This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to GHD Services, Inc. for groundwater performance monitoring activities at the Plant City Laundry site located at 401 East Reynolds Street in Plant City, Hillsborough County, Florida. The task assignment is identified as TA Number DC014E under Contract Number HW684, with a completion date of March 2, 2025. The Department Project Manager is Nicole Varela (850-245-8959), and the Contractor's Project Manager is Brian Moore (813-257-0658). The project is associated with FDEP ERIC facility number ERIC_4722.

The scope of work comprises three subtasks: Subtask 1 covers project management costs calculated at 13% of direct labor; Subtask 2 involves well installation and groundwater monitoring including replacement of ten monitoring wells and groundwater sampling with VOC, PAH, and TRPH analysis; and Subtask 3 covers additional TRPH groundwater sampling in accordance with the approved Interim Source Removal Plan (ISRP). The total task assignment value is $32,738.01 on a fixed unit rate basis. Deliverables include a Subtask 2 Well Installation & Groundwater Monitoring Report due October 3, 2024 ($26,800.24), and a Subtask 3 & 1 Groundwater Sampling Summary plus Project Management due January 2, 2025 ($5,937.77). The contract is authorized under an indefinite delivery vehicle arrangement, with work to be performed in accordance with FDEP standard operating procedures and EPA methodology. Funding information shows the project is under Org. Code N/A with no additional grant or appropriation category specified.

View the file

Other files

File Type Posted
CN-370000-HW684-BIL02B.pdf PDF
CN-370000-HW684-BIL02D.pdf PDF
CN-370000-HW684-BIL02G.pdf PDF
CN-370000-HW684-CSS01A.pdf PDF
CN-370000-HW684-CSS1ACO1.pdf PDF
CN-370000-HW684-CSS3BCO1.pdf PDF
CN-370000-HW684-DC001D.pdf PDF
CN-370000-HW684-DC003B.pdf PDF
CN-370000-HW684-DC004A.pdf PDF
CN-370000-HW684-DC004E.pdf PDF
CN-370000-HW684-DC005B.pdf PDF
CN-370000-HW684-DC005E.pdf PDF
CN-370000-HW684-DC006C.pdf PDF
CN-370000-HW684-DC007C.pdf PDF
CN-370000-HW684-DC008A.pdf PDF
CN-370000-HW684-DC008D.pdf PDF
CN-370000-HW684-DC010D.pdf PDF
CN-370000-HW684-DC011D.pdf PDF
CN-370000-HW684-DC012E.pdf PDF
CN-370000-HW684-DC013A.pdf PDF
CN-370000-HW684-DC014A.pdf PDF
CN-370000-HW684-DC017B.pdf PDF
CN-370000-HW684-DC018D.pdf PDF
CN-370000-HW684-DC019A.pdf PDF
CN-370000-HW684-DC019B.pdf PDF
CN-370000-HW684-DC01ACO1.pdf PDF
CN-370000-HW684-DC01ACO5.pdf PDF
CN-370000-HW684-DC01ACO6.pdf PDF
CN-370000-HW684-DC021D.pdf PDF
CN-370000-HW684-DC022B.pdf PDF
CN-370000-HW684-DC023A.pdf PDF
CN-370000-HW684-DC025B.pdf PDF
CN-370000-HW684-DC025C.pdf PDF
CN-370000-HW684-DC027A.pdf PDF
CN-370000-HW684-DC028B.pdf PDF
CN-370000-HW684-DC031B.pdf PDF
CN-370000-HW684-DC031C.pdf PDF
CN-370000-HW684-DC032A.pdf PDF
CN-370000-HW684-DC035B.pdf PDF
CN-370000-HW684-DC035C.pdf PDF
CN-370000-HW684-DC039A.pdf PDF
CN-370000-HW684-DC03ACO2.pdf PDF
CN-370000-HW684-DC040B.pdf PDF
CN-370000-HW684-DC040C.pdf PDF
CN-370000-HW684-DC041A.pdf PDF
CN-370000-HW684-DC043A.pdf PDF
CN-370000-HW684-DC044A.pdf PDF
CN-370000-HW684-DC045C.pdf PDF
CN-370000-HW684-DC04A.pdf PDF
CN-370000-HW684-DC053A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

HW684

DC014E March 2, 2025

This Task Assignment authorizes GHD Services, Inc. to conduct groundwater performance monitoring activities at the Plant City Laundry site in Plant City, Florida, in accordance with the scope of work and cost proposal submitted on June 19, 2024.

Nicole Varela 850-245-8959 GHD Services, Inc.

Brian Moore 813-257-0658

ERIC_4722

401 East Reynolds Street, Plant City, Hillsborough County

Plant City Laundry

$ 32,738.01

$ 32,738.01

Scope of Work

GHD Services, Inc.

Brian Moore Digitally signed by Brian Moore Date: 2024.06.25 10:03:05 -04'00'

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2024.06.24 09:54:32 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: ERIC_4722

Plant City Laundry

FROM: Nicole Varela, Project Manager

SUBJECT: Negotiation Summary

HW684_DC014E

Groundwater Performance Monitoring

DATE: June 19, 2024

This Task Assignment authorizes GHD Services, Inc. to conduct groundwater performance monitoring activities at the Plant City Laundry site in accordance with the scope of work, cost estimate form, and schedule received on June 19, 2024.

The final deliverable due date will be January 2, 2025.

The completion date for the task assignment will be March 2, 2025.

The final total cost will be $32,738.01.

Specific subtasks are detailed below:

Subtask 1: Project Management GHD is authorized to calculate Project Management costs at 13% of direct labor costs for all tasks associated with project management for groundwater monitoring at the site.

Subtask 2: Well Installation & Groundwater Monitoring GHD will conduct well installation activities along with groundwater sampling, analysis, and reporting in accordance with FDEP standard operating procedures (SOPs) and EPA methodology.

Subtask 3: Groundwater Sampling GHD will also conduct additional TRPH groundwater sampling, analysis, and reporting in accordance with FDEP SOPs and with the Interim Source Removal Plan (ISRP), which was approved by FDEP on March 19, 2024.

P a g e

P g e

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Plant City Laundry SUBTASK 2: Groundwater Monitoring (Q1)

DATE: 6/19/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr Professional Engineer JH 1

Project Manager JM 1

Project Manager JM Utility locate 1

Project Manager JM Field work preparation (well installation and sampling) 1.5

Project Manager JM Groundwater Monitoring Report (background info) 4

Project Manager JM Well Installation summary (GWMR) 4

Project Manager JM Groundwater Sampling Methodology (GWMR) 2

Project Manager JM Groundwater water field parameter summary (GWMR) 2

Project Manager JM Groundwater flow evaluation (3 zones) 3

Project Manager JM Groundwater Analytical Data Evaluation 4

Project Manager JM UIC results 1

Project Manager JM Laboratory data validation 1

Project Manager JM 1

25.5

Professional Geologist GE Mob/demob (3 days) 4.5

Professional Geologist GE Oversee well installation 22

26.5

Sr Technician WM 3

Sr Technician WM water levels (all wells - 33 total) 2.5

Sr Technician WM Groundwater Sampling (7 wells) 10.5

Sr Technician SA 3

Sr Technician SA water levels (all wells - 33 total) 2.5

Sr Technician SA Groundwater Sampling (8 wells) 12

17.5

Drafting Technician PM Groundwater Elevation Figures (shallow/int/deep) 4

Drafting Technician PM Groundwater Analtyical Figures (shallow/int/deep) 4

Drafting Technician PM GPR Results 2

Administrative Assistant JJ Data Entry (wls, gw parameters, analytical data) 3

Administrative Assistant JJ Update summary tables 3

TOTAL LABOR 102.5

VEHICLE TYPE RATE UNIT USEAGE

GE Company Truck $120.00 day 3 $360.00

WM/SA Company Truck $120.00 day 2 $240.00

TOTAL VEHICLE $600.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Groundwater Protection Mobilization $600.00 each 1 $600.00

Groundwater Protection Per diem $300.00 night 1 $300.00

Groundwater Protection DP Daily Rate $1,750.00 day 2 $3,500.00

Groundwater Protection DP 1/2 day rate $1,475.00 day 0 $0.00

Groundwater Protection Prepack well screens $100.00 each 6 $600.00

Groundwater Protection prepack screens 10 ft $175.00 each 4 $700.00

Groundwater Protection Well riser $4.00 ft 184 $736.00

Groundwater Protection Completion $150.00 each 10 $1,500.00

Groundwater Protection Development $50.00 each 10 $500.00

Groundwater Protection Drums $75.00 drum 5 $375.00

Groundwater Protection Permits $52.00 each 2 $104.00

Erwin Remediation IDW Water Disposal $125.00 drum 4 $500.00

Erwin Remediation IDW Soil disposal $110.00 drum 1 $110.00

TOTAL $9,525.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOCs (gw) EPA 8260 $150.00 15 $2,250.00 MW002S, MW004S, MW004I, MW004D, MW005S, MW005I, MW005D, MW006I, MW007S, MW007I, MW008S, MW008I, MW011S, MW011I, MW011D TRPH (gw) FL-PRO $88.00 6 $528.00 MW002S, MW004S, MW005S, MW006I, MW007S, MW008S PAHs (gw) EPA 8270SIM $110.00 2 $220.00 MW004D, MW006I

Shipping (Large Cooler - 2 day) $70.00 1 $70.00

Ice $6.50 1 $6.50

TOTAL LAB $3,074.50

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 day 5 $200.00

Groundwater Sampling Kit $290.00 day 4 $1,160.00

Poly Tubing $0.30 ft 300 $90.00

Silicon Tubing $3.00 ft 15 $45.00

Drum $100.00 drum 1 $100.00

TOTAL EQUIPMENT $1,595.00

Conclusions/Recommendations

Contact property owner

Conclusions/Recommendations mob/demob (2 days) mob/demob (2 days)

FINAL --7/24/96

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Plant City Laundry SUBTASK 3: Groundwater Monitoring (Q2)

DATE: 6/19/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr Professional Engineer JH 1

Project Manager JM Field work preparation (groundwater sampling) 1.5

Project Manager JM Groundwater Monitoring Letter Report (background info) 4

Project Manager JM Groundwater Sampling Methodology (GWMR) 2

Project Manager JM Groundwater water field parameter summary (GWMR) 2

Project Manager JM UIC results 1

Project Manager JM Laboratory data validation 1

Project Manager JM 1

12.5

Sr Technician WM 1.5

Sr Technician WM Groundwater Sampling (5 wells) 7.5

Administrative Assistant JJ Data Entry (wls, gw parameters, UIC data) 1.5

Administrative Assistant JJ Update summary tables 1.5

TOTAL LABOR 25.5

VEHICLE TYPE RATE UNIT USEAGE

WM Company Truck $120.00 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW Water Disposal $125 drum 1 $125.00

TOTAL $125.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TRPH (gw) FL-PRO $88.00 5 $440.00 MW002S, MW004S, MW005S, MW007S, MW008S Shipping (Large Cooler - 2 day) $70.00 1 $70.00

Ice $6.50 1 $6.50

TOTAL LAB $516.50

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 day 1 $40.00

Groundwater Sampling Kit $290.00 day 1 $290.00

Poly Tubing $0.30 ft 75 $22.50

Silicon Tubing $3.00 ft 5 $15.00

Drum $100.00 drum 1 $100.00

TOTAL EQUIPMENT $467.50

Conclusions/Recommendations

Conclusions/Recommendations mob/demob

FINAL --7/24/96

COST PROPOSAL FOR TASK DC014E

<Plant City Laundry/FDEP ERIC_4722>

< Groundwater Performance Monitoring >

1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >

GHD Services Inc. (GHD) completed source removal activities for the Plant City Laundry site located in Plant City, Hillsborough County, in March, April, and May 2024. In accordance with the approved ISRP, performance groundwater monitoring is required following source removal. Task DC014D includes quarter 1 and quarter 2 post source removal sampling.

Subtask 1: Project Management Subtask 1 includes all tasks associated with project management of the groundwater sampling activities at the Plant City Laundry site.

Subtask 2: Quarter 1 – Well Installation & Groundwater Monitoring As several wells were abandoned prior to the source removal, the first step will include well replacement. In total, ten (10) monitoring wells will be replaced including 4 shallow wells, 3 intermediate wells, and 3 deep wells. The wells will be installed with direct push equipment and the construction details will be equivalent to the abandoned wells.

Following well installation, groundwater sampling will be conducted in accordance with the approved ISRP. GHD personnel will gather depth to water measurements at all available monitoring wells (33 total). Following depth to water measurements, groundwater sampling will be conducted. Groundwater sampling is recommended at 15 select site monitor wells with VOC, PAH, and/or TRPH analysis using Methods 8260, 8270SIM, and/or FL-PRO (per the ISRP sampling schedule). Groundwater sampling will be conducted in accordance with FDEP standard operating procedures.

Following receipt of analytical data, a summary report will be prepared. The summary report will include details of well installation, a summary of sampling procedures and results, and conclusions and recommendations for additional monitoring and/or rehabilitation activities.

Subtask 3: Quarter 2 – Groundwater Sampling Quarter 2 sampling is limited to UIC chemical analysis. Groundwater sampling will be conducted in accordance with the approved ISRP. Groundwater sampling is recommended at 5 select site monitor wells (MW002S, MW004S, MW005S, MW007S, and MW008S) with TRPH analysis using State Method FL-PRO (per the ISRP sampling schedule). Groundwater sampling will be conducted in accordance with FDEP standard operating procedures.

Following receipt of analytical data, a letter summary will be prepared. The summary will include details of sampling procedures and results, and conclusions and recommendations for additional monitoring and/or rehabilitation activities.

Deliverables:

Deliverable Deliverable Due Date

Quarter 1 Groundwater Monitoring Report 10/3/24

Quarter 2 Groundwater Summary Letter 1/2/25

D r i l l i n g

M o b i l i z a t i o n e a c h e a c h e a c h

P e r d i e m n i g h t n i g h t n i g h t

D P

D a i l y

R a t e d a y d a y d a y

D P d a y r a t e d a y d a y d a y

P r e p a c k w e l l s c r e e n s e a c h e a c h e a c h p r e p a c k s c r e e n s f t e a c h

W e l l r i s e r f t e a c h e a c h

C o m p l e t i o n e a c h e a c h e a c h

D e v e l o p m e n t e a c h

D r u m s d r u m d r u m d r u m

P e r m i t s e a c h e a c h e a c h

G r o u n d w a t e r

P r o t e c t i o n

P r e f e r r e d

E a r t h T e c h

B id s S u m m ry

REVISED DATE: 6/12/2024

ESTIMATE #: 624030

Project Description:

ID QTY Unit Rate TOTAL

1 1 each 600.00$ 600.00$

2 1 night 300.00$ 300.00$

3 2 day 1,750.00$ 3,500.00$

4 each 3.00$ -$

5 184 foot 4.00$ 736.00$

6 4 each 175.00$ 700.00$

7 6 each 100.00$ 600.00$

10 10 each 150.00$ 1,500.00$

11 10 each 50.00$ 500.00$

12 55 gallon drums (Soil) (Estimated) 1 each 75.00$ 75.00$

13 55 gallon drums (Water) (Estimated) 4 each 75.00$ 300.00$

14 Decon Pad (If Needed) each 250.00$ -$

15 Permits: SWFLWMD ($52 up to 8 Wells per App/Parcell) 2 each 52.00$ 104.00$

Completion: Subtotal 8,915.00$

Todd Hodgson

TOTAL 8,915.00$

Partner

If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or Todd@drillprollc.com.

THANK YOU FOR YOUR BUSINESS!

Todd Hodgson

Daily Rate: DPT Rig w/ 2-man Crew

"Actual quantities used and days on site will be invoiced"

2 Days

Materials: 1" PVC Well Installation

Well Development (up to 1/2 hour w/Pump)

2' x 2' Concrete Pad w/8" BD Completion

Materials: 1" x 5' PVC .010 Slot Prepack Screen, 3" Exp Point

Materials: (2) 1" x 5' PVC .010 Slot Prepack Screen, 3" Exp Point

Materials: Soil Sample Liners (If Needed)

(813) 971-3882

(3) 1" x 19' PVC Well w/5' of .010 Prepack Screen, 2' x 2' Pad w/8" BD Completion, No Soil Sampling

(4) 1" x 12' PVC Well w/10' of .010 Prepack Screen, 2' x 2' Pad w/8" BD Completion, No Soil Sampling

All Locations in Grass (Facility has been Removed and Cleared.)

(1) 1" x 25' PVC Well w/5' of .010 Prepack Screen, 2' x 2' Pad w/8" BD Completion, No Soil Sampling

(2) 1" x 27' PVC Well w/5' of .010 Prepack Screen, 2' x 2' Pad w/8" BD Completion, No Soil Sampling

Locations must be accessible with track mounted DPT Rig

DESCRIPTION

Mobilization

Utility Locates on Private Property is the responsibility of the client Borehole Clearance to 5’ bgs beyond 20 minutes may require a change order for additional time and cost.

Per Diem - 2 Man Crew Est. (Min. Hotel Cost + $50/per man)

PROJECT

Plant City Laundry 401 E Reynolds Street

Damages to utilities on private property clearance are the responsibility of the client

5904 Hampton Oaks Pkwy Suite F

CUSTOMER

GHD

Brian Moore

Tampa, Florida 33610 Plant City, Florida

DPT Well Installation

2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586

Preferred Drilling Solutions, Inc.

8820 66th St. North, Pinellas Park, FL 33782

Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com

DIRECT PUSH TECHNOLOGY QUOTE FORM

Date: 6/13/24 FAC ID#: ERIC_4722

Unit Unit Rate Number of Units

Extended Price whole day $1,875.00 2 3,750.00$ half day $1,475.00 1 1,475.00$ per foot $25.00 -$ each $110.00 14 1,540.00$ each $50.00 -$ each $35.00 27 945.00$ per well $150.00 10 1,500.00$ roundtrip $650.00 1 650.00$ per crew / per night $575.00 -$ each $75.00 6 450.00$ per day $150.00 -$ each $75.00 2 150.00$ lump sum $350.00 -$ per day $100.00 -$

TOTAL QUOTE PRICE $10,460.00

Notes: 1. Includes saw cuts, development, standby time, and decon.

Project No.:

Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477

Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782

Signature and Title of Person Submitting Quote: ___________________________________Austin Bonacum, Estimator Date: 6/13/24

(2) 1" x 27' MW's with 5' .010 prepacked screen, no soil sampling, drum soil & water, pad and 8" manhole

401 E Reynolds St, Plant City, Hillsborough County, FL

Well Completion (includes MH w/ cover, concrete pad, and locking well cap)

Well Riser (includes all materials) ID 1" 5' Length

Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5"

Pre-Packed Well Screen (includes all materials) ID 1" 5' Length Pack OD 3.5"

Auger Attachment, 2" Well Install

Direct Push Half-Day Rate 1 - on-site half day

(1) 1" x 25' MW with 5' .010 prepacked screen, no soil sampling, drum soil & water, pad and 8" manhole

Site Name and Location: Plant City Laundry and Cleaners

Consultant Name: GHD

PROPOSED SCOPE OF WORK:

(4) 1" x 12' MW's with 10' .010 prepacked screen, no soil sampling, drum soil & water, pad and 8" manhole

(3) 1" x 19' MW's with 5' .010 prepacked screen, no soil sampling, drum soil & water, pad and 8" manhole

Days to Complete Scope of Work: 2.5

Direct Push Daily Rate 1 - on-site day

Equipment Type: Geoprobe 8040DT, 3230DT, 7822DT

*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner

Other (specify)

Steam Cleaner

Decon pad

GeoProbe Consumables (includes tubing, points, liners, concrete patch, asphalt patch, and grouting)

DOT Approved 55-gal Drum

Per Diem

Mobilization

DIRECT PUSH TECHNOLOGY

MISCELLANEOUS

Permits

EARTH TECH DRILLING

2703 NW 19TH STREET, POMPANO BEACH, FL 33069

954.974.2424 FAX:954.974.2423

Date: 6/12/2024

FAC ID#:

PROPOSED SCOPE OF WORK:

Unit Unit Rate Number of Units

Extended Price

Equipment Type: DPT Track Rig

Direct Push Daily Rate 1 - on-site day whole day $1,700.00 2 $3,400.00

Direct Push Half-Day Rate 1 - on-site half day half day $0.00

Pre-Packed Well Screen (includes all materials) ID ___1"___ 5' Length Pack OD _______ each $100.00 14 $1,400.00

Auger Attachment, 2" Well Install with 4.25" ID Augers per foot $0.00

Auger Attachment, 4" Well Install with 6.25" ID Augers each $0.00

Slotted PVC Well Screen (includes all materials) 5' Length Pack OD ___1"____ each $0.00

Well Riser (includes all materials) ID ___1"___ 5' Length each $40.00 27 $1,080.00

Well Completion (includes 30 Min Dev. 8" B-D MH & locking well cap) per well $225.00 10 $2,250.00

Mobilization daily roundtrip $1,700.00 1 $1,700.00

Per Diem per crew / per night $575.00 2 $1,150.00

DOT Approved 55-gal Drum (As Needed) each $80.00 6 $480.00

Permits 2 (Drilling or abandonment only; cost according to WMD & Local Municipalities) each $60.00 2 $120.00

Permits 2 (Drilling or abandonment only; cost according to WMD & Local Municipalities) each $0.00

Water Sample each $65.00 0 $0.00

$0.00

TOTAL QUOTE PRICE $11,580.00

Notes:

Project No.: ___________________________

Date: 6/12/2024

Contractor Name: GHD - Brian Moore - 813 335-2147

Site Name : Plant City Laundry - 401 E Reynolds St - Plant City, FL

Signature and Title of Person Submitting Quote: Charles Bucher

Hand Clear ALL Locations to 5' or REFUSAL

(4) MW 1" x 12' w/ 10' Pre-Pack Screen & 8" BD Completion

(3) MW 1" x 19' w/ 5' Pre-Pack Screen & 8" BD Completion

(1) MW 1" x 25' w/ 5' Pre-Pack Screen & 8" BD Completion

(2) MW 1" x 27' w/ 5' Pre-Pack Screen & 8" BD Completion

No Soil Sampling

DIRECT PUSH TECHNOLOGY

MISCELLANEOUS

Days to Complete Scope of Work: 2 Days

Subcontract Company Name: EARTH TECH DRILLING. Inc.

Subcontract Mailing Address: 2703 NW 19th Street, Pompano Beach, FL 33069

ETD Policy: If pea gravel is encountered, borehole advancement is terminated. If client would like to continue borehole advancement, it is at the risk of the consultant, FDEP or property owner.

Monitoring Wells Sparge Wells Horizontal and Vertical Extraction Wells Geotechnical Drilling Direct Push

Updated: June 3, 2024

Bids Summary

IDW Disposal Bids – Non-Haz Water

Subcontractor Rate Unit

Erwin Remediation $125.00 Per Drum

Clark Environmental $140.00 - $310.00 Per Drum

Whatever Waste, LLC $150.00 - $200.00 Per Drum

From: Craig Burns To: Brian Moore Subject: GHD_IDW Drum Rates FL Date: Tuesday, June 28, 2022 10:26:46 AM Attachments: image001.png image002.png image003.png image004.png image005.png GHD Drum Rates FL 2022.pdf

Here you go Brian. I do this for a lot of engineering/consulting firms.

Be aware of the low stop less than 6 drums at $50/flat Be aware of the 10% to the total cost for FSC (implemented April 15).

Pass around the GHD Florida offices

From: Brian Moore <Brian.Moore@ghd.com> Sent: Tuesday, June 28, 2022 10:05 AM To: Craig Burns <cburns@clarkenvironmental.com> Subject: IDW Drums

Craig, Is it possible to provide a generic quote for IDW water disposal.

Assumption is non-haz with necessary analytical Maybe provide a range of locations

South florida or central florida, or both?

Thanks in advance

We have many sites that we generate 1 gw drum of IDW and would like to streamline the vendor coordination

BRIAN MOORE PE

GHD

Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA

O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com

The Power of Commitment

Connect

Please consider our environment before printing this email

CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.

File details come from the government source that posted it. Updated .