This Task Assignment (TA DC006C) is a contract entered into between the State of Florida Department of Environmental Protection (FDEP) and GHD Services, Inc., with a completion date of March 13, 2025. The contract is issued under the parent contract HW684 and authorizes GHD to conduct groundwater monitoring and Per- and Polyfluoroalkyl Substances (PFAS) analysis at the Dryclean USA #11204 facility located at 2861 Stirling Road in Broward County, Florida. Benjamin Grubbs serves as the FDEP project manager, while Brian Moore represents GHD Services, Inc. as the contractor's project manager.
The task assignment encompasses three subtasks with a total value of $10,031.80 on a fixed unit rate basis. Subtask 1 includes project management activities associated with annual groundwater sampling, analysis, and reporting. Subtask 2 involves annual groundwater sampling and analysis at seven wells (MW001, MW003, MW006, MW009, IW001, IW002, and IW003) with volatile organic halcarbon analysis, and includes preparation of a groundwater monitoring report due January 13, 2025, valued at $7,248.17. Subtask 3 requires PFAS sampling at all 13 site monitoring wells with submission to the FDEP laboratory, also due January 13, 2025, valued at $2,783.63. The cost estimate reflects 67.08 labor hours with overhead and fringe benefits factored at 129.80% and 37.80% respectively. Direct costs include $360 for vehicle rental, $137.50 for subcontractor services (IDW drum disposal), $897 for laboratory analysis, and $1,248.10 for field expenses. All deliverables, including field notes and PFAS data, are due by January 13, 2025.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW684
DC006C Completion March 13, 2025
This Task Assignment authorizes GHD Services, Inc to conduct Groundwater Monitoring and PFAS Analysis at Dryclean USA #11204, located in Broward County.
FL.
Benjamin Grubbs 850-245-8992 Contractor GHD Services, Inc Contractor
Contractor Brian Moore Contractor 813-971-3882
ERIC_4174
2861 Stirling Rd, Ft Lauderdale, Broward County, FL
Dryclean USA #11204
Contractor Contractor
✔ $ 10,031.80
$ 10,031.80
Scope of Work
GHD Services, Inc Contractor
Brian Moore Digitally signed by Brian Moore Date: 2024.11.12 10:04:31 -05'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2024.10.31 13:18:03 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 1 & 2: Groundwater Monitoring Report, field notes, and proof of subcontractor payment; Project Management 01/13/2025
Subtask 3: PFAS Data and paid Subcontractor Invoices 01/13/2025
Subtask 1 & 2: Groundwater Monitoring Report, field notes, and proof of subcontractor payment; Project Management $ 7,248.17
Subtask 3: PFAS Data $ 2,783.63
$ 10,031.80
HW684
DC006C
FFLORIDAA DEPARTMENTT OF
EEnvironmentall Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ronn DeSantis Governor
Jeanette Nuñez Lt. Governor
SShawnn Hamiltonn Secretary
To:
From:
Date:
Subject:
, Project Manager , 202
Negotiation Summary
HW68
This Task Assignment authorizes to conduct roundwater onitoring activities in accordance with the 202 , Scope of Work, and Cost Estimate.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $$ with labor hours.
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
G H
D S er vi ce s
In c.
D at e:
/2
5/
Ta sk
D C
6C
S ub Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
S ite
D ry cl ea n
U S
A #1
Ta sk
G ro un dw at er
M on ito rin g S ub Ta sk
A ct iv ity
/P ha se
M on ito rin g
Ta sk
P
FA
S
S am pl in g S ub Ta sk
P ro je ct
M an ag er
B ria n
M oo re , P
E
Ta sk
S ub Ta sk
S ub
Ta sk
S ub Ta sk
T T ot al s
La bo r R at e
C at eg or y $5
1.
P P ro je ct
M an ag er
JM
5.
5.
$0 .0
P rin ci pa l E ng in ee r/S ci en tis t
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
Te ch ni ca l D ire ct or 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$5
8.
S r P ro fe ss io na l E ng in ee r
JH
1.
1.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
S en io r P ro je ct M an ag er 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$4
5.
P ro fe ss io na l E ng in ee r/S ci e G
E 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$3
9.
P ro je ct
E ng in ee r/S ci en tis t C
H 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$5
1.
P ro je ct
M an ag er
/ E ng in ee
JM
.0
.0
4.
0.
0.
0.
0.
0.
0.
0.
$3
0.
S ta ff E ng in ee r/S ci en tis t
E D
.5
.5
.0
0.
0.
0.
0.
0.
0.
0.
$3
6.
D at a A na ly st
JL
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$4 6.
Fi el d
M an ag er
O T
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2 5.
S en io r T ec hn ic ia n
S A
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2 9.
S en io r T ec hn ic ia n
W M
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2 7.
S en io r T ec hn ic ia n
D C
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2 1.
Ju ni or
T ec hn ic ia n
W O
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$1 8.
Ju ni or
T ec hn ic ia n
C D
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$3 1.
D ra fti ng T ec hn ic ia n K
J 7.
4.
3.
0.
0.
0.
0.
0.
0.
0.
$2
2.
Ad m in is tra tiv e As si st an t
JJ
7.
4.
2.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
T ot al
H ou rs
.0
5.
.0
.5
0.
0.
0.
0.
0.
0.
0.
D ire ct L ab or
$2
,5
.2
$2
.7
$1 ,4
.5
$7
.9
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
O ve rh ea d
9.
$3
,2
.3
$3
.8
$1 ,9
.9
$9
.5
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
G en
A dm in
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fr in ge
.8 0%
$9
.8
$1
.1
$5
.5
$2
.1
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
L ab or
$6 ,7
.4
$7
.8
$3
,9
.0
$2 ,0
.5
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Pa ge
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
G H
D S er vi ce s
In c.
e:
5/
D C
6C
Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
S ite
D ry cl ea n
U S
A #1
Ta sk
G ro un dw at er
M on ito rin g S ub Ta sk
A ct iv ity
/P ha se
M on ito rin g
Ta sk
P
FA
S
S am pl in g S ub Ta sk
P ro je ct
M an ag er
B ria n
M oo re , P
E
Ta sk
S ub Ta sk
S ub
Ta sk
S ub Ta sk
T T ot al s
T ra ve l
V eh ic le
R en ta l
$3
.0
$2
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ile ag e C os ts
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
A ir
Fa re
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P er d ie m
H ot el $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l T ra ve l $3
.0
$2
.0
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (E qu ip m en t P ro cu re m en t)
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P ro cu re m en t F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
S ub co nt ra ct or C os t
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (S er vi ce s
P ro cu re m en t) ril lin g
(C on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D ril lin g (N on -c on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ob ile L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ur ve yi ng
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
ID
W
$1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til iti es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til ity L oc at io n
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
H an dl in g Fe e $1
2.
$1 2.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
S ub co nt ra ct or C os t
$1
.5
$1
.5
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
La bo ra to ry
A na ly tic al C os ts
$7
.0
$7
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fa st
T ur na ro un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S am pl e
S hi pp in g $1
.0
$1
.5
$6
.5
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
L ab or at or y
$8
.0
$8
.5
$6 .5
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fi el d E xp en se s
P so na l P ro te ct io n $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E xp en da bl es $1
.0
$8
0.
$4 0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
D ril lin g re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
A na ly tic al re la te
d) $1
,0
.1
$6
.1
$3
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t (
ID
W re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( O th er
$1
.0
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
F ie ld E xp en se s
$1 ,2
.1
$8
.1
$4
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub to ta l $9
,3
.0
$7
.8
$6 ,0
.1
$2
,5
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
C om pl et io n Fe e $6
.7
$7
7.
$3
.9
$2
.5
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al E st im at ed
C os t $1
0, 1.
$8
.0
$6 ,3
.0
$2
,7
.6
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
C os t f ro m P rio r C
E F:
M an ua l E nt ry
C os t f ro m D el ta
C E
F;
M an ua l E nt ry C os t (
P rio r + D el ta
$0
.0
Au to
-C al cu la te d
R ou nd in g E rr or
$1
0, 1.
Au to
-C al cu la te d
Fi na l T ot al C os t:
$1 0, 1.
Au to -C al cu la te d
Pa ge
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Dryclean USA #11204 SUBTASK 2: Groundwater Monitoring
DATE: 10/25/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr Professional Engineer JH Conclusions/Recommendations 1
Project Manager JM Coordinate site access with property manager/owner 1 Project Manager JM Field Work Preparation 1 Project Manager JM IDW Characterization and coordination 1 Project Manager JM Prepare groundwater report general text 1 Project Manager JM Field quality parameter summary and trends 1
Project Manager JM Summarize groundwater flow/gradients (shallow/int) 3 Project Manager JM Summarize groundwater analytical results (shallow/int) & UIC 4 Project Manager JM Conclusions/recommendations 1
Staff Scientist ED Mob/demob (from West Palm Beach) - 2 days 4 Staff Scientist ED Water Levels (all wells - 13 wells) 2 Staff Scientist ED Groundwater Sampling (7 wells) 10.5
16.5
Drafting Technician KJ Prepare GW Flow maps (shallow, intermediate) 2 Drafting Technician KJ Prepare VOC plume figures with updated concentration data 2
Staff Assistant JJ Data Entry (13 wls, and 7 monitor wells) 1.5 Staff Assistant JJ Update summary tables (wl, parameter, analytical) 1 Staff Assistant JJ Document Preparation/Publishing 2
4.5
TOTAL LABOR 39
VEHICLE TYPE RATE UNIT USEAGE
Company Truck $120.00 day 2 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation IDW Drum Disposal $125 drum 1 $125.00
TOTAL $125.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOHs EPA 8260 $73.00 8 $584.00
TOC 9060 $30.00 1 $30.00
ammonia 350.2 $24.00 3 $72.00
TDS 160.1 $16.00 3 $48.00
sample shipping (Next Day) Large Cooler $150.00 1 $150.00 Ice $6.50 1 $6.50
TOTAL LAB $890.50
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 2 $80.00
Groundwater Sampling Kit $290.00 day 2 $580.00 Poly Tubing (HDPE) $0.30 ft 127 $38.10 Silicon Tubing $3.00 ft 7 $21.00 drum $100.00 each 1 $100.00
TOTAL EQUIPMENT $819.10
FINAL --7/24/96
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Dryclean USA #11204 SUBTASK 3: PFAS Sampling
DATE: 10/25/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager JM Field Work Preparation (PFAS) 1 Project Manager JM Summarize groundwater analytical results PFAS 2 Project Manager JM Conclusions/recommendations (PFAS) 1
Staff Scientist ED Mob/demob (from West Palm Beach) 4 Staff Scientist ED Groundwater Sampling (6 wells) 9
Drafting Technician KJ Prepare PFAS plume figures with updated concentration data 3
Staff Assistant JJ Data Entry (6 monitor wells) 1.5 Staff Assistant JJ Update summary tables- PFAS 1
2.5
TOTAL LABOR 22.5
VEHICLE TYPE RATE UNIT USEAGE
Company Truck $120.00 day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Ice $6.50 1 $6.50
TOTAL LAB $6.50
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 1 $40.00
Groundwater Sampling Kit $290.00 day 1 $290.00 Poly Tubing (HDPE) $0.30 ft 270 $81.00 Silicon Tubing $3.00 ft 6 $18.00
TOTAL EQUIPMENT $429.00
FINAL --7/24/96
COST PROPOSAL FOR TASK DC006C
Dryclean USA #11204/069502168
Groundwater Monitoring
1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >
GHD operated a Soil Vapor Extraction System at the Dryclean USA site from March 19, 2009, through February 2011. Historically, soil excavation activities were completed along with enhanced bioremediation injections in accordance with an approved RAP Modification, utilizing a slow release substrate EOS, along with other nutrients. Following the initial injection event, periodic groundwater monitoring was conducted to evaluate concentration data over time. Following the annual sampling event in February 2014, an additional injection event was recommended. The additional injections occurred in October 2014. Currently, periodic groundwater monitoring activities are ongoing on an annual basis. The previous monitoring report was submitted in November 2023 and FDEP provide comments in February 2024.
Subtask 1: Project Management Subtask 1 includes all activities associated with completing annual groundwater sampling, analysis, and reporting for the Dryclean USA #11204 site.
Subtask 2: Groundwater Monitoring Task assignment DC006C (Subtask 2) includes annual groundwater sampling and analysis at seven (7) wells including MW001, MW003, MW006, MW009, IW001, IW002, and IW003.
Groundwater analysis will include volatile organic halocarbons (VOHs) at all wells, as well as TOC at monitor well MW001. In addition, ammonia and total dissolved solids (TDS) will be analyzed at MW001, MW003 and MW006. This sampling is in accordance with GHD’s recommendations in the Nobember 2023 monitoring report, and DEP comments from February 2024. During mobilization for sampling, depth to water measurements will be gathered from all available wells. Groundwater sampling will be conducted in general accordance with FDEP SOPs; however, interior wells IW001, IW002, and IW003 will be sampled following collection of one set of parameters in order to reduce the amount of odor entering the active Pawn Shop facility. In addition, the well caps will be sealed with epoxy following sampling to reduce odors.
Following groundwater sampling, a summary report will be prepared. The summary report will include a description of field sampling methodology and analytical results. The report will also include recommendations regarding the next step toward site rehabilitation.
Subtask 3: PFAS Groundwater Sampling Task assignment DC006C (Subtask 3) also includes PFAS sampling at site monitoring wells.
Based on PFAS screening results that identified elevated PFAS at 4 wells, GHD recommends sampling all site monitoring wells with PFAS analysis. Therefore, monitoring wells MW002, MW004, MW005, MW007, MW008, and MW010 will also be sampled. PFAS sampling will be conducted in accordance with FDEP and GHD PFAS sampling protocols. Samples from all wells (13 total) will be submitted to the FDEP laboratory for PFAS analysis.
Upon receipt of PFAS data, the results will be summarized within the Groundwater Monitoring Report described under Subtask 2.
Deliverables:
Deliverable Deliverable Due Date
Groundwater Monitoring Report 1/13/25
Field notes and PFAS data 1/13/25
408 Ditmar Street
Pensacola, FL 32503
To: Mr. Brian Moore
GHD
5904 Hampton Oaks Parkway, Suite F Tampa, FL 33610
June 13, 2023
Re: Non-Hazardous Drum Disposal – State of Florida
Mr. Moore:
The price for the transportation and disposal (T&D) of drums of non-hazardous soil and water located in the State of Florida is listed below.
Non-Hazardous Drums:
Description Rate Unit False Mobilization (No drum found) $ 85.00 Per Stop T&D - Non-Haz Soil $ 110.00 Per Drum T&D - Non-Haz Water $ 125.00 Per Drum
The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.
The lab data we require for the disposal of drums of petroleum impacted soils are totals for BTEX and the 4 RCRA metals (arsenic, cadmium, chromium, and lead), with analyses no older than 1 year from the estimated disposal date.
We do not require analyticals for the disposal of Petroleum Contact Water (PCW) as long as it has only been impacted with petroleum - not pesticides, herbicides or dry-cleaning solvents etc.
Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc.
This quote is valid for 90 days.
408 Ditmar Street Pensacola, FL 32503
Respectfully, Robert Donado Erwin Remediation, Inc.
Email: Robert@erwinremediation.com Office: (850) 466-2358 p y, Robert Donado
6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 1/2
Quote Number: 19644
QUOTE
QUOTED TO: Brian Moore QUOTE DATE: 1/1/2022
COMPANY NAME: GHD - 2022 QUOTED BY: Craig Burns
PHONE NUMBER: Ext.
FAX NUMBER:
PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS
CUSTOMER PO:
CONTACT EMAIL:
SITE ADDRESS: TBD
CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING
COST ESTIMATE FOR THE SITE/ PROJECT LISTED ABOVE.
DESCRIPTION PRICE QTY. UNIT TOTAL
NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00
NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00
TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$30.00 DRUM $0.00
TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$40.00 DRUM $0.00
TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site
$50.00 DRUM $0.00
Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax
$0.00 . $0.00
HAZ Drums to be quoted case-by-case $0.00 . $0.00
OPTIONAL LINE ITEMS
***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00
TOTAL REQUIRED ITEMS $0.00
TOTAL OPTIONAL ITEMS $0.00
GRAND TOTAL $0.00
NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups. **Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns
863.327.6289 - cburns@clarkenv.com
This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.
6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 2/2
Name (print) Title
Signature Date
CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854
WWW.ClarkEnvironmental.com
From: Craig Burns To: Brian Moore Subject: GHD_IDW Drum Rates FL Date: Tuesday, June 28, 2022 10:26:46 AM Attachments: image001.png image002.png image003.png image004.png image005.png GHD Drum Rates FL 2022.pdf
Here you go Brian. I do this for a lot of engineering/consulting firms.
Be aware of the low stop less than 6 drums at $50/flat Be aware of the 10% to the total cost for FSC (implemented April 15).
Pass around the GHD Florida offices
From: Brian Moore <Brian.Moore@ghd.com> Sent: Tuesday, June 28, 2022 10:05 AM To: Craig Burns <cburns@clarkenvironmental.com> Subject: IDW Drums
Craig, Is it possible to provide a generic quote for IDW water disposal.
Assumption is non-haz with necessary analytical Maybe provide a range of locations
South florida or central florida, or both?
Thanks in advance
We have many sites that we generate 1 gw drum of IDW and would like to streamline the vendor coordination
BRIAN MOORE PE
GHD
Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com
The Power of Commitment Connect
Please consider our environment before printing this email
CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.
Whatever Waste, LLC 3834 Mandarin Woods Dr. No.
Jacksonville, Florida 32223 United States 904.881.1957
Brian Moore PE
GHD
5904 Hampton Road Parkway Suite F Tampa, FL 33610
Estimate Number 062922.1
Notes Dry Cleaner Site Locations: Central and South Florida Regions excluding Florida Keys Required analytical data for non-haz disposal acceptance would be VOCs and includes waste profiling assistance if the IDW-GW drums don't fall under a blanket waste profile DOT shippable drums must be on a hard surface at each accessible location
Terms Non-hazardous IDW drum pickup, transport and disposal pricing is based on per service event No-load drum fee if unable to pickup drums on any site in Central FL is $150; in South FL is $200 Pricing is valid or subject to change on a monthly basis in part due to escalating fuel prices Payment required within 45 days after email receipt of invoice
Indemnification: Each party agrees to indemnify, defend and hold harmless each other for and from any loss
Estimate Date 06/29/2022
Description Rate Qty Line Total
IDW-GW Drum Transport & Disposal - Central FL Sites
(1) Regional Stop Fee $600 - then $150 per 55-gal drum < 10 drums
$150.00 1 $150.00
IDW-GW Drum Transport & Disposal - Central FL Sites
(1) Regional Stop Fee $300 - then $150 per 55-gal drum > 10 drums
$150.00 1 $150.00
IDW-GW Drum Transport & Disposal - South FL Sites
(1) Regional Stop Fee $850 - then $200 per 55-gal drum < 10 drums
$200.00 1 $200.00
IDW-GW Drum Transport & Disposal - South FL Sites
(1) Regional Stop Fee $425 - then $200 per 55-gal drum > 10 drums
$200.00 1 $200.00
Subtotal
Tax
700.00
0.00
Estimate Total (USD) $700.00 or liability arising out of the party's breach of this agreement, scope of work, except for gross negligence, willful misconduct or bad faith.
ID
M od e Ta sk N am e
Du ra tio n
St ar t Fi ni sh
LO
E Su bm itt al /A pp ro va l w ks Th u
/1 7/
W ed
0/
/2
Su bt as k 1:
P ro je ct an ag em en t d ay s Fr i 1 1/
1/
M on
/1
3/
Su bt as k 2:
G ro un dw on ito rin g d ay s
Fr i 1
1/ 8/
M on
/1 3/
Fi el d
W or k Pr ep ar at io n w k
Fr i 1
1/ 8/
Th u
/1 4/
Gr ou nd w at er S am pl in g da ys M on
1/
/2 4T ue
1/
/2
Gr ou nd w ito rin g Re po rt w ks Tu e
/3 /2
M on
/1 3/
Su bt as k 3:
P
FA
S Sa m pl in g da ys Fr i 1 1/
8/
W ed
1/
/2
Fi el d
W or k Pr ep ar at io n w k
Fr i 1
1/ 8/
Th u
/1 4/
Gr ou nd w at er S am pl in g da y W ed
1/
/2 4W ed
1/
/2
W T
F S
S M
T W
T F
S S
M T
W T
F S
S
O ct
1, '2
O ct
8, '2
Ta sk
Sp lit
M ile st on e
Su m m ar y
Pr oj ec t S um m ar y
In ac tiv e
Ta sk
In ac tiv e
M ile st on e
In ac tiv e
Su m m ar y
M an ua l T as k
Du ra tio n-on ly
M an ua l S um m ar y
Ro llu p
M an ua l S um m ar y
St ar t-on ly
Fi ni sh -o nl y
Ex te rn al
T as ks
Ex te rn al
M ile st on e
De ad lin e
Pr og re ss
M an ua l P ro gr es s
Sc he du le fo r t he Im pl em en ta tio n of T as k
DC
6C a t t he
D ry cle an
U
SA
sit e lo ca te d in H ol ly w oo d, B ro w ar d
Co un ty
Pa ge
Pr oj ec t:
TA
_0
C
Da te
: T hu
0/ e Ta sk N am e
Du ra tio n
St ar t Fi ni sh
LO
E Su bm itt al /A pp ro va l w ks Th u
/1 7/
W ed
0/
/2
Su bt as k 1:
P ro ag em en t d ay s Fr i 1 1/
1/
M on
/1
3/
Su bt as k 2:
G ro un dw ito rin g d ay s
Fr i 1
1/ 8/
M on
/1 3/
Fi el d
W or k Pr ep ar at io n w k
Fr i 1
1/ 8/
Th u
/1 4/
Gr ou nd w at er S am pl in g da ys M on
1/
/2 4T ue
1/
/2
Gr ou nd w ito rin g Re po rt w ks Tu e
/3 /2
M on
/1 3/
Su bt as k 3:
P
FA
S Sa m pl in g da ys Fr i 1 1/
8/
W ed
1/
/2
Fi el d
W or k Pr ep ar at io n w k
Fr i 1
1/ 8/
Th u
/1 4/
Gr ou nd w at er S am pl in g da y W ed
1/
/2 4W ed
1/
/2
Je nn a M ar tin
Ed ga r D i
Je nn a M ar tin
Ed ga r
M T
W T
F S
S M
T W
T F
S S
M T
W T
F N ov
N ov
1, '2
N ov
8, '2
Ta sk
Sp lit
M ile st on e
Su m m ar y
Pr oj ec t S um m ar y
In ac tiv e
Ta sk
In ac tiv e
M ile st on e
In ac tiv e
Su m m ar y
M an ua l T as k
Du ra tio n-on ly
M an ua l S um m ar y
Ro llu p
M an ua l S um m ar y
St ar t-on ly
Fi ni sh -o nl y
Ex te rn al
T as ks
Ex te rn al
M ile st on e
De ad lin e
Pr og re ss
M an ua l P ro gr es s
Sc he du le fo r t he Im pl em en ta tio n of T as k
DC
6C a t t he
D ry cle an
U
SA
sit e lo ca te d in H ol ly w oo d, B ro w ar d
Co un ty
Pa ge
Pr oj ec t:
TA
_0
C
Da te
: T hu
0/ e Ta sk N am e
Du ra tio n
St ar t Fi ni sh
LO
E Su bm itt al /A pp ro va l w ks Th u
/1 7/
W ed
0/
/2
Su bt as k 1:
P ro ag em en t d ay s Fr i 1 1/
1/
M on
/1
3/
Su bt as k 2:
G ro un dw ito rin g d ay s
Fr i 1
1/ 8/
M on
/1 3/
Fi el d
W or k Pr ep ar at io n w k
Fr i 1
1/ 8/
Th u
/1 4/
Gr ou nd w at er S am pl in g da ys M on
1/
/2 4T ue
1/
/2
Gr ou nd w ito rin g Re po rt w ks Tu e
/3 /2
M on
/1 3/
Su bt as k 3:
P
FA
S Sa m pl in g da ys Fr i 1 1/
8/
W ed
1/
/2
Fi el d
W or k Pr ep ar at io n w k
Fr i 1
1/ 8/
Th u
/1 4/
Gr ou nd w at er S am pl in g da y W ed
1/
/2 4W ed
1/
/2 iaz r D iaz
S S
M T
W T
F S
S M
T W
T F
S S
M T
W N ov
5, '2
De c 2, '2
De c
9, '2
Ta sk
Sp lit
M ile st on e
Su m m ar y
Pr oj ec t S um m ar y
In ac tiv e
Ta sk
In ac tiv e
M ile st on e
In ac tiv e
Su m m ar y
M an ua l T as k
Du ra tio n-on ly
M an ua l S um m ar y
Ro llu p
M an ua l S um m ar y
St ar t-on ly
Fi ni sh -o nl y
Ex te rn al
T as ks
Ex te rn al
M ile st on e
De ad lin e
Pr og re ss
M an ua l P ro gr es s
Sc he du le fo r t he Im pl em en ta tio n of T as k
DC
6C a t t he
D ry cle an
U
SA
sit e lo ca te d in H ol ly w oo d, B ro w ar d
Co un ty
Pa ge
Pr oj ec t:
TA
_0
C
Da te
: T hu
0/ e Ta sk N am e
Du ra tio n
St ar t Fi ni sh
LO
E Su bm itt al /A pp ro va l w ks Th u
/1 7/
W ed
0/
/2
Su bt as k 1:
P ro ag em en t d ay s Fr i 1 1/
1/
M on
/1
3/
Su bt as k 2:
G ro un dw ito rin g d ay s
Fr i 1
1/ 8/
M on
/1 3/
Fi el d
W or k Pr ep ar at io n w k
Fr i 1
1/ 8/
Th u
/1 4/
Gr ou nd w at er S am pl in g da ys M on
1/
/2 4T ue
1/
/2
Gr ou nd w ito rin g Re po rt w ks Tu e
/3 /2
M on
/1 3/
Su bt as k 3:
P
FA
S Sa m pl in g da ys Fr i 1 1/
8/
W ed
1/
/2
Fi el d
W or k Pr ep ar at io n w k
Fr i 1
1/ 8/
Th u
/1 4/
Gr ou nd w at er S am pl in g da y W ed
1/
/2 4W ed
1/
/2
T F
S S
M T
W T
F S
S M
T W
T F
S S
M De c
, '2
De c
, '2
De c
Ta sk
Sp lit
M ile st on e
Su m m ar y
Pr oj ec t S um m ar y
In ac tiv e
Ta sk
In ac tiv e
M ile st on e
In ac tiv e
Su m m ar y
M an ua l T as k
Du ra tio n-on ly
M an ua l S um m ar y
Ro llu p
M an ua l S um m ar y
St ar t-on ly
Fi ni sh -o nl y
Ex te rn al
T as ks
Ex te rn al
M ile st on e
De ad lin e
Pr og re ss
M an ua l P ro gr es s
Sc he du le fo r t he Im pl em en ta tio n of T as k
DC
6C a t t he
D ry cle an
U
SA
sit e lo ca te d in H ol ly w oo d, B ro w ar d
Co un ty
Pa ge
Pr oj ec t:
TA
_0
C
Da te
: T hu
0/ e Ta sk N am e
Du ra tio n
St ar t Fi ni sh
LO
E Su bm itt al /A pp ro va l w ks Th u
/1 7/
W ed
0/
/2
Su bt as k 1:
P ro ag em en t d ay s Fr i 1 1/
1/
M on
/1
3/
Su bt as k 2:
G ro un dw ito rin g d ay s
Fr i 1
1/ 8/
M on
/1 3/
Fi el d
W or k Pr ep ar at io n w k
Fr i 1
1/ 8/
Th u
/1 4/
Gr ou nd w at er S am pl in g da ys M on
1/
/2 4T ue
1/
/2
Gr ou nd w ito rin g Re po rt w ks Tu e
/3 /2
M on
/1 3/
Su bt as k 3:
P
FA
S Sa m pl in g da ys Fr i 1 1/
8/
W ed
1/
/2
Fi el d
W or k Pr ep ar at io n w k
Fr i 1
1/ 8/
Th u
/1 4/
Gr ou nd w at er S am pl in g da y W ed
1/
/2 4W ed
1/
/2
Je re m y H es s,J e
T W
T F
S S
M T
W T
F S
S M
T W
T F
S c
Ja n 6, '2
Ja n
, '2
Ta sk
Sp lit
M ile st on e
Su m m ar y
Pr oj ec t S um m ar y
In ac tiv e
Ta sk
In ac tiv e
M ile st on e
In ac tiv e
Su m m ar y
M an ua l T as k
Du ra tio n-on ly
M an ua l S um m ar y
Ro llu p
M an ua l S um m ar y
St ar t-on ly
Fi ni sh -o nl y
Ex te rn al
T as ks
Ex te rn al
M ile st on e
De ad lin e
Pr og re ss
M an ua l P ro gr es s
Sc he du le fo r t he Im pl em en ta tio n of T as k
DC
6C a t t he
D ry cle an
U
SA
sit e lo ca te d in H ol ly w oo d, B ro w ar d
Co un ty
Pa ge
Pr oj ec t:
TA
_0
C
Da te
: T hu
0/
Kevin Kane 2/14/2022 Ben Grubbs 2/14/2022