This document is a Task Assignment (TA) under Contract HW684 between the State of Florida Department of Environmental Protection (FDEP) and GHD Services, Inc. The TA authorizes GHD to conduct site assessment activities at the Club Cleaners of Martin County facility located at 3320 Southeast Salerno Road in Stuart, Martin County, Florida. The work is managed by Nicole Varela (FDEP) and Brian Moore (GHD Services, Inc.), with the project number designated as ERIC_4923. The Task Assignment number is DC055A with a completion date of January 22, 2025.

The scope of work comprises four subtasks: Subtask 1 involves project management with costs calculated at 13% of direct labor; Subtask 2 covers soil and groundwater sampling including soil boring advancement, Modified Active Gas Sampling (MAGS), groundwater profiling using direct push technology, and monitoring well installation and sampling; Subtask 3 includes surveying and Investigative Derived Waste (IDW) disposal; and Subtask 4 involves preparation of a Site Assessment Report. The total Task Assignment value is $69,306.53 on a fixed unit rate basis. Deliverables include field notes and sampling data due October 8, 2024; IDW manifests due November 22, 2024; and the Site Assessment Report due November 18, 2024. Detailed subcontractor quotes from Preferred Drilling Solutions ($19,325.00), SurvTech Solutions ($5,985.00), Erwin Remediation, Perma-Fix Environmental Services ($1,816.25), and Atlantic Supply are incorporated into the cost estimate, with labor and laboratory costs detailed in comprehensive worksheets supporting the final invoice schedule.

View the file

Other files

File Type Posted
CN-370000-HW684-BIL02B.pdf PDF
CN-370000-HW684-BIL02D.pdf PDF
CN-370000-HW684-BIL02G.pdf PDF
CN-370000-HW684-CSS01A.pdf PDF
CN-370000-HW684-CSS1ACO1.pdf PDF
CN-370000-HW684-CSS3BCO1.pdf PDF
CN-370000-HW684-DC001D.pdf PDF
CN-370000-HW684-DC003B.pdf PDF
CN-370000-HW684-DC004A.pdf PDF
CN-370000-HW684-DC004E.pdf PDF
CN-370000-HW684-DC005B.pdf PDF
CN-370000-HW684-DC005E.pdf PDF
CN-370000-HW684-DC006C.pdf PDF
CN-370000-HW684-DC007C.pdf PDF
CN-370000-HW684-DC008A.pdf PDF
CN-370000-HW684-DC008D.pdf PDF
CN-370000-HW684-DC010D.pdf PDF
CN-370000-HW684-DC011D.pdf PDF
CN-370000-HW684-DC012E.pdf PDF
CN-370000-HW684-DC013A.pdf PDF
CN-370000-HW684-DC014A.pdf PDF
CN-370000-HW684-DC017B.pdf PDF
CN-370000-HW684-DC018D.pdf PDF
CN-370000-HW684-DC019A.pdf PDF
CN-370000-HW684-DC019B.pdf PDF
CN-370000-HW684-DC01ACO1.pdf PDF
CN-370000-HW684-DC01ACO5.pdf PDF
CN-370000-HW684-DC01ACO6.pdf PDF
CN-370000-HW684-DC021D.pdf PDF
CN-370000-HW684-DC022B.pdf PDF
CN-370000-HW684-DC023A.pdf PDF
CN-370000-HW684-DC025B.pdf PDF
CN-370000-HW684-DC025C.pdf PDF
CN-370000-HW684-DC027A.pdf PDF
CN-370000-HW684-DC028B.pdf PDF
CN-370000-HW684-DC031B.pdf PDF
CN-370000-HW684-DC031C.pdf PDF
CN-370000-HW684-DC032A.pdf PDF
CN-370000-HW684-DC035B.pdf PDF
CN-370000-HW684-DC035C.pdf PDF
CN-370000-HW684-DC039A.pdf PDF
CN-370000-HW684-DC03ACO2.pdf PDF
CN-370000-HW684-DC040B.pdf PDF
CN-370000-HW684-DC040C.pdf PDF
CN-370000-HW684-DC041A.pdf PDF
CN-370000-HW684-DC043A.pdf PDF
CN-370000-HW684-DC044A.pdf PDF
CN-370000-HW684-DC045C.pdf PDF
CN-370000-HW684-DC04A.pdf PDF
CN-370000-HW684-DC053A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

HW684

DC055A January 22, 2025

This Task Assignment authorizes GHD Services, Inc. to conduct site assessment activities at the Club Cleaners of Martin County site in Stuart, Florida, in accordance with the scope of work and cost proposal submitted on June 14, 2024.

Nicole Varela 850-245-8959 GHD Services, Inc.

Brian Moore 813-257-0658

ERIC_4923

3320 Southeast Salerno Road, Stuart, Martin County

Club Cleaners of Martin County

$ 69,306.53

$ 69,306.53

Scope of Work

GHD Services, Inc.

Brian Moore Digitally signed by Brian Moore Date: 2024.06.25 10:01:39 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2024.06.24 12:28:57 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: ERIC_4923

Club Cleaners of Martin County

FROM: Nicole Varela, Project Manager

SUBJECT: Negotiation Summary

HW684_DC055A

Site Assessment

DATE: June 19, 2024

This Task Assignment authorizes GHD Services, Inc. to conduct site assessment activities at the Club Cleaners of Martin County site in accordance with the scope of work, cost estimate form, and schedule received on June 14, 2024.

The final deliverable due date will be November 22, 2024.

The completion date for the task assignment will be January 22, 2025.

The final total cost will be $69,306.53.

Specific subtasks are detailed below:

Subtask 1: Project Management GHD is authorized to calculate Project Management costs at 13% of direct labor costs for all tasks associated with project management for site assessment at the site.

Subtask 2: Soil & Groundwater Sampling GHD will conduct soil assessment, which will include soil sampling and Modified Active Gas Sampling (MAGS), along with groundwater assessment, which will include groundwater sampling and profiling, in accordance with FDEP standard operating procedures (SOPs).

Subtask 3: Surveying & IDW Disposal GHD will delegate its respective subcontractors to survey the site and to dispose of Investigative Derived Waste (IDW) in accordance with FDEP SOPs.

Subtask 4: Site Assessment Report GHD will prepare a Site Assessment Report (SAR) to detail the site assessment activities conducted on site, describe impacts to site, and evaluate potential remediation activities.

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Club Cleaners of Martin County SUBTASK 2: Soil and Groundwater Sampling

DATE: 6/19/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager JM Arrange for Site Access with owner 2

Project Manager JM Utility Locate 1

Project Manager JM Prepare field scope of work (DP, soil, MAGS) 1.5

Project Manager JM Prepare daily summary reports of assessment results (1 hour per day) 4

8.5

Senior Geologist GE Mob/demob 4

Senior Geologist GE direct push sampling oversight (2 days) 16

Senior Geologist GE Well Installation (2 days) 16

Staff Engineer/Scientist ED Mob/demob (from WP Beach - 5 days) 10

Staff Engineer/Scientist ED Concrete Coring/Soil Boring Advancement and Screening 6 locations) 8

Staff Engineer/Scientist ED Install 6 piezometers for MAGS (1.5 hr each) 9

Staff Engineer/Scientist ED Install interior monitor well (3 hours) 3

Staff Engineer/Scientist ED Conduct MAGS (6 locations) 9

Staff Engineer/Scientist ED Round of Water Levels (6 total) 1

Staff Engineer/Scientist ED Groundwater Sampling (4 wells) 6

Senior Technician SA Mob/demob (from Tampa) 4

Senior Technician SA Concrete Coring/Soil Boring Advancement and Screening 6 locations) 8

Senior Technician SA Install 6 piezometers for MAGS (1.5 hr each) 9

Senior Technician SA Install interior monitor well (3 hours) 3

Senior Technician SA Conduct MAGS (6 locations) 9

Senior Technician SA Round of Water Levels (6 total) 1

Senior Technician SA Groundwater Sampling (3 wells) 4.5

38.5

TOTAL LABOR 129

VEHICLE TYPE RATE UNIT USEAGE

4 days Company Truck GE $480.00 week 1 $480.00

5 days Company Truck ED $480.00 week 1 $480.00

4 days Company Truck SA $480.00 week 1 $480.00

TOTAL VEHICLE $1,440.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel GE $150.00 night 3 $450.00

Per Diem GE $36.00 day 4 $144.00

Hotel SA $150.00 night 2 $300.00

Per Diem SA $36.00 day 3 $108.00

TOTAL PER DIEM $1,002.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Groundwater Protection Mobilization 1 each 900.00$ $900.00

Groundwater Protection Per Diem (2 man crew) 4 night 300.00$ $1,200.00

Groundwater Protection DPT Rig and Crew 4 day 1,750.00$ $7,000.00

Groundwater Protection Materials: Soil Sample Line 9 each 3.00$ $27.00

Groundwater Protection Materials: GW Sampling Po 35 each 3.00$ $105.00

Groundwater Protection Materials: HDPE Tubing (pe 3 each 120.00$ $360.00

Groundwater Protection Materials: Borehole Grouting 8 each 15.00$ $120.00

Groundwater Protection Materials: 1" PVC Well Inst 125 ft 4.00$ $500.00

Groundwater Protection Materials: 1" x 5' PVC .010 0 each 95.00$ $0.00

Groundwater Protection Materials: (2) 1" x 5' PVC .0 6 each 175.00$ $1,050.00

Groundwater Protection 2' x 2' Concrete Pad w/8" B 6 each 150.00$ $900.00

Groundwater Protection Well Development (up to 1/ 6 each 50.00$ $300.00

Groundwater Protection 55 gallon drums (Soil) 2 each 75.00$ $150.00

Groundwater Protection 55 gallon drums (Water) 4 each 75.00$ $300.00

Groundwater Protection Decon Pad 1 each 250.00$ $250.00

Groundwater Protection Permits 1 each 175.00$ $175.00

Atlantic Supply Well Screen (5 feet, 2-inch, 6 each 23.85$ $143.10

Atlantic Supply Well Point (2-inch) 6 each 8.30$ $49.80

Atlantic Supply Well Riser (2-inch - 5 ft) 6 each 19.15$ $114.90

Atlantic Supply Well Riser (1-inch - 5 ft) 1 each 12.25$ $12.25

Atlantic Supply 20/30 silica sand 1 bag 6.80$ $6.80

Atlantic Supply 30/65 silica sand 1 bag 6.05$ $6.05

Atlantic Supply Prepack (1-inch 5 ft) 1 each 76.00$ $76.00

Atlantic Supply Well point (1-inch) 1 each 9.20$ $9.20

Atlantic Supply expandable cap (2") 6 each 5.75$ $34.50

Atlantic Supply expandable cap (1") 1 each 5.50$ $5.50

Atlantic Supply Boltdown Manhole (6") 7 Each 29.50$ $206.50

Atlantic Supply Delivery Fee 1 each 40.00$ $40.00

Atlantic Supply Tax 7.50% $52.85

TOTAL $14,094.45

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Volatile Organics (full range) Soil $150.00 30 $4,500.00

Volatile Organics (full range) Groundwater $150.00 42 $6,300.00

TO-15 (VOCs) Soil Gas $200.00 6 $1,200.00

TOC walkley black soil $36.00 5 $180.00 density soil $25.00 5 $125.00 moisture soil $13.00 5 $65.00

Shipping (large cooler) overnight - soil $150.00 2 $300.00

Shipping (small cooler) 2 day - soil TOC $52.00 1 $52.00

Shipping (large cooler) 2 day - DP GW $70.00 2 $140.00

Shipping (large cooler) overnight - soil gas $150.00 2 $300.00

Shipping (small cooler) 2 day - MW GW $52.00 1 $52.00

Ice $6.50 6 $39.00

TOTAL LAB $13,253.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 day 9 $360.00

Air Sampling Pump $27.00 Day 1 $27.00

Regenerative Blower $180.00 Day 1 $180.00

Portable generator $70.00 Day 1 $70.00

Vacuum Gages $19.00 Day 1 $19.00 anemometer $33.00 Day 1 $33.00

Summa Canisters $33.00 Each 6 $198.00

Encore (for SPLP) $16.00 Each 30 $480.00

Soil sampling kit (through concrete) $235.00 Day 2 $470.00

Groundwater Sampling Kit $290.00 Day 2 $580.00

Poly Tubing $0.30 Ft 140 $42.00

Silicon Tubing $3.00 Ft 7 $21.00

TOTAL EQUIPMENT $2,480.00

FINAL --7/24/96

SUBTASK 3: IDW Management and Surveying

DATE: 6/19/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager JM Complete waste profile, transmit waste manifest 4

Project Manager JM IDW Pickup and sign manifest 4

TOTAL LABOR 8

VEHICLE TYPE RATE UNIT USEAGE

Company Truck $120.00 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW Drum Dispos 2 soil drum $110.00 $220.00

Erwin Remediation IDW Drum Dispos 4 water drum $125.00 $500.00

SurvTech Solutions Site Survey 1 each $5,985.00 $5,985.00

TOTAL $6,705.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Volatile Organics ( Soil $150.00 1 $150.00

Volatile Organics ( Groundwater $150.00 1 $150.00 shipping small cooler (2 day) $52.00 1 $52.00

Ice $6.50 1 $6.50

TOTAL LAB $358.50

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

SUBTASK 4: Site Assessment Report

DATE: 6/19/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Professional Scientist GE Site History (SAR) 4 Professional Scientist GE Regional Geology - Site Specific Lithology (SAR) 2 Professional Scientist GE Site Assessment Workplan Summary (SAR) 4 Professional Scientist GE Soil Sampling Methods (SAR) 3 Professional Scientist GE Soil Sampling Results (SAR) 3 Professional Scientist GE MAGS point installation methods (SAR) 2 Professional Scientist GE MAGS Procedures (SAR) 2 Professional Scientist GE MAGS Results (SAR) 2 Professional Scientist GE Direct Push Profiling Methods (SAR) 3 Professional Scientist GE Direct Push Profiling Results (SAR) 3 Professional Scientist GE Monitor well installation methods (SAR) 3 Professional Scientist GE Groundwater sampling methods (SAR) 2 Professional Scientist GE Groundwater flow evaluation (SAR) 2 Professional Scientist GE Groundwater water quality parameter results (SAR) 3 Professional Scientist GE Groundwater analytical data results (SAR) 4 Professional Scientist GE Conceptual Site Model (SAR) 4 Professional Scientist GE Findings (SAR) 3 Professional Scientist GE Laboratory Data Validation (SAR) 2 Professional Scientist GE Conclusions and Recommendations (SAR) 4

Sr. Professional Engineer JH Conlusions and recommendations (SAR) 4 Sr. Professional Engineer JH Remedial Action recommendations 4

Drafting Technician PM Draft Figures (site location/layout/site plan) 4 Drafting Technician PM Prepare DP groundwater analytical figure 2 Drafting Technician PM Prepare soil analytical figure 2 Drafting Technician PM Prepare MAGS analytical figure 2 Drafting Technician PM Prepare groundwater flow figures 2 Drafting Technician PM Prepare groundwater monitor well results figure 2

Staff Assistant JJ Data Entry (field data to report tables) 8 Staff Assistant JJ Prepare Summary Tables from lab EDDs 4 Staff Assistant JJ Prepare final SAR (pdf) 4

TOTAL LABOR 93

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

COST PROPOSAL FOR TASK DC055A

< Club Cleaners/FDEP ERIC_4923>

< Site Assessment >

1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >

GHD Services Inc. (GHD) submitted a Site Assessment Workplan for the Club Cleaners site located in Stuart, Martin County, in May 2024. The Site Assessment Workplan detailed an approach to determining the extent of contamination in soil and groundwater both vertically and horizontally. Task DC055A includes initial site assessment activities including soil sampling, modified active gas sampling (MAGS), discrete groundwater profiling using direct push technology (DPT), monitor well installation, and groundwater sampling

Subtask 1: Project Management Subtask 1 includes all tasks associated with project management of the site assessment activities at the Club Cleaners site.

Subtask 2: Soil & Groundwater Sampling

Upon Department approval, GHD will mobilize with the selected direct-push contractor. Soil sampling and groundwater profiling will be conducted in order to establish the extent of soil and groundwater impacts both vertically and horizontally. Soil sampling will include advancement of soil borings within and in the immediate vicinity of the drycleaner with hand operated equipment and through the use of direct-push technology (DPT). Modified Active Gas Sampling (MAGS) will also be conducted as part of the soil assessment. One continuous soil boring will also be completed to establish site lithologic conditions.

The initial scope of work includes groundwater profiling at seven (7) exterior locations. At each location, direct-push tooling will be advanced to the desired depths and discrete groundwater samples will be gathered for fixed laboratory analysis. For planning purposes, it is assumed that discrete groundwater samples will be gathered from the surface of the groundwater, 10, 20 feet, 30 feet, 40 feet, and 50 feet below land surface. All groundwater samples will be submitted to a Florida-certified laboratory for volatile organic analysis by EPA Method 8260.

The initial soil sampling will involve the advancement of six (6) shallow soil borings within and in close proximity to the former drycleaner facility. Soil borings will be advanced with a stainless steel hand auger and soil samples will be collected from 0-0.5’, 0.5-2.0’, and 2’ intervals until refusal or the water table. All soil samples will be submitted to a fixed laboratory for analysis for the presence of volatile organics (VOCs).

Following soil sampling, piezometers will be installed at six (6) locations. The piezometers will be constructed with 2-inch PVC well screens across the vadose zone. Following installation, MAGS will be conducted and soil gas samples will be gathered for field screening and fixed laboratory analysis for the presence of VOCs by Method TO-15.

During the same mobilization, permanent monitor wells will be installed. At this time, up to seven (7) monitorng wells are planned for installation. The 6 shallow wells will be installed to approximate depths of 15 ft bls. One of the shallow wells will be installed within the facility using hand operated equipment. The wells will be screened to straddle the water table. The deep well is proposed for a total depth of 50 feet and will be screened between 45 and 50 feet, depending on site lithology. Well locations and construction details will be provided to the Department for approval prior to installation. Following installation, the wells will be surveyed and sampled in accordance with FDEP SOPs. All of the groundwater samples will be submitted to a fixed laboratory for VOC analysis by EPA Method 8260.

Subtask 3: Surveying & IDW Disposal Following all field activities, a surveyor will be subcontracted to develop a site plan and survey elevations of all sample locations. Investigative Derived Waste (IDW) will be disposed of at an appropriate off-site facility. GHD will coordinate manifest generation and IDW pickup.

Subtask 4: Site Assessment Report Upon receipt of analytical data, a Site Assessment Report (SAR) will be prepared. The SAR will include a summary of field methodology, field screening data, and laboratory analytical results. The SAR will also include conclusions and recommendations. The recommendations may include the use of active remediation to mitigate identified impacts.

Deliverables:

Deliverable Deliverable Due Date

Field notes, soil and groundwater data, MAGS data, and subcontractor receipts

10/8/24

IDW Manifests and subcontractor receipts 11/22/24

Site Assessment Report 11/18/24

D r i l l i n g e a c h e a c h e a c h n i g h t n i g h t d a y d a y e a c h e a c h

C on su m ab le s d a y

M at er ia ls

H D

P E

T u bi ng p e r

' R o ll) e a c h

M at er ia ls

B o re ho le G ro ut in g w /C on cr et e

P a tc h e a c h e a c h f t e a c h e a c h e a c h e a c h e a c h e a c h g a llo n d ru m s

E st im at ed e a c h e a c h e a c h g a llo n d ru m s

E st im at ed e a c h e a c h e a c h

S te am C le an er d a y

D ec on P ad e a c h e a c h

L ith o B o rin g e a c h

D P

P ro fil e e a c h

S ha llo w

W el l w e l l

D ee p W el l w e l l

P er m its

S

W F

L W

M D

N

/A f o r

F D

E P

S ite s e a c h e a c h e a c h

ID

W

D is po sa l d r u m d r u m d r u m d r u m d r u m d r u m d r u m e a c h

S to p fe e s t o p

O th er F e e s e a c h

C o l l i e r s

P r o f e s s i o n a l s e r v i c e

S u r v e y tr an sp or ta tio n

F S

C

W e ll D e ve lo p m en t ( up t o

/2 h ou r w

/P u m p

E r w i n

E n v i r o s e r v e

P e r m a F i x

ID

W

S oi l

ID

W

G W

M at er ia ls

S o il S a m pl e

L in er s

M at er ia ls

G W

S a m pl in g

P oi nt s

M at er ia ls

1" P

V C

W el l I n st al la tio n

M at er ia ls

1" x

' P

V C

S lo t

P re pa ck

S cr ee n, E xp

P oi n t

M at er ia ls

(2 x 5'

P V

C .0

S lo t P re p ac k

S cr e en

, 3

E xp

P o in t

' x

' C o nc re te

P ad w /8

B

D C om pl et io n

D P

T R ig a nd C re w

G r o u n d w a t e r

P r o t e c t i o n

P r e f e r r e d

E a r t h T e c h

M ob ili za tio n

P er

D ie m m a n c re w

B id s S u m m a ry

REVISED DATE: 6/11/2024

ESTIMATE #: 624024

Project Description:

ID QTY Unit Rate TOTAL

1 1 each 900.00$ 900.00$

2 4 night 300.00$ 1,200.00$

3 4 day 1,750.00$ 7,000.00$

4 9 each 3.00$ 27.00$

5 35 each 3.00$ 105.00$

6 Materials: HDPE Tubing (per 500' Roll) 3 each 120.00$ 360.00$

7 Materials: Borehole Grouting w/Concrete Patch 8 each 15.00$ 120.00$

8 125 foot 4.00$ 500.00$

9 6 each 175.00$ 1,050.00$

9a each 100.00$ -$

10 6 each 150.00$ 900.00$

11 6 each 50.00$ 300.00$

12 55 gallon drums (Soil) (Estimated) 2 each 75.00$ 150.00$

13 55 gallon drums (Water) (Estimated) 4 each 75.00$ 300.00$

14 Decon Pad 1 each 250.00$ 250.00$

15 Permits: Martin County (up to 8 per app) 1 each 175.00$ 175.00$

Completion: Subtotal 13,337.00$

Todd Hodgson

TOTAL 13,337.00$

Partner

Per Diem - 2 Man Crew Est. (Min. Hotel Cost + $50/per man)

PROJECT

Club Cleaners 3320 SE Salerno Road

Damages to utilities on private property clearance are the responsibility of the client

5904 Hampton Oaks Pkwy Suite F

CUSTOMER

GHD

Brian Moore

Tampa, Florida 33610 Stuart, Martin County, Florida

DPT Soil and GW Sampling w/Well Installation

Locations must be accessible with track mounted DPT Rig

DESCRIPTION

Mobilization

Utility Locates on Private Property is the responsibility of the client Borehole Clearance to 5’ bgs beyond 20 minutes may require a change order for additional time and cost.

(813) 971-3882

(5) 1" x 15' PVC Well w/10' of .010 Prepack Screen, 2' x 2' Pad w/8" BD Completion, No Soil Sampling

(1) DPT Litho Boring to 50' bls w/Continuous Macrocores to Depth. Borehole Grout w/Concrete Patch.

(7) Hand Auger Borings w/DPT Soil Grab from 3' to 5', then GW Profiling.

(1) 1" x 50' PVC Well w/10' of .010 Prepack Screen, 2' x 2' Pad w/8" BD Completion, No Soil Sampling

(7) DPT GW Profiling Borings to 50' w/Sampling at 5 Intervals from GWT (6-10', 16-20', 26-30', 36-40' and 46-50' bls). Borehole Grouting and Patch to Surface.

If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or Todd@drillprollc.com.

THANK YOU FOR YOUR BUSINESS!

Todd Hodgson

Daily Rate: DPT Rig w/ 2-man Crew

"Actual quantities used and days on site will be invoiced"

4 Days

Materials: 1" PVC Well Installation

Well Development (up to 1/2 hour w/Pump)

2' x 2' Concrete Pad w/8" BD Completion

Materials: 1" x 5' PVC .010 Slot Prepack Screen, 3" Exp Point

Materials: (2) 1" x 5' PVC .010 Slot Prepack Screen, 3" Exp Point

Materials: Soil Sample Liners

Materials: GW Sampling Points

2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586

Preferred Drilling Solutions, Inc.

8820 66th St. North, Pinellas Park, FL 33782

Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com

DIRECT PUSH TECHNOLOGY QUOTE FORM

Date: 6/13/24 FAC ID#: ERIC_4923

Unit Unit Rate Number of Units

Extended Price whole day $2,250.00 5 11,250.00$ half day $1,750.00 -$ per foot $25.00 -$ each $110.00 11 1,210.00$ each $50.00 -$ each $35.00 14 490.00$ per well $150.00 6 900.00$ roundtrip $850.00 1 850.00$ per crew / per night $575.00 4 2,300.00$ each $75.00 11 825.00$ per day $150.00 3 450.00$ each $200.00 1 200.00$ lump sum $350.00 1 350.00$ per day $100.00 5 500.00$

TOTAL QUOTE PRICE $19,325.00

Notes: 1. Includes saw cuts, development, standby time, and decon.

Project No.:

Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477

Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782

Signature and Title of Person Submitting Quote: ___________________________________Austin Bonacum, Estimator Date: 6/13/24

(1) 1" x 50' MW with 5' .010 prepacked screen, soil sampling as needed, drum soil & water, pad and 8" manhole

3320 SE Salerno Road, Stuart, Martin County, FL

Well Completion (includes MH w/ cover, concrete pad, and locking well cap)

Well Riser (includes all materials) ID 1" 5' Length

Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5"

Pre-Packed Well Screen (includes all materials) ID 1" 5' Length Pack OD 3.5"

Auger Attachment, 2" Well Install

Direct Push Half-Day Rate 1 - on-site half day

Decon pad, decon between borings with steam cleaner, drum all IDW

(5) 1" x 15' MW's with 10' .010 prepacked screen, soil sampling as needed, drum soil & water, pad and 8" manhole

Site Name and Location: Club Cleaners

Consultant Name: GHD

PROPOSED SCOPE OF WORK:

(1) DPT boring to 50', drum cuttings, grout and restore grade

(7) DPT borings to 50', grab groundwater sampling at (5) intervals per boring, drum soil & water, grout and restore grade

Days to Complete Scope of Work: 5

Direct Push Daily Rate 1 - on-site day

Equipment Type: Geoprobe 8040DT, GeoProbe 3230DT

*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner

Other (specify)

Steam Cleaner

Decon pad

GeoProbe Consumables (includes tubing, points, liners, concrete patch, asphalt patch, and grouting)

DOT Approved 55-gal Drum

Per Diem

Mobilization

DIRECT PUSH TECHNOLOGY

MISCELLANEOUS

Permits

GHD SERVICES INC

REQUEST FOR DRILLING BIDS

Club Cleaners 3320 SE Salerno Road, Stuart, Martin County, Florida FDEP Drycleaner Program Site

GHD Services Inc. (GHD) is requesting bids for continuous soil sampling to depth and the construction of monitoring wells at the above-referenced project Site. The drycleaner is located in an end unit of the strip shopping center on the south side of Salerno Road. Underground utility services are assumed to be present and active.

Expected lithology beneath the site includes shallow fine grained sands transitioning from brown to tan to a depth of 28 feet below land surface (ft bls). The depth to water at the site is expected to be on the order of 3 to 5 ft bls.

The Driller will provide cost estimates to obtain continuous soil samples using direct-push techniques at one (1) location, advance seven (7) direct-push profiling points, install five (5) shallow monitoring wells, and install one (1) deep well. GHD will obtain permission from the Owner and contact the statewide utility location services. The Driller will obtain all necessary well permits.

The following are the specifications:

Lithology Boring – one (1) Exterior Locations

1. The Driller will obtain continuous soil samples from surface to the total depth (50 feet) of investigation.

2. GHD desires to obtain representative soil samples from land surface to a projected total depth of 40 ft bls using hand auger and direct-push equipment.

3. Upon completion, the borehole shall be backfilled with Portland cement, or a Portland cement/bentonite mixture. The backfill material will be placed using a grout pump from the bottom up.

Direct-Push Sampling – seven (7) Exterior Locations

1. The Driller will obtain continuous soil samples from surface to the water table at all boring locations.

2. GHD desires to obtain representative soil and groundwater samples to a projected total depth of 50 ft bls at each location. Continuous soil samples will be collected from above the water table (estimated at 3 to 5 ft bls) and groundwater samples will be collected at approximately 10-ft intervals to the total depth, starting at the water table.

3. The boreholes shall be backfilled with Portland cement, or a Portland cement/bentonite mixture. The backfill material will be placed using a grout pump from the bottom up.

Exterior Shallow Monitoring Wells (5) Locations

1. During same mobilization, use direct-push techniques to install five exterior permanent monitoring wells. Driller shall specify the actual drilling method proposed. The actual depth will be determined in the field by GHD’s field representative based on the Site lithology and groundwater screening results. The projected total depths are 15 ft bls.

2. The wells will be constructed of 1-inch diameter, Schedule 40 PVC casing and 0.010-inch slotted, factory “pre-packed” screen.

3. The screened interval will be 10 feet in length, based on a field determination by GHD.

4. The remaining space between borehole wall and the well screen will be backfilled with 20/30 gradational silica sand up to approximately one foot above the well screen. A one foot section of fine (30/65 gradational silica) sand will be placed above the sand pack as a seal.

5. The sand pack and seal will be poured or tremied in place as the drive casing is removed.The

Driller will ensure proper placement of sand and verify that the sand pack has not bridged. The depth to the top of the sand pack will be verified.

6. The annular area above the fine sand seal will be topped with neat cement grout to prevent surface runoff from entering the annular area.

7. The wells will be completed at ground surface with a flush-mounted concrete pad, bolt-down steel cover and water-tight locking cap.

Exterior Deep Monitoring Well

1. During same mobilization, use direct-push techniques to install one deep permanent monitoring well. Driller shall specify the actual drilling method proposed. The actual depth will be determined in the field by GHD’s field representative based on the Site lithology and groundwater screening results. The projected total depth is up to 50 ft bls.

2. The well will be constructed of 1-inch diameter, Schedule 40 PVC casing and 0.010-inch slotted, factory “pre-packed” screen.

3. The screened interval will be 5 to 10 feet in length, based on a field determination by GHD.

4. The remaining space between borehole wall and the well screen will be backfilled with 20/30 gradational silica sand up to approximately two (2) feet above the well screen. A two (2) foot section of fine (30/65 gradational silica) sand will be placed above the sand pack as a seal.

5. The sand pack and seal will be poured or tremied in place as the drive casing is removed. The Driller will ensure proper placement of sand and verify that the sand pack has not bridged.

The depth to the top of the sand pack will be verified.

The annular area above the fine sand seal will be topped with neat cement grout to prevent surface runoff from entering the annular area.

All down-hole tools will be steam-cleaned between locations.

Following installation, each well will be developed by overpumping until the discharge stream is free of visible sediments. GHD will oversee the development process and determine when the development is complete at each location.

All discharge water and drill cuttings will be containerized in 55-gallon drums suitable for later shipping. The Driller shall provide the cost per drum in the lump sum bids below.

If additional mobilizations are required, the bid rates provided will be used.

Bids must be submitted on the attached form to the contact shown below:

Brian Moore GHD Services Inc.

5904 Hampton Oaks Parkway, Suite F Tampa, Florida 33610

Phone: (813) 257-0658 Fax: (813)971-1862.

GHD BID FORM

Club Cleaners

3320 SE Salerno Road, Stuart, Martin County, Florida

ITEM 1 Mobilization Lump Sum Cost Per Mobilization: $

ITEM 2 Advance one (1) exterior lithology boring to 50 ft bls. Drum all wastes.

Lump Sum Cost per exterior lithology boring (est @ 50’) $ /Boring

ITEM 3 Advance seven (7) exterior direct-push profile borings with continuous soils above water table and groundwater profiling at app. 10 ft intervals to 50 ft bls. Drum all wastes.

Lump Sum Cost per exterior DP profile (est @ 50’) $ /Profile

ITEM 4 Install five (5) exterior shallow monitoring wells. Develop wells. Drum all wastes.

Lump Sum Cost per exterior Shallow Well (est @ 15’) $ /Well

ITEM 5 Install one (1) exterior deep monitoring well. Develop wells. Drum all wastes.

Lump Sum Cost per exterior Deep Well (est @ 50’) $ /Well

REQUIRED ADDITIONAL INFORMATION

Number of days required to complete DP Profiling: days

Number of days required to complete well network: days

Cost to supply, fill, and stage drums at central area: per drum

Number of drums required drums

Cost for well installation permits: each total

Bidder agrees that the proposed costs for the work specified in this bid package will be good for a period of 180 days from the bid opening.

Name of Bidder Authorizing Signature and Title

Address Date

From: Craig Burns To: Brian Moore Subject: GHD_Drycleaner Sites Date: Friday, May 17, 2024 10:46:21 AM Attachments: image001.png image002.png image003.png image004.png image005.png image619285.png image074121.png image912395.png image953180.png

Disposal $80/per drum for liquids or solids.

Transportation 251-400 miles $65/drum Totes - $260 <11 drums/site - Surchage of

$200/site 101-250 miles $50/drum Totes - $200 <6 drums/site - Surchage of

$50/site 0-100 miles $35/drum Totes - $150 <6 drums/site - Surchage of

$75/site New Drums $50/plus tax

FSC 15% to total invoice *See below for the sites you provided Brian – I provided the rates next to the locations.* www.enviroserve.com

24/7 Emergency Response

(800) 488 0910

Craig Burns Account Manager 4600 Brookpark Rd Cleveland, OH 44134 M 863 327 6289 craigburns@enviroserve.com

From: Brian Moore <Brian.Moore@ghd.com> Sent: Thursday, May 16, 2024 3:40 PM To: Craig Burns <craigburns@enviroserve.com> Subject: Drycleaner Sites

Craig, Can you provide a quote for soil and GW IDW disposal from the below sites, assume non-haz

Fashion Cleaners and Wood Lake Cleaners Tampa, FL $80/per drums disposal, $35/drum trans, If less than 6 drums per pick up $75/flat then 15% FSC

Atlantis Plaza Cleaners Lantana, FL $80/per drums disposal, $55/drum trans, If less than 6 drums per pick up $75/flat then 15% FSC

Club Cleaners Stuart, FL $80/per drums disposal, $55/drum trans, If less than 6 drums per pick up $75/flat then 15% FSC

Berkshire Cleaners Naples, FL $80/per drums disposal, $55/drum trans, If less than 6 drums per pick up $75/flat then 15% FSC

Thank you

BRIAN MOORE PE

GHD

Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA

O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com

The Power of Commitment

Connect

Please consider our environment before printing this email

CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.

Perma-Fix of Florida, Inc.

C:\Users\Bamoore\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\OJECJ1S0\GHD-Tampa - 4.doc.docx

June 3, 2024

GHD

5904 Hampton Oaks Parkway Suite F Tampa FL 33610 813 335 2147

Quote #2024-0159

Subject: Waste Quotation for Transportation and Disposal.

Sent via email: brian.moore@ghd.com

Dear Brian:

On behalf of Perma-Fix Environmental Services, Inc. (Perma-Fix of Florida), I would like to thank you for the opportunity to provide you with this quotation outlining the costs associated with the transportation and disposal. This quotation is based upon the waste you have on site at Club Cleaners – Stuart. Perma-Fix will provide labor, transportation, disposal, labels, and documentation as needed to process the waste.

We appreciate the opportunity to address your waste disposal needs and are pleased to submit the following quotation.

Disposal Est Quantity/Size

Unit Price Total

Non-Regulated, wastewater, (Profile # Pending) (4)55 Gal/DM $175.00 $700.00

Non-Regulated, Soil, (Profile # Pending) (2)55 Gal/DM $175.00 $350.00

Disposal Subtotal $1,050.00

Transportation Est Quantity Unit Price Est Total LTL Transportation, per drum (55/30 Gal/DM/DF) 2 $40.00 n/a Stop Fee 1 $75.00 n/a Transportation-Min Charge $355.00, if stop totals less. 1 $355.00 $355.00

Transportation Subtotal $355.00

Other Fees Quantity Unit Price Total Florida Hazardous Waste Fee $0.00 3% $0.00 Florida Sales Tax, On supplies only $0.00 .075% n/a Administration/Insurance Fee $1,405.00 25% $351.25 E-Manifest Filing Fee 1 $35.00 n/a Profile Fee 2 $30.00 $60.00

Other Fees Subtotal $411.25 Total: $1,816.25

Perma-Fix of Florida, Inc.

C:\Users\Bamoore\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\OJECJ1S0\GHD-Tampa - 4.doc.docx

Pricing Notes: Included in Scope of Work:

Terms and conditions in Perma-Fix Waste Transportation & Disposal Agreement, Rev. 1 dated

October 2020, apply upon acceptance/signature of this quote.

Demurrage: One-hour free loading. $110.00 per hour thereafter.

No-Load Charge: Stop + LTL Fees (includes cancellation with less than 48 hours’ notice).

Current pricing is subject to change after 30 days.

Non-Conforming Drums: If after receipt the drum has not conformed to the drum acceptance/container criteria, the generator (or broker if applicable) will be contacted to discuss the discrepancy and any resultant additional fees, as appropriate, will be applied.

Drums cannot be accepted if:

Minimum Transportation Fee is $355.00 for areas normally serviced by PFF in Florida.

Subject to final waste profile review & approval.

Payment terms: COD

We look forward to being of service to you. If you have any questions, or if I can be of further assistance, please call me at (253) 219-8640.

Sincerely, Dwayne Singleton

Dwayne Singleton Field Service Manager

PPEERRMMAA--FFIIXX EENNVVIIRROONNMMEENNTTAALL SSEERRVVIICCEESS,, IINNCC..

MMoobbiillee:: ((335522)) 221199--88664400

EEmmaaiill:: ddssiinngglleettoonn@@ppeerrmmaa--ffiixx..ccoomm

Quote Approval 2024-0159

Signature

Name, Printed

Brain Moore

Date

SurvTech Solutions, Inc.

10220 U.S. Highway 92 East Phone: 813-621-4929 Tampa, Florida 33610 Fax: 813-621-7194 Web: www.survtechsolutions.com Email: Sales@survtechsolutions.com

Monday, June 10, 2024

Brian Moore GHD Services Inc 4019 E. Fowler Ave., Tampa, FL 33617

RE: Proposal for Services for Club Cleaners PLS located at 3320 SE Salerno Rd, Stuart, FL, 34997-6719; Folio No.: N/A; Estimate No.: 241082; Project No.: N/A

Dear Brian;

SurvTech Solutions, Inc. is pleased to submit the following information for your consideration in selecting a firm to perform the necessary services, as noted above. We feel that you will find SurvTech Solutions, Inc. is well qualified to accomplish all services set forth in the request for proposal. Our outstanding staff of professional, technical, and support personnel has extensive and varied qualifications.

The lump-sum cost for the project will be $5,985.00, with an estimated time frame of 28 days from notice to proceed. Please see attached scope of work for a detailed breakdown of costs and services. If a quicker schedule is needed, please contact us, and we will try to accommodate your schedule.

If this proposal is acceptable, please sign the attached contract and send it to SurvTech Solutions via fax, email, or U.S. Mail. SurvTech cannot start said project without having a signed contract in place. If your firm wishes to use its own in-house contract or purchase order, then please forward them to SurvTech for review and signatures. SurvTech Solutions, Inc. appreciates this opportunity to submit this proposal for services. We look forward to serving GHD Services Inc on this project.

Respectfully submitted, SurvTech Solutions, Inc.

Florida Licensed Business No. 7340

Matthew S. Brooks PSM, LS, PLS V.P. of Contracts Management

Tampa, Florida 33610 Fax: 813-621-7194 Web: www.survtechsolutions.com Email: Sales@survtechsolutions.com

PROPOSAL 241082

Specific Purpose Survey per FDEP PLS Requirements

See Scope of Services Below

$5,985.00

TOTAL $5,985.00

Scope of Services

Standards of Practice:

1. All Surveying and Mapping will be performed per “The Florida Standards of Practice for Surveying and Mapping” and signed and sealed by a Florida Licensed Surveyor and Mapper.

Geodesy & Datums

1. Survey project data will be on the following coordinate system(s) and datum(s):

Horizontal datum (x, y; easting, northing)

SPC NAD1983, Florida East zone state plane coordinates

Vertical datum (z; elevation)

NAVD 1988 benchmark (North American Vertical Datum of 1988)

2. Units for the project shall be:

U.S. Survey Feet

FDEP Pre-Approval Specific Purpose Survey

1. The base map shall be prepared by a Professional Surveyor and Mapper (PSM). SurvTech shall deliver a signed and sealed map, electronic and paper copies. The electronic format shall be in its original updateable format (AutoCAD). The electronic copy shall be forwarded to the client (or contracted local program, as appropriate) so that it can be kept on file to be used by future Contractors to build upon as necessary (also see section 3.5.6 – Access to Public Records).

2. SurvTech shall establish a minimum of two (2) benchmarks on site with at least one benchmark being adjacent to the dry cleaner facility.

3. This proposal does NOT include the potable well survey and the area use survey; these activities do not need to be performed by a PSM.

4. SurvTech shall coordinate with the client, if requested, so that the survey task can be coordinated with another on-site task, such as the “Area Survey.”

5. The scope of work for this survey is as follows [maps to be provided in both paper and electronic format (typically Auto CADD)]:

Tampa, Florida 33610 Fax: 813-621-7194 Web: www.survtechsolutions.com Email: Sales@survtechsolutions.com

a. Designation of North direction;

b. The scale of the drawing (the scale should be written and represented as a bar scale);

c. The date of the field survey;

d. The location of the property in relation to bordering roads and streets, neighboring properties and the locations of the property entrances from the roadway. Business names and street addresses of adjoining properties should be marked on the site plan;

e. Approximate property boundaries and right-of-ways;

f. Accurate dimensions and locations of the foundation outlines of any existing structures on the subject property, including buildings, pump islands, tank areas, UST vents, septic drain fields and treatment systems;

g. Accurate dimensions and locations of the foundation outlines of any existing structures that establish a reasonably continuous and uniform construction line, including any permanent walls or fences;

h. Accurate location and elevation of top-of-casing for any existing monitoring wells or compliance wells, including on-site wells and any off-site wells, as identified by the Contractor or FDEP, associated with the subject property (elevations will be referenced to a known published datum.) See detailed scope of services below relating to monitoring wells to be surveyed.

i. Location and type of all surface cover materials, including asphalt, concrete, bare soil, vegetation, lawns and landscaping;

j. Location and type of any surface features not covered above, including overhead and above ground utilities, fire hydrants, communication poles or boxes, transformer enclosures, well pumps and pump enclosures and free-standing satellite dishes;

k. Location and dimensions of all major underground utilities or structures that are evidenced by manholes, fill port covers, monitoring point covers, significant visible pavement repairs or saw cuts (including remediation system piping trenches if visible), storm sewer grates and utility marking posts;

l. Accurate dimensions and locations of any surface features in the immediate (contiguous or adjacent) areas, including surface water bodies of any sort (canals, streams, creeks, rivers, pools, ponds, lakes, including storm water retention ponds), or surface relief (ditches, swales, berms, ravines, gullies, sinkholes);

m. The signature and seal of the surveyor who performed the survey;

n. Any other site-specific information required to make a complete site map; and

o. The site plan shall be submitted in both paper and electronic format (typically Auto

CADD).

Specific Purpose Survey Deliverables

1. The following deliverables are included in this proposal:

Survey drawing at a standard scale on a standard 18" x 24"size title block, unless specifically requested otherwise by client.

Final drawings shall be submitted as full-size copies, certified, and sealed, dated, and signed by a Florida Professional Surveyor and Mapper.

Final survey shall be made available to client in electronic format, AutoCAD (.dwg format), and Adobe PDF format. File will be sent by email unless the client specifically requests a CD of the drawing file.

Tampa, Florida 33610 Fax: 813-621-7194 Web: www.survtechsolutions.com Email: Sales@survtechsolutions.com

Establish Elevations and State Plane Coordinates on Monitoring Wells

2. SurvTech will recover known horizontal and vertical control stations from governmental agencies, such as:

a. National Geodetic Survey (NGS).

b. Department of Transportation (DOT).

c. County Agency.

d. City Agency.

e. Water Management Districts.

f. Department of Environmental Protection (FDEP).

2. Horizontally locate 7 monitoring wells to an accuracy of +/- 0.1 feet, utilizing RTK (real-time kinematic) GPS and/or conventional surveying instruments.

3. Elevate 7 monitoring wells to an accuracy of +/- 0.01 feet, utilizing closed-loop differential leveling.

Monitoring Wells Survey Deliverables

1. The following deliverables are included in this proposal:

A spreadsheet will be delivered to client in electronic format and as hard copies accompanying a signed and sealed surveyors report. File will be sent by email unless the client specifically requests a CD of the electronic file. SurvTech is NOT preparing a map of the site. The deliverables shall be a Microsoft Excel spreadsheet (.xlsx) format and surveyors report in Adobe (.pdf) format. Hard copies shall be sent only upon request.

Additional Non-Typical Items, Exceptions, and Conditions

1. Please reference attached aerial imagery for approximate project location and site limits.

Tampa, Florida 33610 Fax: 813-621-7194 Web: www.survtechsolutions.com Email: Sales@survtechsolutions.com

Yellow Polygon = Approximate Parcel Boundary Red Polygon = Approximate Survey Limits

Tampa, Florida 33610 Fax: 813-621-7194 Web: www.survtechsolutions.com Email: Sales@survtechsolutions.com

Exhibit "A" SurvTech Solutions, Inc. Short Form Agreement

General Terms of Agreement for Consulting (Surveying and Mapping) Services

1. Client hereby agrees to retain SurvTech Solutions, Inc. to perform professional land surveying services as described herein. This Agreement applies only to the specific project identified herein.

2. General Responsibility: SurvTech Solutions, Inc. agrees that we shall act as an independent contractor and shall perform the services provided for in this Agreement in accordance with the generally accepted standard of care of SurvTech Solutions, Inc.'s profession.

3. SurvTech Solutions, Inc. agrees to perform the services set forth in attached “Proposal of Services” ("services").

4. Payment: Client shall be invoiced upon completion of the project . . Client agrees to pay invoice(s) within thirty (30) days of its receipt. Client further agrees to pay interest on all amounts invoiced and not paid or objected to for valid cause in writing within said thirty (30) day period at the rate of eighteen (18) percent per annum (or the maximum interest rate permitted under applicable law), until paid. Client agrees to pay SurvTech Solutions, Inc.'s cost of collection of all amounts due and unpaid after ninety

(90) days, including court costs and reasonable attorney's fees. SurvTech Solutions, Inc. shall not be bound by any provision or agreement requiring or providing for arbitration of disputes or controversies arising out of this agreement, any provision wherein SurvTech Solutions, Inc. waives any rights to a mechanics' lien, or any provision conditioning SurvTech Solutions, Inc.’s right to receive payment for its work upon payment to Client by any third party. These General Conditions are notice where required, that SurvTech Solutions, Inc. shall file a lien whenever necessary to collect past due amounts. Failure to make payment within 30 days of invoice shall constitute a release of SurvTech Solutions, Inc. from any and all claims which Client may have whether in tort, contract or otherwise and whether known or unknown at the time.

5. Insurance: For any services provided under this Agreement, SurvTech Solutions, Inc. shall procure and maintain in effect insurance coverage in amounts not less than set forth below.

a. Workers' Compensation and Employers' Liability: Comply with the laws of the State of Florida.

b. General Liability: Comprehensive Liability Insurance for personal and bodily injury, including death and property damage in the amount of $1,000,000 combined single limit each occurrence and $2,000,000 in aggregate.

c. Professional Liability Insurance: SurvTech Solutions, Inc. shall provide Professional Liability Insurance in the amount of $5,000,000.

d. Umbrella Liability Insurance: SurvTech Solutions, Inc. shall provide additional Liability Insurance in the amount of $10,000,000 for Auto Liability and General Liability.

e. Certificates: SurvTech Solutions, Inc. shall provide certificates of insurance upon request evidencing coverage required above. Each certificate shall provide that coverage afforded shall not be canceled nor ordered reduced by the SurvTech Solutions, Inc. except with at least thirty (30) days prior written notice to the Client. Should this occur, SurvTech Solutions, Inc. shall procure and furnish for Client prior to such effective date new certificates conforming to the above coverage requirement.

SurvTech Solutions, Inc. shall not have the right to receive any payment under the Agreement until such certificates are received by Client.

6. Indemnification and Hold Harmless: Client agrees to defend, indemnify and save harmless SurvTech Solutions, Inc. from all claims, including negligence claims, suits, losses, personal injuries, death and property liability resulting from client’s performance of the proposed work, whether such claims or

Tampa, Florida 33610 Fax: 813-621-7194 Web: www.survtechsolutions.com Email: Sales@survtechsolutions.com damages are caused in whole or in part by client, and agrees to reimburse SurvTech Solutions, Inc. for expenses in connection with any such claims or suits, including reasonable attorney’s fees.

7. Termination: Client may terminate this Agreement with SurvTech Solutions, Inc. upon written notice if SurvTech Solutions, Inc. breaches his obligations under this Agreement or for any other cause. Client shall compensate SurvTech Solutions, Inc. for performance of services through the period of notice.

8. SurvTech Solutions, Inc. and client mutually waive claims for consequential and incidental damages arising out of or relating to this agreement.

9. Attorney Fees: Should suit be filed to enforce or for the breach of the term of this Agreement, the prevailing party shall be entitled to the award of reasonable attorney's fees.

10. Governing Law: This Agreement shall be governed by the Laws of the State of Florida.

11. Severability: If any provision of this Agreement is held by a court of competent jurisdiction to be invalid, void, or unenforceable, the remaining provisions shall remain in full force and effect and are binding on SurvTech Solutions, Inc. and Client.

Tampa, Florida 33610 Fax: 813-621-7194 Web: www.survtechsolutions.com Email: Sales@survtechsolutions.com

CLIENT AND SURVTECH SOLUTIONS, INC.

PROFESSIONAL SERVICES AGREEMENT - (SHORT FORM)

This agreement is made and entered into and made effective Monday, June 10, 2024 , by and between:

SurvTech Solutions, Inc. Client: GHD Services Inc Name: Matthew Brooks Name: Brian Moore Address: 10220 U.S. Highway 92 East Address: 4019 E. Fowler Ave.

Address cont: Tampa, Florida 33610 Address cont:

Phone: 813-621-4929 Address cont: Tampa, FL 33617 Fax: 813-621-7194 Phone: None Project No.: N/A Email: Brian.Moore@ghd.com

Estimate No.: 241082

The property upon which the services hereinafter described are to be performed is located at 3320 SE Salerno Rd, Stuart, FL, 34997-6719; Property Appraiser Parcel No.: N/A ("the property")

Services: Surveying and mapping services as described in “Scope of Services” as attached herein.

Fee & Time frame: Payment for the hereinabove described services will be $5,985.00. Estimated time frame is 28 days. All government fees or miscellaneous expenses will be incurred by the Client.