SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 17 PAGES

Repair HVAC BEQ's Bldg. 2407 & 2408

01 11 00 SD-01 Preconstruction Submittals GUtility Outage Requests GRoad Closure Requests GAir Force Work Clearance Permit GContractor's Proposed Laydown

Area Plan 01 14 00 SD-01 Preconstruction Submittals

1.2.1.1 GList of Contact Personnel

01 30 00 SD-01 Preconstruction Submittals

1.2 GView Location Map

1.3 GProgress and Completion

Pictures GResume for Superintendent

01 32 16.00 20 SD-01 Preconstruction Submittals

1.2 GQualifications

1.3.1 GBaseline Project Schedule

1.4.1 GInitial Contract Progress Report

(AF IMT 3065)

1.4.2 GInitial Contract Progress

Schedule (AF IMT 3064) SD-07 Certificates

GMonthly Project Schedule Update GBi-Weekly Contract Progress

Reports (AF IMT 3065)

1.4.2 GMonthly Contract Progress

Schedule (AF IMT 3064)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 17 PAGES

01 33 00 SD-01 Preconstruction Submittals

1.7 GSubmittal register

01 35 26 SD-01 Preconstruction Submittals

1.6 GAccident Prevention Plan (APP)

1.7 GActivity Hazard Analysis (AHA)

1.6.1 GCrane Critical Lift Plan

1.5.1.2 GCrane Operators

SD-06 Test Reports 1.11Notifications and Reports

1.11.2 GAccident Reports

1.11.3Crane Reports

SD-07 Certificates 1.8Confined Space Entry Permit 1.8Hot work permit

License Certificates 01 45 00 SD-01 Preconstruction Submittals

1.6.1 GConstruction Quality Control (QC)

Plan

01 45 35 SD-07 Certificates

1.5 GSpecial Inspector

1.4 GSpecial Inspection Quality

Control Plan 01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.4.1 GTraffic Control Plan

01 50 10 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 17 PAGES

01 50 10 1.4.1 GMaterial Safety Data Sheet

(MSDS)

SD-06 Test Reports

1.8 GMonthly Green Procurement

Report

1.8 GAnnual Green Procurement

Report

1.3 GMonthly Recycling Report

GAnnual Recycling Report 01 54 00 SD-03 Product Data

Affirmative Procurement Reporting Form

Proposed environmentally preferred products.

01 57 20 SD-01 Preconstruction Submittals GConstruction Waste Management

Plan 01 57 50 SD-01 Preconstruction Submittals

1.7.1 GPreconstruction Survey

1.7.6 GRegulatory Notifications

1.5 GEnvironmental Protection Plan

1.6 GDirt and Dust Control Plan

SD-06 Test Reports 3.9.2Disposal Requirements 1.7.7Erosion and Sediment Control

Inspection Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 17 PAGES

01 57 50 3.4Erosion and Sediment Control Inspection Reports

Storm Water Inspection Reports for General Permit

1.7.8 GSolid Waste Disposal Report

SD-07 Certificates

1.7.5 GContractor 40 CFR employee

training records

SD-11 Closeout Submittals

3.4.2 GStorm Water Pollution Prevention

Plan compliance notebook 1.7.3Waste Determination

Documentation 1.7.4Disposal Documentation for

Hazardous and Regulated Waste 1.7.5Contractor 40 CFR Employee

Training Records 1.7.2Solid Waste Disposal Permit 1.7.8Solid Waste Disposal Report

Hazardous Waste/Debris Management

01 78 00 SD-03 Product Data

1.5.1 GWarranty Management Plan

1.5.4 GWarranty Tags

1.4Spare Parts Data

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 17 PAGES

01 78 00 1.5.1Instructions SD-10 Operation and Maintenance Data

3.7Operation and Maintenance Manuals

Condition Monitoring (Predictive Testing

Inspection Posted Instructions

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

GRecord Drawings As-Built Record of Equipment and Materials

Final Approved Shop Drawings Construction Contract Specifications

GInterim DD Form 1354 GChecklist for DD Form 1354

02 41 00 SD-01 Preconstruction Submittals

1.2.1 GDemolition Plan

GDeconstruction Plan 1.10Existing Conditions

SD-07 Certificates

1.6 GNotification

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 17 PAGES

02 41 00 3.2.2Receipts 07 60 00 SD-02 Shop Drawings

3.1.7 GCovering on flat, sloped, or

curved surfaces

SD-11 Closeout Submittals 3.5Quality Control Plan

07 84 00 SD-02 Shop Drawings

2.1 GFirestopping System

SD-03 Product Data

2.2 GFirestopping Materials

SD-06 Test Reports

3.3 GInspection

SD-07 Certificates 2.2Firestopping Materials

1.5.1 GInstaller Qualifications

07 92 00 SD-03 Product Data

2.1 GSealants

2.2 GPrimers

2.3 GBond breakers

2.4 GBackstops

SD-07 Certificates

3.3.6 GSealant

08 91 00 SD-02 Shop Drawings

1.4 GWall louvers

1.5 GWall louvers

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 17 PAGES

08 91 00 2.2 GMetal Wall Louvers SD-04 Samples

1.4 GWall louvers

1.5 GWall louvers

21 13 13.00 20 SD-02 Shop Drawings

1.4.2 GShop Drawings

SD-03 Product Data

2.1.1 GPipe

2.1.1 GFittings

2.1.4 GSprinklers

2.1.5 GPipe hangers and supports

2.1.1 GMechanical couplings

2.1.5 GSeismic Bracing

SD-06 Test Reports

3.4 Grequest to schedule Preliminary

Tests

3.4 GPreliminary Test Report

3.5 Grequest to schedule Final

Acceptance Test

3.5 GFinal Acceptance Test Report

SD-07 Certificates

3.1 GInspection by Fire Protection

Engineer

1.4.1 GFire Protection Engineer

1.4.2 GSprinkler System Installer

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 17 PAGES

21 13 13.00 20 3.5As-built drawings 23 00 00 SD-02 Shop Drawings

1.4.3 GDetail Drawings

SD-03 Product Data

2.8.1.2Insulated Nonmetallic Flexible Duct Runouts

2.8.1.2Duct Connectors

2.8.2 GDuct Access Doors

GManual Balancing Dampers

2.8.5 GRegisters And Grilles

2.9.1.1 GIn-Line Centrifugal Fans

2.10 GAir Handling Units

2.11.1.1 GVariable Volume, Single Duct

Terminal Units

2.12 GEnergy Recovery Modules

2.9.3 GAir Filters & Filter Modules

1.4.4 GTest Procedures

GDiagrams SD-06 Test Reports

3.9 GPerformance Tests

3.7 GDamper Acceptance Test

SD-08 Manufacturer’s Instructions

3.2 GManufacturer's Installation

Instructions 3.11.2Operation and Maintenance

Training

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 17 PAGES

23 00 00 SD-10 Operation and Maintenance Data

3.11.1 GOperation and Maintenance

Manuals

GManual Balancing Dampers

2.9.1.1 GIn-Line Centrifugal Fans

2.10 GAir Handling Units

2.11.1.1 GVariable Volume, Single Duct

Terminal Units 23 05 48.00 40 SD-02 Shop Drawings

1.2 GInstallation Drawings

1.2 GOutline Drawings

SD-03 Product Data

1.2 GEquipment and Performance

Data GIsolators

SD-06 Test Reports

2.4 GType of Isolator

2.4 GType of Base

2.4 GAllowable Deflection

2.4 GMeasured Deflection

23 05 93 SD-01 Preconstruction Submittals

1.3.3 GRecords of Existing Conditions

1.5.1 GIndependent TAB Agency and

Personnel Qualifications

1.5.3.2 GTAB Design Review Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 17 PAGES

23 05 93 SD-02 Shop Drawings

1.3.3 GTAB Schematic Drawings and

Report Forms SD-03 Product Data

1.3 GEquipment and Performance

Data

1.5.1.3 GTAB Related HVAC Submittals

SD-06 Test Reports

1.5.3.3 GPrerequisite HVAC Work

Checkout List

GProportional Balancing SD-07 Certificates

1.5.1 GIndependent TAB Agency and

Personnel Qualifications

1.5.3.2 GTAB Submittal and Work

Schedule

1.5.3.3 GTAB Pre-Field Engineering

Report

1.5.5 GInstrument Calibration

Certificates

3.6 GTAB Procedures Summary

23 07 00 SD-02 Shop Drawings

3.2.2.4 GMICA Plates

2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 17 PAGES

23 07 00 3.4Equipment Insulation Systems SD-03 Product Data

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

3.4 GEquipment Insulation Systems

SD-04 Samples

2.2.1.3 GThermal Insulation

GDisplay Samples SD-08 Manufacturer’s Instructions

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

3.4 GEquipment Insulation Systems

23 09 23.13 20 SD-02 Shop Drawings

1.4.1.1 GControl system drawings title

sheet

1.4.1.2 GList of I/O Points

1.4.1.3 GControl System Components List

1.4.1.4 GControl system schematics

1.4.1.5 GHVAC Equipment Electrical

Ladder diagrams

1.4.1.6 GComponent wiring diagrams

1.4.1.7 GTerminal strip diagrams

1.4.1.8 GBACnet communication

architecture schematic

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 17 PAGES

23 09 23.13 20 SD-03 Product Data

2.1.1 GDirect Digital Controllers

2.1.1.13 GBACnet Gateways

2.1.4 GBACnet Protocol Analyzer

2.1.2 GDDC Software

2.1.3 GBACnet Operator Workstation

GBACnet Operator Workstation DDC Software

2.2 GSensors and Input Hardware

2.2.6 GAir Flow Monitoring Station

2.3 GOutput Hardware

2.4.2 GSurge and transient protection

2.6 GIndicators

2.5.1 GDuct smoke detectors

2.7 GVariable frequency (motor) drives

SD-05 Design Data

3.4.2 GPerformance Verification Testing

Plan

3.4.4 GPre-Performance Verification

Testing Checklist SD-06 Test Reports

3.4.11 GPerformance Verification Testing

Report

SD-07 Certificates

1.6.6 GContractor's Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 17 PAGES

23 09 23.13 20 SD-09 Manufacturer’s Field Reports

3.4.1 GPre-PVT Checklist

SD-10 Operation and Maintenance Data

1.4 GBACnet Direct Digital Control

Systems

3.3 GControls System Operators

Manuals

2.7.2 GVFD Service Manuals

SD-11 Closeout Submittals

3.5.1 GTraining documentation

23 64 26 SD-03 Product Data

2.4.3 GCalibrated Balancing Valves

SD-06 Test Reports

3.1.1.3Piping Welds NDE Report

3.4.2 GPressure Tests Reports

SD-07 Certificates 3.1.1.2Welding Procedures and

Qualifications SD-10 Operation and Maintenance Data

2.4.3 GCalibrated Balancing Valves

26 05 00.00 40 SD-01 Preconstruction Submittals

2.1 GMaterial, Equipment, and Fixture

Lists

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 17 PAGES

26 05 00.00 40 SD-03 Product Data

2.1.1 GConduits and Raceways

2.1.2 GWire and Cable

3.2.1.8 GSplices and Connectors

2.1.3 GSwitches

2.1.4 GOutlets, Outlet Boxes, and Pull

Boxes

2.1.5 GCircuit Breakers

2.1.6 GLamps and Lighting Fixtures

SD-06 Test Reports 3.3Continuity Test 3.3Phase-Rotation Tests 3.3Insulation Resistance Test

SD-07 Certificates

1.4 GCertification

SD-08 Manufacturer’s Instructions Part 2 GManufacturer's Instructions

26 05 48.00 10 SD-02 Shop Drawings 3.1Lighting Fixtures in Buildings 1.3Equipment Requirements

SD-03 Product Data

3.1 GLighting Fixtures in Buildings

1.3 GEquipment Requirements

1.2.4 GContractor Designed Bracing

26 08 00 SD-06 Test Reports

3.1 GAcceptance tests and inspections

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 17 PAGES

26 08 00 SD-07 Certificates

1.4.1 GQualifications

1.4.3 GAcceptance test and inspections

procedure 26 20 00 SD-02 Shop Drawings

2.12 GPanelboards

2.22 GWireways

SD-03 Product Data

2.11 GReceptacles

2.12.1 GCircuit breakers

2.9 GSwitches

2.13 GEnclosed circuit breakers

GMotor controllers GCATV outlets GGrounding Busbar GSurge protective devices

SD-06 Test Reports

3.5.2 G600-volt wiring test

3.5.3 GGrounding system test

SD-07 Certificates

2.10 GFuses

SD-10 Operation and Maintenance Data

1.5.1 GElectrical Systems

26 24 16.00 40 SD-03 Product Data

GCircuit Breakers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 17 PAGES

26 24 16.00 40 SD-06 Test Reports

3.2 GContinuity Tests

3.2 GInsulation Tests

SD-07 Certificates

1.4 GStatements

SD-08 Manufacturer’s Instructions

1.3 GPanelboards

28 31 76 SD-02 Shop Drawings GAmplifiers GDevice Operation GFinal As-Built Drawings GOperation And Maintenance

(O&M) Manual and Instructions GRiser Diagram GShop Drawing GWiring Diagram

SD-03 Product Data GBattery Charger, Wiring, and

Cable GElectromagnetic Door Holder, Transmitters and Housing GFAS and MNS firmware, FACP and MNS Panel GMonitor Module and Relay

Control and Mini-Module

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 17 PAGES

28 31 76 GNotification Appliance Circuits (NACs) and NAC Extenders

GSmoke Detectors or Sensors and Heat Detectors or Sensors

GWater Flow Detectors and Tamper Switches

SD-05 Design Data GDesign Data

SD-06 Test Reports GTest Reports

SD-07 Certificates GCertificates

SD-09 Manufacturer’s Field Reports

GManufacturer's Field Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR