CN-370000-HW684-DC04A.pdf

PDF 3 MB Posted

Attached to
Master Agreement FL|HW684|68b160b8827755ddf560142dd2a41e53
Contract number
HW684
Issued by
Florida

About this file

Task Assignment DC004A - Garland Supply Co. Site Assessment

This Task Assignment (TA) is a state contract between the State of Florida Department of Environmental Protection (FDEP) and GHD Services, Inc., a consulting firm. The contract was executed on January 24, 2022, under the indefinite delivery vehicle Contract Number HW684. The work is being performed at the former Garland Supply Co. site located at 7800 W 25th Ave, Hallandale, Miami-Dade County, Florida. FDEP's Department Project Manager is Kevin Kane, and the contractor's Project Manager is Brian Moore. The contract references Project Number ERIC_4464.

The task assignment authorizes GHD Services, Inc. to conduct soil sampling, groundwater sampling, and modified active gas sampling (MAGS) at the former Garland Supply Co. site in accordance with a scope of work and cost proposal submitted on January 20, 2022. The work is divided into two subtasks: Subtask 1 covers project management calculated at 13% of direct labor costs, and Subtask 2 encompasses soil and groundwater assessment activities including twelve direct push soil borings to the water table, groundwater sampling at each boring location, and MAGS at four existing locations. The total contract value is $17,395.45 on a fixed unit rate basis. The deliverable—a Soil and Groundwater Assessment Summary plus Project Management report—is due April 28, 2022, with an overall task completion date of July 29, 2022. Payment is contingent upon FDEP's approval and submittal of the deliverable. The cost estimate includes labor ($6,071.77), travel ($652.00), drilling and investigation derived waste disposal services ($4,361.50), laboratory analysis ($4,579.00), field equipment and expendables ($1,124.00), and a completion fee ($607.18).

View the file

Other files

File Type Posted
CN-370000-HW684-BIL02F.pdf PDF
CN-370000-HW684-BIL2CC03.pdf PDF
CN-370000-HW684-BIL2ECO1.pdf PDF
CN-370000-HW684-BIL2FCO1.pdf PDF
CN-370000-HW684-BIL2GCO1.pdf PDF
CN-370000-HW684-CSS02A.pdf PDF
CN-370000-HW684-CSS03B.pdf PDF
CN-370000-HW684-D033CCO1.pdf PDF
CN-370000-HW684-DC001A.pdf PDF
CN-370000-HW684-DC001F.pdf PDF
CN-370000-HW684-DC002B.pdf PDF
CN-370000-HW684-DC002C.pdf PDF
CN-370000-HW684-DC002D.pdf PDF
CN-370000-HW684-DC003D.pdf PDF
CN-370000-HW684-DC004D.pdf PDF
CN-370000-HW684-DC005A.pdf PDF
CN-370000-HW684-DC005D.pdf PDF
CN-370000-HW684-DC006B.pdf PDF
CN-370000-HW684-DC009C.pdf PDF
CN-370000-HW684-DC009D.pdf PDF
CN-370000-HW684-DC009E.pdf PDF
CN-370000-HW684-DC011A.pdf PDF
CN-370000-HW684-DC011C.pdf PDF
CN-370000-HW684-DC012D.pdf PDF
CN-370000-HW684-DC013B.pdf PDF
CN-370000-HW684-DC014D.pdf PDF
CN-370000-HW684-DC014F.pdf PDF
CN-370000-HW684-DC015A.pdf PDF
CN-370000-HW684-DC015C.pdf PDF
CN-370000-HW684-DC016B.pdf PDF
CN-370000-HW684-DC016C.pdf PDF
CN-370000-HW684-DC017C.pdf PDF
CN-370000-HW684-DC018C.pdf PDF
CN-370000-HW684-DC019C.pdf PDF
CN-370000-HW684-DC019D.pdf PDF
CN-370000-HW684-DC01ACO2.pdf PDF
CN-370000-HW684-DC020B.pdf PDF
CN-370000-HW684-DC025A.pdf PDF
CN-370000-HW684-DC026B.pdf PDF
CN-370000-HW684-DC026D.pdf PDF
CN-370000-HW684-DC027C.pdf PDF
CN-370000-HW684-DC028C.pdf PDF
CN-370000-HW684-DC029C.pdf PDF
CN-370000-HW684-DC031A.pdf PDF
CN-370000-HW684-DC034B.pdf PDF
CN-370000-HW684-DC03ACO1.pdf PDF
CN-370000-HW684-DC03CCO1.pdf PDF
CN-370000-HW684-DC03CCO2.pdf PDF
CN-370000-HW684-DC040A.pdf PDF
CN-370000-HW684-DC045B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW684

DC004A Completion July 29, 2022

GHD Services, Inc. will conduct soil sampling, groundwater sampling, and modified active gas sampling (MAGS) at the former Garland Supply Co. site. All work will be conducted in accordance with the scope of work and cost proposal submitted on January 20, 2022.

Kevin Kane (850) 245-8971 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

GHD Services, Inc.

GHD Services, Inc.

Brian Moore (813) 257-0658

ERIC_4464

7800 W 25th Ave, Hallandale, Miami-Dade County

Garland Supply Co.

✔ $ 17,395.45

$ 17,395.45

Scope of Work

Brian Moore

Contract Manager

Brian Moore Digitally signed by Brian Moore Date: 2022.01.24 14:13:26 -05'00'

William E. Burns Jr.

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2022.01.24 09:55:08 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Soil and Groundwater Assessment Summary + Project Management 04/28/2022

Subtasks 1 and 2: Upon submittal and FDEP approval of the Soil and Groundwater Assessment Summary + Project Management $ 17,395.45

$ 17,395.45

HW684

DC004A

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

TO: HW684 Contract File

FROM: Kevin Kane, Contract Manager

DATE: January 21, 2022

SUBJECT: Task Assignment DC004A

Garland Supply Co.

ERIC_4644

Assessment

GHD Services, Inc. (GHD) will conduct soil sampling, groundwater sampling, and modified active gas sampling (MAGS) at the former Garland Supply Co. site. Specific subtasks are detailed below:

Subtask 1: Project Management Project management is calculated at 13% of direct labor costs.

Subtask 2: Soil and Groundwater Assessment GHD personnel will mobilize to the site and oversee soil boring advancement at twelve

(12) locations using direct push (DP) technology. Soil borings will be advanced with a stainless-steel hand auger and the DP rig, and soil samples will be field-screened with an OVA. Soil samples will be gathered from 0-0.5, 0.5-2, and 2-4 ft bls at all soil boring locations for laboratory analysis. Soil samples will be submitted to a fixed laboratory for analysis for the presence of VOHs. During the same mobilization, GHD will conduct groundwater sampling at each of the soil boring locations. Groundwater sampling will be completed using a DP screenpoint sampler. The DP equipment will be pushed to a depth of approximately 7 ft bls and the tooling will be retracted to expose the screen sampler. The samples will be gathered using a peristaltic pump. All groundwater samples will be analyzed for VOHs by EPA Method 8260.

GHD personnel will also conduct MAGS at four existing locations (MAG04, MAG06, MAG07, and MAG08). MAGS will be conducted with a regenerative blower at each location. Soil gas extraction will occur for a minimum of 30 minutes at each location and vacuum and flow measurements will be recorded. Vacuum measurements will also be recorded for nearby MAGS wells and VMPs. After approximately 30 minutes, a soil gas sample will be gathered for laboratory analysis using of volatile organics using Method

TO-15.

Following receipt of analytical results, GHD will prepare a summary report detailing the current soil, soil gas, and groundwater sampling results. The summary report will include recommendations regarding source removal and additional testing.

Subcontractors for drilling and investigation derived waste (IDW) disposal were chosen on a lowest-cost basis.

The Florida Department of Environmental Protection (FDEP) has a current and valid Site Access Agreement for this site, signed November 9, 2015.

This work will be conducted in line with the scope of work included with GHD’s proposal, received January 20, 2022.

Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and proposal letter. The final deliverable due date is April 28, 2022, and the completion date for the task assignment is July 29, 2022.

The final cost total for Task Assignment DC004A is $17,395.45.

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 01/21/22

Task #: DC004A SubTask 1 Project Management SubTask 6

Site: Garland Supply SubTask 2 Soil and Groundwater Assessment SubTask 7

Activity/Phase: Assessment SubTask 3 SubTask 8

Project Manager: Brian Moore, PE SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$40.12 Project Manager JM 6.50 6.5 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$46.33 Sr Professional Engineer JH 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$43.28 Professional Engineer/Sc GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $39.82 Project Engineer/Scientis TC 20.00 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $40.12 Project Manager/ Engine JM 14.00 14.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $33.17 Staff Engineer/Scientist DB 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.40 Data Analyst JL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $43.35 Field Manager OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.76 Senior Technician SA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.65 Senior Technician SC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.69 Senior Technician WM 14.00 14.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.58 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.75 Junior Technician JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.69 Drafting Technician PM 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $22.44 Administrative Assistant DA 5.50 5.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Driller 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 HSEQ&R Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 67 7 59.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $2,268.97 $261.03 $2,007.94 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 129.80% $2,945.13 $338.82 $2,606.31 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% $857.67 $98.67 $759.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $6,071.77 $698.52 $5,373.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $480.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 1

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 01/21/22

Task #: DC004A SubTask 1 Project Management SubTask 6

Site: Garland Supply SubTask 2 Soil and Groundwater Assessment SubTask 7

Activity/Phase: Assessment SubTask 3 SubTask 8

Project Manager: Brian Moore, PE SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $172.00 $172.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $652.00 $652.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $3,865.00 $3,865.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $3,965.00 $3,965.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $396.50 $396.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $4,361.50 $4,361.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $4,377.00 $4,377.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $202.00 $202.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $4,579.00 $4,579.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,004.00 $1,004.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,124.00 $1,124.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $16,788.27 $698.52 $16,089.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $607.18 $69.85 $537.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $17,395.45 $768.37 $16,627.08 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Garland Supply SUBTASK 2: Soil and Groundwater Assessment

DATE: 01/21/22

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Professional Engineer JH Complete Assessment Summary (Conclusions/Recommendations) 1

Project Manager/Engineer JM Prepare field scope of work and laboratory coordination 1 Project Manager/Engineer JM Uility Locate 0.5 Project Manager/Engineer JM Review field package (QA/QC) 1 Project Manager/Engineer JM Background information for Assessment Summary 2 Project Manager/Engineer JM Soil Sampling Methodology 1 Project Manager/Engineer JM MAGS Sampling Methodology 1 Project Manager/Engineer JM Groundwater Sampling Methodology 1 Project Manager/Engineer JM Soil Sampling Results 1 Project Manager/Engineer JM MAGS Results 1 Project Manager/Engineer JM Groundwater Sampling Results 1 Project Manager/Engineer JM QA/QC Laboratory Data 1.5 Project Manager/Engineer JM Conclusions/Recommendations 2

Project Engineer/Scientist TC Mob/demob (2 days) 4 Project Engineer/Scientist TC Oversee DP soil and groundwater sampling 16

Senior Technician WM Mob/demob 8 Senior Technician WM Conduct MAGS (4 locations) 6

Drafting Technician PM Site Plan (base figure) 1 Drafting Technician PM Sampling Locations (soil/MAGS/GW) 1 Drafting Technician PM Soil Results Plan 1 Drafting Technician PM MAGS Results Plan 1 Drafting Technician PM GW Results Plan 1

Admin Assistant DA Data Entry (soil/MAGS/GW - 16 points) 2 Admin Assistant DA Summary Tables (soil/MAGS/GW) 2 Admin Assistant DA Publish Summary Report 1.5

5.5

TOTAL LABOR 59.5

VEHICLE TYPE RATE UNIT USEAGE

Soil/GW (Project Scientist) Company Truck $120.00 day 2 $240.00 MAGS (Sr. Tech) Company Truck $120.00 day 2 $240.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

MAGS (Sr. Tech) Hotel $100.00 night 1 $100.00 MAGS (Sr. Tech) Per Diem $36.00 per day 2 $72.00

TOTAL PER DIEM $172.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

JAEE Daily Rate (DPT) $1,600.00 day 2 $3,200.00 JAEE Mobilization $300.00 day 2 $600.00 JAEE Drum $65.00 drum 1 $65.00 Erwin IDW Disposal $100.00 drum 1 $100.00

TOTAL $3,965.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOHs - soil EPA 8260 $73.00 36 $2,628.00 VOHs - gw EPA 8260 $73.00 12 1 $949.00 VOCs - soil gas TO-15 $200.00 4 $800.00 Shipping (soil/gw) large cooler -overnight $150.00 1 $150.00 shipping (soil gas) large cooler - 2 day $52.00 1 $52.00

TOTAL LAB $4,579.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables Expendables $40.00 day 3 $120.00

Equipment (Analytical Related)

Air Sampling Pump $27.00 Day 1 $27.00 Regenerative Blower $180.00 Day 1 $180.00 Portable generator $70.00 Day 1 $70.00 Vacuum Gages $19.00 Day 1 $19.00 Air sampling canister $33.00 Each 4 $132.00 Encore Sampler (25 g) $16.00 each 36 $576.00

Equipment (Other) $0.00

TOTAL EQUIPMENT $1,124.00

FINAL --7/24/96

COST PROPOSAL FOR TASK DC004A

<Garland Supply Company / FDEP ERIC_4464>

< Soil and Groundwater Assessment>

1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >

GHD Services Inc. (GHD) completed a review of soil assessment information at the former Garland Supply site located in Hialeah, Miami-Dade County. The soil assessment identified slightly elevated tetrachloroethene in soil and soil gas in the central portion of the site. Task DC004A includes soil and groundwater sampling at the Garland Supply site in order to further evaluate potential shallow source areas and soil quality.

Subtask 1: Project Management Subtask 1 includes all tasks associated with project management of the soil and groundwater testing activities at the former Garland Supply site.

Subtask 2: Soil and Groundwater Sampling GHD personnel will mobilize to the site and oversee soil boring advancement at twelve (12) locations using direct push (DP) technology. Soil borings will be advanced with a stainless-steel hand auger and the DP rig, and soil samples will be field-screened with an OVA. Soil samples will be gathered from 0-0.5, 0.5-2, and 2-4 ft bls at all soil boring locations for laboratory analysis. Soil samples will be submitted to a fixed laboratory for analysis for the presence of VOHs. During the same mobilization, GHD will conduct groundwater sampling at each of the soil boring locations. Groundwater sampling will be completed using a DP screen-point sampler. The DP equipment will be pushed to a depth of approximately 7 ft bls and the tooling will be retracted to expose the screen sampler. The samples will be gathered using a peristaltic pump. All groundwater samples will be analyzed for VOHs by EPA Method 8260.

During the same mobilization, GHD personnel will also conduct MAGS at four existing locations (MAG04, MAG06, MAG07, and MAG08). MAGS will be conducted with a regenerative blower at each location. Soil gas extraction will occur for a minimum of 30 minutes at each location and vacuum and flow measurements will be recorded. Vacuum measurements will also be recorded for nearby MAGS wells and VMPs. After approximately 30 minutes, a soil gas sample will be gathered for laboratory analysis using of volatile organics using Method TO-15.

Following receipt of analytical results, GHD will prepare a summary report detailing the current soil, soil gas, and groundwater sampling results. The summary report will include recommendations regarding source removal and additional testing.

Deliverables:

Deliverable Deliverable Due Date

Soil and Groundwater Assessment Summary 4/28/22

From: willie smitherman To: Brian Moore Subject: Re: Garland Supply - 7800 W. 25th Avenue, Hialeah Date: Monday, January 17, 2022 4:24:58 PM

$65,00

Willie Smitherman President JAEE Environmental Services, Inc (954)476-8333 office (954)401-9512 cell jaee@bellsouth.net

On Jan 17, 2022, at 1:06 PM, Brian Moore <Brian.Moore@ghd.com> wrote:

What’s the cost to add a drum?

BRIAN MOORE PE

GHD

Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com

<image001.png>The Power of Commitment

Connect

<image002.png><image003.png><image004.png><image005.png>

Please consider our environment before printing this email

From: willie smitherman <jaee@bellsouth.net> Sent: Monday, January 17, 2022 11:03 AM To: Brian Moore <Brian.Moore@ghd.com> Subject: Re: Garland Supply - 7800 W. 25th Avenue, Hialeah

Hello Brian… Please find attached the quote for the work in Hialeah…. thanks willie

Willie Smitherman President JAEE Environmental Services, Inc (954)476-8333 office (954)401-9512 cell mailto:jaee@bellsouth.net mailto:Brian.Moore@ghd.com mailto:jaee@bellsouth.net mailto:Brian.Moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.ghd.com%2F&data=04%7C01%7CBrian.Moore%40ghd.com%7Ca4c97c28b6b24695618508d9d9ffcbe8%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637780514977497549%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=6OKNox%2Fb1AA1K0zZ%2FSxVgvDe88ptvQjsymEL7YFP5Ro%3D&reserved=0 mailto:brian.moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fghd%2F&data=04%7C01%7CBrian.Moore%40ghd.com%7Ca4c97c28b6b24695618508d9d9ffcbe8%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637780514977497549%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=mP91OPSncCyV2RTaJHAXIbMZnxE7LOEl5tMjrHFcGfw%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2FGHDGroup&data=04%7C01%7CBrian.Moore%40ghd.com%7Ca4c97c28b6b24695618508d9d9ffcbe8%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637780514977497549%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=Jzi7zHqkTJqjqZKh0TVbhNmmQlHuHP32JqhcAgnUudU%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Ftwitter.com%2FGHDspeaks&data=04%7C01%7CBrian.Moore%40ghd.com%7Ca4c97c28b6b24695618508d9d9ffcbe8%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637780514977497549%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=2tabJtq5PIv6f2d4e3rxTKWzCV4eu5GMBXlSrBxRdC4%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.youtube.com%2Fchannel%2FUCwUGfe6zgaddIXqA7entIwQ&data=04%7C01%7CBrian.Moore%40ghd.com%7Ca4c97c28b6b24695618508d9d9ffcbe8%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637780514977497549%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=PV01WfKdC3c%2BDB8LAvL4TEVF1hLTqd320pG%2FH1y2s%2Fo%3D&reserved=0 mailto:jaee@bellsouth.net mailto:Brian.Moore@ghd.com jaee@bellsouth.net

On Jan 17, 2022, at 9:43 AM, Brian Moore <Brian.Moore@ghd.com> wrote:

Willie, Can you provide a proposal for 12 soil borings to the water table and collect a DP screening water sample at each location. Site is an open field

Thank you

BRIAN MOORE PE

GHD

Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com

<image001.png>The Power of Commitment

<image002.png><image003.png><image004.png><image005.png>

Please consider our environment before printing this email

CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.

mailto:jaee@bellsouth.net mailto:Brian.Moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.ghd.com%2F&data=04%7C01%7CBrian.Moore%40ghd.com%7Ca4c97c28b6b24695618508d9d9ffcbe8%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637780514977497549%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=6OKNox%2Fb1AA1K0zZ%2FSxVgvDe88ptvQjsymEL7YFP5Ro%3D&reserved=0 mailto:brian.moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fghd%2F&data=04%7C01%7CBrian.Moore%40ghd.com%7Ca4c97c28b6b24695618508d9d9ffcbe8%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637780514977497549%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=mP91OPSncCyV2RTaJHAXIbMZnxE7LOEl5tMjrHFcGfw%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2FGHDGroup&data=04%7C01%7CBrian.Moore%40ghd.com%7Ca4c97c28b6b24695618508d9d9ffcbe8%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637780514977497549%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=Jzi7zHqkTJqjqZKh0TVbhNmmQlHuHP32JqhcAgnUudU%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Ftwitter.com%2FGHDspeaks&data=04%7C01%7CBrian.Moore%40ghd.com%7Ca4c97c28b6b24695618508d9d9ffcbe8%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637780514977497549%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=2tabJtq5PIv6f2d4e3rxTKWzCV4eu5GMBXlSrBxRdC4%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.youtube.com%2Fchannel%2FUCwUGfe6zgaddIXqA7entIwQ&data=04%7C01%7CBrian.Moore%40ghd.com%7Ca4c97c28b6b24695618508d9d9ffcbe8%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637780514977497549%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=PV01WfKdC3c%2BDB8LAvL4TEVF1hLTqd320pG%2FH1y2s%2Fo%3D&reserved=0

EARTH TECH DRILLING

2703 NW 19TH STREET, POMPANO BEACH, FL 33069

954.974.2424 FAX:954.974.2423

Date: 1/17/2022

FAC ID#:

PROPOSED SCOPE OF WORK:

Unit Unit Rate Number of Units Extended Price

Equipment Type: DPT Track Rig

Direct Push Daily Rate 1 - on-site day whole day $1,575.00 2 $3,150.00

Direct Push Half-Day Rate 1 - on-site half day half day $0.00 Pre-Packed Well Screen (includes all materials) ID ___1"___ 5' Length Pack OD _______ each $0.00 Auger Attachment, 2" Well Install with 4.25" ID Augers per foot $0.00 Auger Attachment, 4" Well Install with 6.25" ID Augers each $0.00 Slotted PVC Well Screen (includes all materials) 5' Length Pack OD ___1"____ each $0.00 Well Riser (includes all materials) ID ___1"___ 5' Length each $0.00 Well Completion (includes 30 Min Dev. 8" B-D MH & locking well cap) per well $0.00

Mobilization daily roundtrip $425.00 2 $850.00 Per Diem per crew / per night $0.00 DOT Approved 55-gal Drum (As Needed) each $80.00 1 $80.00

Permits 2 (Drilling or abandonment only; cost according to WMD & Local Municipalities) each $110.00 0 $0.00

Permits 2 (Drilling or abandonment only; cost according to WMD & Local Municipalities) each $0.00 Water Sample each $65.00 12 $780.00

$0.00

TOTAL QUOTE PRICE $4,860.00

Notes:

Project No.: ___________________________

Date: 1/17/2022

Contractor Name: GHD - Brian Moore - 813 335-2147

Site Name : Garland Supply - 7800 W 25th Ave. Hialeah, FL

Signature and Title of Person Submitting Quote: Charles Bucher

Hand Clear ALL Locations to 5' or REFUSAL

Hand Clearing is will be time consuming and will take extra time - 2 days estimated for borings

(12) DPT Soil Borings to Water Table (<10' Estimated) then collect a water Sample using DPT Water Sampler - Backfill & Patch

1 Drum for water

Site is an open field

DIRECT PUSH TECHNOLOGY

MISCELLANEOUS

Days to Complete Scope of Work: 2 Days

Subcontract Company Name: EARTH TECH DRILLING. Inc.

Subcontract Mailing Address: 2703 NW 19th Street, Pompano Beach, FL 33069

ETD Policy: If pea gravel is encountered, borehole advancement is terminated. If client would like to continue borehole advancement, it is at the risk of the consultant, FDEP or property owner.

Monitoring Wells Sparge Wells Horizontal and Vertical Extraction Wells Geotechnical Drilling Direct Push

Sonic Auger DPT Injection Well Abandonment

DATE: 1/18/2022

ESTIMATE #: 122050

Project Description:

ID QTY Unit Rate TOTAL

1 1 ls 1,000.00$ 1,000.00$

2 2 night 200.00$ 400.00$

3 1 day 1,500.00$ 1,500.00$

3 1 1/2 day 1,100.00$ 1,100.00$

4 12 sample 12.00$ 144.00$

8 55 gallon drums (Soil) (As Needed) 0 each 65.00$ -$

9 55 gallon drums (Water) (As Needed) 0 each 65.00$ -$

Completion: Subtotal 4,144.00$

Todd Hodgson

TOTAL 4,144.00$

Partner

If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or Todd@drillprollc.com.

THANK YOU FOR YOUR BUSINESS!

Todd Hodgson

DPT Rig and Crew

"Actual quantities used and days on site will be invoiced"

1 to 1.5 Days depending on borehole clearing time

DESCRIPTION

Mobilization

Utility Locates on Private Property is the responsibility of the client Borehole Clearance to 5’ bgs beyond 20 minutes may require a change order for additional time and cost.

Per Diem (2 man crew)

Materials: GW Sampling Expendables

(813) 971-3882

(12) DPT Soil Boring to GWT ~8' bls w/GW Grab

DPT Rig and Crew

PROJECT

Garland Supply 7800 W. 25th Avenue

Damages to utilities on private property during borehole clearance are the responsibility of the client

5904 Hampton Oaks Pkwy Suite F

CUSTOMER

GHD

Brian Moore

Tampa, Florida 33610 Hialeah, Florida

DPT Water Sampling

2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511

To: Mr. Brian Moore

GHD

5904 Hampton Oaks Parkway – Suite F

Tampa, FL 33610

March 16, 2020

Re: IP Cleaners - Miami, FL

Mr. Moore:

The price for disposal of two (2) drums of non-hazardous groundwater located in Miami, FL will be $100.00 per drum, or $200.00 total, for both transportation and disposal.

Respectfully, Jonathan Erwin

Erwin Remediation, Inc.

Email: ErwinRemediation@Gmail.com

Office: (850) 292-6511 mailto:Remediation@Gmail.com

From: Jamie Infinger To: Brian Moore Subject: RE: IP Cleaners - Miami Date: Monday, March 16, 2020 8:39:32 AM Attachments: image001.png image002.png image003.png image004.png

$95.00 per drum plus $150.00 stop charge Have a great day

Thanks, Jamie Infinger A Nationwide Waste Disposal Company Clean Management Environmental Group, Inc.

P: (800)-538-8131 F: (843)-538-7845 C: (912)-674-6783 jinfinger@cleanmanagement.com www.cleanmanagement.com

From: Brian.Moore@ghd.com [mailto:Brian.Moore@ghd.com] Sent: Sunday, March 15, 2020 11:45 AM To: Jamie Infinger <jinfinger@cleanmanagement.com> Subject: IP Cleaners - Miami

Jamie, Can you provide quote for disposal of 2 drums of water from the above site. Low level solvents, assume non-haz thanks

Brian Moore, PE

GHD

Proudly employee owned T: 813 257 0658 | M: 813 335 2147 | E: Brian.Moore@ghd.com 5904 Hampton Oaks Parkway Suite F Tampa Florida 33610 USA | www.ghd.com

WATER | ENERGY & RESOURCES | ENVIRONMENT | PROPERTY & BUILDINGS | TRANSPORTATION

mailto:jinfinger@cleanmanagement.com mailto:Brian.Moore@ghd.com mailto:jinfinger@cleanmanagement.com http://www.cleanmanagement.com/ mailto:Brian.Moore@ghd.com http://www.ghd.com/ https://www.linkedin.com/company/ghd https://www.facebook.com/GHDGroup https://twitter.com/GHD_Namerica https://www.youtube.com/channel/UCwUGfe6zgaddIXqA7entIwQ https://www.ghd.com/en/sectors/water.aspx https://www.ghd.com/en/sectors/energy---resources.aspx https://www.ghd.com/en/sectors/environment.aspx https://www.ghd.com/en/sectors/property---buildings.aspx https://www.ghd.com/en/sectors/transportation.aspx

Please consider our environment before printing this email

CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.

This e-mail has been scanned for viruses

ID Task Mode

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Mon 1/17/22Fri 1/28/22

2 Subtask 1: Project Manageme64 days Mon 1/31/22Thu 4/28/22

3 Subtask 2: Soil and Groundwater Sampling

64 days Mon 1/31/22

Thu 4/28/22

4 Field Work Preparation (driller scheduling)

4 wks Mon 1/31/22

Fri 2/25/22

5 Utility Locate 1 wk Tue 3/1/22 Mon 3/7/22

6 Soil and Groundwater Samp2 days Tue 3/8/22 Wed 3/9/22

7 MAGS 1 day Wed 3/9/22 Wed 3/9/22

8 Summary Report Preparatio6 wks Fri 3/18/22 Thu 4/28/22

1/9 1/16 1/23 1/30 2/6 February

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC004A at the former Garland Supply site located in Hialeah, Miami-Dade County

Project: TA_004A Date: Mon 1/17/22

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Mon 1/17/22Fri 1/28/22

2 Subtask 1: Project Manageme64 days Mon 1/31/22Thu 4/28/22

3 Subtask 2: Soil and Groundwater Sampling

64 days Mon 1/31/22

Thu 4/28/22

4 Field Work Preparation (driller scheduling)

4 wks Mon 1/31/22

Fri 2/25/22

5 Utility Locate 1 wk Tue 3/1/22 Mon 3/7/22

6 Soil and Groundwater Samp2 days Tue 3/8/22 Wed 3/9/22

7 MAGS 1 day Wed 3/9/22 Wed 3/9/22

8 Summary Report Preparatio6 wks Fri 3/18/22 Thu 4/28/22

Jenna Martin

Jenna Martin

Thomas Cozzie

William McKinne

2/13 2/20 2/27 3/6 3/13 March

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC004A at the former Garland Supply site located in Hialeah, Miami-Dade County

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Mon 1/17/22Fri 1/28/22

2 Subtask 1: Project Manageme64 days Mon 1/31/22Thu 4/28/22

3 Subtask 2: Soil and Groundwater Sampling

64 days Mon 1/31/22

Thu 4/28/22

4 Field Work Preparation (driller scheduling)

4 wks Mon 1/31/22

Fri 2/25/22

5 Utility Locate 1 wk Tue 3/1/22 Mon 3/7/22

6 Soil and Groundwater Samp2 days Tue 3/8/22 Wed 3/9/22

7 MAGS 1 day Wed 3/9/22 Wed 3/9/22

8 Summary Report Preparatio6 wks Fri 3/18/22 Thu 4/28/22 ey

3/20 3/27 4/3 4/10 4/17 April

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC004A at the former Garland Supply site located in Hialeah, Miami-Dade County

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Mon 1/17/22Fri 1/28/22

2 Subtask 1: Project Manageme64 days Mon 1/31/22Thu 4/28/22

3 Subtask 2: Soil and Groundwater Sampling

64 days Mon 1/31/22

Thu 4/28/22

4 Field Work Preparation (driller scheduling)

4 wks Mon 1/31/22

Fri 2/25/22

5 Utility Locate 1 wk Tue 3/1/22 Mon 3/7/22

6 Soil and Groundwater Samp2 days Tue 3/8/22 Wed 3/9/22

7 MAGS 1 day Wed 3/9/22 Wed 3/9/22

8 Summary Report Preparatio6 wks Fri 3/18/22 Thu 4/28/22 Jeremy Hess,Jenna Martin,Peter McLean,Debra Andr

4/24 5/1 5/8 5/15 5/22 May

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC004A at the former Garland Supply site located in Hialeah, Miami-Dade County

File details come from the government source that posted it. Updated .