CN-370000-HW684-DC005E.pdf
PDF 1 MB Posted
- Contract number
- HW684
- Issued by
- Florida
About this file
This is a Task Assignment (TA) executed between the State of Florida Department of Environmental Protection (FDEP) and GHD Services, Inc., authorized under Contract Number HW684. The task assignment is identified as DC005E and is effective through December 5, 2025. The project involves well installation and groundwater sampling activities at Michael the Cleaner site located at 3432 Clark Road, Sarasota County, Florida (Project Number ERIC_5426). Key personnel include Mackenzie Childs as the Department Project Manager and Brian Moore as the Contractor's Project Manager.
The scope of work comprises four subtasks: (1) Project Management calculated at 13% of direct labor costs; (2) Well Installation and Sampling, which includes installation of replacement wells (MW006, MW011, MW012) and three additional shallow/intermediate well clusters using direct push and sonic drilling technologies, followed by groundwater sampling at multiple monitoring wells for VOH analysis by EPA Method 8260 and TRPH analysis, culminating in a Groundwater Monitoring Report due April 24, 2025; (3) Groundwater Sampling (Q2) for TRPH monitoring at wells MW006R and MW011R with summary letter due June 30, 2025; and (4) Groundwater Sampling (Q3) for TRPH monitoring with summary letter due October 3, 2025. The total Task Assignment value is $40,813.25 on a fixed unit rate basis, comprising $33,877.27 for Subtask 2, $2,506.14 for Subtask 3, and $4,429.84 for Subtask 4 and 1. The cost estimate includes labor (144.88 total hours), travel, subcontractor services for drilling and IDW disposal, laboratory analytical costs, and field equipment expenses. Work is scheduled to be completed with all deliverables submitted by October 3, 2025.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW684
DC005E Completion December 5, 2025
This Task Assignment authorizes GHD Services, Inc to install replacement wells, additional wells, and conduct groundwater sampling at Michael the Cleaner. All work is to be completed in accordance with the included Scope of Work and Cost Estimate.
Mackenzie Childs 850-245-8929 Contractor GHD Services, Inc. Contractor
Contractor Brian Moore Contractor 813-971-3882
ERIC_5426
3432 Clark Rd, Sarasota County, Sarasota, FL 34231
Michael the Cleaner
Contractor Contractor
✔ $ 40,813.25
$ 40,813.25
Scope of Work
GHD Services, Inc.
Contractor
Brian Moore Digitally signed by Brian Moore Date: 2024.12.18 17:16:20 -05'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2024.12.18 15:43:36 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2: Groundwater Monitoring Report 04/24/2025
Subtask 3: Groundwater Sampling Summary Letter (Q2) 06/30/2025
Subtask 4 and 1: Groundwater Sampling Summary Letter (Q3) 10/03/2025
Subtask 2: Groundwater Monitoring Report + Project Management $ 33,877.27
Subtask 3: Groundwater Sampling Summary Letter (Q2) $ 2,506.14
Subtask 4 and 1: Groundwater Sampling Summary Letter (Q3) + Project Management $ 4,429.84
$ 40,813.25
HW684
DC005E
RRonn DeSantis Governor
JJeanette Nuñez Lt. Governor
Shawnn Hamilton Secretary
TO:
FROM:
DATE:
SUBJECT:
FLORIDAA DEPARTMENTT OFF
Environmentall Protectionn
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
FD
E
P C
O
ST
E
ST
IM
A
T E
C on tra ct or
G H
D S er vi ce s
In c.
D at e:
/1
8/
Ta sk
D C
5E
S ub
Ta sk
P ro je ct M an ag em en t S ub Ta sk
S ite
M ic ha el th e C le an er S ub Ta sk
W el l I ns ta lla tio n an d
S am pl in g S ub Ta sk
A ct iv ity
/P ha se
M on ito rin g S ub Ta sk
G ro un dw at er
S am pl in g (Q
2) S ub Ta sk
P ro je ct
M an ag er
B ria n
M oo re , P
E S ub Ta sk
G ro un dw at er
S am pl in g (Q
3) S ub Ta sk
S ub
Ta sk
S ub Ta sk
T To ta ls
La bo r
R at e C at eg or y
$5 1.
P ro je ct M an ag er
JM
.6
.6
$0
.0
P rin ci pa l E ng in ee r/S ci en tis t 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
Te ch ni ca l D ire ct or
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$5 8.
S r P ro fe ss io na l E ng in ee r
JH
2.
2.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
S en io r P ro je ct
M an ag er
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$4 5.
P ro fe ss io na l E ng in ee r/S ci G
E
.7
.7
0.
0.
0.
0.
0.
0.
0.
0.
$3
9.
P ro je ct
E ng in ee r/S ci en tis t C
H 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$5
1.
P ro je ct
M an ag er
/ E ng in ee
JM
.0
.0
7.
7.
0.
0.
0.
0.
0.
0.
$3
3.
S ta ff E ng in ee r/S ci en tis t
JW
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$3
6.
D at a A na ly st
JL
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$4 6.
Fi el d
M an ag er
O T
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2 5.
S en io r T ec hn ic ia n
S A
.5
.5
0.
0.
0.
0.
0.
0.
0.
0.
$2 9.
S en io r T ec hn ic ia n
W M
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2 7.
S en io r T ec hn ic ia n
D C
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2 1.
Ju ni or
T ec hn ic ia n
W O
.0
.0
6.
6.
0.
0.
0.
0.
0.
0.
$1 8.
Ju ni or
T ec hn ic ia n
C D
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$3 1.
D ra fti ng T ec hn ic ia n K
J 3.
3.
0.
0.
0.
0.
0.
0.
0.
0.
$2
2.
Ad m in is tra tiv e As si st an t
JJ
7.
3.
2.
2.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
To ta l H ou rs
4.
.6
2.
.0
.0
0.
0.
0.
0.
0.
0.
D ire ct L ab or
$5
,6
.5
$6
.5
$3 ,9
.9
$5
.5
$5
.5
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
O ve rh ea d
9.
$7
,3
.3
$8
.2
$5 ,1
.6
$6
.2
$6
.2
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
G en
A dm in 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fr in ge
.8
0% $2
,1
.2
$2
.0
$1 ,4
.6
$2
.3
$2
.3
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l L ab or
$1
5, 1.
$1 ,7
.8
$1
0, 2.
$1 ,4
.1
$1
,4
.1
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Pa ge
FD
E
P C
O
ST
E
ST
IM
A
T E
C on tra ct or
G H
D S er vi ce s
In c.
D at e:
/1
8/
Ta sk
D C
5E
S ub
Ta sk
P ro je ct M an ag em en t S ub Ta sk
S ite
M ic ha el th e C le an er S ub Ta sk
W el l I ns ta lla tio n an d
S am pl in g S ub Ta sk
A ct iv ity
/P ha se
M on ito rin g S ub Ta sk
G ro un dw at er
S am pl in g (Q
2) S ub Ta sk
P ro je ct
M an ag er
B ria n
M oo re , P
E S ub Ta sk
G ro un dw at er
S am pl in g (Q
3) S ub Ta sk
S ub
Ta sk
S ub Ta sk
TTo ta ls
TTr av el
V eh ic le
R en ta l
$8
.0
$6
.0
$1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile ag e
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
A ir Fa re $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P er d ie m
H ot el
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l T ra ve l
$$8
.0
$6
.0
$1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S S ub co nt ra ct or (E qu ip m en t P ro cu re m en
t) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P ro cu re m en t F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l S ub co nt ra ct or
C os t $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S S ub co nt ra ct or
(S er vi ce s P ro cu re m en t)
D ril lin g
(C on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D ril lin g (N on -c on ve nt io na l)
$1 7, 0.
$1
7, 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ob ile L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ur ve yi ng
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
ID
W
$4
.0
$2
.0
$1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til iti es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til ity L oc at io n
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$1 7, 5.
$1
7, 5.
$1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
H an dl in g Fe e $1
,7
.5
$1 ,7
.5
$1
2.
$1 2.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l S ub co nt ra ct or
C os t $1
9, 9.
$1 9, 4.
$1
.5
$1
.5
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
L La bo ra to ry
A na ly tic al C os ts
$1 ,4
.0
$1
,1
.0
$1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fa st
T ur na ro un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S am pl e
S hi pp in g $1
.5
$7
6.
$5 8.
$5
8.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T To ta l L ab or at or y
$1 ,6
.5
$1
,2
.5
$2
.5
$2
.5
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
F Fi el d E xp en se s
P er so na l P ro te ct io n
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E xp en da bl es
$3
.0
$2
.0
$4 0.
$4
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
D ril lin g re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
A na ly tic al re la te
d) $1
,6
.9
$9
.9
$3
.5
$3
.5
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
ID
W re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
O th er
$2
.0
$4 5.
$1
.0
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l F ie ld
E xp en se s $2
,1
.9
$1 ,2
.9
$4
.5
$4
.5
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
SS
ub to ta l $3
9, 3.
$1 ,7
.8
$3
2, 7.
$2 ,3
.6
$2
,3
.6
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
C C om pl et io n
Fe e
$1 ,5
.1
$1
.8
$1
,0
.2
$1
.5
$1
.5
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l E st im at ed C os t
$4 0, 3.
$1
,9
.7
$3 3, 7.
$2
,5
.1
$2 ,5
.1
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
C os t f ro m P rio r C
E F:
M an ua l E nt ry
C os t f ro m D el ta
C E
F;
M an ua l E nt ry C os t (
P rio r + D el ta
$0
.0
Au to
-C al cu la te d
R ou nd in g E rr or
$4
0, 3.
Au to
-C al cu la te d
Fi na l T ot al C os t:
$4 0, 3.
Au to -C al cu la te d
Pa ge
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Michael the Cleaner SUBTASK 2: Well Installation and Sampling
DATE: 12/18/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr Professional Engineer JH Conclusions/Recommendations 2
Project Manager JM Prepare field scope of work 1 Project Manager JM Update HASP 1 Project Manager JM Contact Property Owner 1 Project Manager JM ISR Summary 2 Project Manager JM Well Installation Methodology 3 Project Manager JM Groundwater Sampling Methodology 2 Project Manager JM Groundwater Elevations (shallow/int/deep) 3 Project Manager JM Groundwater quality Evaluation (shallow/int/deep) 3 Project Manager JM Groundwater Analytical Results (shallow/int/deep) 4 Project Manager JM Laboratory Data Validation 2 Project Manager JM Conclusions/Recommendations 2
Professional Geologist GE Utility locate 0.75 Professional Geologist GE Mob/demob (3 days) 9 Professional Geologist GE oversee DP 18 Professional Geologist GE oversee Sonic 9
36.75
Senior Technician SA Mob/demob (2 days) 3 Senior Technician SA Survey new wells (9 total) 2 Senior Technician SA Water Levels (17 total) 2 Senior Technician SA Groundwater Sampling (9 wells) 13.5
20.5 junior Technician WO Mob/demob 3 junior Technician WO Survey new wells (9 total) 2 junior Technician WO Water Levels (17 total) 2 junior Technician WO Groundwater Sampling (4 wells) 6
Drafting Technician KJ Water level contours (3 zones) 1.5 Drafting Technician KJ Groundwater data (shallow/int/deep) 1.5
Administrative Assistant JJ Data Entry (17 wl, 7 gw) 1.5 Administrative Assistant JJ Update Summary Tables 1.5
TOTAL LABOR 102.25
VEHICLE TYPE RATE UNIT USEAGE
GE Company Truck $120.00 day 3 $360.00 SA/WO Company Truck $120.00 day 2 $240.00
TOTAL VEHICLE $600.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Groundwater Protection (DPT) Mobilization $900.00 each 1 $900.00 Groundwater Protection (DPT) per diem $300.00 night 2 $600.00 Groundwater Protection (DPT) Daily Rate DPT $1,750.00 day 2 $3,500.00 Groundwater Protection (DPT) 1" PVC Well Installation $5.00 each 136 $680.00 Groundwater Protection (DPT) Prepack screens (5') $175.00 each 8 $1,400.00 Groundwater Protection (DPT) Prepack screens (10') $95.00 each 0 $0.00 Groundwater Protection (DPT) Completion $200.00 each 8 $1,600.00 Groundwater Protection (DPT) Well Development $50.00 0.5 hr 8 $400.00 Groundwater Protection (DPT) Drums $75.00 drum 2 $150.00 Groundwater Protection (DPT) Permits $75.00 permit 8 $600.00 Groundwater Protection (Sonic) Mobilization $1,800.00 each 1 $1,800.00 Groundwater Protection (Sonic) Per Diem $450.00 night 1 $450.00 Groundwater Protection (Sonic) Daily Rate $3,750.00 day 1 $3,750.00 Groundwater Protection (Sonic) Well Installaton $14.00 ft 70 $980.00 Groundwater Protection (Sonic) Completion $200.00 each 1 $200.00 Groundwater Protection (Sonic) Development $75.00 each 1 $75.00 Groundwater Protection (Sonic) Permits $75.00 each 1 $75.00 Erwin Remediation IDW Groundwater Disposal $125.00 drum 1 $125.00 Erwin Remediation IDW Soil Disposal $110.00 drum 1 $110.00
TOTAL $17,395.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Volatile Organic Halocarbons EPA 8260 $73.00 13 $949.00 MW006, 8, 10, 11, 12, 13, 15, 18, 19, 20, 21, 22, 23 Total Recoverable Petroleum Hydrocarbons FL-PRO $88.00 2 $176.00 shipping large cooler (2 day) $70.00 1 $70.00 ice $6.50 1 $6.50
TOTAL LAB $1,201.50
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables
Expendables $40.00 day 6 $240.00
Equipment (Analytical Related) Groundwater Sampling Kit $290.00 day 3 $870.00 Poly Tubing (HDPE) $0.30 ft 283 $84.90 Silicon Tubing $3.00 ft 13 $39.00
Equipment (Other) Total survey station $45.00 day 1 $45.00
TOTAL EQUIPMENT $1,278.90
FINAL --7/24/96
SUBTASK 3: Groundwater Sampling (Q2)
DATE: 12/18/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager JM Prepare field scope of work 1 Project Manager JM Contact Property Owner 1 Project Manager JM Prepare brief summary letter and attach tables, notes, and data 5 junior Technician WO Mob/demob 3 junior Technician WO Groundwater Sampling (2 wells) 3
Administrative Assistant JJ Data Entry (2 gw) 0.5 Administrative Assistant JJ Update Summary Tables 1.5
TOTAL LABOR 15
VEHICLE TYPE RATE UNIT USEAGE
SA Company Truck $120.00 day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation IDW GW Disposal $125 drum 1 $125.00
TOTAL $125.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Total Recoverable Petroleum Hydrocarbons FL-PRO $88.00 2 $176.00 MW006R and MW011R shipping small cooler (2 day) $52.00 1 $52.00 ice $6.50 1 $6.50
TOTAL LAB $234.50
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables
Expendables $40.00 day 1 $40.00
Equipment (Analytical Related) Groundwater Sampling Kit $290.00 day 1 $290.00 Poly Tubing (HDPE) $0.30 ft 35 $10.50 Silicon Tubing $3.00 ft 2 $6.00
Equipment (Other) Drum $100.00 drum 1 $100.00
TOTAL EQUIPMENT $446.50
SUBTASK 4: Groundwater Sampling (Q3)
DATE: 12/18/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager JM Prepare field scope of work 1 Project Manager JM Contact Property Owner 1 Project Manager JM Prepare brief summary letter and attach tables, notes, and data 5 junior Technician WO Mob/demob 3 junior Technician WO Groundwater Sampling (2 wells) 3
Administrative Assistant JJ Data Entry (2 gw) 0.5 Administrative Assistant JJ Update Summary Tables 1.5
TOTAL LABOR 15
VEHICLE TYPE RATE UNIT USEAGE
SA Company Truck $120.00 day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation IDW GW Disposal $125 drum 1 $125.00
TOTAL $125.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Total Recoverable Petroleum Hydrocarbons FL-PRO $88.00 2 $176.00 MW006R and MW011R shipping small cooler (2 day) $52.00 1 $52.00 ice $6.50 1 $6.50
TOTAL LAB $234.50
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables
Expendables $40.00 day 1 $40.00
Equipment (Analytical Related) Groundwater Sampling Kit $290.00 day 1 $290.00 Poly Tubing (HDPE) $0.30 ft 35 $10.50 Silicon Tubing $3.00 ft 2 $6.00
Equipment (Other) Drum $100.00 drum 1 $100.00
TOTAL EQUIPMENT $446.50
COST PROPOSAL FOR TASK DC005E
<Michael the Cleaner / FDEP ERIC_5426>
< Well Installation and Groundwater Monitoring >
1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >
GHD Services Inc. (GHD) previously completed assessment and source removal at the former Michael the Cleaner site located in Sarasota, Sarasota County. The source removal activities were completed in accordance with the FDEP-approved Interim Source Removal Plan (ISRP).
The ISRP proposed periodic groundwater monitoring following source removal. Task DC005E includes well installation and groundwater sampling.
Subtask 1: Project Management Subtask 1 includes all tasks associated with project management of well installation and performance groundwater monitoring at the former Michael the Cleaner site.
Subtask 2: Well Installation and Sampling Initially, GHD will coordinate site access with the current property owner and contract with the selected driller. GHD will then oversee the installation of replacement wells MW006, MW011, and MW012. GHD will also oversee the installation of three (3) additional shallow/intermediate well clusters at the locations shown in Figure 14 of the ISRP. The shallow/intermediate wells will be installed using direct push technologies to depths of 12 and 21 feet, respectively. The deep well will be installed using roto sonic drilling techniques to a depth of 70 feet bls.
Following installation, groundwater sampling will be conducted. Prior to sampling, depth to water will be gathered at all site wells (23 total). Following depth to water measurements, GHD personnel will sample monitor wells MW006R, MW008, MW010, MW011R, MW012R, MW013, MW015, and the six new wells (MW018 through MW023). Groundwater sampling will be conducted in general accordance with FDEP Standard Operating Procedures. All groundwater samples will be analyzed for VOHs by EPA Method 8260. The samples from monitoring wells MW006R and MW011R will also be analyzed for the presence of total recoverable petroleum hydrocarbons (TRPH).
Following receipt of analytical results, GHD will prepare a Groundwater Monitoring Report (GWMR) detailing well installation, sampling, and analytical results. The GWMR will include recommendations for additional testing and/or remedial activities.
Subtask 3: Groundwater Sampling (Q2) As indicated in the approved ISRP, quarterly TRPH monitoring is proposed. During subsequent quarters, GHD personnel will sample monitoring wells MW006R and MW011R for TRPH analysis. Groundwater sampling will be conducted in general accordance with FDEP Standard Operating Procedures. All groundwater samples will be analyzed for TRPH.
Upon receipt of analytical data, a brief summary letter will be prepared and submitted to the FDEP. The letter will present the sampling results for TRPH.
Subtask 3: Groundwater Sampling (Q3) As indicated in the approved ISRP, quarterly TRPH monitoring is proposed. During subsequent quarters, GHD personnel will sample monitoring wells MW006R and MW011R for TRPH analysis. Groundwater sampling will be conducted in general accordance with FDEP Standard Operating Procedures. All groundwater samples will be analyzed for TRPH.
Upon receipt of analytical data, a brief summary letter will be prepared and submitted to the FDEP. The letter will present the sampling results for TRPH.
Deliverables:
Deliverable Deliverable Due Date
Groundwater Monitoring Report 4/24/25
Groundwater Sampling Summary Letter (Q2) 6/30/25
Groundwater Sampling Summary Letter (Q3) 10/3/25
Sonic Auger DPT Injection Well Abandonment
REVISED DATE: 11/11/2024
ESTIMATE #: 1024034-1
Project Description:
ID QTY Unit Rate TOTAL
1 1 each 900.00$ 900.00$
2 2 night 300.00$ 600.00$
3 2 day 1,750.00$ 3,500.00$
4 1/2 day 1,450.00$ -$
5 each 3.00$ -$
6 136 foot 5.00$ 680.00$
7 Materials: (2) 1" x 5' PVC .010 Slot Prepack Screen, 3" Exp. Point 8 each 175.00$ 1,400.00$
8 8 each 200.00$ 1,600.00$
9 8 each 50.00$ 400.00$
10 55 gallon drums (Soil) (Estimated) 2 each 75.00$ 150.00$
11 55 gallon drums (Water) (As Needed) each 75.00$ -$
12 Permits: Sarasota County 8 each 75.00$ 600.00$
Completion: Subtotal 9,830.00$
Todd Hodgson
TOTAL 9,830.00$
Partner
PROJECT
Michael the Cleaner 3432 Clark Road
Damages to utilities on private property are the responsibility of the client
5904 Hampton Oaks Pkwy Suite F
CUSTOMER
GHD
Brian Moore
Tampa, Florida 33610 Sarasota, Sarasota County, Florida
(813) 971-3882
If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or Todd@drillprollc.com.
THANK YOU FOR YOUR BUSINESS!
TTodd Hodgson
DPT Rig and Crew
"Actual quantities used and days on site will be invoiced"
1.5-2 Days + Travel
Materials: 1" PVC Well Installation
DPT Rig and Crew (1/2 day rate up to 5 hours onsite)
Well Development (up to 1/2 hour w/Pump)
2' x 2' Concrete Pad w/8" BD Completion
Materials: Soil Sample Liners (If Needed)
(4) 1" x 12' PVC Well w/10' of .010 Prepack Screen , 2' x 2' Pad w/8" BD Completion, No Soil Sampling
DPT Well Installation
(4) 1" x 22' PVC Well w/10' of .010 Prepack Screen , 2' x 2' Pad w/8" BD Completion, No Soil Sampling Drum Soils
Locations must be accessible with track mounted DPT Rig
DESCRIPTION
Mobilization
Utility Locates on Private Property is the responsibility of the client Borehole Clearance to 5’ bgs beyond 20 minutes may require a change order for additional time and cost.
Per Diem 2 Man Crew-Est. (Min Hotel Cost + $50 Food/ per man)
2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586
Sonic Auger DPT Injection Well A
DATE:
ESTIMATE #:
ID QTY Unit Rate
1 1 each 1,800.00$
2 1 night 450.00$
3 1 <day 3,750.00$
5 70 foot 14.00$
6 1 each 200.00$
7 1 each 75.00$
8 Drums (Soil) (As Needed) each 75.00$
9 Drums (Water) (As Needed) each 75.00$
10 Permit: (NWFLWMD- up to 10 per App/Parcel) 1 each 75.00$
Completion: <1 Day + Travel Subtotal
TTodd Hodgson Todd Hodgson TOTAL Partner
Mobilization
THANK YOU FOR YOUR BUSINESS!
Well Development (up to 1/2 hour w/pump)
Actual quantities used and days on site will be invoiced
2' x 2' Concrete Pad with 8" BD Completion
Materials: 2" PVC Well Installation
***Utility Locates on Private Property are the responsibility of the client*** Borehole Clearance to 5’ bgs beyond 20 minutes will require a change order for additional tim
Well Locations must be accessible by track mounted DPT Rig
If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 at Todd@dril
Per Diem - 3 Man Crew Est. (Min. Hotel Cost + $50/per man)
DESCRIPTION
***Damage to utilities on private property are the responsibility of the client***
Sonic Rig and Crew
PROJECT
Michael the Cleaner 3432 Clark Road
CUSTOMER
Brian Moore
GHD
Sarasota, Sarasota County, Florida
Sonic Well Installation
Drum Soils and Spread Development Water.
5904 Hampton Oaks Pkwy Suite F Tampa, Florida 33610
(813) 971-3882
Project Description:
(1) 2" x 70' PVC MW w/5' of .010 Screen, 2' x 2' Concrete Pad w/8" BD Completion, No Soil Sampling
Abandonment 11/11/2024
1124012
TOTAL
1,800.00$
450.00$
3,750.00$
980.00$
200.00$
75.00$
75.00$
7,330.00$
7,330.00$ e and cost.
llprollc.com.
Preferred Drilling Solutions, Inc.
8820 66th St. North, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
DIRECT PUSH TECHNOLOGY QUOTE FORM
Date: 10/28/24 FAC ID#:
Unit Unit Rate Number of Units Extended Price whole day $1,875.00 2 3,750.00$ half day $1,475.00 -$ per foot $25.00 136 3,400.00$ each $110.00 -$ each $50.00 -$ each $35.00 -$ per well $150.00 8 1,200.00$ roundtrip $675.00 1 675.00$ per crew / per night $575.00 1 575.00$ each $75.00 10 750.00$ per day $150.00 -$ each $85.00 8 680.00$
TOTAL QUOTE PRICE $11,030.00
Notes: 1. Includes saw cuts, development, standby time, and decon.
Project No.:
Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477
Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782
Signature and Title of Person Submitting Quote: ___________________________________Austin Bonacum, Estimator Date: 10/28/24
Days to Complete Scope of Work: 2
Direct Push Daily Rate 1 - on-site day
Equipment Type: Geoprobe 8040DT, 3230DT, 7822DT, 6620DT, 6712DT
*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner
Other (specify)
Other (specify)
Other (specify)
GeoProbe Consumables (includes tubing, points, liners, concrete patch, asphalt patch, and grouting)
DOT Approved 55-gal Drum
Per Diem Mobilization
DIRECT PUSH TECHNOLOGY
MISCELLANEOUS
Permits
Site Name and Location: Michael The Cleaner
Consultant Name: GHD
PROPOSED SCOPE OF WORK:
(4) 2" x 12' MW's with 10' .010 screen, soil sampling as needed, drum cuttings, pad and 8" manhole
(4) 2" x 22' MW's with 5' .010 screen, soil sampling as needed, drum cuttings, pad and 8" manhole
3432 Clark Road, Sarasota, Sarasota County, FL
Well Completion (includes MH w/ cover, concrete pad, and locking well cap)
Well Riser (includes all materials) ID 1" 5' Length
Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5"
Pre-Packed Well Screen (includes all materials) ID 1" 5' Length Pack OD 3.5"
Auger Attachment, 2" Well Install
Direct Push Half-Day Rate 1 - on-site half day as Park, FL 33782
Preferred Drilling Solutions, Inc.
8820 66th St, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
SONIC DRILLING TECHNOLOGY QUOTE FORM
Date: 10/28/24 FAC ID#:
*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner
Unit Unit Rate Number of Units Extended Price per day $4,500.00 1 4,500.00$ per day $3,500.00 -$ per foot $18.00 -$ per foot $25.00 70 1,750.00$ per foot $35.00 -$ each $150.00 -$ per well $150.00 1 150.00$ roundtrip $950.00 1 950.00$ per crew / per night $600.00 -$ each $75.00 4 300.00$ each $85.00 1 85.00$
TOTAL QUOTE PRICE $7,735.00
Notes: 1. Includes caps, plugs, tubing, saw cuts, development, standby time, and decon.
Project No.:
Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477
Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782
Signature and Title of Person Submitting Quote: ___________________________________Austin Bonacum, Estimator
MISCELLANEOUS
(1) 2" x 70' MW with 5' .010 screen, continuous soil sampling, drum cuttings, pad and 8" manhole
Sonic Daily Rate & Crew (up to 10 hours on site)
Sonic Half Day Rate & Crew (up to 5 hours on site)
1" PVC Well Installation (includes all materials)
2" PVC Well Installation (includes all materials) 4" PVC Well Installation (includes all materials)
Pre-Packed Well Screen (includes all materials) ID 2" 5' Length
Well Completion (includes MH w/ cover, concrete pad, and locking well cap)
Consultant Name: GHD
Site Name and Location: Michael The Cleaner 3432 Clark Road, Sarasota, Sarasota County, FL
PROPOSED SCOPE OF WORK:
Equipment Type: Geoprobe 8150LS, Terrasonic 150CC
SONIC DRILLING TECHNOLOGY
Other (specify)
Other (specify)
Days to Complete Scope of Work: 1
Mobilization Per Diem (4 Men)
DOT Approved 55-gal Drum
Permits
Other (specify) s Park, FL 33782
From: Brian Moore To: cbucher earthtechdrilling.com Bcc: 12576594 Subject: FW: Michael the Cleaner - Sarasota Date: Tuesday, October 22, 2024 5:15:00 PM Attachments: image001.png image002.png image003.png image004.png image005.png
Charles, Actually need
9 wells 2-12 4 total 17-22 4 total 65-70 1 total
Thank you
BRIAN MOORE PE
GHD
Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com
The Power of Commitment Connect
Please consider our environment before printing this email
From: Brian Moore Sent: Tuesday, October 22, 2024 5:04 PM To: cbucher earthtechdrilling.com <cbucher@earthtechdrilling.com> Subject: Michael the Cleaner - Sarasota
Charles, Can you provide a quote for the following
3 1-inch wells with screens 2-12 17-22 65-70
Drum all wastes
Thanks
BRIAN MOORE PE
GHD
Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com
The Power of Commitment Connect
Please consider our environment before printing this email
408 Ditmar Street
Pensacola, FL 32503
To: Mr. Brian Moore
GHD
5904 Hampton Oaks Parkway, Suite F Tampa, FL 33610
June 13, 2023
Re: Non-Hazardous Drum Disposal – State of Florida
Mr. Moore:
The price for the transportation and disposal (T&D) of drums of non-hazardous soil and water located in the State of Florida is listed below.
Non-Hazardous Drums:
Description Rate Unit False Mobilization (No drum found) $ 85.00 Per Stop T&D - Non-Haz Soil $ 110.00 Per Drum T&D - Non-Haz Water $ 125.00 Per Drum
The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.
The lab data we require for the disposal of drums of petroleum impacted soils are totals for BTEX and the 4 RCRA metals (arsenic, cadmium, chromium, and lead), with analyses no older than 1 year from the estimated disposal date.
We do not require analyticals for the disposal of Petroleum Contact Water (PCW) as long as it has only been impacted with petroleum - not pesticides, herbicides or dry-cleaning solvents etc.
Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc.
This quote is valid for 90 days.
408 Ditmar Street Pensacola, FL 32503
Respectfully, Robert Donado Erwin Remediation, Inc.
Email: Robert@erwinremediation.com Office: (850) 466-2358 p y, Robert Donado
6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 1/2
Quote Number: 19644
QUOTE
QUOTED TO: Brian Moore QUOTE DATE: 1/1/2022
COMPANY NAME: GHD - 2022 QUOTED BY: Craig Burns
PHONE NUMBER: Ext.
FAX NUMBER:
PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS
CUSTOMER PO:
CONTACT EMAIL:
SITE ADDRESS: TBD
CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING
COST ESTIMATE FOR THE SITE/ PROJECT LISTED ABOVE.
DESCRIPTION PRICE QTY. UNIT TOTAL
NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00
NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00
TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$30.00 DRUM $0.00
TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$40.00 DRUM $0.00
TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site
$50.00 DRUM $0.00
Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax
$0.00 . $0.00
HAZ Drums to be quoted case-by-case $0.00 . $0.00
OPTIONAL LINE ITEMS
***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00
TOTAL REQUIRED ITEMS $0.00
TOTAL OPTIONAL ITEMS $0.00
GRAND TOTAL $0.00
NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups. **Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns
863.327.6289 - cburns@clarkenv.com
This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.
6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 2/2
Name (print) Title
Signature Date
CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854
WWW.ClarkEnvironmental.com
From: Craig Burns To: Brian Moore Subject: GHD_IDW Drum Rates FL Date: Tuesday, June 28, 2022 10:26:46 AM Attachments: image001.png image002.png image003.png image004.png image005.png GHD Drum Rates FL 2022.pdf
Here you go Brian. I do this for a lot of engineering/consulting firms.
Be aware of the low stop less than 6 drums at $50/flat Be aware of the 10% to the total cost for FSC (implemented April 15).
Pass around the GHD Florida offices
From: Brian Moore <Brian.Moore@ghd.com> Sent: Tuesday, June 28, 2022 10:05 AM To: Craig Burns <cburns@clarkenvironmental.com> Subject: IDW Drums
Craig, Is it possible to provide a generic quote for IDW water disposal.
Assumption is non-haz with necessary analytical Maybe provide a range of locations
South florida or central florida, or both?
Thanks in advance
We have many sites that we generate 1 gw drum of IDW and would like to streamline the vendor coordination
BRIAN MOORE PE
GHD
Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com
The Power of Commitment Connect
Please consider our environment before printing this email
CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.
Whatever Waste, LLC 3834 Mandarin Woods Dr. No.
Jacksonville, Florida 32223 United States 904.881.1957
Brian Moore PE
GHD
5904 Hampton Road Parkway Suite F Tampa, FL 33610
Estimate Number 062922.1
Notes Dry Cleaner Site Locations: Central and South Florida Regions excluding Florida Keys Required analytical data for non-haz disposal acceptance would be VOCs and includes waste profiling assistance if the IDW-GW drums don't fall under a blanket waste profile DOT shippable drums must be on a hard surface at each accessible location
Terms Non-hazardous IDW drum pickup, transport and disposal pricing is based on per service event No-load drum fee if unable to pickup drums on any site in Central FL is $150; in South FL is $200 Pricing is valid or subject to change on a monthly basis in part due to escalating fuel prices Payment required within 45 days after email receipt of invoice
Indemnification: Each party agrees to indemnify, defend and hold harmless each other for and from any loss
Estimate Date 06/29/2022
Description Rate Qty Line Total
IDW-GW Drum Transport & Disposal - Central FL Sites
(1) Regional Stop Fee $600 - then $150 per 55-gal drum < 10 drums
$150.00 1 $150.00
IDW-GW Drum Transport & Disposal - Central FL Sites
(1) Regional Stop Fee $300 - then $150 per 55-gal drum > 10 drums
$150.00 1 $150.00
IDW-GW Drum Transport & Disposal - South FL Sites
(1) Regional Stop Fee $850 - then $200 per 55-gal drum < 10 drums
$200.00 1 $200.00
IDW-GW Drum Transport & Disposal - South FL Sites
(1) Regional Stop Fee $425 - then $200 per 55-gal drum > 10 drums
$200.00 1 $200.00
Subtotal
Tax
700.00
0.00
Estimate Total (USD) $700.00 or liability arising out of the party's breach of this agreement, scope of work, except for gross negligence, willful misconduct or bad faith.
File details come from the government source that posted it. Updated .