CN-370000-HW684-DC031C.pdf
PDF 5 MB Posted
- Contract number
- HW684
- Issued by
- Florida
About this file
This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) to GHD Services Inc. for groundwater monitoring services at Holiday Square Shopping Center located at 1034 US Highway 19 in Holiday, Pasco County, Florida. The task assignment, numbered DC031C, is executed under Contract Number HW684 and was signed on November 6, 2024, with a completion date of April 25, 2025. Benjamin Aoki serves as the FDEP project manager, while Brian Moore is the contractor's project manager for GHD Services Inc.
The contract authorizes GHD Services Inc. to conduct three subtasks: Project Management (calculated at 13% of direct labor), Groundwater Monitoring at nine monitoring wells (MW011, MW016, MW021, MW023, MW024, MW027, MW028, MW029, and MW030), and PFAS groundwater sampling at seven of those wells plus fourteen additional monitoring wells. The total task assignment value is $11,478.97 on a fixed unit rate basis, with 91.15 labor hours. Labor costs total $8,002.25, with field expenses including equipment, laboratory analytical costs of $657.00 for VOH analysis, and $125.00 for IDW disposal subcontracted to Erwin Remediation. Deliverables consist of a Groundwater Monitoring Report and PFAS Field Notes and Laboratory Data, both due February 3, 2025. The work includes water level measurements, groundwater and PFAS sampling in accordance with FDEP Standard Operating Procedures, and the preparation of a comprehensive monitoring report with conclusions and recommendations.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW684
DC031C Completion April 25, 2025
This Task Assignment authorizes GHD Services Inc. to conduct Groundwater Monitoring at Holiday Square Shopping Center per their proposed scope of work submitted on 29OCT2024.
Benjamin Aoki 850-245-7527 Contractor GHD Services Inc. Contractor
Contractor Brian Moore Contractor 813-257-0658
ERIC_5248
1034 US Highway 19, Holiday, Pasco County, FL
Holiday Square Shopping Center
Contractor Contractor
✔ $ 11,478.97
$ 11,478.97
Scope of Work
GHD Services Inc.
Contractor
Brian Moore Digitally signed by Brian Moore Date: 2024.11.06 12:36:17 -05'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2024.11.06 11:55:07 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 1 & 2: Groundwater Monitoring Report; Project Management 02/03/2025
Subtask 3: PFAS Field Notes and Laboratory Data (Groundwater Monitoring Report) 02/03/2025
Subtask 1 & 2: Groundwater Monitoring Report; Project Management $ 7,548.57
Subtask 3: PFAS Field Notes and Laboratory Data (Groundwater Monitoring Report) $ 3,930.40
$ 11,478.97
HW684
DC031C
RRonn DeSantis Governor
JJeanette Nuñez Lt. Governor
Shawnn Hamilton Secretary
TO:
FROM:
DATE:
SUBJECT:
FLORIDAA DEPARTMENTT OFF
Environmentall Protectionn
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
G H
D S er vi ce s
In c.
D at e:
/5
/2
Ta sk
D C
1C
S ub Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
S ite
H ol id ay S qu ar e S ho pp in g
Ta sk
G ro un dw at er
M on ito rin g S ub Ta sk
A ct iv ity
/P ha se
M on ito rin
Ta sk
P
FA
S
S am pl in g S ub Ta sk
P ro je ct
M an ag er
B ria n
M oo re , P
E
Ta sk
S ub Ta sk
S ub
Ta sk
S ub Ta sk
T T ot al s
La bo r R at e
C at eg or y $5
1.
P P ro je ct
M an ag er
JM
6.
6.
$0 .0
P rin ci pa l E ng in ee r/S ci en tis t
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
Te ch ni ca l D ire ct or 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$5
8.
S r P ro fe ss io na l E ng in ee r
JH
2.
1.
1.
0.
0.
0.
0.
0.
0.
0.
$0
.0
S en io r P ro je ct M an ag er 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$4
5.
P ro fe ss io na l E ng in ee r/S ci e G
E 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$3
9.
P ro je ct
E ng in ee r/S ci en tis t C
H 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$5
1.
P ro je ct
M an ag er
/ E ng in ee
JM
.0
.5
5.
0.
0.
0.
0.
0.
0.
0.
$3
3.
S ta ff E ng in ee r/S ci en tis t
JW
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$3
6.
D at a A na ly st
JL
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$4 6.
Fi el d
M an ag er
O T
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2 5.
S en io r T ec hn ic ia n
S A
.0
.5
.5
0.
0.
0.
0.
0.
0.
0.
$2
9.
S en io r T ec hn ic ia n W
M 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2
7.
S en io r T ec hn ic ia n D
C 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2
1.
Ju ni or T ec hn ic ia n W
O
.5
.0
.5
0.
0.
0.
0.
0.
0.
0.
$1 8.
Ju ni or
T ec hn ic ia n
C D
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$3 1.
D ra fti ng T ec hn ic ia n K
J 7.
5.
2.
0.
0.
0.
0.
0.
0.
0.
$2
2.
Ad m in is tra tiv e As si st an t
JJ
7.
4.
2.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
T ot al
H ou rs
.1
6.
.5
.0
0.
0.
0.
0.
0.
0.
0.
D ire ct L ab or
$2
,9
.3
$3
.0
$1 ,6
.7
$1
,0
.5
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
O ve rh ea d
9.
$3
,8
.5
$4
.5
$2 ,0
.4
$1
,3
.4
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
G en
A dm in 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fr in ge
.8
0% $1
,1
.3
$1
.0
$6
.4
$3
.8
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
L ab or
$8 ,0
.2
$9
.6
$4
,3
.7
$2 ,7
.9
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Pa ge
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
G H
D S er vi ce s
In c.
e:
/5
/2
D C
1C
Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
S ite
H ol id ay S qu ar e S ho pp in
Ta sk
G ro un dw at er
M on ito rin g S ub Ta sk
A ct iv ity
/P ha se
M on ito rin
Ta sk
P
FA
S
S am pl in g S ub Ta sk
P ro je ct
M an ag er
B ria n
M oo re , P
E
Ta sk
S ub Ta sk
S ub
Ta sk
S ub Ta sk
T T ot al s
T ra ve l
V eh ic le
R en ta l
$2
.0
$1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ile ag e C os ts
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
A ir
Fa re
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P er d ie m
H ot el $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l T ra ve l $2
.0
$1
.0
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (E qu ip m en t P ro cu re m en t)
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P ro cu re m en t F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
S ub co nt ra ct or C os t
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (S er vi ce s
P ro cu re m en t) ril lin g
(C on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D ril lin g (N on -c on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ob ile L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ur ve yi ng
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
ID
W
$1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til iti es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til ity L oc at io n
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
H an dl in g Fe e $1
2.
$1 2.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
S ub co nt ra ct or C os t
$1
.5
$1
.5
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
La bo ra to ry
A na ly tic al C os ts
$6
.0
$6
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fa st
T ur na ro un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S am pl e
S hi pp in g $8
3.
$7 6.
$6
.5
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
L ab or at or y
$7
.0
$7
.5
$6 .5
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fi el d E xp en se s
P so na l P ro te ct io n $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E xp en da bl es $8
0.
$4 0.
$4
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( D ril lin g re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( A na ly tic al re la te d)
$1 ,3
.0
$6
.4
$7
.6
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
ID
W re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
O th er
$1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al F ie ld
E xp en se s $1
,5
.0
$8
.4
$7
.6
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub to ta l $1
0, 8.
$9
.6
$6 ,1
.1
$3
,6
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
C om pl et io n Fe e $8
.2
$9
2.
$4
.7
$2
.3
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al E st im at ed
C os t $1
1, 8.
$1 ,0
.6
$6
,5
.8
$3 ,9
.4
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
C os t f ro m P rio r C
E F:
M an ua l E nt ry
C os t f ro m D el ta
C E
F;
M an ua l E nt ry C os t (
P rio r + D el ta
$0
.0
Au to
-C al cu la te d
R ou nd in g E rr or
$1
1, 8.
Au to
-C al cu la te d
Fi na l T ot al C os t:
$1 1, 8.
Au to -C al cu la te d
Pa ge
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Holiday Square Shopping Center SUBTASK 2: Groundwater Monitoring
DATE: 11/5/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr. Professional Engineer JH Conclusions/Recommendations 1
Project Manager JM Site Access 1 Project Manager JM Field Work Preparation 1 Project Manager JM Update HASP 1 Project Manager JM Profile IDW 1 Project Manager JM Project Background (GWMR) 1 Project Manager JM Groundwater Sampling Methods (GWMR) 1 Project Manager JM Groundwater flow evaluation (shallow, intermediate, deep) - GWMR 2 Project Manager JM Water Quality Parameter Summary (GWMR) 2 Project Manager JM Groundwater Analtycial Results (GWMR) 2 Project Manager JM Laboratory data validation (GWMR) 1.5 Project Manager JM Conclusions/Recommendations 1
14.5
Senior Technician SA Mob/demob 2 Senior Technician SA Water Levels (all wells - 23 total) 3 Senior Technician SA Groundwater Sampling (5 wells) 7.5
12.5
Junior Technician WO Mob/demob 2 Junior Technician WO Waterl Levels (all wells - 23 total) 3 Junior Technician WO Groundwater Sampling (4 wells) 6
Drafting Technician KJ Prepare GW Flow maps (shallow, intermediate, deep) 3 Drafting Technician KJ Prepare VOC plume figures with updated concentration data 2
Staff Assistant JJ Data Entry (23 wls, and 9 monitor wells) 1.5 Staff Assistant JJ Update tables (wl, water quality, analytical) 1 Staff Assistant JJ Document Preparation/Publishing 2
4.5
TOTAL LABOR 48.5
VEHICLE TYPE RATE UNIT USEAGE
Company Truck $120.00 day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation IDW Disposal $125.00 drum 1 $125.00
TOTAL $125.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOHs EPA 8260 $73.00 9 $657.00 Sample Shipping Large Cooler (2 day) $70.00 1 $70.00
Ice $6.50 1 $6.50
TOTAL LAB $733.50
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 1 $40.00
Groundwater Sampling Kit $290.00 day 2 $580.00 Poly Tubing (HDPE) $0.30 ft 198 $59.40 Silicon Tubing $3.00 ft 9 $27.00
Drum $100.00 drum 1 $100.00
TOTAL EQUIPMENT $806.40
FINAL --7/24/96
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Holiday Square Shopping Center SUBTASK 3: PFAS Sampling
DATE: 11/5/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr. Professional Engineer JH Conclusions/Recommendations (PFAS) 1
Project Manager JM Field Work Preparation (PFAS) 1 Project Manager JM Groundwater Analtycial Results (PFAS) 2 Project Manager JM Laboratory data validation (PFAS) 1.5 Project Manager JM Conclusions/Recommendations (PFAS) 1
5.5
Senior Technician SA Mob/demob 2 Senior Technician SA Groundwater Sampling (7 wells) 10.5
12.5
Junior Technician WO Mob/demob 2 Junior Technician WO Groundwater Sampling (7 wells) 10.5
12.5
Drafting Technician PM Prepare PFAS plume figures with updated concentration data 2
Staff Assistant JJ Data Entry (14 monitor wells) 1.5 Staff Assistant JJ Update tables (PFAS Analyticall) 1
2.5
TOTAL LABOR 36
VEHICLE TYPE RATE UNIT USEAGE
Company Truck $120.00 day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Ice $6.50 1 $6.50
TOTAL LAB $6.50
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 1 $40.00
Groundwater Sampling Kit $290.00 day 2 $580.00 Poly Tubing (HDPE) $0.30 ft 302 $90.60 Silicon Tubing $3.00 ft 14 $42.00
TOTAL EQUIPMENT $752.60
FINAL --7/24/96
COST PROPOSAL FOR TASK DC031C
<Holiday Square Shopping Center/FDEP #51-9700641>
< Groundwater Monitoring>
1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >
GHD Services Inc. (GHD) submitted a Site Assessment Report and Interim Source Removal Plan (SAR/ISRP) for the Holiday Square Shopping Center site located in Holiday, Pinellas County, in July 2017. The SAR/ISRP detailed the results of the assessment and detailed a plan to remove contaminated soil near a sewer cleanout. The ISRP activities were implemented in January 2018 and an Interim Source Removal Report (ISRR) was submitted in March 2018.
Additional Assessment was conducted late in 2018 and a SSAR was submitted in early 2019.
GHD’s latest groundwater monitoring report was submitted in December 2023, which recommended additional groundwater monitoring. The FDEP provided approval of the monitoring report in correspondence dated January 26, 2024. Task DC037C proposes annual groundwater sampling.
Subtask 1: Project Management Subtask 1 includes all tasks associated with project management of the groundwater monitoring activities at the Holiday Square Shopping Center site.
Subtask 2: Groundwater Monitoring In accordance with GHD recommendations, groundwater sampling is proposed at monitoring wells MW011, MW016, MW021, MW023, MW024, MW027, MW028, MW029, and MW030 will be sampled in accordance with FDEP SOPs. Prior to sampling, a complete round of water levels will be gathered from all site monitor wells. Groundwater sampling will be conducted in accordance with FDEP SOPs. The groundwater samples will be submitted to a fixed laboratory for VOH analysis.
Upon receipt of analytical data, a Groundwater Monitoring Report (GMR) will be prepared.
The GMR will include a summary of field methodology, field screening data, and laboratory analytical results. The GMR will also include conclusions and recommendations.
Subtask 3: PFAS Groundwater Sampling As part of the groundwater sampling program, GHD will also sample all on-site monitoring wells to be analyzed for the presence of PFAS. Previous PFAS screening identified elevated levels at 2 wells. PFAS sampling will be conducted at 7 wells identified in subtask 2 (MW011, MW016, MW021, MW023, MW024, MW027, and MW030) as well as monitoring wells
MW001, MW005, MW006, MW007, MW009, MW010, MW012, MW015, MW017, MW018,
MW020, MW022, MW025, and MW026. PFAS sampling will be conducted in accordance with FDEP and GHD SOPs. Samples will be submitted for PFAS analysis by EPA Method
537.1. The PFAS results will be summarized along with the VOH data referenced in Subtask 2.
Deliverables:
Deliverable Deliverable Due Date
Groundwater Monitoring Report 2/3/25
PFAS Field Notes and Laboratory Data (Groundwater Monitoring Report) 2/3/25
408 Ditmar Street
Pensacola, FL 32503
To: Mr. Brian Moore
GHD
5904 Hampton Oaks Parkway, Suite F Tampa, FL 33610
June 13, 2023
Re: Non-Hazardous Drum Disposal – State of Florida
Mr. Moore:
The price for the transportation and disposal (T&D) of drums of non-hazardous soil and water located in the State of Florida is listed below.
Non-Hazardous Drums:
Description Rate Unit False Mobilization (No drum found) $ 85.00 Per Stop T&D - Non-Haz Soil $ 110.00 Per Drum T&D - Non-Haz Water $ 125.00 Per Drum
The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.
The lab data we require for the disposal of drums of petroleum impacted soils are totals for BTEX and the 4 RCRA metals (arsenic, cadmium, chromium, and lead), with analyses no older than 1 year from the estimated disposal date.
We do not require analyticals for the disposal of Petroleum Contact Water (PCW) as long as it has only been impacted with petroleum - not pesticides, herbicides or dry-cleaning solvents etc.
Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc.
This quote is valid for 90 days.
408 Ditmar Street Pensacola, FL 32503
Respectfully, Robert Donado Erwin Remediation, Inc.
Email: Robert@erwinremediation.com Office: (850) 466-2358 p y, Robert Donado
6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 1/2
Quote Number: 19644
QUOTE
QUOTED TO: Brian Moore QUOTE DATE: 1/1/2022
COMPANY NAME: GHD - 2022 QUOTED BY: Craig Burns
PHONE NUMBER: Ext.
FAX NUMBER:
PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS
CUSTOMER PO:
CONTACT EMAIL:
SITE ADDRESS: TBD
CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING
COST ESTIMATE FOR THE SITE/ PROJECT LISTED ABOVE.
DESCRIPTION PRICE QTY. UNIT TOTAL
NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00
NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00
TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$30.00 DRUM $0.00
TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$40.00 DRUM $0.00
TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site
$50.00 DRUM $0.00
Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax
$0.00 . $0.00
HAZ Drums to be quoted case-by-case $0.00 . $0.00
OPTIONAL LINE ITEMS
***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00
TOTAL REQUIRED ITEMS $0.00
TOTAL OPTIONAL ITEMS $0.00
GRAND TOTAL $0.00
NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups. **Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns
863.327.6289 - cburns@clarkenv.com
This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.
6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 2/2
Name (print) Title
Signature Date
CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854
WWW.ClarkEnvironmental.com
From: Craig Burns To: Brian Moore Subject: GHD_IDW Drum Rates FL Date: Tuesday, June 28, 2022 10:26:46 AM Attachments: image001.png image002.png image003.png image004.png image005.png GHD Drum Rates FL 2022.pdf
Here you go Brian. I do this for a lot of engineering/consulting firms.
Be aware of the low stop less than 6 drums at $50/flat Be aware of the 10% to the total cost for FSC (implemented April 15).
Pass around the GHD Florida offices
From: Brian Moore <Brian.Moore@ghd.com> Sent: Tuesday, June 28, 2022 10:05 AM To: Craig Burns <cburns@clarkenvironmental.com> Subject: IDW Drums
Craig, Is it possible to provide a generic quote for IDW water disposal.
Assumption is non-haz with necessary analytical Maybe provide a range of locations
South florida or central florida, or both?
Thanks in advance
We have many sites that we generate 1 gw drum of IDW and would like to streamline the vendor coordination
BRIAN MOORE PE
GHD
Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com
The Power of Commitment Connect
Please consider our environment before printing this email
CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.
Whatever Waste, LLC 3834 Mandarin Woods Dr. No.
Jacksonville, Florida 32223 United States 904.881.1957
Brian Moore PE
GHD
5904 Hampton Road Parkway Suite F Tampa, FL 33610
Estimate Number 062922.1
Notes Dry Cleaner Site Locations: Central and South Florida Regions excluding Florida Keys Required analytical data for non-haz disposal acceptance would be VOCs and includes waste profiling assistance if the IDW-GW drums don't fall under a blanket waste profile DOT shippable drums must be on a hard surface at each accessible location
Terms Non-hazardous IDW drum pickup, transport and disposal pricing is based on per service event No-load drum fee if unable to pickup drums on any site in Central FL is $150; in South FL is $200 Pricing is valid or subject to change on a monthly basis in part due to escalating fuel prices Payment required within 45 days after email receipt of invoice
Indemnification: Each party agrees to indemnify, defend and hold harmless each other for and from any loss
Estimate Date 06/29/2022
Description Rate Qty Line Total
IDW-GW Drum Transport & Disposal - Central FL Sites
(1) Regional Stop Fee $600 - then $150 per 55-gal drum < 10 drums
$150.00 1 $150.00
IDW-GW Drum Transport & Disposal - Central FL Sites
(1) Regional Stop Fee $300 - then $150 per 55-gal drum > 10 drums
$150.00 1 $150.00
IDW-GW Drum Transport & Disposal - South FL Sites
(1) Regional Stop Fee $850 - then $200 per 55-gal drum < 10 drums
$200.00 1 $200.00
IDW-GW Drum Transport & Disposal - South FL Sites
(1) Regional Stop Fee $425 - then $200 per 55-gal drum > 10 drums
$200.00 1 $200.00
Subtotal
Tax
700.00
0.00
Estimate Total (USD) $700.00 or liability arising out of the party's breach of this agreement, scope of work, except for gross negligence, willful misconduct or bad faith.
ID
M od e Ta sk N am e
Du ra tio n
St ar t Fi ni sh
LO
E Su bm itt al /A pp ro va l w ks Tu e
/2 9/
M on
1/
/2
Su bt as k 1:
P ro je ct an ag em en t d ay s Tu e
/1 2/
M on
/3 /2
Su bt as k 2:
Gr ou nd w on ito irn g d ay s
/1 8/
M on
/3 /2
Fi el d
W or k Pr ep ar at io n2 w ks M on
1/
/2 4F ri
/2 9/
Gr ou nd w at er S am pl in g1 d ay
Tu e
/3
/2
Tu e
/3
/2
Gr ou nd w ito rin g Re po rt w ks Tu e
/2 4/
M on
/3 /2
Su bt as k 3:
P
FA
S Gr ou nd w at er S am pl in g d ay s
8/
M on
/3 /2
Fi el d
W or k Pr ep ar at io n2 w ks M on
1/
/2 4F ri
/2 9/
PF
AS
S am pl in g da y W ed
2/ 4/
W ed
2/ 4/
Fi el d
No te s a nd
D at a w ks
Tu e
/2
4/
M on
/3
/2
M T
W T
F S
S M
T W
T F
S S
M T
W T
F S
S M
T W
T O ct
8, '2
N ov
N ov
1, '2
N ov
8, '2
Ta sk
Sp lit
M ile st on e
Su m m ar y
Pr oj ec t S um m ar y
In ac tiv e
Ta sk
In ac tiv e
M ile st on e
In ac tiv e
Su m m ar y
M an ua l T as k
Du ra tio n-on ly
M an ua l S um m ar y
Ro llu p
M an ua l S um m ar y
St ar t-on ly
Fi ni sh -o nl y
Ex te rn al
T as ks
Ex te rn al
M ile st on e
De ad lin e
Pr og re ss
M an ua l P ro gr es s
Sc he du le fo r t he Im pl em en ta tio n of T as k
DC
1C a t t he
H ol id ay
S qu ar e
Sh op pi ng
C en te r l oc at ed in
H ol id ay
, P as co C ou nt y
Pa ge
Pr oj ec t:
TA
_0
C
Da te
: T ue
0/
/2 e Ta sk N am e
Du ra tio n
St ar t Fi ni sh
LO
E Su bm itt al /A pp ro va l w ks Tu e
/2 9/
M on
1/
/2
Su bt as k 1:
P ro ag em en t d ay s Tu e
/1 2/
M on
/3 /2
Su bt as nd w ito irn g d ay s
8/
M on
/3 /2
Fi el d
W or k Pr ep ar at io n2 w ks M on
1/
/2 4F ri
/2 9/
Gr ou nd w at er S am pl in g1 d ay
Tu e
/3
/2
Tu e
/3
/2
Gr ou nd w ito rin g Re po rt w ks Tu e
/2 4/
M on
/3 /2
Su bt as k 3:
P
FA
S Gr ou nd w at er S am pl in g d ay s
8/
M on
/3 /2
Fi el d
W or k Pr ep ar at io n2 w ks M on
1/
/2 4F ri
/2 9/
PF
AS
S am pl in g da y W ed
2/ 4/
W ed
2/ 4/
Fi el d
No te s a nd
D at a w ks
Tu e
/2
4/
M on
/3
/2
Je nn a M ar tin Sk yla r A lb rit to n, W illi am
O uc hi e
Je nn a M ar tin
Sk yla r A lb rit to n, W illi am
O uc h
F S
S M
T W
T F
S S
M T
W T
F S
S M
T W
T F
S S
M N ov
5, '2
De c 2, '2
De c
9, '2
De c
Ta sk
Sp lit
M ile st on e
Su m m ar y
Pr oj ec t S um m ar y
In ac tiv e
Ta sk
In ac tiv e
M ile st on e
In ac tiv e
Su m m ar y
M an ua l T as k
Du ra tio n-on ly
M an ua l S um m ar y
Ro llu p
M an ua l S um m ar y
St ar t-on ly
Fi ni sh -o nl y
Ex te rn al
T as ks
Ex te rn al
M ile st on e
De ad lin e
Pr og re ss
M an ua l P ro gr es s
Sc he du le fo r t he Im pl em en ta tio n of T as k
DC
1C a t t he
H ol id ay
S qu ar e
Sh op pi ng
C en te r l oc at ed in
H ol id ay
, P as co C ou nt y
Pa ge
Pr oj ec t:
TA
_0
C
Da te
: T ue
0/ e Ta sk N am e
Du ra tio n
St ar t Fi ni sh
LO
E Su bm itt al /A pp ro va l w ks Tu e
/2 9/
M on
1/
/2
Su bt as k 1:
P ro ag em en t d ay s Tu e
/1 2/
M on
/3 /2
Su bt as nd w ito irn g d ay s
8/
M on
/3 /2
Fi el d
W or k Pr ep ar at io n2 w ks M on
1/
/2 4F ri
/2 9/
Gr ou nd w at er S am pl in g1 d ay
Tu e
/3
/2
Tu e
/3
/2
Gr ou nd w ito rin g Re po rt w ks Tu e
/2 4/
M on
/3 /2
Su bt as k 3:
P
FA
S Gr ou nd w at er S am pl in g d ay s
8/
M on
/3 /2
Fi el d
W or k Pr ep ar at io n2 w ks M on
1/
/2 4F ri
/2 9/
PF
AS
S am pl in g da y W ed
2/ 4/
W ed
2/ 4/
Fi el d
No te s a nd
D at a w ks
Tu e
/2
4/
M on
/3
/2 hi eT
W T
F S
S M
T W
T F
S S
M T
W T
F S
S M
T W
T F c
De c
, '2
De c
, '2
Ja n
6, '2
Ta sk
Sp lit
M ile st on e
Su m m ar y
Pr oj ec t S um m ar y
In ac tiv e
Ta sk
In ac tiv e
M ile st on e
In ac tiv e
Su m m ar y
M an ua l T as k
Du ra tio n-on ly
M an ua l S um m ar y
Ro llu p
M an ua l S um m ar y
St ar t-on ly
Fi ni sh -o nl y
Ex te rn al
T as ks
Ex te rn al
M ile st on e
De ad lin e
Pr og re ss
M an ua l P ro gr es s
Sc he du le fo r t he Im pl em en ta tio n of T as k
DC
1C a t t he
H ol id ay
S qu ar e
Sh op pi ng
C en te r l oc at ed in
H ol id ay
, P as co C ou nt y
Pa ge
Pr oj ec t:
TA
_0
C
Da te
: T ue
0/ e Ta sk N am e
Du ra tio n
St ar t Fi ni sh
LO
E Su bm itt al /A pp ro va l w ks Tu e
/2 9/
M on
1/
/2
Su bt as k 1:
P ro ag em en t d ay s Tu e
/1 2/
M on
/3 /2
Su bt as nd w ito irn g d ay s
8/
M on
/3 /2
Fi el d
W or k Pr ep ar at io n2 w ks M on
1/
/2 4F ri
/2 9/
Gr ou nd w at er S am pl in g1 d ay
Tu e
/3
/2
Tu e
/3
/2
Gr ou nd w ito rin g Re po rt w ks Tu e
/2 4/
M on
/3 /2
Su bt as k 3:
P
FA
S Gr ou nd w at er S am pl in g d ay s
8/
M on
/3 /2
Fi el d
W or k Pr ep ar at io n2 w ks M on
1/
/2 4F ri
/2 9/
PF
AS
S am pl in g da y W ed
2/ 4/
W ed
2/ 4/
Fi el d
No te s a nd
D at a w ks
Tu e
/2
4/
M on
/3
/2
J J
S S
M T
W T
F S
S M
T W
T F
S S
M T
W T
F S
S M
T Ja n
, '2
Ja n
, '2
Ja n
, '2
Fe b
3, Sp lit
M ile st on e
Su m m ar y
Pr oj ec t S um m ar y
In ac tiv e
Ta sk
In ac tiv e
M ile st on e
In ac tiv e
Su m m ar y
M an ua l T as k
Du ra tio n-on ly
M an ua l S um m ar y
Ro llu p
M an ua l S um m ar y
St ar t-on ly
Fi ni sh -o nl y
Ex te rn al
T as ks
Ex te rn al
M ile st on e
De ad lin e
Pr og re ss
M an ua l P ro gr es s
Sc he du le fo r t he Im pl em en ta tio n of T as k
DC
1C a t t he
H ol id ay
S qu ar e
Sh op pi ng
C en te r l oc at ed in
H ol id ay
, P as co C ou nt y
Pa ge
Pr oj ec t:
TA
_0
C
Da te
: T ue
0/
File details come from the government source that posted it. Updated .