This Task Assignment (TA) is a state contract between the State of Florida Department of Environmental Protection (FDEP) and GHD Services, Inc., executed pursuant to underlying Contract Number HW684. The task assignment, designated TA Number DC053A, authorizes work at the Fashion Cleaners site located at 8442 Sheldon Road, Tampa, Hillsborough County, Florida (Project Number ERIC_4784). The Department Project Manager is Nicole Varela, and the Contractor's Project Manager is Brian Moore. The task assignment is effective as of June 19, 2024, with a completion date of February 7, 2025, and a final deliverable due date of November 1, 2024.

The contract authorizes GHD Services, Inc. to conduct site assessment activities at the Fashion Cleaners site in accordance with a scope of work submitted on June 6, 2024. The total task assignment value is $56,130.83 on a fixed unit rate basis. Deliverables are structured in three phases with corresponding invoice schedules: Subtask 2 (Soil & Groundwater Sampling) for $39,919.41 due upon submission of field notes and data by September 20, 2024; Subtask 3 (Surveying & IDW Disposal) for $2,436.87 due upon submission of manifests by October 25, 2024; and Subtasks 4 & 1 (Site Assessment Report and Project Management) for $13,774.55 due upon FDEP approval by November 1, 2024. The scope includes soil and groundwater sampling using direct-push technology, Modified Active Gas Sampling (MAGS), installation of monitoring wells, surveying, investigative derived waste (IDW) disposal, and preparation of a comprehensive Site Assessment Report detailing field methodology, analytical results, and remediation recommendations.

View the file

Other files

File Type Posted
CN-370000-HW684-BIL02F.pdf PDF
CN-370000-HW684-BIL2CC03.pdf PDF
CN-370000-HW684-BIL2ECO1.pdf PDF
CN-370000-HW684-BIL2FCO1.pdf PDF
CN-370000-HW684-BIL2GCO1.pdf PDF
CN-370000-HW684-CSS02A.pdf PDF
CN-370000-HW684-CSS03B.pdf PDF
CN-370000-HW684-D033CCO1.pdf PDF
CN-370000-HW684-DC001A.pdf PDF
CN-370000-HW684-DC001F.pdf PDF
CN-370000-HW684-DC002B.pdf PDF
CN-370000-HW684-DC002C.pdf PDF
CN-370000-HW684-DC002D.pdf PDF
CN-370000-HW684-DC003D.pdf PDF
CN-370000-HW684-DC004D.pdf PDF
CN-370000-HW684-DC005A.pdf PDF
CN-370000-HW684-DC005D.pdf PDF
CN-370000-HW684-DC006B.pdf PDF
CN-370000-HW684-DC009C.pdf PDF
CN-370000-HW684-DC009D.pdf PDF
CN-370000-HW684-DC009E.pdf PDF
CN-370000-HW684-DC011A.pdf PDF
CN-370000-HW684-DC011C.pdf PDF
CN-370000-HW684-DC012D.pdf PDF
CN-370000-HW684-DC013B.pdf PDF
CN-370000-HW684-DC014D.pdf PDF
CN-370000-HW684-DC014F.pdf PDF
CN-370000-HW684-DC015A.pdf PDF
CN-370000-HW684-DC015C.pdf PDF
CN-370000-HW684-DC016B.pdf PDF
CN-370000-HW684-DC016C.pdf PDF
CN-370000-HW684-DC017C.pdf PDF
CN-370000-HW684-DC018C.pdf PDF
CN-370000-HW684-DC019C.pdf PDF
CN-370000-HW684-DC019D.pdf PDF
CN-370000-HW684-DC01ACO2.pdf PDF
CN-370000-HW684-DC020B.pdf PDF
CN-370000-HW684-DC025A.pdf PDF
CN-370000-HW684-DC026B.pdf PDF
CN-370000-HW684-DC026D.pdf PDF
CN-370000-HW684-DC027C.pdf PDF
CN-370000-HW684-DC028C.pdf PDF
CN-370000-HW684-DC029C.pdf PDF
CN-370000-HW684-DC031A.pdf PDF
CN-370000-HW684-DC034B.pdf PDF
CN-370000-HW684-DC03ACO1.pdf PDF
CN-370000-HW684-DC03CCO1.pdf PDF
CN-370000-HW684-DC03CCO2.pdf PDF
CN-370000-HW684-DC040A.pdf PDF
CN-370000-HW684-DC045B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW684

DC053A Completion February 7, 2025

This Task Assignment authorizes GHD Services, Inc. to conduct site assessment activities at the Fashion Cleaners site in Tampa, Florida, in accordance with the scope of work and cost proposal submitted on June 6, 2024.

Nicole Varela 850-245-8959 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

GHD Services, Inc.

GHD Services, Inc.

Brian Moore 813-257-0658

ERIC_4784

8442 Sheldon Road, Tampa, Hillsborough County

Fashion Cleaners

✔ $ 56,130.83

$ 56,130.83

Scope of Work

Brian Moore Digitally signed by Brian Moore Date: 2024.06.19 16:46:45 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2024.06.18 11:32:13 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 2: Soil & Groundwater Sampling (Field notes, soil and groundwater data, MAGS data, and subcontractor receipts) 09/20/2024

Subtask 3: Surveying & IDW Disposal (IDW Manifests and subcontractor receipts) 10/25/2024

Subtasks 4 & 1: Site Assessment Report + Project Management 11/01/2024

Subtask 2: Upon submission of Field notes, soil and groundwater data, MAGS data, and subcontractor receipts $ 39,919.41

Subtask 3: Upon submission of IDW Manifests and subcontractor receipts $ 2,436.87

Subtasks 4 & 1: Upon FDEP approval of Site Assessment Report + Project Management $ 13,774.55

$ 56,130.83

HW684

DC053A

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: ERIC_4784

Fashion Cleaners

FROM: Nicole Varela, Project Manager

SUBJECT: Negotiation Summary

HW684_DC053A

Site Assessment

DATE: June 14, 2024

This Task Assignment authorizes GHD Services, Inc. to conduct site assessment activities at the Fashion Cleaners site in accordance with the scope of work, cost estimate form, and schedule received on June 6, 2024.

The final deliverable due date will be November 1, 2024.

The completion date for the task assignment will be January 31, 2025.

The final total cost will be $56,130.83.

Specific subtasks are detailed below:

Subtask 1: Project Management GHD is authorized to calculate Project Management costs at 13% of direct labor costs for all tasks associated with project management for site assessment at the site.

Subtask 2: Soil & Groundwater Sampling GHD will conduct soil assessment, which will include soil sampling and Modified Active Gas Sampling (MAGS), along with groundwater assessment, which will include groundwater sampling and profiling, in accordance with FDEP standard operating procedures (SOPs).

Subtask 3: Surveying & IDW Disposal GHD will delegate its respective subcontractors to survey the site and to dispose of Investigative Derived Waste (IDW) in accordance with FDEP SOPs.

Subtask 4: Site Assessment Report GHD will prepare a Site Assessment Report (SAR) to detail the site assessment activities conducted on site, describe impacts to site, and evaluate potential remediation activities.

FDEP COST ESTI MATEContractor: GHD Services Inc.

Date: 6/14/2024

Task #: DC053A SubTask 1 Project Management SubTask 6

Site: Fashion Cleaners SubTask 2 Soil and Groundwater Sampling SubTask 7

Activity/Phase: Assessment SubTask 3 IDW Management and Surveying SubTask 8

Project Manager: Brian Moore, PE SubTask 4 Site Assessment Report SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$49.53 Project Manager JM 19.98 19.98 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$56.19 Sr Professional Enginee JH 8.00 0.00 0.00 8.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$45.07 Professional Engineer/S GE 91.00 36.00 0.00 55.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Project Engineer/Scientist CH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$49.53 Project Manager/ Engine JM 16.50 8.50 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Staff Engineer/Scientist JW 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Data Analyst JL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Manager OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$22.21 Senior Technician SA 29.50 29.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $26.63 Senior Technician WM 31.00 31.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Senior Technician DC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Junior Technician JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$29.69 Drafting Technician PM 14.00 0.00 0.00 14.00 0.00 0.00 0.00 0.00 0.00 0.00 $21.63 Administrative Assistant JJ 16.00 0.00 0.00 16.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 225.98 19.98 105.00 8.00 93.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $8,599.99 $989.38 $3,524.26 $396.24 $3,690.11 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 129.80% $11,162.79 $1,284.22 $4,574.49 $514.32 $4,789.76 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% $3,250.80 $373.99 $1,332.17 $149.78 $1,394.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $23,013.58 $2,647.59 $9,430.92 $1,060.34 $9,874.73 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

FDEP COST ESTI MATEContractor: GHD Services Inc.

Date: 6/14/2024

Task #: DC053A SubTask 1 Project Management SubTask 6

Site: Fashion Cleaners SubTask 2 Soil and Groundwater Sampling SubTask 7

Activity/Phase: Assessment SubTask 3 IDW Management and Surveying SubTask 8

Project Manager: Brian Moore, PE SubTask 4 Site Assessment Report SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $960.00 $840.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $960.00 $840.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) Atlantic Supply $714.45 $714.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $714.45 $714.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $71.45 $71.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $785.90 $785.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $14,505.00 $14,505.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $720.00 $0.00 $720.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $15,225.00 $14,505.00 $720.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $1,522.50 $1,450.50 $72.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $16,747.50 $15,955.50 $792.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $9,570.00 $9,270.00 $300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $941.50 $883.00 $58.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $10,511.50 $10,153.00 $358.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $280.00 $280.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,531.00 $1,531.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,811.00 $1,811.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $53,829.48 $2,647.59 $38,976.32 $2,330.84 $9,874.73 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $2,301.35 $264.76 $943.09 $106.03 $987.47 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $56,130.83 $2,912.35 $39,919.41 $2,436.87 $10,862.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Cost from Prior CEF: Manual Entry Cost from Delta CEF; Manual Entry

Cost (Prior + Delta): $0.00 Auto-Calculated Rounding Error: $56,130.83 Auto-Calculated

Final Total Cost: $56,130.83 Auto-Calculated

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Fashion Cleaners SUBTASK 2: Soil and Groundwater Sampling

DATE: 6/14/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager JM Arrange for Site Access with owner 2 Project Manager JM Utility Locate 1 Project Manager JM Prepare field scope of work (DP, soil, MAGS) 1.5 Project Manager JM Prepare daily summary reports of assessment results (1 hour per day) 4

8.5

Senior Geologist GE Mob/demob (4 days) 4 Senior Geologist GE direct push sampling oversight (2 days) 16 Senior Geologist GE Well Installation (2 days) 16

Senior Technician WM Mob/demob (3 days) 3 Senior Technician WM Concrete Coring/Soil Boring Advancement and Screening 4 locations) 6 Senior Technician WM Install 4 piezometers for MAGS (1.5 hr each) 6 Senior Technician WM Install interior monitor well (3 hours) 3 Senior Technician WM Conduct MAGS (4 locations) 6 Senior Technician WM Round of Water Levels (6 total) 1 Senior Technician WM Groundwater Sampling (4 wells) 6

Senior Technician SA Mob/demob (3 days) 3 Senior Technician SA Concrete Coring/Soil Boring Advancement and Screening 4 locations) 6 Senior Technician SA Install 4 piezometers for MAGS (1.5 hr each) 6 Senior Technician SA Install interior monitor well (3 hours) 3 Senior Technician SA Conduct MAGS (4 locations) 6 Senior Technician SA Round of Water Levels (6 total) 1 Senior Technician SA Groundwater Sampling (3 wells) 4.5

29.5

TOTAL LABOR 105

VEHICLE TYPE RATE UNIT USEAGE

Geologist 4 days Company Truck $480.00 week 1 $480.00 Sr Techs 3 days Company Truck $120.00 day 3 $360.00

TOTAL VEHICLE $840.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Groundwater Protection Mobilization 1 each 800.00$ $800.00 Groundwater Protection Per Diem (2 man crew) 4 night 300.00$ $1,200.00 Groundwater Protection DPT Rig and Crew 4 day 1,750.00$ $7,000.00 Groundwater Protection DPT Rig and Crew 1/2 day 1 1/2 day 1,250.00$ $1,250.00 Groundwater Protection Materials: Soil Sample Line 16 each 3.00$ $48.00 Groundwater Protection Materials: GW Sampling Po 35 each 3.00$ $105.00 Groundwater Protection Materials: HDPE Tubing (p 4 each 120.00$ $480.00 Groundwater Protection Materials: Borehole Groutin 8 each 15.00$ $120.00 Groundwater Protection Materials: 1" PVC Well Inst 125 ft 4.00$ $500.00 Groundwater Protection Materials: 1" x 5' PVC .010 0 each 95.00$ $0.00 Groundwater Protection Materials: (2) 1" x 5' PVC .0 6 each 175.00$ $1,050.00 Groundwater Protection 2' x 2' Concrete Pad w/8" B 6 each 150.00$ $900.00 Groundwater Protection Well Development (up to 1/ 6 each 50.00$ $300.00 Groundwater Protection 55 gallon drums (Soil) 2 each 75.00$ $150.00 Groundwater Protection 55 gallon drums (Water) 4 each 75.00$ $300.00 Groundwater Protection Decon Pad 1 each 250.00$ $250.00 Groundwater Protection Permits 1 each 52.00$ $52.00

Atlantic Supply Well Screen (5 feet, 2-inch 6 each 23.85$ $143.10 Atlantic Supply Well Point (2-inch) 6 each 8.30$ $49.80 Atlantic Supply Well Riser (2-inch - 5 ft) 6 each 19.15$ $114.90 Atlantic Supply Well Riser (1-inch - 5 ft) 1 each 12.25$ $12.25 Atlantic Supply 20/30 silica sand 1 bag 6.80$ $6.80 Atlantic Supply 30/65 silica sand 1 bag 6.05$ $6.05 Atlantic Supply Prepack (1-inch 5 ft) 1 each 76.00$ $76.00 Atlantic Supply Well Point (1-inch) 1 each 9.20$ $9.20 Atlantic Supply expandable cap (2") 6 each 5.75$ $34.50 Atlantic Supply expandable cap (1") 1 each 5.50$ $5.50 Atlantic Supply Boltdown Manhole (6") 7 Each 29.50$ $206.50 Atlantic Supply Delivery Fee 0 each 40.00$ $0.00 Atlantic Supply Taxes 7.50% $49.85

TOTAL $15,219.45

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Volatile Organics (full range) Soil $150.00 12 $1,800.00 Volatile Organics (full range) Groundwater $150.00 42 $6,300.00 TO-15 (VOCs) Soil Gas $200.00 4 $800.00 TOC walkley black soil $36.00 5 $180.00 density soil $25.00 5 $125.00 moisture soil $13.00 5 $65.00 Shipping (large cooler) overnight - soil $150.00 2 $300.00 Shipping (small cooler) 2 day - soil TOC $52.00 1 $52.00 Shipping (large cooler) 2 day - DP GW $70.00 2 $140.00 Shipping (large cooler) overnight - soil gas $150.00 2 $300.00 Shipping (small cooler) 2 day - MW GW $52.00 1 $52.00

Ice $6.50 6 $39.00

TOTAL LAB $10,153.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 day 7 $280.00

Air Sampling Pump $27.00 Day 1 $27.00 Regenerative Blower $180.00 Day 1 $180.00 Portable generator $70.00 Day 1 $70.00 Vacuum Gages $19.00 Day 1 $19.00 anemometer $33.00 Day 1 $33.00 Summa Canisters $33.00 Each 4 $132.00 Encore (for SPLP) $16.00 Each 12 $192.00 Soil sampling kit (through concrete) $235.00 Day 1 $235.00 Groundwater Sampling Kit $290.00 Day 2 $580.00 Poly Tubing $0.30 Ft 140 $42.00 Silicon Tubing $3.00 Ft 7 $21.00

TOTAL EQUIPMENT $1,811.00

FINAL --7/24/96

SUBTASK 3: IDW Management and Surveying

DATE: 6/14/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager JM Complete waste profile, transmit waste manifest 4 Project Manager JM IDW Pickup and sign manifest 4

TOTAL LABOR 8

VEHICLE TYPE RATE UNIT USEAGE

Company Truck $120.00 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW Drum Disposal 2 soil drum $110.00 $220.00 Erwin Remediation IDW Drum Disposal 4 water drum $125.00 $500.00

TOTAL $720.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Volatile Organics Soil $150.00 1 $150.00 Volatile Organics Groundwater $150.00 1 $150.00 shipping small cooler (2 day) $52.00 1 $52.00

Ice $6.50 1 $6.50

TOTAL LAB $358.50

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

SUBTASK 4: Site Assessment Report

DATE: 6/14/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Professional Scientist GE Site History (SAR) 4 Professional Scientist GE Regional Geology - Site Specific Lithology (SAR) 2 Professional Scientist GE Site Assessment Workplan Summary (SAR) 4 Professional Scientist GE Soil Sampling Methods (SAR) 3 Professional Scientist GE Soil Sampling Results (SAR) 3 Professional Scientist GE MAGS point installation methods (SAR) 2 Professional Scientist GE MAGS Procedures (SAR) 2 Professional Scientist GE MAGS Results (SAR) 2 Professional Scientist GE Direct Push Profiling Methods (SAR) 3 Professional Scientist GE Direct Push Profiling Results (SAR) 3 Professional Scientist GE Monitor well installation methods (SAR) 3 Professional Scientist GE Groundwater sampling methods (SAR) 2 Professional Scientist GE Groundwater flow evaluation (SAR) 2 Professional Scientist GE Groundwater water quality parameter results (SAR) 3 Professional Scientist GE Groundwater analytical data results (SAR) 4 Professional Scientist GE Conceptual Site Model (SAR) 4 Professional Scientist GE Findings (SAR) 3 Professional Scientist GE Laboratory Data Validation (SAR) 2 Professional Scientist GE Conclusions and Recommendations (SAR) 4

Sr. Professional Engineer JH Conlusions and recommendations (SAR) 4 Sr. Professional Engineer JH Remedial Action recommendations 4

Drafting Technician PM Draft Figures (site location/layout/site plan) 4 Drafting Technician PM Prepare DP groundwater analytical figure 2 Drafting Technician PM Prepare soil analytical figure 2 Drafting Technician PM Prepare MAGS analytical figure 2 Drafting Technician PM Prepare groundwater flow figures 2 Drafting Technician PM Prepare groundwater monitor well results figure 2

Staff Assistant JJ Data Entry (field data to report tables) 8 Staff Assistant JJ Prepare Summary Tables from lab EDDs 4 Staff Assistant JJ Prepare final SAR (pdf) 4

TOTAL LABOR 93

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

COST PROPOSAL FOR TASK DC053A

< Fashion Cleaners/FDEP ERIC_4784>

< Site Assessment >

1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >

GHD Services Inc. (GHD) submitted a Site Assessment Workplan for the Fashion Cleaners site located in Tampa, Hillsborough County, in April 2024. The Site Assessment Workplan detailed an approach to determining the extent of contamination in soil and groundwater both vertically and horizontally. Task DC053A includes initial site assessment activities including soil sampling, modified active gas sampling (MAGS), discrete groundwater profiling using direct push technology (DPT), monitor well installation, and groundwater sampling

Subtask 1: Project Management Subtask 1 includes all tasks associated with project management of the site assessment activities at the Fashion Cleaners site.

Subtask 2: Soil & Groundwater Sampling

Upon Department approval, GHD will mobilize with the selected direct-push contractor. Soil sampling and groundwater profiling will be conducted in order to establish the extent of soil and groundwater impacts both vertically and horizontally. Soil sampling will include advancement of soil borings within and in the immediate vicinity of the drycleaner with hand operated equipment and through the use of direct-push technology (DPT). Modified Active Gas Sampling (MAGS) will also be conducted as part of the soil assessment. One continuous soil boring will also be completed to establish site lithologic conditions.

The initial scope of work includes groundwater profiling at seven (7) exterior locations. At each location, direct-push tooling will be advanced to the desired depths and discrete groundwater samples will be gathered for fixed laboratory analysis. For planning purposes, it is assumed that discrete groundwater samples will be gathered from the surface of the groundwater, 10, 20 feet, 30 feet, 40 feet, and 50 feet below land surface. All groundwater samples will be submitted to a Florida-certified laboratory for volatile organic analysis by EPA Method 8260.

The initial soil sampling will involve the advancement of four (4) shallow soil borings within and in close proximity to the former drycleaner facility. Soil borings will be advanced with a stainless steel hand auger and soil samples will be collected from 0-0.5’, 0.5-2.0’, and 2’ intervals until refusal or the water table. All soil samples will be submitted to a fixed laboratory for analysis for the presence of volatile organics (VOCs).

Following soil sampling, piezometers will be installed at four (4) locations. The piezometers will be constructed with 2-inch PVC well screens across the vadose zone. Following installation, MAGS will be conducted and soil gas samples will be gathered for field screening and fixed laboratory analysis for the presence of VOCs by Method TO-15.

During the same mobilization, permanent monitor wells will be installed. At this time, up to six (6) shallow and one deep well are planned for installation. The 6 shallow wells will be installed to approximate depths of 15 ft bls. One of the shallow wells will be installed within the facility using hand operated equipment. The wells will be screened to straddle the water table. The deep well is proposed for a total depth of 50 feet and will be screened between 45 and 50 feet, depending on site lithology. Well locations and construction details will be provided to the Department for approval prior to installation. Following installation, the wells will be surveyed and sampled in accordance with FDEP SOPs. All of the groundwater samples will be submitted to a fixed laboratory for VOC analysis by EPA Method 8260.

Subtask 3: Surveying & IDW Disposal Following all field activities, Investigative Derived Waste (IDW) will be disposed of at an appropriate off-site facility. GHD will coordinate manifest generation and IDW pickup. A surveyor will be subcontracted (under Task DC052A) to develop a site plan and survey elevations of all sample locations.

Subtask 4: Site Assessment Report Upon receipt of analytical data, a Site Assessment Report (SAR) will be prepared. The SAR will include a summary of field methodology, field screening data, and laboratory analytical results. The SAR will also include conclusions and recommendations. The recommendations may include the use of active remediation to mitigate identified impacts.

Deliverables:

Deliverable Deliverable Due Date

Field notes, soil and groundwater data, MAGS data, and subcontractor receipts

9/20/24

IDW Manifests and subcontractor receipts 10/25/24

Site Assessment Report 11/1/24

Drilling

$800.00 each 1 $800.00 $1,700.00 each 1 $1,700.00 No Bid $300.00 night 4 $1,200.00

$1,750.00 day 4 $7,000.00 $1,250.00 1/2 day 1 $1,250.00

$3.00 each 16 $48.00 $3.00 each 35 $105.00

Materials: HDPE Tubing (per 500' Roll) $120.00 each 4 $480.00 Materials: Borehole Grouting w/Concrete Patch $15.00 each 8 $120.00

$4.00 ft 125 $500.00 $100.00 each 0 $0.00 $175.00 each 6 $1,050.00 $150.00 each 6 $900.00 $50.00 each 6 $300.00

55 gallon drums (Estimated) $75.00 each 2 $150.00 $75.00 each 2 $150.00 55 gallon drums (Estimated) $75.00 each 4 $300.00 $75.00 each 8 $600.00 Decon Pad $250.00 each 1 $250.00 Litho Boring $850.00 each 1 $850.00 DP Profile $850.00 each 7 $5,950.00 Shallow Well $850.00 well 5 $4,250.00 Deep Well $2,850.00 well 1 $2,850.00 Permits: SWFLWMD (N/A for FDEP Sites $52.00 each 1 $52.00 $100.00 each 1 $100.00

$14,505.00 $16,450.00

IDW Disposal

$110.00 drum 2 $220.00 $80.00 drum 2 $160.00 $175.00 drum 2 $350.00 $125.00 drum 4 $500.00 $80.00 drum 4 $320.00 $175.00 drum 4 $700.00

$35.00 drum 6 $210.00 $355.00 each 1 $355.00 Stop fee $75.00 stop 0 $0.00

$411.25 each 1 $411.25 15% $103.50

$720.00 $793.50 $1,816.25

Colliers Professional service Survey

Included with Wood Lake

DPT Rig and Crew

PreferredGroundwater Protection JAEE Environmental Mobilization

Per Diem (2 man crew)

Enviroserve Perma-Fix IDW Soil

IDW GW

Materials: Soil Sample Liners

Materials: GW Sampling Points

Materials: 1" PVC Well Installation

Materials: 1" x 5' PVC .010 Slot Prepack Screen, 3" Exp Point

Materials: (2) 1" x 5' PVC .010 Slot Prepack Screen, 3" Exp Point

2' x 2' Concrete Pad w/8" BD Completion

DPT rig and Crew (1/2 day) transportation

FSC

Well Development (up to 1/2 hour w/Pump)

Erwin

Other Fees

Sonic Auger DPT Injection Well Abandonment

REVISED DATE: 5/21/2024

ESTIMATE #: 524064

Project Description:

ID QTY Unit Rate TOTAL

1 1 each 800.00$ 800.00$

2 4 night 300.00$ 1,200.00$

3 4 day 1,750.00$ 7,000.00$

3a 1 1/2 day 1,250.00$ 1,250.00$

4 16 each 3.00$ 48.00$

5 35 each 3.00$ 105.00$

6 Materials: HDPE Tubing (per 500' Roll) 4 each 120.00$ 480.00$

7 Materials: Borehole Grouting w/Concrete Patch 8 each 15.00$ 120.00$

8 125 foot 4.00$ 500.00$

9 each 95.00$ -$

10 6 each 175.00$ 1,050.00$

11 6 each 150.00$ 900.00$

12 6 each 50.00$ 300.00$

13 55 gallon drums (Soil) (Estimated) 2 each 75.00$ 150.00$

14 55 gallon drums (Water) (Estimated) 4 each 75.00$ 300.00$

15 Decon Pad 1 each 250.00$ 250.00$

16 Permits: SWFLWMD (up to 10 per app) 1 each 52.00$ 52.00$

Completion: Subtotal 14,505.00$

Todd Hodgson

TOTAL 14,505.00$

Partner

PROJECT

Fashion Cleaners 8442 Sheldon Road

Damages to utilities on private property are the responsibility of the client

5904 Hampton Oaks Pkwy Suite F

CUSTOMER

GHD

Brian Moore

Tampa, Florida 33610 Tampa, Florida

DPT Soil and GW Sampling w/Well Installation

2' x 2' Concrete Pad w/8" BD Completion

(813) 971-3882

(5) 1" x 15' PVC Well w/10' of .010 Prepack Screen, 2' x 2' Pad w/8" BD Completion, No Soil Sampling

(1) DPT Litho Boring to 50' bls w/Continuous Macrocores to Depth. Borehole Grout and Patch to Surface

(1) 1" x 50' PVC Well w/10' of .010 Slot Prepack Screen, 2' x 2' Pad w/8" BD Completion, No Soil Sampling

Materials: (2) 1" x 5' PVC .010 Slot Prepack Screen, 3" Exp Point

Materials: Soil Sample Liners

(7) DPT GW Profiling Borings to 50' w/Sampling at 5 Intervals from GWT (6-10', 16-20', 26-30', 36-40' and 46-50' bls). Borehole Grouting and Patch to Surface.

Materials: GW Sampling Points

Locations must be accessible with track mounted DPT Rig

(7) Hand Auger Borings w/DPT Soil Sample from 4' to 7', then GW Profiling.

If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or Todd@drillprollc.com.

THANK YOU FOR YOUR BUSINESS!

Todd Hodgson

Daily Rate: DPT Rig w/ 2-man Crew

"Actual quantities used and days on site will be invoiced"

4 to 4.5 Days

DESCRIPTION

Mobilization

Utility Locates on Private Property is the responsibility of the client Borehole Clearance to 5’ bgs beyond 20 minutes may require a change order for additional time and cost.

Per Diem - 2 Man Crew Est. (Min. Hotel Cost + $50/per man)

Materials: 1" PVC Well Installation

Materials: 1" x 5' PVC .010 Slot Prepack Screen, 3" Exp Point (If Needed)

Well Development (up to 1/2 hour w/Pump)

Daily Rate: DPT Rig w/ 2-man Crew

2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586

GHD SERVICES INC

REQUEST FOR DRILLING BIDS

Fashion Cleaners 8442 Sheldon Road, Tampa, Hillsborough County, Florida FDEP Drycleaner Program Site

GHD Services Inc. (GHD) is requesting bids for continuous soil sampling to depth and the construction of monitoring wells at the above-referenced project Site. The drycleaner is located in an end unit of the strip shopping center on the west side of Sheldon Road. Underground utility services are assumed to be present and active.

Expected lithology beneath the site includes shallow fine grained sands transitioning from brown to gray to a depth of 11 feet below land surface (ft bls). The shallow sands are underlain by interlayered clayey sand and fine sand. The depth to water at the site is expected to be on the order of 3 to 5 ft bls.

The Driller will provide cost estimates to obtain continuous soil samples using direct-push techniques at one (1) location, advance seven (7) direct-push profiling points, install five (5) shallow monitoring wells, and install one (1) deep well. GHD will obtain permission from the Owner and contact the statewide utility location services. The Driller will obtain all necessary well permits.

The following are the specifications:

Lithology Boring – one (1) Exterior Locations

1. The Driller will obtain continuous soil samples from surface to the total depth (50 feet) of investigation.

2. GHD desires to obtain representative soil samples from land surface to a projected total depth of 40 ft bls using hand auger and direct-push equipment.

3. Upon completion, the borehole shall be backfilled with Portland cement, or a Portland cement/bentonite mixture. The backfill material will be placed using a grout pump from the bottom up.

Direct-Push Sampling – seven (7) Exterior Locations

1. The Driller will obtain continuous soil samples from surface to the water table at all boring locations.

2. GHD desires to obtain representative soil and groundwater samples to a projected total depth of 50 ft bls at each location. Continuous soil samples will be collected from above the water table (estimated at 5 to 7 ft bls) and groundwater samples will be collected at approximately 10-ft intervals to the total depth, starting at the water table.

3. The boreholes shall be backfilled with Portland cement, or a Portland cement/bentonite mixture. The backfill material will be placed using a grout pump from the bottom up.

Exterior Shallow Monitoring Wells (5) Locations

1. During same mobilization, use direct-push techniques to install five exterior permanent monitoring wells. Driller shall specify the actual drilling method proposed. The actual depth will be determined in the field by GHD’s field representative based on the Site lithology and groundwater screening results. The projected total depths are 15 ft bls.

2. The wells will be constructed of 1-inch diameter, Schedule 40 PVC casing and 0.010-inch slotted, factory “pre-packed” screen.

3. The screened interval will be 10 feet in length, based on a field determination by GHD.

4. The remaining space between borehole wall and the well screen will be backfilled with 20/30 gradational silica sand up to approximately one foot above the well screen. A one foot section of fine (30/65 gradational silica) sand will be placed above the sand pack as a seal.

5. The sand pack and seal will be poured or tremied in place as the drive casing is removed. The

Driller will ensure proper placement of sand and verify that the sand pack has not bridged. The depth to the top of the sand pack will be verified.

6. The annular area above the fine sand seal will be topped with neat cement grout to prevent surface runoff from entering the annular area.

7. The wells will be completed at ground surface with a flush-mounted concrete pad, bolt-down steel cover and water-tight locking cap.

Exterior Deep Monitoring Well

1. During same mobilization, use direct-push techniques to install one deep permanent monitoring well. Driller shall specify the actual drilling method proposed. The actual depth will be determined in the field by GHD’s field representative based on the Site lithology and groundwater screening results. The projected total depth is up to 50 ft bls.

2. The well will be constructed of 1-inch diameter, Schedule 40 PVC casing and 0.010-inch slotted, factory “pre-packed” screen.

3. The screened interval will be 5 to 10 feet in length, based on a field determination by GHD.

4. The remaining space between borehole wall and the well screen will be backfilled with 20/30 gradational silica sand up to approximately two (2) feet above the well screen. A two (2) foot section of fine (30/65 gradational silica) sand will be placed above the sand pack as a seal.

5. The sand pack and seal will be poured or tremied in place as the drive casing is removed. The Driller will ensure proper placement of sand and verify that the sand pack has not bridged.

The depth to the top of the sand pack will be verified.

The annular area above the fine sand seal will be topped with neat cement grout to prevent surface runoff from entering the annular area.

All down-hole tools will be steam-cleaned between locations.

Following installation, each well will be developed by overpumping until the discharge stream is free of visible sediments. GHD will oversee the development process and determine when the development is complete at each location.

All discharge water and drill cuttings will be containerized in 55-gallon drums suitable for later shipping. The Driller shall provide the cost per drum in the lump sum bids below.

If additional mobilizations are required, the bid rates provided will be used.

Bids must be submitted on the attached form to the contact shown below:

Brian Moore GHD Services Inc.

5904 Hampton Oaks Parkway, Suite F Tampa, Florida 33610

Phone: (813) 257-0658 Fax: (813)971-1862.

GHD BID FORM

Fashion Cleaners

8442 Sheldon Road, Tampa, Hillsborough County, Florida

ITEM 1 Mobilization Lump Sum Cost Per Mobilization: $

ITEM 2 Advance one (1) exterior lithology boring to 50 ft bls. Drum all wastes.

Lump Sum Cost per exterior lithology boring (est @ 50’) $ /Boring

ITEM 3 Advance seven (7) exterior direct-push profile borings with continuous soils above water table and groundwater profiling at app. 10 ft intervals to 50 ft bls. Drum all wastes.

Lump Sum Cost per exterior DP profile (est @ 50’) $ /Profile

ITEM 4 Install five (5) exterior shallow monitoring wells. Develop wells. Drum all wastes.

Lump Sum Cost per exterior Shallow Well (est @ 15’) $ /Well

ITEM 5 Install one (1) exterior deep monitoring well. Develop wells. Drum all wastes.

Lump Sum Cost per exterior Deep Well (est @ 50’) $ /Well

REQUIRED ADDITIONAL INFORMATION

Number of days required to complete DP Profiling: days

Number of days required to complete well network: days

Cost to supply, fill, and stage drums at central area: per drum

Number of drums required drums

Cost for well installation permits: each total austin_pdsflorida.co Typewritten Text 850.00 austin_pdsflorida.co Typewritten Text 850.00 austin_pdsflorida.co Typewritten Text 850.00 austin_pdsflorida.co Typewritten Text 2850.00 austin_pdsflorida.co Typewritten Text 2.5 austin_pdsflorida.co Typewritten Text 2.0 austin_pdsflorida.co Typewritten Text $75 austin_pdsflorida.co Typewritten Text austin_pdsflorida.co Typewritten Text $100 austin_pdsflorida.co Typewritten Text $16,450 austin_pdsflorida.co

1700.00

Bidder agrees that the proposed costs for the work specified in this bid package will be good for a period of 180 days from the bid opening.

Name of Bidder Authorizing Signature and Title

Address Date austin_pdsflorida.co Typewritten Text Austin Bonacum austin_pdsflorida.co Typewritten Text Project Estimator austin_pdsflorida.co Typewritten Text 8820 66th Street North, Pinellas Park, FL 33782 austin_pdsflorida.co

5/23/2024

From: willie smitherman To: Brian Moore Subject: Re: Fashion Cleaners and Wood Lake Cleaners Date: Thursday, May 23, 2024 11:46:20 AM

Too deep for us Sent from my iPhone

On May 23, 2024, at 10:15 AM, Brian Moore <Brian.Moore@ghd.com> wrote:

Any interest in responding to this willie?

BRIAN MOORE PE

GHD

Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com

<image001.png>The Power of Commitment

Connect

<image002.png><image003.png><image004.png><image005.png>

Please consider our environment before printing this email

From: Brian Moore Sent: Thursday, May 16, 2024 3:31 PM To: jaee@bellsouth.net Subject: Fashion Cleaners and Wood Lake Cleaners

Willie, See attached requests for 2 sites located on the same property

Thank you

Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA

<image001.png>The Power of Commitment mailto:jaee@bellsouth.net mailto:Brian.Moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.ghd.com%2F&data=05%7C02%7CBrian.Moore%40ghd.com%7C2ded8d243bf64fb31cef08dc7b3f79aa%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638520759794025245%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=EsPij0juWAAsqnxkSpAABiuHOrD2aikyYuxTSV63NCE%3D&reserved=0 mailto:brian.moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fghd%2F&data=05%7C02%7CBrian.Moore%40ghd.com%7C2ded8d243bf64fb31cef08dc7b3f79aa%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638520759794037316%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=DYT4F0H7OHLoQ7Ik1r1s57NRoffqNdZao3X2S5KjnjI%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2FGHDGroup&data=05%7C02%7CBrian.Moore%40ghd.com%7C2ded8d243bf64fb31cef08dc7b3f79aa%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638520759794048515%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=z%2B87JxJr67luTzo61%2FIHY%2BIYnINhFbdCj6KuaegaDjg%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Ftwitter.com%2FGHDspeaks&data=05%7C02%7CBrian.Moore%40ghd.com%7C2ded8d243bf64fb31cef08dc7b3f79aa%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638520759794057768%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=l5jFMCysY5%2Fio7ctX%2FYWp8ttshxkA9FeK9qHoMc3INo%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.youtube.com%2Fchannel%2FUCwUGfe6zgaddIXqA7entIwQ&data=05%7C02%7CBrian.Moore%40ghd.com%7C2ded8d243bf64fb31cef08dc7b3f79aa%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638520759794066522%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=3YeNp91lwLUlfCn9%2FvU%2FKRmZSaBlse40GOvKuuW0Cc8%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.ghd.com%2F&data=05%7C02%7CBrian.Moore%40ghd.com%7C2ded8d243bf64fb31cef08dc7b3f79aa%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638520759794075540%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=RphyvAgTOssBtES5Miav9IQofv%2FI2%2Fet70E7jjoaXXs%3D&reserved=0 mailto:brian.moore@ghd.com

<image002.png><image003.png><image004.png><image005.png>

CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.

<Request for drill bids Fashion 5-24.pdf> <Request for drill bids Wood Lake 5-24.pdf> <Site Plan.pdf> https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fghd%2F&data=05%7C02%7CBrian.Moore%40ghd.com%7C2ded8d243bf64fb31cef08dc7b3f79aa%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638520759794086194%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=kr7me4dRgX%2FhP3y9udgFIYPplCWny%2F4GZKWeJTEf0pU%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2FGHDGroup&data=05%7C02%7CBrian.Moore%40ghd.com%7C2ded8d243bf64fb31cef08dc7b3f79aa%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638520759794095690%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=KZAggyDgBQR2EyBaVbE%2Fg7xt120zQTSfcwB4nw1lcxo%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Ftwitter.com%2FGHDspeaks&data=05%7C02%7CBrian.Moore%40ghd.com%7C2ded8d243bf64fb31cef08dc7b3f79aa%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638520759794105636%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=GE4GJol%2BI7SbdZCjUzUw8h%2Fo9y7t1xxuuARSXKKpmMg%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.youtube.com%2Fchannel%2FUCwUGfe6zgaddIXqA7entIwQ&data=05%7C02%7CBrian.Moore%40ghd.com%7C2ded8d243bf64fb31cef08dc7b3f79aa%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638520759794113735%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=JAmoM2dH%2FZlmZY70WCfFeRZ8fJ4zPWx%2BXih7UMbHWTc%3D&reserved=0

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511

To: Mr. Brian Moore

5904 Hampton Oaks Parkway, Suite F Tampa, FL 33610

May 20, 2024

Re: Drum Disposal – Wood Lake Cleaners and Fashion Cleaners – Tampa, FL

Mr. Moore:

The price for transportation and disposal of 55-gallon drums of non-hazardous soil and water located at your site Tampa, FL will be the following:

Description Rate Unit

T&D - Non-Haz Water $ 110.00 Per Drum

T&D - Non-Haz Impacted Soil $ 125.00 Per Drum

Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc. This quote is valid for 90 days.

Respectfully, Robert Donado Erwin Remediation, Inc.

Phone: 850-466-2358 email: robert@erwinremediation.com

From: Craig Burns To: Brian Moore Subject: GHD_Drycleaner Sites Date: Friday, May 17, 2024 10:46:21 AM Attachments: image001.png image002.png image003.png image004.png image005.png image619285.png image074121.png image912395.png image953180.png

Disposal $80/per drum for liquids or solids.

Transportation

251-400 miles $65/drum Totes - $260 <11 drums/site - Surchage of $200/site

101-250 miles $50/drum Totes - $200 <6 drums/site - Surchage of $50/site

0-100 miles $35/drum Totes - $150 <6 drums/site - Surchage of $75/site

New Drums $50/plus tax

FSC 15% to total invoice *See below for the sites you provided Brian – I provided the rates next to the locations.* www.enviroserve.com

24/7 Emergency Response

(800) 488‑0910

Craig Burns Account Manager 4600 Brookpark Rd Cleveland, OH 44134 M 863 327 6289 craigburns@enviroserve.com

From: Brian Moore <Brian.Moore@ghd.com> Sent: Thursday, May 16, 2024 3:40 PM To: Craig Burns <craigburns@enviroserve.com> Subject: Drycleaner Sites

Craig, Can you provide a quote for soil and GW IDW disposal from the below sites, assume non-haz

Fashion Cleaners and Wood Lake Cleaners Tampa, FL $80/per drums disposal, $35/drum trans, If less than 6 drums per pick up $75/flat then 15% FSC

Atlantis Plaza Cleaners Lantana, FL $80/per drums disposal, $55/drum trans, If less than 6 drums per pick up $75/flat then 15% FSC mailto:craigburns@enviroserve.com mailto:Brian.Moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fus.content.exclaimer.net%2F%3Furl%3Dhttp%253A%252F%252Fwww.enviroserve.com%252F%26tenantid%3D4gZUCz1GEe6j8QAiSCOEEg%26templateid%3D0c621e73ef41ee11a3f1002248238412%26excomponentid%3D-iffYfkALXEboPKMm4dvpgM-zViCM0G8I_ZtU_0TD9s%26excomponenttype%3DLink%26signature%3DjZuXnSgheA72gbIr9CNbOR3aL9WwF2nb3MRKKpOc4EHjv5erO8FMEVWCTGCax4mI7iZMJ6IYXcIv6mpThLjcGIHkjjDBGY7Ok1lAuaD_JZ0M5xyUbUGhBoubxmWFMKRY9iOXabxzxAlQLKi3RTKpX1hY_SK1VRDIIuBx-eX5JgRmuHXt4etv8uUXEDwtM9AuIDLQflMY8yzGjMEGoGIlKYRKM1REYD5xcKwX1qEs_hDFwQ3Ar61MPVpLtHzWMOJCL_FE7qIIZiV77NV4hgTxx47yNSu0c4GcYoBqOPzY8lZcKkI817uZmDY2qb-Tw0CP9SMJGPIFaIUk3LZEL10H9A%26v%3D1%26imprintMessageId%3D6a9cc458-47a0-403d-a4b2-b3ffd4b7d606&data=05%7C02%7CBrian.Moore%40ghd.com%7Cd3cead6090dc4f90c16308dc7680183d%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638515539800972374%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=nn5XyN%2FMsP7rE2gtPvhlLrdFTXke9DUwJLzZX2akkeI%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fus.content.exclaimer.net%2F%3Furl%3Dhttps%253A%252F%252Fwww.facebook.com%252Fenviroserveusa%252F%26tenantid%3D4gZUCz1GEe6j8QAiSCOEEg%26templateid%3D0c621e73ef41ee11a3f1002248238412%26excomponenttype%3DSocialMediaIcon%26signature%3DCmgEsmFDLI2ItBJ4iwQz0dIAZksXLzXweIZGm7thoaGkoOJyKfx1m27jQ1-zWimhyaIhM8mwxUYeYLdp8Pit3w5R7f-4eVMUURPy9JKKpBFt3VdoVQnJSf_z0a0nOf91PavkSQ6BNObQjfvn0w55gzrJq51zMuTlwcjnIVDfRm_4ogecVE3uEqU5E2kQrUCm8Fj9NJD2oNhPKWHokU5TKOufqsajXLuigxTFZVboRnqJ2rnmOAplVcTJItCIaeQD5Y8u099a5r87a-3hlP_V3xVhGVItVWQLtAyO0wcrGFdsLTRqrUNu0lbh8e_XRqJldCQSYRgqc1w8XM4wDYKBbg%26v%3D1%26imprintMessageId%3D6a9cc458-47a0-403d-a4b2-b3ffd4b7d606&data=05%7C02%7CBrian.Moore%40ghd.com%7Cd3cead6090dc4f90c16308dc7680183d%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638515539800990937%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=MTnklgUxqD3MpJ79e7EPzZFyrJJoYaqtNJoH6niH%2FFQ%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fus.content.exclaimer.net%2F%3Furl%3Dhttps%253A%252F%252Ftwitter.com%252FEnviroServe_USA%26tenantid%3D4gZUCz1GEe6j8QAiSCOEEg%26templateid%3D0c621e73ef41ee11a3f1002248238412%26excomponenttype%3DSocialMediaIcon%26signature%3Dk9AtMvi_Fj7t1KDvc2dxYSd6V3AdliZ2EuZFH0_l9COex5OwMK9Osrm_ErnjpjCUlFYjvI3RJjTL0Sc_1Hg-0CmVxPwKr6tf9W6VwnAtttLpcZdBAd9rKo4xj6QOMy8LuN1tUiiN20f-IOp9kde7baiJ5Xljo9Yh4duREbH765Av4lhB-35uUg6E1wvXc-qbrUoBV9VBVCSHBZ0zSVq0Z-VuFUItXuJsa6HfvPmZOk0V53F5rM6BnRF6PrLVqT4-WuXSNFAWUhUsi2Y6m3RcgxmXwQ-RZu-gpxwPK4FBVtWGFK6ww2YFW2kN1SoJtL4-vcSMlTJOcquLjwRNYVAlbQ%26v%3D1%26imprintMessageId%3D6a9cc458-47a0-403d-a4b2-b3ffd4b7d606&data=05%7C02%7CBrian.Moore%40ghd.com%7Cd3cead6090dc4f90c16308dc7680183d%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638515539801006723%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=U9t%2B9Vu59RyoQIurnYYRB9DkzoiyHUVdHopn3a%2FCK14%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fus.content.exclaimer.net%2F%3Furl%3Dhttps%253A%252F%252Fwww.linkedin.com%252Fcompany%252Fenviroserve-j-v-%252Fabout%252F%26tenantid%3D4gZUCz1GEe6j8QAiSCOEEg%26templateid%3D0c621e73ef41ee11a3f1002248238412%26excomponenttype%3DSocialMediaIcon%26signature%3DfMoqmJHqaeJ-zljcqKD_x1lpDf1sfYYS7G01g1kuY9OFZr1FSEGXNo-PVYfI4UYO8l3LOImHDIT9TeU3qISfQl8gAJR4bUshDIjyJG-yBok_XE73PluFyhkWNl3W6lAQhJDLwElzhj_T-FpZhVsDIQyKBSB4Uj7xsUfmbLNeb4UPblXCC-lW8BX_HIztJ8tdcMJ9mEp7g04VLnCzZ-OqI2wBWRl2AhSsz4-olrUIiAidt0zVBNuHJ2a3myb8z2_rZwAcuokdRr0Fm6yHO5_0Xg_PBs2tCjcG7P1WBWaWJvrp1Te6Ki6s5-Y0rD7W-Mn9fFODETD-Z3LsonoC1cN2IQ%26v%3D1%26imprintMessageId%3D6a9cc458-47a0-403d-a4b2-b3ffd4b7d606&data=05%7C02%7CBrian.Moore%40ghd.com%7Cd3cead6090dc4f90c16308dc7680183d%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638515539801021263%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=nmNgsk0Dvbf%2BYxpSPWSeVx89Hcp%2BeavxQPM8tgoOX%2BQ%3D&reserved=0 tel:863%20327%206289 mailto:craigburns@enviroserve.com

Club Cleaners Stuart, FL $80/per drums disposal, $55/drum

Berkshire Cleaners Naples, FL $80/per drums disposal, $55/drum

Thank you

Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA

The Power of Commitment

CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.

https://aus01.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.ghd.com%2F&data=05%7C02%7CBrian.Moore%40ghd.com%7Cd3cead6090dc4f90c16308dc7680183d%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638515539801035492%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=LKckQEbPqgxkBP4d%2BTMySXfEta%2FrEU7WjbJ28I1%2BWhw%3D&reserved=0 mailto:brian.moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fghd%2F&data=05%7C02%7CBrian.Moore%40ghd.com%7Cd3cead6090dc4f90c16308dc7680183d%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638515539801048068%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=BxAo%2FRtjZ6niCkn0PKpPxZHJOGOVcCckC0QFWueK1Gg%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2FGHDGroup&data=05%7C02%7CBrian.Moore%40ghd.com%7Cd3cead6090dc4f90c16308dc7680183d%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638515539801059205%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=oS0%2BURCPoEzTyY9JlctIFIvL2Y27NqACpELtufDgscg%3D&reserved=0…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .