Attachment 4 - AF Form 66.pdf

Air Force Form PDF 35 KB Posted

Attached to
Upgrade Irrigation Systems
Solicitation number
FA2816-09-R-0049
Issued by

About this file

Attachment 4 - AF Form 66

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

ER

'S

R

EC

O M

M

EN

D A

TI

O

N

M A

N U

FA

C

TU

R

ER

'S

W A

R R

A N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

SC

H

ED

U

LE

S, L

IS

TI

N

G S, R

EP

O R

TS

D R

A W

IN

G

S

C O

ST

E

ST

IM

A

TE

TE

C

H N

IC

A

L D

A

TA

TE

ST

R

EP

O R

TS

FI

EL

D R

EP

O

R

TS

EL

EC

TR

O

N

IC

V

ER

SI

O

N (C

D o r D

VD

R

EQ

U

IR

ED

S

U B

M

IS

SI

O

N D

A

TE

D A

TE

R

EC

EI

VE

D

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

SU

B

M

IT

TA

L

N U

M B

ER

S

C O

N

TR

A C

TO

R

R

ES

U B

M

IT

TA

L

FI

N

A L

A

PP

R O

VA

L

REMARKS

1 Project Manager and designated representatives contact information (SOW Sec 5.8.1) 2 1 At time of NTP

2 Project Schedule (SOW Sec 5.2)

2 1 NTP plus 5 working days - Updated

SCHEDULE OF MATERIAL SUBMITTALS

(To be completed by Project Engineer)

NUMBER OF COPIES REQUIRED

SOLICITATION / CONTRACT NO.:

DATE CONTRACTOR

NOTIFIED

(To be completed by Contract Administrator)

PROJECT NUMBER:

HHEK083118

PROJECT TITLE:

Irrigation Controls, LAAFB and Fort MacArthur

Updated weekly

3 Meeting Minutes (SOW Sec 5.5.1)

2 1 5 working days after event

4 Site Safety Plan (SOW Sec 6.4.3

2 1 5 working days prior to onsite work

5 Work Phasing Plan (SOW Sec 6.2.1)

2 1 5 working days after

NTP

6 Environmental Protection Plan (Spec Sec 01010 - Section 1.6)

2 1 5 working days prior to onsite work

7 List of Equipment Requiring Air Permit (Spec Sec 01010 - Section 1.7)

2 1 5 working days prior to onsite work

8 Hazardous Waste Certification & Hazardous Waste Transporter Documentation (Spec Sec 01010 - Section 1.8)

2 1 As required

9 AF form 3952, MSDS Chemical/Hazardous Material Request Authorization (Spec Sec 01010 - Section 1.9)

2 1 5 working days prior to use

Schedule of Material Submittals, Feb 05 (SAF/AQCP) AF Form 66 1 of 3 Construction Attachment 1 (11/17/08)

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

ER

'S

R

EC

O M

M

EN

D A

TI

O

N

M A

N U

FA

C

TU

R

ER

'S

W A

R R

A N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

SC

H

ED

U

LE

S, L

IS

TI

N

G S, R

EP

O R

TS

D R

A W

IN

G

S

C O

ST

E

ST

IM

A

TE

TE

C

H N

IC

A

L D

A

TA

TE

ST

R

EP

O R

TS

FI

EL

D R

EP

O

R

TS

EL

EC

TR

O

N

IC

V

ER

SI

O

N (C

D o r D

VD

R

EQ

U

IR

ED

S

U B

M

IS

SI

O

N D

A

TE

D A

TE

R

EC

EI

VE

D

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

SU

B

M

IT

TA

L

N U

M B

ER

S

C O

N

TR

A C

TO

R

R

ES

U B

M

IT

TA

L

FI

N

A L

A

PP

R O

VA

L

REMARKS

SCHEDULE OF MATERIAL SUBMITTALS

(To be completed by Project Engineer)

NUMBER OF COPIES REQUIRED

SOLICITATION / CONTRACT NO.:

DATE CONTRACTOR

NOTIFIED

(To be completed by Contract Administrator)

PROJECT NUMBER:

HHEK083118

PROJECT TITLE:

Irrigation Controls, LAAFB and Fort MacArthur

10 Hazardous Material Spill/Release Report (Spec Sec 01010 - Section 1.10)

2 1 As required

11 Green Procurement Determination Form and Estimate/Certification Form (Spec Sec 01010 - Section 1.11) 2 1

5 working days prior to it kSec 01010 - Section 1.11) onsite work

12 Construction & Demolition Debris Report (Spec Sec 01010 - Section 1.13)

2 1 As required

13 NPDES General Permit Notice of Intent, SWPPP and Draft Notice of Termination (Spec Sec 01010 - Section 1.14) 2 1

5 working days prior to onsite work

14 Lead-Based Paint Abatement Submittals (Spec Sec 01010 - Section 1.15)

2 1 5 working days prior to onsite work

15 Asbestos Abatement Submittals (Spec Sec 01010 - Section 1.16)

2 1 5 working days prior to onsite work

16 AST Technical Information and Site Specific Spill Plan (Spec Sec 01010 - Section 1.19) 2 1 As required

17 Construction Material and Shop Drawing Submittals Schedule/Log (SOW Sec 6.2.2) 2 1

At start of Construction

Phase - Updated weekly

18 AF Form 3000, Material Submittals (SOW Sec 6.2.2)

2 2 2 2 2 2 2 2 2 2 2 As required

Schedule of Material Submittals, Feb 05 (SAF/AQCP) AF Form 66 2 of 3 Construction Attachment 1 (11/17/08)

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

ER

'S

R

EC

O M

M

EN

D A

TI

O

N

M A

N U

FA

C

TU

R

ER

'S

W A

R R

A N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R

U C

TI

O

N S

SC

H

ED

U

LE

S, L

IS

TI

N

G S, R

EP

O R

TS

D R

A W

IN

G

S

C O

ST

E

ST

IM

A

TE

TE

C

H N

IC

A

L D

A

TA

TE

ST

R

EP

O R

TS

FI

EL

D R

EP

O

R

TS

EL

EC

TR

O

N

IC

V

ER

SI

O

N (C

D o r D

VD

R

EQ

U

IR

ED

S

U B

M

IS

SI

O

N D

A

TE

D A

TE

R

EC

EI

VE

D

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

SU

B

M

IT

TA

L

N U

M B

ER

S

C O

N

TR

A C

TO

R

R

ES

U B

M

IT

TA

L

FI

N

A L

A

PP

R O

VA

L

REMARKS

SCHEDULE OF MATERIAL SUBMITTALS

(To be completed by Project Engineer)

NUMBER OF COPIES REQUIRED

SOLICITATION / CONTRACT NO.:

DATE CONTRACTOR

NOTIFIED

(To be completed by Contract Administrator)

PROJECT NUMBER:

HHEK083118

PROJECT TITLE:

Irrigation Controls, LAAFB and Fort MacArthur

19 Operations and Maintenance Manuals (SOW Sec 7.3)

2 2 30 days after

BOD

20 Equipment/Workmanship Warranty Letter (SOW Sec 7.4)

2 2 30 days after

BODBOD

21 DD-1354 Transfer and Acceptance of Real Property (Draft / Interim) (SOW Sec 7.5) 2 1 20 days prior to BOD

22 DD-1354 Transfer and Acceptance of Real Property (Final) (SOW Sec 7.5)

2 1 30 days after

BOD

23 Construction Record Drawings (SOW Sec 7.6 and 7.7)

2 1 30 days after

BOD

Schedule of Material Submittals, Feb 05 (SAF/AQCP) AF Form 66 3 of 3 Construction Attachment 1 (11/17/08)