AF_Form_66.pdf
PDF 238 KB Posted
- Attached to
- FY19 Basewide EIFS Repair Federal contract opportunity
- Solicitation number
- FA303019BA003
About this file
AF Form 66 - Schedule of Submittals
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_Amendment_FA303019BA0030002_SF_30.pdf | ||
| Solicitation_Amendment_-_FA303019BA0030002.pdf | ||
| Solicitation_Amendment_FA303019BA0030001_SF_30_(1).pdf | ||
| Lead_Based_Paint_Testing.pdf | ||
| Drawings.pdf | ||
| Solicitation_-_FA303019BA003.pdf | ||
| DBA_Wage_Determination_TX190282.pdf | ||
| Asbestos_Test_Report.pdf | ||
| Base_Access_Request_Letter_Template.docx | DOCX document | |
| Statement_of_Work_(Basewide_EFIS).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER
JCGU 15-1019
PROJECT TITLE SOLICITATION/CONTRACT NO.
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
1 Part 1, 1.7, Company
Safety Policy and
Accident Prevention
Plan
4 (a) FIO
2 Part 1, 1.14, Warranties 4 (d) GA
3 Part 1, 1.15.1, Contractor Storage 4 (b) GA
4 Part 1, 1.16.1.1, AF
Form 103 Work
Clearance Permit, Dig Permit
14 Days
Prior
GA
5 Part 1, 1.16.2, Utility
Outages
14 Days
Prior
GA
6 Part 1, 1.16.4.1, AF
Form 592 Welding, Cutting, Brazing permit
4 4
(b) or as needed basis
GA
7 Part 1, 1.17
Demolition Work
Plan
4 (b) GA
8 Part 1, 1.18, As-
Built's 4 (d) GA
L
I
N
E
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
FINAL
APPROVAL
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S
R E
C O
M M
E N
D A
T
IO
N S
M A
N U
F A
C T
U R
E R
'S
W A
R R
A N
T Y
O P
E R
A T
IN
G
IN
S
T R
U C
T
IO
N S
S E
E P
A R
A
O T
H E
R S
A S
S P
E C
IF
IE
D
REQUIRED
SUBMISSION
DATE
REMARKS
DATE
RECEIVED
IN CON-
TRACTING
DATE TO
CIVIL
ENGINEER-
ING
RETURN
SUSPENSE
DATE
FOLLOW UP
CONTRACT-
TOR RE-
SUBMIT-
TAL
(a) As soon as possible, no later than 7 calendar days after NTP
(b) Prior to Phase I (c) Prior to Use
(d) Final Inspection
AF Form 66, SEP 86
PROJECT NUMBER
JCGU 15-1019
PROJECT TITLE SOLICITATION/CONTRACT NO.
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
FINAL
APPROVAL
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S
R E
C O
M M
E N
D A
T
IO
N S
M A
N U
F A
C T
U R
E R
'S
W A
R R
A N
T Y
O P
E R
A T
IN
G
IN
S
T R
U C
T
IO
N S
S E
E P
A R
A
O T
H E
R S
A S
S P
E C
IF
IE
D
REQUIRED
SUBMISSION
DATE
REMARKS
DATE
RECEIVED
IN CON-
TRACTING
DATE TO
CIVIL
ENGINEER-
ING
RETURN
SUSPENSE
DATE
FOLLOW UP
CONTRACT-
TOR RE-
SUBMIT-
TAL
Part 2, 2.3, Environmental Form
G0104
Environmental
Reporting
2 (a) GA
10 Part 2, 2.5, AF Form
3952 HAZMAT
Request
2 (c) GA
11 Part 2, 2.5, MSDS 4 (c) GA
12 Part 3, 3.1 Job Mix
Proportaions for base and finish coats
4 (a) GA
13 Part 3, 3.1
Manufacturer’s
Installation/Applicati ons Directions
4 (a) GA
14 Part 3, 3.1.1 Colored
EIFS & Stucco
Samples
4 (a) GA
15 Part 3, 3.1.14 Sample
Panels 4 x (a) GA
(a) As soon as possible, no later than 7 calendar days after NTP
(b) Prior to Phase I (c) Prior to Use
(d) Final Inspection
PROJECT NUMBER
JCGU 15-1019
PROJECT TITLE SOLICITATION/CONTRACT NO.
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
FINAL
APPROVAL
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S
R E
C O
M M
E N
D A
T
IO
N S
M A
N U
F A
C T
U R
E R
'S
W A
R R
A N
T Y
O P
E R
A T
IN
G
IN
S
T R
U C
T
IO
N S
S E
E P
A R
A
O T
H E
R S
A S
S P
E C
IF
IE
D
REQUIRED
SUBMISSION
DATE
REMARKS
DATE
RECEIVED
IN CON-
TRACTING
DATE TO
CIVIL
ENGINEER-
ING
RETURN
SUSPENSE
DATE
FOLLOW UP
CONTRACT-
TOR RE-
SUBMIT-
TAL
Part 3,3.2. 1 & 2
Painting
Manufacturers Data, Material Data Sheets, Technical Data
Sheets
4 x (a) GA
17 Part 3, 3.3.2.3 Paint
Certificates 4 x (a) GA
AF Form 66
(a) As soon as possible but in no case later then 45 calendar days after NTP
(b) Prior to Final Inspection
(c) Prior to Use
(d) As required
(a) As soon as possible, no later than 7 calendar days after NTP
(b) Prior to Phase I (c) Prior to Use
(d) Final Inspection
File details come from the government source that posted it.