3.5As-built drawings 23 00 00 SD-02 Shop Drawings
1.4.3 GDetail Drawings
SD-03 Product Data
2.8.1.2Insulated Nonmetallic Flexible Duct Runouts
2.8.1.2Duct Connectors
2.8.2 GDuct Access Doors
GManual Balancing Dampers
2.8.5 GRegisters And Grilles
2.9.1.1 GIn-Line Centrifugal Fans
2.10 GAir Handling Units
2.11.1.1 GVariable Volume, Single Duct
Terminal Units
2.12 GEnergy Recovery Modules
2.9.3 GAir Filters & Filter Modules
1.4.4 GTest Procedures
GDiagrams SD-06 Test Reports
3.9 GPerformance Tests
3.7 GDamper Acceptance Test
SD-08 Manufacturer’s Instructions
3.2 GManufacturer's Installation
Instructions 3.11.2Operation and Maintenance
Training
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 17 PAGES
23 00 00 SD-10 Operation and Maintenance Data
3.11.1 GOperation and Maintenance
Manuals
GManual Balancing Dampers
2.9.1.1 GIn-Line Centrifugal Fans
2.10 GAir Handling Units
2.11.1.1 GVariable Volume, Single Duct
Terminal Units 23 05 48.00 40 SD-02 Shop Drawings
1.2 GInstallation Drawings
1.2 GOutline Drawings
SD-03 Product Data
1.2 GEquipment and Performance
Data GIsolators
SD-06 Test Reports
2.4 GType of Isolator
2.4 GType of Base
2.4 GAllowable Deflection
2.4 GMeasured Deflection
23 05 93 SD-01 Preconstruction Submittals
1.3.3 GRecords of Existing Conditions
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
1.5.3.2 GTAB Design Review Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 17 PAGES
23 05 93 SD-02 Shop Drawings
1.3.3 GTAB Schematic Drawings and
Report Forms SD-03 Product Data
1.3 GEquipment and Performance
Data
1.5.1.3 GTAB Related HVAC Submittals
SD-06 Test Reports
1.5.3.3 GPrerequisite HVAC Work
Checkout List
GProportional Balancing SD-07 Certificates
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
1.5.3.2 GTAB Submittal and Work
Schedule
1.5.3.3 GTAB Pre-Field Engineering
Report
1.5.5 GInstrument Calibration
Certificates
3.6 GTAB Procedures Summary
23 07 00 SD-02 Shop Drawings
3.2.2.4 GMICA Plates
2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 17 PAGES
23 07 00 3.4Equipment Insulation Systems SD-03 Product Data
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
3.4 GEquipment Insulation Systems
SD-04 Samples
2.2.1.3 GThermal Insulation
GDisplay Samples SD-08 Manufacturer’s Instructions
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
3.4 GEquipment Insulation Systems
23 09 23.13 20 SD-02 Shop Drawings
1.4.1.1 GControl system drawings title
sheet
1.4.1.2 GList of I/O Points
1.4.1.3 GControl System Components List
1.4.1.4 GControl system schematics
1.4.1.5 GHVAC Equipment Electrical
Ladder diagrams
1.4.1.6 GComponent wiring diagrams
1.4.1.7 GTerminal strip diagrams
1.4.1.8 GBACnet communication
architecture schematic
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 17 PAGES
23 09 23.13 20 SD-03 Product Data
2.1.1 GDirect Digital Controllers
2.1.1.13 GBACnet Gateways
2.1.4 GBACnet Protocol Analyzer
2.1.2 GDDC Software
2.1.3 GBACnet Operator Workstation
GBACnet Operator Workstation DDC Software
2.2 GSensors and Input Hardware
2.2.6 GAir Flow Monitoring Station
2.3 GOutput Hardware
2.4.2 GSurge and transient protection
2.6 GIndicators
2.5.1 GDuct smoke detectors
2.7 GVariable frequency (motor) drives
SD-05 Design Data
3.4.2 GPerformance Verification Testing
Plan
3.4.4 GPre-Performance Verification
Testing Checklist SD-06 Test Reports
3.4.11 GPerformance Verification Testing
Report
SD-07 Certificates
1.6.6 GContractor's Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 17 PAGES
23 09 23.13 20 SD-09 Manufacturer’s Field Reports
3.4.1 GPre-PVT Checklist
SD-10 Operation and Maintenance Data
1.4 GBACnet Direct Digital Control
Systems
3.3 GControls System Operators
Manuals
2.7.2 GVFD Service Manuals
SD-11 Closeout Submittals
3.5.1 GTraining documentation
23 64 26 SD-03 Product Data
2.4.3 GCalibrated Balancing Valves
SD-06 Test Reports
3.1.1.3Piping Welds NDE Report
3.4.2 GPressure Tests Reports
SD-07 Certificates 3.1.1.2Welding Procedures and
Qualifications SD-10 Operation and Maintenance Data
2.4.3 GCalibrated Balancing Valves
26 05 00.00 40 SD-01 Preconstruction Submittals
2.1 GMaterial, Equipment, and Fixture
Lists
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 17 PAGES
26 05 00.00 40 SD-03 Product Data
2.1.1 GConduits and Raceways
2.1.2 GWire and Cable
3.2.1.8 GSplices and Connectors
2.1.3 GSwitches
2.1.4 GOutlets, Outlet Boxes, and Pull
Boxes
2.1.5 GCircuit Breakers
2.1.6 GLamps and Lighting Fixtures
SD-06 Test Reports 3.3Continuity Test 3.3Phase-Rotation Tests 3.3Insulation Resistance Test
SD-07 Certificates
1.4 GCertification
SD-08 Manufacturer’s Instructions Part 2 GManufacturer's Instructions
26 05 48.00 10 SD-02 Shop Drawings 3.1Lighting Fixtures in Buildings 1.3Equipment Requirements
SD-03 Product Data
3.1 GLighting Fixtures in Buildings
1.3 GEquipment Requirements
1.2.4 GContractor Designed Bracing
26 08 00 SD-06 Test Reports
3.1 GAcceptance tests and inspections
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 17 PAGES
26 08 00 SD-07 Certificates
1.4.1 GQualifications
1.4.3 GAcceptance test and inspections
procedure 26 20 00 SD-02 Shop Drawings
2.12 GPanelboards
2.22 GWireways
SD-03 Product Data
2.11 GReceptacles
2.12.1 GCircuit breakers
2.9 GSwitches
2.13 GEnclosed circuit breakers
GMotor controllers GCATV outlets GGrounding Busbar GSurge protective devices
SD-06 Test Reports
3.5.2 G600-volt wiring test
3.5.3 GGrounding system test
SD-07 Certificates
2.10 GFuses
SD-10 Operation and Maintenance Data
1.5.1 GElectrical Systems
26 24 16.00 40 SD-03 Product Data
GCircuit Breakers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 17 PAGES
26 24 16.00 40 SD-06 Test Reports
3.2 GContinuity Tests
3.2 GInsulation Tests
SD-07 Certificates
1.4 GStatements
SD-08 Manufacturer’s Instructions
1.3 GPanelboards
28 31 76 SD-02 Shop Drawings GAmplifiers GDevice Operation GFinal As-Built Drawings GOperation And Maintenance
(O&M) Manual and Instructions GRiser Diagram GShop Drawing GWiring Diagram
SD-03 Product Data GBattery Charger, Wiring, and
Cable GElectromagnetic Door Holder, Transmitters and Housing GFAS and MNS firmware, FACP and MNS Panel GMonitor Module and Relay
Control and Mini-Module
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 17 PAGES
28 31 76 GNotification Appliance Circuits (NACs) and NAC Extenders
GSmoke Detectors or Sensors and Heat Detectors or Sensors
GWater Flow Detectors and Tamper Switches
SD-05 Design Data GDesign Data
SD-06 Test Reports GTest Reports
SD-07 Certificates GCertificates
SD-09 Manufacturer’s Field Reports
GManufacturer's Field Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR