SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER

JCGU 15-1019

PROJECT TITLE SOLICITATION/CONTRACT NO.

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

1 Part 1, 1.7, Company

Safety Policy and

Accident Prevention

Plan

4 (a) FIO

2 Part 1, 1.14, Warranties 4 (d) GA

3 Part 1, 1.15.1, Contractor Storage 4 (b) GA

4 Part 1, 1.16.1.1, AF

Form 103 Work

Clearance Permit, Dig Permit

14 Days

Prior

GA

5 Part 1, 1.16.2, Utility

Outages

14 Days

Prior

GA

6 Part 1, 1.16.4.1, AF

Form 592 Welding, Cutting, Brazing permit

4 4

(b) or as needed basis

GA

7 Part 1, 1.17

Demolition Work

Plan

4 (b) GA

8 Part 1, 1.18, As-

Built's 4 (d) GA

L

I

N

E

U

M

B

E

R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

FINAL

APPROVAL

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S

R E

C O

M M

E N

D A

T

IO

N S

M A

N U

F A

C T

U R

E R

'S

W A

R R

A N

T Y

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

N S

S E

E P

A R

A

O T

H E

R S

A S

S P

E C

IF

IE

D

REQUIRED

SUBMISSION

DATE

REMARKS

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW UP

CONTRACT-

TOR RE-

SUBMIT-

TAL

(a) As soon as possible, no later than 7 calendar days after NTP

(b) Prior to Phase I (c) Prior to Use

(d) Final Inspection

AF Form 66, SEP 86

PROJECT NUMBER

JCGU 15-1019

PROJECT TITLE SOLICITATION/CONTRACT NO.

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

L

I

M

B

E

R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

FINAL

APPROVAL

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S

R E

C O

M M

E N

D A

T

IO

N S

M A

N U

F A

C T

U R

E R

'S

W A

R R

A N

T Y

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

N S

S E

E P

A R

A

O T

H E

R S

A S

S P

E C

IF

IE

D

REQUIRED

SUBMISSION

DATE

REMARKS

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW UP

CONTRACT-

TOR RE-

SUBMIT-

TAL

Part 2, 2.3, Environmental Form

G0104

Environmental

Reporting

2 (a) GA

10 Part 2, 2.5, AF Form

3952 HAZMAT

Request

2 (c) GA

11 Part 2, 2.5, MSDS 4 (c) GA

12 Part 3, 3.1 Job Mix

Proportaions for base and finish coats

4 (a) GA

13 Part 3, 3.1

Manufacturer’s

Installation/Applicati ons Directions

4 (a) GA

14 Part 3, 3.1.1 Colored

EIFS & Stucco

Samples

4 (a) GA

15 Part 3, 3.1.14 Sample

Panels 4 x (a) GA

(a) As soon as possible, no later than 7 calendar days after NTP

(b) Prior to Phase I (c) Prior to Use

(d) Final Inspection

PROJECT NUMBER

JCGU 15-1019

PROJECT TITLE SOLICITATION/CONTRACT NO.

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

L

I

M

B

E

R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

FINAL

APPROVAL

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

'S

R E

C O

M M

E N

D A

T

IO

N S

M A

N U

F A

C T

U R

E R

'S

W A

R R

A N

T Y

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

N S

S E

E P

A R

A

O T

H E

R S

A S

S P

E C

IF

IE

D

REQUIRED

SUBMISSION

DATE

REMARKS

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW UP

CONTRACT-

TOR RE-

SUBMIT-

TAL

Part 3,3.2. 1 & 2

Painting

Manufacturers Data, Material Data Sheets, Technical Data

Sheets

4 x (a) GA

17 Part 3, 3.3.2.3 Paint

Certificates 4 x (a) GA

AF Form 66

(a) As soon as possible but in no case later then 45 calendar days after NTP

(b) Prior to Final Inspection

(c) Prior to Use

(d) As required

(a) As soon as possible, no later than 7 calendar days after NTP

(b) Prior to Phase I (c) Prior to Use

(d) Final Inspection