This is a Task Assignment (TA) issued under Contract Number HW684 between the State of Florida Department of Environmental Protection (FDEP) and GHD Services, Inc., a consulting firm. The task assignment was entered into on January 10, 2023, with a completion date of June 16, 2023. The work is being conducted at the Former Applied Electronic Technologies property located at 257 S Lake Destiny Drive, Eatonville, Orange County, Florida (ERIC_9110). The services are being conducted using federal funds from the CERCLA Site Screening Program (CSS) cooperative agreement administered by FDEP on behalf of the EPA.
The task assignment comprises three subtasks: Subtask 1 (Project Management) at $1,087.39; Subtask 2 (Site-Specific Quality Assurance Project Plan) at $3,099.56; and Subtask 3 (Site Screening Activities) at $11,176.45, for a total TA value of $15,363.40 on a fixed unit rate basis. Deliverables include a site-specific QAPP due February 3, 2023, and field notes, subcontractor receipts, and waste manifests due March 30, 2023. Subtask 3 involves conducting five soil borings to approximately 15 feet below land surface, collecting soil samples at specified intervals for field screening and laboratory analysis (VOCs, PAHs, hexavalent chromium, RCRA metals, and PFAS), installing temporary monitoring wells, and preparing summary tables and figures. The work is scheduled from December 2022 through March 2023, with direct push drilling, utility locating, groundwater sampling, and IDW disposal subcontracted to specialized vendors.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW684
CSS01A Completion June 16, 2023
This Task Assignment (TA) is issued in accordance with the Cost Proposal (CP) submitted by GHD Services, Inc (GHD) on January 3, 2023. This TA includes Project Management, a Site Specific Quality Assurance Plan, and Site Screening Activities. The final deliverable is field notes, subcontractor receipts, and waste maninfests.
Andrew Smith 850-245-8935 Consultant Consultant
Consultant Consultant
Consultant Consultant
Consultant
GHD Services, Inc
GHD Services, Inc
Brian Moore 8139713882
ERIC_9110
257 S Lake Destiny Dr, Orlando, FL
Former Applied Electronic Technologies
✔ $ 15,363.40
$ 15,363.40
Scope of Work
Brian Moore
Vice President
Brian Moore Digitally signed by Brian Moore Date: 2023.01.10 10:00:49 -05'00'
Kelly Crain
Kelly Crain Digitally signed by Kelly Crain Date: 2023.01.09 14:05:52 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
QAPP
02/03/2023
Project Management & Site Screening Activities 03/30/2023
FDEP approval of site specific QAPP (subtask 2) $ 3,099.56
FDEP approval of Field notes, subcontractor receipts, waste manifest/ Project Management. (Subtask 1 and 3) $ 12,263.84
$ 15,363.40
HW684
CSS01A
www.FloridaDEP.gov
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: GHD Services, Inc., HW684 Contract File
FROM: Andrew Smith, Contract Manager
DATE: January 5, 2023
SUBJECT: Negotiation Summary – CER21, TA CSS01A
Site Investigation (SI) Activities Applied Electronic Technology
ERIC_9118
This Task Assignment (TA) is intended for conducting Site Investigation activities at the Former Applied Electronic Technology property. The services are being conducted using federal funds from the CERCLA Site Screening Program (CSS) cooperative agreement that is administered by DEP on behalf of EPA.
Subtask 1 Project Management This subtask is a percentage of the overall project and has been negotiated as a contract rate. It includes project management, overhead, general and administrative, and fringe costs. The cost of this subtask is $1087.39.
Subtask 2: Site Specific QAPP In accordance with an EPA directive, this subtask includes the completion of a Work Plan/Quality Assurance Project Plan (QAPP). The QAPP will include details regarding the site background, objectives of the site screening, a sampling plan detailing locations and rationale for testing, laboratory analytical methods, field methods to be utilized, and the approach to data validation and use. The QAPP will be submitted to the Department for review prior to initiating field activities. The agreed upon cost of this subtask is $3099.56.
Subtask 3: Site Screening In accordance with an EPA directive, this subtask includes the completion of site screening activities. GHD will advance a series of borings to determine lithology, collect soil samples, and install temporary monitor wells. At this time, a total of five (5) borings are proposed. The borings will be advanced with a direct-push (DP) drill rig or a hand auger. Each boring will be advanced and soil samples collected at one foot intervals to the water table for field screening with an organic vapor analyzer (OVA). At each location, soil samples will be gathered from depths of land surface to 2 feet below land surface (bls) and 2-4 feet bls for confirmation laboratory analysis.
The samples will be submitted to the FDEP analytical laboratory in Tallahassee for analysis. The samples will be analyzed for the presence of volatile organics (VOCs) by EPA Method 8260, polycyclic aromatic hydrocarbons (PAHs) by EPA Method 8270-SIM, hexavalent chromium by http://www.floridadep.gov/ www.FloridaDEP.gov
Negotiation Summary – Task Assignment (TA) CSS01A Applied Electronic Technology
ERIC_9118
Orange County SI Activities January 5, 2023
Method 7195, the 8 RCRA metals by Method 6010/6020/7470, and PFAS by EPA Method 537 (or equivalent).
Each soil boring will be advanced into the underlying groundwater following soils sampling. The borings will be advanced to approximately 15 feet bls (using the DP equipment) or as deep as possible using a hand auger. Upon completion of the borings, temporary monitor wells will be installed. The temporary wells will be constructed with 5 or 10 foot lengths of 0.010-slot PVC slotted well screens and casing blank. The screen intervals will be installed to straddle the water table (estimated at 5 feet bls). The agreed upon cost of this subtask is $11,176.45.
Summary DEP’s CSS Project Manager and WSP’s Project Manager have both agreed to the scope of work and associated costs. The final cost associated with this TA is $15,363.40. Documentation of these costs is included in the Level of Effort/Cost Proposal (LOE-CP) Form and LOE-CP letter provided by GHD on January 3, 2023, as well as the Task Assignment Form for CSS-01A prepared by DEP. The final deliverable must be received by FDEP no later than March 30, 2023.
COST PROPOSAL FOR TASK CS001A
<Applied Electronic Technologies Site/FDEP ERIC_9110>
< Site Screening >
1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >
GHD Services Inc. (GHD) is pleased to submit this proposal for site screening activities at the referenced site located in Eatonville, Orange County. We understand that a site screening has been recommended for the referenced site based on previous observations and past site uses.
A detail of our proposed scope of work is included below.
Subtask 1: Project Management Subtask 1 includes all tasks associated with project management of the site screening activities for the Applied Electronic Technologies Site.
Subtask 2: Site-Specific Quality Assurance Project Plan The initial step in the site screening process will be the development of a site-specific quality assurance project plan (QAPP). The QAPP will include details regarding the site background, objectives of the site screening, a sampling plan detailing locations and rationale for testing, laboratory analytical methods, field methods to be utilized, and the approach to data validation and use. The QAPP will be submitted to the Department for review prior to initiating field activities.
Subtask 3: Site Screening In accordance with our teleconference and the agreed upon scope of work, GHD will advance a series of borings to determine lithology, collect soil samples, and install temporary monitor wells. At this time, a total of five (5) borings are proposed. The borings will be advanced with a direct-push (DP) drill rig or a hand auger. Each boring will be advanced and soil samples collected at one foot intervals to the water table for field screening with an organic vapor analyzer (OVA). At each location, soil samples will be gathered from depths of land surface to 2 feet below land surface (bls) and 2-4 feet bls for confirmation laboratory analysis. The samples will be submitted to the FDEP analytical laboratory in Tallahassee for analysis. The samples will be analyzed for the presence of volatile organics (VOCs) by EPA Method 8260, polycyclic aromatic hydrocarbons (PAHs) by EPA Method 8270-SIM, hexavalent chromium by Method 7195, the 8 RCRA metals by Method 6010/6020/7470, and PFAS by EPA Method 537 (or equivalent).
Each soil boring will be advanced into the underlying groundwater following soils sampling.
The borings will be advanced to approximately 15 feet bls (using the DP equipment) or as deep as possible using a hand auger. Upon completion of the borings, temporary monitor wells will be installed. The temporary wells will be constructed with 5 or 10 foot lengths of 0.010-slot PVC slotted well screens and casing blank. The screen intervals will be installed to straddle the water table (estimated at 5 feet bls).
Following installation, the temporary wells will be sampled in general accordance with FDEP Standard Operating Procedures. The groundwater samples will be submitted to the FDEP laboratory in Tallahassee for analysis for the presence of VOCs by EPA Method 8260, PAHs by EPA Method 8270 SIM, hexavalent chromium by Method 7195, the 8 RCRA metals by Method 6010/6020/7470, and PFAS by EPA Method 537 (or equivalent). Following sampling, each of the temporary wells will be removed and the boreholes abandoned with neat cement grout.
Following receipt of analytical data, GHD will prepare summary tables and figures presenting a summary of the field and laboratory analytical results. The summary tables and figures will be provided to the FDEP along with all field notes and laboratory analytical repots.
Deliverables:
Deliverable Deliverable Due Date
Site-specific QAPP 2/3/23
Field notes, subcontractor receipts, waste manifest 3/30/23
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 01/09/23
Task #: CS001A SubTask 1 Project Management SubTask 6
Site: Applied Electronic Techn SubTask 2 QAPP SubTask 7
Activity/Phase: Site Screening SubTask 3 Site Screening SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$44.81 Project Manager JM 8.20 8.2 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$51.08 Sr Professional Engineer JH 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$43.28 Professional Engineer/Sc GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $40.11 Project Engineer/Scientis TC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $44.81 Project Manager/ Engine JM 33.00 20.00 13.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $35.16 Staff Engineer/Scientist DB 19.00 0.00 19.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.40 Data Analyst JL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $43.35 Field Manager OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.53 Senior Technician SA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.35 Senior Technician SC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.89 Senior Technician WM 11.00 0.00 11.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.25 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.00 Junior Technician JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.69 Drafting Technician PM 7.00 2.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.16 Administrative Assistant DA 7.00 2.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Driller 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 HSEQ&R Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 86.20 8.20 25.00 53.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $3,211.00 $369.41 $1,052.98 $1,788.61 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 129.80% $4,167.88 $479.49 $1,366.77 $2,321.62 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% $1,213.76 $139.64 $398.03 $676.09 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $8,592.64 $988.54 $2,817.78 $4,786.32 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $240.00 $0.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 01/09/23
Task #: CS001A SubTask 1 Project Management SubTask 6
Site: Applied Electronic Techn SubTask 2 QAPP SubTask 7
Activity/Phase: Site Screening SubTask 3 Site Screening SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $240.00 $0.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $3,350.00 $0.00 $3,350.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $220.00 $0.00 $220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Blood Hound $905.00 $0.00 $905.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $4,475.00 $0.00 $4,475.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $447.50 $0.00 $447.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $4,922.50 $0.00 $4,922.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $6.50 $0.00 $6.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $6.50 $0.00 $6.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $0.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $562.50 $0.00 $562.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $0.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $742.50 $0.00 $742.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $14,504.14 $988.54 $2,817.78 $10,697.82 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $859.26 $98.85 $281.78 $478.63 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $15,363.40 $1,087.39 $3,099.56 $11,176.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Applied Electronic Technologies
SUBTASK 2: QAPP
DATE: 01/05/23
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr. Professional Engineer JH Finalize QAPP 1
Project Manager JM Prepare QAPP 4 Project Manager JM Overview and Study objectives 4 Project Manager JM Data Generation and quality/handling 4 Project Manager JM Field Work 4 Project Manager JM Data Validation 4
Drafting Technician PM Prepare figures for QAPP 2
Administrative Assistant DA Finalize QAPP 2
TOTAL LABOR 25
VEHICLE TYPE RATE UNIT USEAGE
$0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
$0.00 $0.00 $0.00 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables
$0.00 $0.00
Equipment (Analytical Related)
$0.00 $0.00
Equipment (Other) $0.00
TOTAL EQUIPMENT $0.00
FINAL --7/24/96
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Applied Electronic Technologies SUBTASK 3: Site Screening
DATE: 01/05/23
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager JM Site Access 1 Project Manager JM Prepare HASP 3 Project Manager JM Prepare field scope of work 2 Project Manager JM Characterize IDW 1 Project Manager JM Laboratory Data Validation 2 Project Manager JM Prepare Data Summary Package 4
Staff Engineer/Scientist DB Mob/demob (2 days) 3 Staff Engineer/Scientist DB Oversee DP borings and temp well installation 8 Staff Engineer/Scientist DB Sample temp wells and abandon 8
Sr Technician WM Mob/demob (1 day) 4 Sr Technician WM Conduct shallow soil sampling (5 locations) 6 Sr Technician WM Prepare site plan 1
Drafting Technician PM Site Plan with sample Locations 1 Drafting Technician PM Prepare soil data figure 2 Drafting Technician PM Prepare groundwater data figure 2
Administrative Assistant DA Data entry and prepare summary tables (soil and groundwater) 5
TOTAL LABOR 53
VEHICLE TYPE RATE UNIT USEAGE
Company Truck $120.00 day 2 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
JAEE Environmental Mobilization $500.00 each 1 $500.00 JAEE Environmental Daily Rate $1,700.00 day 1 $1,700.00 JAEE Environmental Drum $75.00 each 2 $150.00 JAEE Environmental Temp Well $200.00 each 5 $1,000.00 Blood Hound Locate Service $220.00 hr 4 $880.00 Blood Hound Fuel Surcharge $25.00 each 1 $25.00 Erwin Remediation IDW Disposal $110.00 drum 2 $220.00
TOTAL $4,475.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Ice $6.50 1 $6.50
TOTAL LAB $6.50
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables
Expendables $40.00 day 2 $80.00
Equipment (Analytical Related)
Soil Sampling Ket (through concrete) $235.00 day 1 $235.00 Shallow GW Sampling Kit $290.00 day 1 $290.00 Poly Tubing $0.30 ft 75 $22.50 Silicon Tubing $3.00 ft 5 $15.00
Equipment (IDW Related)
Drum $100.00 each 1 $100.00
TOTAL EQUIPMENT $742.50
FINAL --7/24/96
Sonic Auger DPT Injection Well Abandonment
DATE: 12/1/2022
ESTIMATE #: 1222001
Project Description:
ID QTY Unit Rate TOTAL
1 1 each 500.00$ 500.00$
2 0 night 250.00$ -$
3 1 day 1,650.00$ 1,650.00$
4 1 1/2 day 800.00$ 800.00$
5 Materials: 1" PVC Well Installation 100 foot 4.00$ 400.00$
6 Materials: (2) 1" x 5' PVC .010 Slot Prepack Screen, 3" Exp Point 5 each 175.00$ 875.00$
7 Materials: Grout and Abandon After Client Sampling, Concrete Patch 5 each 25.00$ 125.00$
8 Well Development (up to 1/2 hour w/Pump) 5 each 75.00$ Included
9 55 gallon drums (Soil) (Estimated) 1 each 65.00$ 65.00$
10 55 gallon drums (Water) (Estimated) 1 each 65.00$ 65.00$
11 Permits (Orange County-N/A if Pulled within 30 days of Installation) each 44.00$ -$
Completion: Subtotal 4,480.00$
Todd Hodgson
TOTAL 4,480.00$
Partner
Eatonville, Orange County, Florida
DPT Well Installation
Pull After Client Sampling
PROJECT
Site Investigation 257 Lake Destiny Drive
Tampa, Florida 33610
(813) 971-3882
(5) 1" x 20' PVC Temp MW w/10' of .010 Prepack Screen, No Completion, DPT Sampling
5904 Hampton Oaks Pkwy Suite F
CUSTOMER
GHD
Brian Moore
If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or Todd@drillprollc.com.
Note: It is Groundwater Protection policy that if 'Pea Gravel' is encountered, ANY type of boring/drilling will be terminated immediately and the boring location will need to be relocated to a clear location by the client.
THANK YOU FOR YOUR BUSINESS!
Todd Hodgson
DPT Rig and Crew
"Actual quantities used and days on site will be invoiced"
1 to 1.5 days with Abandonment after Client Sampling
DESCRIPTION
Mobilization/Demobilization
Utility Locates on Private Property is the responsibility of the client Borehole Clearance to 5’ bgs beyond 20 minutes may require a change order for additional time and cost.
Per Diem (2 man crew)
DPT Rig and Crew (If Needed)
Damages to utilities on private property during borehole clearance are the responsibility of the client
2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586
Preferred Drilling Solutions, Inc.
8820 66th St. North, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
DIRECT PUSH TECHNOLOGY QUOTE FORM
Date: 12/2/22 FAC ID#:
Unit Unit Rate Number of Units Extended Price whole day $1,775.00 1 1,775.00$ half day $1,375.00 -$ per foot $20.00 -$ each $95.00 -$ each $45.00 10 450.00$ each $25.00 10 250.00$ per well $125.00 -$ roundtrip $650.00 1 650.00$ per crew / per night $450.00 -$ each $70.00 6 420.00$ per day $150.00 1 150.00$ each -$
TOTAL QUOTE PRICE $3,695.00
Notes: 1. Includes saw cuts, development, standby time, and decon.
Project No.:
Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477
Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782
Signature and Title of Person Submitting Quote: ___________________________________Kevin Bonacum, Estimator Date: 12/2/22
Days to Complete Scope of Work: 1
Direct Push Daily Rate 1 - on-site day
Equipment Type: Geoprobe 8040DT, Geoprobe 3230DT, Geoprobe 7822DT
*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner
Other (specify)
Other (specify)
Other (specify)
GeoProbe Consumables (includes tubing, points, liners, concrete patch, asphalt patch, and grouting)
DOT Approved 55-gal Drum
Per Diem Mobilization
DIRECT PUSH TECHNOLOGY
MISCELLANEOUS
Permits
Site Name and Location: 257 Lake Destiny Dr, Eatonville, Orange County, FL
Consultant Name: GHD
PROPOSED SCOPE OF WORK:
(1) Day of DPT borings
(5) DPT borings to approx. 20', convert to temp MW's
Well Completion (includes MH w/ cover, concrete pad, and locking well cap)
Well Riser (includes all materials) ID 1" 5' Length
Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5"
Pre-Packed Well Screen (includes all materials) ID 1" 5' Length Pack OD 3.5"
Auger Attachment, 2" Well Install
Direct Push Half-Day Rate 1 - on-site half day
(5) 1" x 20' temp MW's with 10' .010 screen, remove after sampling, drum soil & water, grout and restore grade
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Brian Moore
GHD
5904 Hampton Oaks Parkway – Suite F
Tampa, FL 33610
May 23, 2022
Re: Transportation and Disposal of Non-Hazardous Soil and Water – Florida
Mr. Moore:
The price for disposal of drums of non-hazardous soil or groundwater located in the State of Florida will be $110.00 per drum, for both transportation and disposal.
This pricing is valid for all regions in the State of Florida except for the Florida Keys.
Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.
This quote is valid for 180 days.
Respectfully, Jonathan Erwin
Erwin Remediation, Inc.
Email: ErwinRemediation@Gmail.com
Office: (850) 292-6511 mailto:Remediation@Gmail.com
6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 1/2
Quote Number: 19644
QUOTE
QUOTED TO: Brian Moore
QUOTE DATE: 1/1/2022
COMPANY NAME: GHD - 2022 QUOTED BY: Craig Burns
PHONE NUMBER:
Ext.
FAX NUMBER:
PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS
CUSTOMER PO:
CONTACT EMAIL:
SITE ADDRESS: TBD
CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING
COST ESTIMATE FOR
THE SITE/ PROJECT LISTED ABOVE.
DESCRIPTION PRICE QTY. UNIT TOTAL
NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00
NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00
TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$30.00 DRUM $0.00
TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$40.00 DRUM $0.00
TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site
$50.00 DRUM $0.00
Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax
$0.00 . $0.00
HAZ Drums to be quoted case-by-case $0.00 . $0.00
OPTIONAL LINE ITEMS
***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00
TOTAL REQUIRED ITEMS $0.00
TOTAL OPTIONAL ITEMS $0.00
GRAND TOTAL $0.00
NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.
**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns
863.327.6289 - cburns@clarkenv.com
This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.
quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 2/2
Name (print) Title
Signature Date
CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854
WWW.ClarkEnvironmental.com
From: Craig Burns To: Brian Moore Subject: GHD_IDW Drum Rates FL Date: Tuesday, June 28, 2022 10:26:46 AM Attachments: image001.png image002.png image003.png image004.png image005.png GHD Drum Rates FL 2022.pdf
Here you go Brian. I do this for a lot of engineering/consulting firms.
Be aware of the low stop less than 6 drums at $50/flat Be aware of the 10% to the total cost for FSC (implemented April 15).
Pass around the GHD Florida offices
From: Brian Moore <Brian.Moore@ghd.com> Sent: Tuesday, June 28, 2022 10:05 AM To: Craig Burns <cburns@clarkenvironmental.com> Subject: IDW Drums
Craig, Is it possible to provide a generic quote for IDW water disposal.
Assumption is non-haz with necessary analytical Maybe provide a range of locations
South florida or central florida, or both?
Thanks in advance
We have many sites that we generate 1 gw drum of IDW and would like to streamline the vendor coordination
BRIAN MOORE PE
Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com
The Power of Commitment
Connect
Please consider our environment before printing this email
CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please mailto:cburns@clarkenvironmental.com mailto:Brian.Moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttp-253A-252F-252Fwww.ghd.com-252F-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093857306-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3DorO8Q-252BVqTyo6Ej-252F8ZwSbVyQzLpZtJywYELQonaQNZfo-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3DsMxOUn-szAtJTATQBUgjjDdI6e6b1jo5alN-ez9vKSM%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=K3MyGMhP6XEk1ApT%2FRIPjGR%2BUFJFG9ahCVCi8Z9R1n0%3D&reserved=0 mailto:brian.moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttps-253A-252F-252Fwww.linkedin.com-252Fcompany-252Fghd-252F-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093857306-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3D5HB99sCNyHUdh3ySqo-252BMbX9lHf94JW-252BuI1gRPH6qLGY-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3DBQdX3FW3jjZZNHH7wbXXUS30LUnS3GtU1HJ8G56Snwo%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=%2BQlcPM%2FGtFT%2FrIbbuGi0PnSgurtBD8yqWgV1hvkvk00%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttps-253A-252F-252Fwww.facebook.com-252FGHDGroup-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093867263-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3DKXDgOYLYSf-252BwLLtpvQNMpyPzR3DV5-252FDBogAW3HWif9Y-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3DdHZdva6F1f6cSXNf7WLXU9x5VBxbTV01G78hKDk-cSA%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=142JKLTMfwfz%2FAO%2FXHrz%2FUodXSRzYWWBygfbg7vBIWs%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttps-253A-252F-252Ftwitter.com-252FGHDspeaks-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093877221-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3Duwh4lLmvdNCQkyPoUgiL7r2l9-252BmFgEv2JbZPLM3ptM0-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3D6FLD5pJDe4zG94aUPcPkIB9mx5JTMUxrAOX-fjV9l3o%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=O7BUsLKToxyyPXzZcLcBA1z3Q7%2FKvVsiCNGMGHOzln0%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttps-253A-252F-252Fwww.youtube.com-252Fchannel-252FUCwUGfe6zgaddIXqA7entIwQ-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093877221-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3DVTPo9BdB-252FyUkff7ZLoE6J99Jt9f-252Fvtuta-252Fsm1KEOuNc-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3D9S3nI6ai6gtzPu1y34Kb_OuqwixCpq0TgIkmYlOz0gk%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=YX45%2BiFGXo7axCd4VDmEIFdcmHajQE6n8KvktA7llOs%3D&reserved=0 quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 1/2
Quote Number: 19644
QUOTE
QUOTED TO: Brian Moore
QUOTE DATE: 1/1/2022
COMPANY NAME: GHD - 2022 QUOTED BY: Craig Burns
PHONE NUMBER:
Ext.
FAX NUMBER:
PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS
CUSTOMER PO:
CONTACT EMAIL:
SITE ADDRESS: TBD
CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING
COST ESTIMATE FOR
THE SITE/ PROJECT LISTED ABOVE.
DESCRIPTION PRICE QTY. UNIT TOTAL
NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00
NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00
TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$30.00 DRUM $0.00
TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$40.00 DRUM $0.00
TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site
$50.00 DRUM $0.00
Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax
$0.00 . $0.00
HAZ Drums to be quoted case-by-case $0.00 . $0.00
OPTIONAL LINE ITEMS
***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00
TOTAL REQUIRED ITEMS $0.00
TOTAL OPTIONAL ITEMS $0.00
GRAND TOTAL $0.00
NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.
**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns
863.327.6289 - cburns@clarkenv.com
This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.
quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 2/2
Name (print) Title
Signature Date
CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854
WWW.ClarkEnvironmental.com delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.
Whatever Waste, LLC 3834 Mandarin Woods Dr. No.
Jacksonville, Florida 32223 United States 904.881.1957
Brian Moore PE
GHD
5904 Hampton Road Parkway Suite F Tampa, FL 33610
Estimate Number 062922.1
Notes Dry Cleaner Site Locations: Central and South Florida Regions excluding Florida Keys Required analytical data for non-haz disposal acceptance would be VOCs and includes waste profiling assistance if the IDW-GW drums don't fall under a blanket waste profile DOT shippable drums must be on a hard surface at each accessible location
Terms Non-hazardous IDW drum pickup, transport and disposal pricing is based on per service event No-load drum fee if unable to pickup drums on any site in Central FL is $150; in South FL is $200 Pricing is valid or subject to change on a monthly basis in part due to escalating fuel prices Payment required within 45 days after email receipt of invoice
Indemnification: Each party agrees to indemnify, defend and hold harmless each other for and from any loss
Estimate Date 06/29/2022
Description Rate Qty Line Total
IDW-GW Drum Transport & Disposal - Central FL Sites
(1) Regional Stop Fee $600 - then $150 per 55-gal drum < 10 drums
$150.00 1 $150.00
IDW-GW Drum Transport & Disposal - Central FL Sites
(1) Regional Stop Fee $300 - then $150 per 55-gal drum > 10 drums
$150.00 1 $150.00
IDW-GW Drum Transport & Disposal - South FL Sites
(1) Regional Stop Fee $850 - then $200 per 55-gal drum < 10 drums
$200.00 1 $200.00
IDW-GW Drum Transport & Disposal - South FL Sites
(1) Regional Stop Fee $425 - then $200 per 55-gal drum > 10 drums
$200.00 1 $200.00
Subtotal
Tax
700.00
0.00
Estimate Total (USD) $700.00 or liability arising out of the party's breach of this agreement, scope of work, except for gross negligence, willful misconduct or bad faith.
78454Estimate Number
3/19/2023Expiration Date
12/19/2022Created Date
ESTIMATE
Blood Hound 6500 Technology Center Dr.
Suite 200 Indianapolis, IN 46278
Email: BHI@bhug.com bhug.com Website:
Phone #: 888-858-9830 888-858-9829 Fax #:
Customer has requested an estimate for the following scope of work:
The following work is being performed to Quality Level B standards in accordance with CI/ASCE 38-02.
Client has requested an estimate to horizontally locate private detectable underground utilities and investigate the presence of an underground vault underneath the building located at the provided address and as directed on site.
A print or image was not provided to review to assist with the estimate. Therefor, pre-marking or a meet on site will be required to confirm the locate area and assist with access.
Based on limited information, an estimate for four (4) hours on site is being provided. Client will only be invoiced for time needed to complete the stated SOW with a two-hour minimum. Customer is advised if less time onsite is required than estimated, invoicing will be reduced to no less than the minimum fee.
Any additional time required on site to complete the task beyond the estimated / minimum time will be invoiced in 15-minute increments @ $55 per increment, upon customer approval.
EM and Real-Time GPR Locating equipment will both be utilized to locate and mark any detectable underground utilities and / or anomalies. A not to scale digital field sketch and photos will be provided of our discoveries for surveying and documentation purposes.
Customer has requested approximate depths to be noted on site sketch. Please note that all depths are approximate and can only be verified using vacuum excavation.
Customer is always responsible to call 811 for locates of any public utilities.
Customer is advised that Blood Hound utilizes water-based paint and flags to identify any discoveries onsite. If this is an issue, Blood Hound must be made aware of this when scheduling.
Estimated time onsite does not include time for any site-specific training, escorting or ingress / egress time which if required, shall be an additional billable charge up to and including exceeding the estimate.
All findings will be marked according to APWA standard.
Estimate does not include any Hand Held GPR or surveying services.
The performance of BHUG’s services is limited to full and unobstructed access to include but not limited to: mechanical rooms, manholes, hand holes, vaults, meter rooms, telecom rooms, fixtures (plumbing, electrical, communication), dispensers, fenced compounds, tanks and structures. Full
BHUG SOW
$905.00Grand Total brian.moore@ghd.comEmail
(813) 971-3882Phone
Brian MooreName
257 Lake Destiny Drive, Orlando, FL, 32810Job Site Location
5904 Hampton Oaks Pkwy., Suite F Tampa, FL 33610
US
Billing Address
(813) 971-3882Billing Phone
GHD Services, Inc.Customer
Product Invoice Description Quantity Sales Price Total Price
Advantage Locate (hourly) Advantage Locate (hourly rate) 4.00 $220.00 $880.00
Fuel Surcharge Fuel Surcharge 1.00 $25.00 $25.00
Scope of Work
12/19/2022Created Date
ESTIMATE
Blood Hound 6500 Technology Center Dr.
Payment is due at the time of service, unless you already have an account with us. If you do have an account with us, payment terms are Net 30 days, unless otherwise stated in a pre-approved contract. To learn more, please call the office at 888-858-9830.
PRICE MAY VARY BASED ON ACTUAL TIME ON SITE. The above pricing is based only on the information supplied by the customer.
If a site walk through has not been conducted, this may affect the price.
Blood Hound will use electromagnetic (EM) and ground-penetrating-radar (GPR) equipment to locate private underground utilities at site indicated by client. All findings will be marked according to APWA standard. Customer is responsible for calling 811 for locates of any public utilities. If the scope of work should change or is different than that listed on estimate, please call our office for a revised estimate.
Unless expressly noted, Vacuum Excavation estimates do not include any of the following services: Permitting, Traffic Control, Restoration, Special Restoration, Special Backfill or Waste Disposal. If you need any of those services please call our office for a revised estimate.
Blood Hound is not responsible for the condition of the pipes or structures before or after jetting/clearing service is performed. Unsatisfactory conditions could be present within the structure and any services may bring those deficiencies to light.
In the event of inclement weather, if the client still requests for crew to arrive on site, then the client will be responsible for minimum charges even if no work is performed.
cooperation from the on-site personnel is necessary to perform a complete scan. Should access not be provided or it is delayed, this could impact time to safely complete and accuracy of work.
Results are dependent upon field conditions at the time of locating services. It may be necessary to have parked vehicles or machinery moved to allow for a full scan and to access structures.
*BHUG will attempt to locate Public utilities to the best of our ability , with thewhen requested information provided. However, not having access to utility records, plans or maps may be cause for some utilities to be unaccounted for, therefor it is always the customer responsibility to call 811 and dig responsibly. Any available as-builts, engineered or other record drawings, if available, should be supplied to BHUG an estimate and commencement of any field work.prior to providing If the Scope of Work should change, or is different than listed on estimate, please call our office for a revised estimate.
Estimate DOES NOT include the use of Robotic or Push/Pull Cameras for assistance in locating Sewer Lines or Laterals. These lines would attempt to be marked by EM / Rodder if possible or GPR. If lines are not able to be completely located, Blood Hound will arrow the direction of each line leaving a manhole.
CUSTOMER IS ADVISED THAT LIMITATIONS EXIST IN LOCATING PLASTIC MATERIALS
WITHOUT TRACEABLE WIRES ATTACHED.
The scheduling of the work must go through the Blood Hound Call Center. Upon acceptance of this estimate please sign and return via email a signed copy of the estimate. Then, you must call 1-888-858-9830 select option one (1) for scheduling and reference your estimate number to schedule your work request.
•If PO# is not available during the estimating phase please provide the PO# prior to scheduling this work.
Payment terms must be arranged prior to scheduling any work with Blood Hound. Services can be paid for via credit card or granting of payment terms with invoicing however the Credit Application must be completed and on file to grant payment terms. Blood Hound does not accept checks or cash as payment on site.
•Please refer all COI requests, Change Orders, PO Numbers, Prequalification Forms, Sub Consultant Agreements or MSA’s to BHUGContracts@bhug.com
Quoted rates are exclusive to this estimate only. Rates quoted by Call Center Representatives are in effect unless otherwise stipulated within a formal estimate.
Please note estimate is valid for 90 days from the quote created date.
12/19/2022Created Date
ESTIMATE
Blood Hound 6500 Technology Center Dr.
By signing this Estimate the client acknowledges that they accept the scope of work listed on the estimate, as well as the service rates provided and are providing Blood Hound with a Notice To Proceed (NTP) for the listed Project. If the scope of work should change while the work is in progress, any changes will be documented on the technician’s field notes and signed off on by the client. Signing this estimate also acknowledges that the client agrees to the terms and conditions as they relate to payment for services rendered.
Signature: ______________________________________________________________________________________
Printed Name: ___________________________________________________________________________________
Date Signed: ____________________________________________________________________________________
If this is a prevailing wage job, please contact our office for a revised quote as this pricing does not reflect prevailing wage rates. If at some later date a project is determined to be a prevailing wage job, then any extra expense incurred by Blood Hound will be billed to the client.
The project estimate outlined in this specific proposal is valid for 90 days from the date of the proposal. Blood Hound reserves the right to review and adjust this estimate if client does not approve of the proposal within 90 days.
Please send all POs / Contracts to .BHUGContracts@bhug.com
We look forward to working with you.
From: GPRS Customer Service
Subject: Re:Fwd: A New Request A Quote Lead Is Available Date: Monday, December 19, 2022 3:32:13 PM Attachments: 1671481915558000_1354599784.png
1671481915581002_1064616381.png 1671481915601000_700412730.png 1671481915621000_1354599784.png 1671481915643035_1064616381.png
You don't often get email from floridainfo@gprsinc.com. Learn why this is important
This scope of work falls in our $1,950 rate is you approve this rate I can get you on our schedule.
Is there a specific day you are wanting?
Laura Perez Project Coordinator Customer Service Department | GPRS
419-767-2437 www.gprsinc.com
---- on Mon, 19 Dec 2022 14:47:04 -0500 "Brian Moore"<brian.moore@ghd.com> wrote ----
Over slab
Proudly employee owned | ghd.com mailto:floridainfo@gprsinc.com mailto:Brian.Moore@ghd.com https://aka.ms/LearnAboutSenderIdentification https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2FGPRSLLC%2F&data=05%7C01%7Cbrian.moore%40ghd.com%7C9b00d1293e7b4f6a57fd08dae200158d%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638070787327482510%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=N5o5uOuC3UIR6jUDcg%2FHWCkDQFX46E9p1Dxctz6Nwks%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fgprs%2F&data=05%7C01%7Cbrian.moore%40ghd.com%7C9b00d1293e7b4f6a57fd08dae200158d%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638070787327482510%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=NiOqq3RoIgWT4hTDLj%2BXFicjLsJHuDbDMSfRbTDwLus%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.gprsinc.com%2F&data=05%7C01%7Cbrian.moore%40ghd.com%7C9b00d1293e7b4f6a57fd08dae200158d%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638070787327482510%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=y7MvNm3NKRhPk7mBmfQWBw1JIjubLLEn9NkTzIIiJ4w%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.ghd.com%2F&data=05%7C01%7Cbrian.moore%40ghd.com%7C9b00d1293e7b4f6a57fd08dae200158d%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638070787327482510%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=LZGRZK2AZ%2B4udkGGjJyl0MNMRCpoD2y5GJUTViBJNS0%3D&reserved=0 mailto:brian.moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.linkedin.com%2Fcompany%2Fghd%2F&data=05%7C01%7Cbrian.moore%40ghd.com%7C9b00d1293e7b4f6a57fd08dae200158d%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638070787327482510%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=SBV8LnwFb1VhaRRlpF90MXhm9mCUwJCgkSYCmAtpq24%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.facebook.com%2FGHDGroup&data=05%7C01%7Cbrian.moore%40ghd.com%7C9b00d1293e7b4f6a57fd08dae200158d%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638070787327482510%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=EJCrjmwrTIUUgpQ7WlF4v%2FyNWP8IeOHlD61qWec1mBM%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Ftwitter.com%2FGHDspeaks&data=05%7C01%7Cbrian.moore%40ghd.com%7C9b00d1293e7b4f6a57fd08dae200158d%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C638070787327482510%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=lc6dk2SAdSd7WbHA393srX13UaSrLT7JN%2FuwXHFbmJc%3D&reserved=0…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .