Task Assignment DC004A - Garland Supply Co. Site Assessment
This Task Assignment (TA) is a state contract between the State of Florida Department of Environmental Protection (FDEP) and GHD Services, Inc., a consulting firm. The contract was executed on January 24, 2022, under the indefinite delivery vehicle Contract Number HW684. The work is being performed at the former Garland Supply Co. site located at 7800 W 25th Ave, Hallandale, Miami-Dade County, Florida. FDEP's Department Project Manager is Kevin Kane, and the contractor's Project Manager is Brian Moore. The contract references Project Number ERIC_4464.
The task assignment authorizes GHD Services, Inc. to conduct soil sampling, groundwater sampling, and modified active gas sampling (MAGS) at the former Garland Supply Co. site in accordance with a scope of work and cost proposal submitted on January 20, 2022. The work is divided into two subtasks: Subtask 1 covers project management calculated at 13% of direct labor costs, and Subtask 2 encompasses soil and groundwater assessment activities including twelve direct push soil borings to the water table, groundwater sampling at each boring location, and MAGS at four existing locations. The total contract value is $17,395.45 on a fixed unit rate basis. The deliverable—a Soil and Groundwater Assessment Summary plus Project Management report—is due April 28, 2022, with an overall task completion date of July 29, 2022. Payment is contingent upon FDEP's approval and submittal of the deliverable. The cost estimate includes labor ($6,071.77), travel ($652.00), drilling and investigation derived waste disposal services ($4,361.50), laboratory analysis ($4,579.00), field equipment and expendables ($1,124.00), and a completion fee ($607.18).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW684
DC004A Completion July 29, 2022
GHD Services, Inc. will conduct soil sampling, groundwater sampling, and modified active gas sampling (MAGS) at the former Garland Supply Co. site. All work will be conducted in accordance with the scope of work and cost proposal submitted on January 20, 2022.
Kevin Kane (850) 245-8971 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
GHD Services, Inc.
GHD Services, Inc.
Brian Moore (813) 257-0658
ERIC_4464
7800 W 25th Ave, Hallandale, Miami-Dade County
Garland Supply Co.
✔ $ 17,395.45
$ 17,395.45
Scope of Work
Brian Moore
Contract Manager
Brian Moore Digitally signed by Brian Moore Date: 2022.01.24 14:13:26 -05'00'
William E. Burns Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.01.24 09:55:08 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Soil and Groundwater Assessment Summary + Project Management 04/28/2022
Subtasks 1 and 2: Upon submittal and FDEP approval of the Soil and Groundwater Assessment Summary + Project Management $ 17,395.45
$ 17,395.45
HW684
DC004A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
TO: HW684 Contract File
FROM: Kevin Kane, Contract Manager
DATE: January 21, 2022
SUBJECT: Task Assignment DC004A
Garland Supply Co.
ERIC_4644
Assessment
GHD Services, Inc. (GHD) will conduct soil sampling, groundwater sampling, and modified active gas sampling (MAGS) at the former Garland Supply Co. site. Specific subtasks are detailed below:
Subtask 1: Project Management Project management is calculated at 13% of direct labor costs.
Subtask 2: Soil and Groundwater Assessment GHD personnel will mobilize to the site and oversee soil boring advancement at twelve
(12) locations using direct push (DP) technology. Soil borings will be advanced with a stainless-steel hand auger and the DP rig, and soil samples will be field-screened with an OVA. Soil samples will be gathered from 0-0.5, 0.5-2, and 2-4 ft bls at all soil boring locations for laboratory analysis. Soil samples will be submitted to a fixed laboratory for analysis for the presence of VOHs. During the same mobilization, GHD will conduct groundwater sampling at each of the soil boring locations. Groundwater sampling will be completed using a DP screenpoint sampler. The DP equipment will be pushed to a depth of approximately 7 ft bls and the tooling will be retracted to expose the screen sampler. The samples will be gathered using a peristaltic pump. All groundwater samples will be analyzed for VOHs by EPA Method 8260.
GHD personnel will also conduct MAGS at four existing locations (MAG04, MAG06, MAG07, and MAG08). MAGS will be conducted with a regenerative blower at each location. Soil gas extraction will occur for a minimum of 30 minutes at each location and vacuum and flow measurements will be recorded. Vacuum measurements will also be recorded for nearby MAGS wells and VMPs. After approximately 30 minutes, a soil gas sample will be gathered for laboratory analysis using of volatile organics using Method
TO-15.
Following receipt of analytical results, GHD will prepare a summary report detailing the current soil, soil gas, and groundwater sampling results. The summary report will include recommendations regarding source removal and additional testing.
Subcontractors for drilling and investigation derived waste (IDW) disposal were chosen on a lowest-cost basis.
The Florida Department of Environmental Protection (FDEP) has a current and valid Site Access Agreement for this site, signed November 9, 2015.
This work will be conducted in line with the scope of work included with GHD’s proposal, received January 20, 2022.
Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and proposal letter. The final deliverable due date is April 28, 2022, and the completion date for the task assignment is July 29, 2022.
The final cost total for Task Assignment DC004A is $17,395.45.
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 01/21/22
Task #: DC004A SubTask 1 Project Management SubTask 6
Site: Garland Supply SubTask 2 Soil and Groundwater Assessment SubTask 7
Activity/Phase: Assessment SubTask 3 SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$40.12 Project Manager JM 6.50 6.5 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$46.33 Sr Professional Engineer JH 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$43.28 Professional Engineer/Sc GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $39.82 Project Engineer/Scientis TC 20.00 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $40.12 Project Manager/ Engine JM 14.00 14.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $33.17 Staff Engineer/Scientist DB 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.40 Data Analyst JL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $43.35 Field Manager OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.76 Senior Technician SA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.65 Senior Technician SC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.69 Senior Technician WM 14.00 14.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.58 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.75 Junior Technician JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.69 Drafting Technician PM 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $22.44 Administrative Assistant DA 5.50 5.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Driller 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 HSEQ&R Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 67 7 59.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $2,268.97 $261.03 $2,007.94 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 129.80% $2,945.13 $338.82 $2,606.31 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% $857.67 $98.67 $759.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $6,071.77 $698.52 $5,373.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $480.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 01/21/22
Task #: DC004A SubTask 1 Project Management SubTask 6
Site: Garland Supply SubTask 2 Soil and Groundwater Assessment SubTask 7
Activity/Phase: Assessment SubTask 3 SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $172.00 $172.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $652.00 $652.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $3,865.00 $3,865.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $3,965.00 $3,965.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $396.50 $396.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $4,361.50 $4,361.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $4,377.00 $4,377.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $202.00 $202.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $4,579.00 $4,579.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,004.00 $1,004.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,124.00 $1,124.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $16,788.27 $698.52 $16,089.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $607.18 $69.85 $537.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $17,395.45 $768.37 $16,627.08 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Garland Supply SUBTASK 2: Soil and Groundwater Assessment
DATE: 01/21/22
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr. Professional Engineer JH Complete Assessment Summary (Conclusions/Recommendations) 1
Project Manager/Engineer JM Prepare field scope of work and laboratory coordination 1 Project Manager/Engineer JM Uility Locate 0.5 Project Manager/Engineer JM Review field package (QA/QC) 1 Project Manager/Engineer JM Background information for Assessment Summary 2 Project Manager/Engineer JM Soil Sampling Methodology 1 Project Manager/Engineer JM MAGS Sampling Methodology 1 Project Manager/Engineer JM Groundwater Sampling Methodology 1 Project Manager/Engineer JM Soil Sampling Results 1 Project Manager/Engineer JM MAGS Results 1 Project Manager/Engineer JM Groundwater Sampling Results 1 Project Manager/Engineer JM QA/QC Laboratory Data 1.5 Project Manager/Engineer JM Conclusions/Recommendations 2
Project Engineer/Scientist TC Mob/demob (2 days) 4 Project Engineer/Scientist TC Oversee DP soil and groundwater sampling 16
Senior Technician WM Mob/demob 8 Senior Technician WM Conduct MAGS (4 locations) 6
Drafting Technician PM Site Plan (base figure) 1 Drafting Technician PM Sampling Locations (soil/MAGS/GW) 1 Drafting Technician PM Soil Results Plan 1 Drafting Technician PM MAGS Results Plan 1 Drafting Technician PM GW Results Plan 1
Admin Assistant DA Data Entry (soil/MAGS/GW - 16 points) 2 Admin Assistant DA Summary Tables (soil/MAGS/GW) 2 Admin Assistant DA Publish Summary Report 1.5
5.5
TOTAL LABOR 59.5
VEHICLE TYPE RATE UNIT USEAGE
Soil/GW (Project Scientist) Company Truck $120.00 day 2 $240.00 MAGS (Sr. Tech) Company Truck $120.00 day 2 $240.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE
MAGS (Sr. Tech) Hotel $100.00 night 1 $100.00 MAGS (Sr. Tech) Per Diem $36.00 per day 2 $72.00
TOTAL PER DIEM $172.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
JAEE Daily Rate (DPT) $1,600.00 day 2 $3,200.00 JAEE Mobilization $300.00 day 2 $600.00 JAEE Drum $65.00 drum 1 $65.00 Erwin IDW Disposal $100.00 drum 1 $100.00
TOTAL $3,965.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOHs - soil EPA 8260 $73.00 36 $2,628.00 VOHs - gw EPA 8260 $73.00 12 1 $949.00 VOCs - soil gas TO-15 $200.00 4 $800.00 Shipping (soil/gw) large cooler -overnight $150.00 1 $150.00 shipping (soil gas) large cooler - 2 day $52.00 1 $52.00
TOTAL LAB $4,579.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables Expendables $40.00 day 3 $120.00
Equipment (Analytical Related)
Air Sampling Pump $27.00 Day 1 $27.00 Regenerative Blower $180.00 Day 1 $180.00 Portable generator $70.00 Day 1 $70.00 Vacuum Gages $19.00 Day 1 $19.00 Air sampling canister $33.00 Each 4 $132.00 Encore Sampler (25 g) $16.00 each 36 $576.00
Equipment (Other) $0.00
TOTAL EQUIPMENT $1,124.00
FINAL --7/24/96
COST PROPOSAL FOR TASK DC004A
<Garland Supply Company / FDEP ERIC_4464>
< Soil and Groundwater Assessment>
1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >
GHD Services Inc. (GHD) completed a review of soil assessment information at the former Garland Supply site located in Hialeah, Miami-Dade County. The soil assessment identified slightly elevated tetrachloroethene in soil and soil gas in the central portion of the site. Task DC004A includes soil and groundwater sampling at the Garland Supply site in order to further evaluate potential shallow source areas and soil quality.
Subtask 1: Project Management Subtask 1 includes all tasks associated with project management of the soil and groundwater testing activities at the former Garland Supply site.
Subtask 2: Soil and Groundwater Sampling GHD personnel will mobilize to the site and oversee soil boring advancement at twelve (12) locations using direct push (DP) technology. Soil borings will be advanced with a stainless-steel hand auger and the DP rig, and soil samples will be field-screened with an OVA. Soil samples will be gathered from 0-0.5, 0.5-2, and 2-4 ft bls at all soil boring locations for laboratory analysis. Soil samples will be submitted to a fixed laboratory for analysis for the presence of VOHs. During the same mobilization, GHD will conduct groundwater sampling at each of the soil boring locations. Groundwater sampling will be completed using a DP screen-point sampler. The DP equipment will be pushed to a depth of approximately 7 ft bls and the tooling will be retracted to expose the screen sampler. The samples will be gathered using a peristaltic pump. All groundwater samples will be analyzed for VOHs by EPA Method 8260.
During the same mobilization, GHD personnel will also conduct MAGS at four existing locations (MAG04, MAG06, MAG07, and MAG08). MAGS will be conducted with a regenerative blower at each location. Soil gas extraction will occur for a minimum of 30 minutes at each location and vacuum and flow measurements will be recorded. Vacuum measurements will also be recorded for nearby MAGS wells and VMPs. After approximately 30 minutes, a soil gas sample will be gathered for laboratory analysis using of volatile organics using Method TO-15.
Following receipt of analytical results, GHD will prepare a summary report detailing the current soil, soil gas, and groundwater sampling results. The summary report will include recommendations regarding source removal and additional testing.
Deliverables:
Deliverable Deliverable Due Date
Soil and Groundwater Assessment Summary 4/28/22
From: willie smitherman To: Brian Moore Subject: Re: Garland Supply - 7800 W. 25th Avenue, Hialeah Date: Monday, January 17, 2022 4:24:58 PM
$65,00
Willie Smitherman President JAEE Environmental Services, Inc (954)476-8333 office (954)401-9512 cell jaee@bellsouth.net
On Jan 17, 2022, at 1:06 PM, Brian Moore <Brian.Moore@ghd.com> wrote:
What’s the cost to add a drum?
BRIAN MOORE PE
GHD
Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com
<image001.png>The Power of Commitment
Connect
<image002.png><image003.png><image004.png><image005.png>
Please consider our environment before printing this email
From: willie smitherman <jaee@bellsouth.net> Sent: Monday, January 17, 2022 11:03 AM To: Brian Moore <Brian.Moore@ghd.com> Subject: Re: Garland Supply - 7800 W. 25th Avenue, Hialeah
Hello Brian… Please find attached the quote for the work in Hialeah…. thanks willie
Willie Smitherman President JAEE Environmental Services, Inc (954)476-8333 office (954)401-9512 cell mailto:jaee@bellsouth.net mailto:Brian.Moore@ghd.com mailto:jaee@bellsouth.net mailto:Brian.Moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.ghd.com%2F&data=04%7C01%7CBrian.Moore%40ghd.com%7Ca4c97c28b6b24695618508d9d9ffcbe8%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637780514977497549%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=6OKNox%2Fb1AA1K0zZ%2FSxVgvDe88ptvQjsymEL7YFP5Ro%3D&reserved=0 mailto:brian.moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fghd%2F&data=04%7C01%7CBrian.Moore%40ghd.com%7Ca4c97c28b6b24695618508d9d9ffcbe8%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637780514977497549%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=mP91OPSncCyV2RTaJHAXIbMZnxE7LOEl5tMjrHFcGfw%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2FGHDGroup&data=04%7C01%7CBrian.Moore%40ghd.com%7Ca4c97c28b6b24695618508d9d9ffcbe8%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637780514977497549%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=Jzi7zHqkTJqjqZKh0TVbhNmmQlHuHP32JqhcAgnUudU%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Ftwitter.com%2FGHDspeaks&data=04%7C01%7CBrian.Moore%40ghd.com%7Ca4c97c28b6b24695618508d9d9ffcbe8%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637780514977497549%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=2tabJtq5PIv6f2d4e3rxTKWzCV4eu5GMBXlSrBxRdC4%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.youtube.com%2Fchannel%2FUCwUGfe6zgaddIXqA7entIwQ&data=04%7C01%7CBrian.Moore%40ghd.com%7Ca4c97c28b6b24695618508d9d9ffcbe8%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637780514977497549%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=PV01WfKdC3c%2BDB8LAvL4TEVF1hLTqd320pG%2FH1y2s%2Fo%3D&reserved=0 mailto:jaee@bellsouth.net mailto:Brian.Moore@ghd.com jaee@bellsouth.net
On Jan 17, 2022, at 9:43 AM, Brian Moore <Brian.Moore@ghd.com> wrote:
Willie, Can you provide a proposal for 12 soil borings to the water table and collect a DP screening water sample at each location. Site is an open field
Thank you
BRIAN MOORE PE
GHD
Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com
<image001.png>The Power of Commitment
<image002.png><image003.png><image004.png><image005.png>
Please consider our environment before printing this email
CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.
mailto:jaee@bellsouth.net mailto:Brian.Moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.ghd.com%2F&data=04%7C01%7CBrian.Moore%40ghd.com%7Ca4c97c28b6b24695618508d9d9ffcbe8%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637780514977497549%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=6OKNox%2Fb1AA1K0zZ%2FSxVgvDe88ptvQjsymEL7YFP5Ro%3D&reserved=0 mailto:brian.moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fghd%2F&data=04%7C01%7CBrian.Moore%40ghd.com%7Ca4c97c28b6b24695618508d9d9ffcbe8%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637780514977497549%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=mP91OPSncCyV2RTaJHAXIbMZnxE7LOEl5tMjrHFcGfw%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2FGHDGroup&data=04%7C01%7CBrian.Moore%40ghd.com%7Ca4c97c28b6b24695618508d9d9ffcbe8%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637780514977497549%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=Jzi7zHqkTJqjqZKh0TVbhNmmQlHuHP32JqhcAgnUudU%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Ftwitter.com%2FGHDspeaks&data=04%7C01%7CBrian.Moore%40ghd.com%7Ca4c97c28b6b24695618508d9d9ffcbe8%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637780514977497549%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=2tabJtq5PIv6f2d4e3rxTKWzCV4eu5GMBXlSrBxRdC4%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.youtube.com%2Fchannel%2FUCwUGfe6zgaddIXqA7entIwQ&data=04%7C01%7CBrian.Moore%40ghd.com%7Ca4c97c28b6b24695618508d9d9ffcbe8%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637780514977497549%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=PV01WfKdC3c%2BDB8LAvL4TEVF1hLTqd320pG%2FH1y2s%2Fo%3D&reserved=0
EARTH TECH DRILLING
2703 NW 19TH STREET, POMPANO BEACH, FL 33069
954.974.2424 FAX:954.974.2423
Date: 1/17/2022
FAC ID#:
PROPOSED SCOPE OF WORK:
Unit Unit Rate Number of Units Extended Price
Equipment Type: DPT Track Rig
Direct Push Daily Rate 1 - on-site day whole day $1,575.00 2 $3,150.00
Direct Push Half-Day Rate 1 - on-site half day half day $0.00 Pre-Packed Well Screen (includes all materials) ID ___1"___ 5' Length Pack OD _______ each $0.00 Auger Attachment, 2" Well Install with 4.25" ID Augers per foot $0.00 Auger Attachment, 4" Well Install with 6.25" ID Augers each $0.00 Slotted PVC Well Screen (includes all materials) 5' Length Pack OD ___1"____ each $0.00 Well Riser (includes all materials) ID ___1"___ 5' Length each $0.00 Well Completion (includes 30 Min Dev. 8" B-D MH & locking well cap) per well $0.00
Mobilization daily roundtrip $425.00 2 $850.00 Per Diem per crew / per night $0.00 DOT Approved 55-gal Drum (As Needed) each $80.00 1 $80.00
Permits 2 (Drilling or abandonment only; cost according to WMD & Local Municipalities) each $110.00 0 $0.00
Permits 2 (Drilling or abandonment only; cost according to WMD & Local Municipalities) each $0.00 Water Sample each $65.00 12 $780.00
$0.00
TOTAL QUOTE PRICE $4,860.00
Notes:
Project No.: ___________________________
Date: 1/17/2022
Contractor Name: GHD - Brian Moore - 813 335-2147
Site Name : Garland Supply - 7800 W 25th Ave. Hialeah, FL
Signature and Title of Person Submitting Quote: Charles Bucher
Hand Clear ALL Locations to 5' or REFUSAL
Hand Clearing is will be time consuming and will take extra time - 2 days estimated for borings
(12) DPT Soil Borings to Water Table (<10' Estimated) then collect a water Sample using DPT Water Sampler - Backfill & Patch
1 Drum for water
Site is an open field
DIRECT PUSH TECHNOLOGY
MISCELLANEOUS
Days to Complete Scope of Work: 2 Days
Subcontract Company Name: EARTH TECH DRILLING. Inc.
Subcontract Mailing Address: 2703 NW 19th Street, Pompano Beach, FL 33069
ETD Policy: If pea gravel is encountered, borehole advancement is terminated. If client would like to continue borehole advancement, it is at the risk of the consultant, FDEP or property owner.
Monitoring Wells Sparge Wells Horizontal and Vertical Extraction Wells Geotechnical Drilling Direct Push
Sonic Auger DPT Injection Well Abandonment
DATE: 1/18/2022
ESTIMATE #: 122050
Project Description:
ID QTY Unit Rate TOTAL
1 1 ls 1,000.00$ 1,000.00$
2 2 night 200.00$ 400.00$
3 1 day 1,500.00$ 1,500.00$
3 1 1/2 day 1,100.00$ 1,100.00$
4 12 sample 12.00$ 144.00$
8 55 gallon drums (Soil) (As Needed) 0 each 65.00$ -$
9 55 gallon drums (Water) (As Needed) 0 each 65.00$ -$
Completion: Subtotal 4,144.00$
Todd Hodgson
TOTAL 4,144.00$
Partner
If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or Todd@drillprollc.com.
THANK YOU FOR YOUR BUSINESS!
Todd Hodgson
DPT Rig and Crew
"Actual quantities used and days on site will be invoiced"
1 to 1.5 Days depending on borehole clearing time
DESCRIPTION
Mobilization
Utility Locates on Private Property is the responsibility of the client Borehole Clearance to 5’ bgs beyond 20 minutes may require a change order for additional time and cost.
Per Diem (2 man crew)
Materials: GW Sampling Expendables
(813) 971-3882
(12) DPT Soil Boring to GWT ~8' bls w/GW Grab
DPT Rig and Crew
PROJECT
Garland Supply 7800 W. 25th Avenue
Damages to utilities on private property during borehole clearance are the responsibility of the client
5904 Hampton Oaks Pkwy Suite F
CUSTOMER
GHD
Brian Moore
Tampa, Florida 33610 Hialeah, Florida
DPT Water Sampling
2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Brian Moore
GHD
5904 Hampton Oaks Parkway – Suite F
Tampa, FL 33610
March 16, 2020
Re: IP Cleaners - Miami, FL
Mr. Moore:
The price for disposal of two (2) drums of non-hazardous groundwater located in Miami, FL will be $100.00 per drum, or $200.00 total, for both transportation and disposal.
Respectfully, Jonathan Erwin
Erwin Remediation, Inc.
Email: ErwinRemediation@Gmail.com
Office: (850) 292-6511 mailto:Remediation@Gmail.com
From: Jamie Infinger To: Brian Moore Subject: RE: IP Cleaners - Miami Date: Monday, March 16, 2020 8:39:32 AM Attachments: image001.png image002.png image003.png image004.png
$95.00 per drum plus $150.00 stop charge Have a great day
Thanks, Jamie Infinger A Nationwide Waste Disposal Company Clean Management Environmental Group, Inc.
P: (800)-538-8131 F: (843)-538-7845 C: (912)-674-6783 jinfinger@cleanmanagement.com www.cleanmanagement.com
From: Brian.Moore@ghd.com [mailto:Brian.Moore@ghd.com] Sent: Sunday, March 15, 2020 11:45 AM To: Jamie Infinger <jinfinger@cleanmanagement.com> Subject: IP Cleaners - Miami
Jamie, Can you provide quote for disposal of 2 drums of water from the above site. Low level solvents, assume non-haz thanks
Brian Moore, PE
GHD
Proudly employee owned T: 813 257 0658 | M: 813 335 2147 | E: Brian.Moore@ghd.com 5904 Hampton Oaks Parkway Suite F Tampa Florida 33610 USA | www.ghd.com
WATER | ENERGY & RESOURCES | ENVIRONMENT | PROPERTY & BUILDINGS | TRANSPORTATION
mailto:jinfinger@cleanmanagement.com mailto:Brian.Moore@ghd.com mailto:jinfinger@cleanmanagement.com http://www.cleanmanagement.com/ mailto:Brian.Moore@ghd.com http://www.ghd.com/ https://www.linkedin.com/company/ghd https://www.facebook.com/GHDGroup https://twitter.com/GHD_Namerica https://www.youtube.com/channel/UCwUGfe6zgaddIXqA7entIwQ https://www.ghd.com/en/sectors/water.aspx https://www.ghd.com/en/sectors/energy---resources.aspx https://www.ghd.com/en/sectors/environment.aspx https://www.ghd.com/en/sectors/property---buildings.aspx https://www.ghd.com/en/sectors/transportation.aspx
Please consider our environment before printing this email
CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.
This e-mail has been scanned for viruses
ID Task Mode
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Mon 1/17/22Fri 1/28/22
2 Subtask 1: Project Manageme64 days Mon 1/31/22Thu 4/28/22
3 Subtask 2: Soil and Groundwater Sampling
64 days Mon 1/31/22
Thu 4/28/22
4 Field Work Preparation (driller scheduling)
4 wks Mon 1/31/22
Fri 2/25/22
5 Utility Locate 1 wk Tue 3/1/22 Mon 3/7/22
6 Soil and Groundwater Samp2 days Tue 3/8/22 Wed 3/9/22
7 MAGS 1 day Wed 3/9/22 Wed 3/9/22
8 Summary Report Preparatio6 wks Fri 3/18/22 Thu 4/28/22
1/9 1/16 1/23 1/30 2/6 February
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC004A at the former Garland Supply site located in Hialeah, Miami-Dade County
Project: TA_004A Date: Mon 1/17/22
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Mon 1/17/22Fri 1/28/22
2 Subtask 1: Project Manageme64 days Mon 1/31/22Thu 4/28/22
3 Subtask 2: Soil and Groundwater Sampling
64 days Mon 1/31/22
Thu 4/28/22
4 Field Work Preparation (driller scheduling)
4 wks Mon 1/31/22
Fri 2/25/22
5 Utility Locate 1 wk Tue 3/1/22 Mon 3/7/22
6 Soil and Groundwater Samp2 days Tue 3/8/22 Wed 3/9/22
7 MAGS 1 day Wed 3/9/22 Wed 3/9/22
8 Summary Report Preparatio6 wks Fri 3/18/22 Thu 4/28/22
Jenna Martin
Jenna Martin
Thomas Cozzie
William McKinne
2/13 2/20 2/27 3/6 3/13 March
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC004A at the former Garland Supply site located in Hialeah, Miami-Dade County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Mon 1/17/22Fri 1/28/22
2 Subtask 1: Project Manageme64 days Mon 1/31/22Thu 4/28/22
3 Subtask 2: Soil and Groundwater Sampling
64 days Mon 1/31/22
Thu 4/28/22
4 Field Work Preparation (driller scheduling)
4 wks Mon 1/31/22
Fri 2/25/22
5 Utility Locate 1 wk Tue 3/1/22 Mon 3/7/22
6 Soil and Groundwater Samp2 days Tue 3/8/22 Wed 3/9/22
7 MAGS 1 day Wed 3/9/22 Wed 3/9/22
8 Summary Report Preparatio6 wks Fri 3/18/22 Thu 4/28/22 ey
3/20 3/27 4/3 4/10 4/17 April
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC004A at the former Garland Supply site located in Hialeah, Miami-Dade County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Mon 1/17/22Fri 1/28/22
2 Subtask 1: Project Manageme64 days Mon 1/31/22Thu 4/28/22
3 Subtask 2: Soil and Groundwater Sampling
64 days Mon 1/31/22
Thu 4/28/22
4 Field Work Preparation (driller scheduling)
4 wks Mon 1/31/22
Fri 2/25/22
5 Utility Locate 1 wk Tue 3/1/22 Mon 3/7/22
6 Soil and Groundwater Samp2 days Tue 3/8/22 Wed 3/9/22
7 MAGS 1 day Wed 3/9/22 Wed 3/9/22
8 Summary Report Preparatio6 wks Fri 3/18/22 Thu 4/28/22 Jeremy Hess,Jenna Martin,Peter McLean,Debra Andr
4/24 5/1 5/8 5/15 5/22 May
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC004A at the former Garland Supply site located in Hialeah, Miami-Dade County