CN-370000-HW684-CSS2ACO1.pdf

PDF 2 MB Posted

Attached to
Master Agreement FL|HW684|68b160b8827755ddf560142dd2a41e53
Contract number
HW684
Issued by
Florida

About this file

This document is a Task Assignment (TA) Change Order issued by the State of Florida Department of Environmental Protection (FDEP) to GHD Services, Inc., under Contract Number HW684. The task assignment number is CSS02A, with project number ERIC_14964. The work is being performed at the Agricultural Insecticide site located at 48 SE Avenue B, Belle Glade, Florida. The project manager for FDEP is Allison Hankins (850-245-8990), and the contractor's project manager is Brian Moore (813-971-3882). The change order was executed on May 26, 2023, and is effective through the completion date of June 9, 2023.

The change order adjusts costs associated with a reduction in Investigative Derived Waste (IDW) disposal activities. The amended total TA value decreased from $25,774.46 to $25,404.40, representing a total cost reduction of $370.06. The reduction includes a $17.16 decrease in Subtask 1 (Project Management) due to reduced labor hours for preparing a waste manifest, and a $352.90 decrease in Subtask 3 (Field Work – Soil and Sediment Sampling) resulting from the removal of an IDW disposal drum and associated labor hours, as native soils were returned to their source locations and no investigation-derived waste was generated. The invoice schedule maintains three deliverables: the Site-Specific QAPP ($3,363.35 due upon QAPP approval), field work documentation ($11,741.44 due upon field work completion), and the Site Investigation Report ($10,299.61 due upon final report approval).

View the file

Other files

File Type Posted
CN-370000-HW684-BIL02B.pdf PDF
CN-370000-HW684-BIL02D.pdf PDF
CN-370000-HW684-BIL02G.pdf PDF
CN-370000-HW684-CSS01A.pdf PDF
CN-370000-HW684-CSS1ACO1.pdf PDF
CN-370000-HW684-CSS3BCO1.pdf PDF
CN-370000-HW684-DC001D.pdf PDF
CN-370000-HW684-DC003B.pdf PDF
CN-370000-HW684-DC004A.pdf PDF
CN-370000-HW684-DC004E.pdf PDF
CN-370000-HW684-DC005B.pdf PDF
CN-370000-HW684-DC005E.pdf PDF
CN-370000-HW684-DC006C.pdf PDF
CN-370000-HW684-DC007C.pdf PDF
CN-370000-HW684-DC008A.pdf PDF
CN-370000-HW684-DC008D.pdf PDF
CN-370000-HW684-DC010D.pdf PDF
CN-370000-HW684-DC011D.pdf PDF
CN-370000-HW684-DC012E.pdf PDF
CN-370000-HW684-DC013A.pdf PDF
CN-370000-HW684-DC014A.pdf PDF
CN-370000-HW684-DC017B.pdf PDF
CN-370000-HW684-DC018D.pdf PDF
CN-370000-HW684-DC019A.pdf PDF
CN-370000-HW684-DC019B.pdf PDF
CN-370000-HW684-DC01ACO1.pdf PDF
CN-370000-HW684-DC01ACO5.pdf PDF
CN-370000-HW684-DC01ACO6.pdf PDF
CN-370000-HW684-DC021D.pdf PDF
CN-370000-HW684-DC022B.pdf PDF
CN-370000-HW684-DC023A.pdf PDF
CN-370000-HW684-DC025B.pdf PDF
CN-370000-HW684-DC025C.pdf PDF
CN-370000-HW684-DC027A.pdf PDF
CN-370000-HW684-DC028B.pdf PDF
CN-370000-HW684-DC031B.pdf PDF
CN-370000-HW684-DC031C.pdf PDF
CN-370000-HW684-DC032A.pdf PDF
CN-370000-HW684-DC035B.pdf PDF
CN-370000-HW684-DC035C.pdf PDF
CN-370000-HW684-DC039A.pdf PDF
CN-370000-HW684-DC03ACO2.pdf PDF
CN-370000-HW684-DC040B.pdf PDF
CN-370000-HW684-DC040C.pdf PDF
CN-370000-HW684-DC041A.pdf PDF
CN-370000-HW684-DC043A.pdf PDF
CN-370000-HW684-DC044A.pdf PDF
CN-370000-HW684-DC045C.pdf PDF
CN-370000-HW684-DC04A.pdf PDF
CN-370000-HW684-DC053A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Name:

4. ☐ There are no changes to the TA compensation.

☐ The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO ☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. ☐ There are no changes to the TA Expiration Date.

☐ The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. ☐ There are no changes to the Attachments.

☐ Attachment ___ is replaced with Attachment -____.

7. ☐ No Additional Changes.

☐ Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

CSS02A 1 HW684

This Task Assignment Change Order (TACO) adjusts costs associated with a reduction in Investigative Derived Waste (IDW) disposal.

Allison Hankins 850 245 8990 Contractor Contractor

Contractor Contractor

Contractor

GHD Services, Inc.

Brian Moore 813 971 3882

ERIC_14964

Agricultural Insecticide

✔ $ 25,404.40 $ 25,774.46

$ 25,404.40 $ 25,774.46 ✔ Completion

Completion 0

✔ 1 1 1

GHD Services, Inc.

Brian Moore

Vice President

Brian Moore Digitally signed by Brian Moore Date: 2023.05.26 21:17:21 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2023.05.26 15:44:23 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01_18

Contract Number:

Task Assignment #:

Change Order #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW684

CSS02A

$ 25,404.40

Site-Specific QAPP

Field Notes, subcontractor receipts

Site Investigation Report/Project Management

Upon completion of QAPP preparation and DEP approval of Site-Specific QAPP (Subtask 2)

Upon completion of site screening event and submittal and DEP approval of Site Investigation Report/Project Management (Subtasks 1 & 4)

Upon completion of field work and DEP approval of field notes, subcontractor receipts (Subtask 3)

03/13/2023

05/18/2023

06/09/2023

$ 11,741.44

$ 3,363.35

$ 10,299.61 www.FloridaDEP.gov

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: GHD Services Inc. HW684 Contract File

FROM: Allison Hankins, Contract Manager

DATE: May 26, 2023

SUBJECT: Negotiation Summary – CER21, TA CSS-02AC1

Site Investigation (SI) Activities Agricultural Insecticide

ERIC_14964

This Task Assignment Change Order (TACO) is for changes in cost associated with a decrease in labor hours for preparing a waste manifest and the removal of a drum. This work is for conducting a Site Investigation, including site Field Work, at Agricultural Insecticide. The services are being conducted using federal funds from the CERCLA Site Screening Program (CSS) cooperative agreement that is administered by DEP on behalf of EPA.

Subtask 1: Project Management The decrease of task labor hours produced a change associated with Project Management. This change resulted in a cost actual decrease of $17.16.

Subtask 2: Preparation of a Site-Specific Quality Assurance Project Plan No cost changes associated with this subtask.

Subtask 3: Field Work – Soil and Sediment Sampling During field activities, native soils were returned to their source locations and no investigation derived waste (IDW) was generated. A drum was not needed to dispose of IDW at the site, and no waste manifest was required. The drum and labor hours associated with IDW were removed from the total cost, resulting in a cost actual decrease of $352.90.

Subtask 4: Report and Data Summary Tables/Figures – Draft and Final No cost changes associated with this subtask.

Summary DEP’s CSS Project Manager and GHD’s Project Manager have both agreed to the above changes. All changes noted above represent a total overall cost decrease of $370.06, as shown in the Cost Actual LOE. The final cost associated with this TA decreased from $25,774.46 to $25,404.40. Documentation of the changes is included in the Delta Level of Effort spreadsheet and the Cost Actual LOE spreadsheet, and the TACO Form for CSS02AC1 prepared by the Department. The final deliverable must be received by DEP no later than June 9, 2023.

http://www.floridadep.gov/

FDEP COST ESTI MATEContractor: GHD Services Inc.

Date: 05/26/23

Task #: CS002 SubTask 1 Project Management SubTask 6

Site: Agricultural Insecticide C SubTask 2 QAPP SubTask 7

Activity/Phase: Site Screening SubTask 3 Soil and Sediment Sampling SubTask 8

Project Manager: Brian Moore, PE SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$44.81 Project Manager JM 21.00 21.0 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$51.08 Sr Professional Enginee JH 34.00 1.00 0.00 33.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$40.72 Professional Engineer/S ES 10.00 0.00 0.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 $40.11 Project Engineer/Scienti TC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $44.81 Project Manager/ Engine JM 38.00 22.00 12.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 $27.40 Staff Engineer/Scientist ED 38.00 0.00 38.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $35.10 Staff Engineer/Scientist CH 48.00 0.00 48.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.40 Data Analyst JL 6.00 0.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.53 Senior Technician SA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.35 Senior Technician SC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.89 Senior Technician WM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.25 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.00 Junior Technician JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.69 Drafting Technician PM 7.00 2.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.16 Administrative Assistant DA 11.00 2.00 5.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Driller 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 HSEQ&R Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 213.00 21.00 27.00 108.00 57.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $8,169.55 $939.86 $1,142.60 $3,527.97 $2,559.12 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 129.80% $10,604.08 $1,219.94 $1,483.09 $4,579.31 $3,321.74 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% $3,088.09 $355.27 $431.90 $1,333.57 $967.35 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $21,861.72 $2,515.07 $3,057.59 $9,440.85 $6,848.21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $480.00 $0.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $480.00 $0.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 4

Task #: CS002 SubTask 1 Project Management SubTask 6

Site: Agricultural Insecticide C SubTask 2 QAPP SubTask 7

Activity/Phase: Site Screening SubTask 3 Soil and Sediment Sampling SubTask 8

Project Manager: Brian Moore, PE SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $6.50 $0.00 $6.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $6.50 $0.00 $6.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $160.00 $0.00 $160.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $530.00 $0.00 $530.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $180.00 $0.00 $180.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $870.00 $0.00 $870.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $23,218.22 $2,515.07 $3,057.59 $10,797.35 $6,848.21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $2,186.18 $251.51 $305.76 $944.09 $684.82 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $25,404.40 $2,766.58 $3,363.35 $11,741.44 $7,533.03 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Original $25,774.46 $2,783.74 $3,363.35 $12,094.34 $7,533.03 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Delta ($370.06) ($17.16) $0.00 ($352.90) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Rounding Error $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 5

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Agricultural Insecticide Company

SUBTASK 2: QAPP

DATE: 05/26/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Professional Engineer JH Finalize QAPP 1

Project Manager JM Prepare QAPP 4 Project Manager JM Overview and Study objectives 4 Project Manager JM Sampling Locations and Rationale 2 Project Manager JM Data Generation and quality/handling 4 Project Manager JM Field Work 4 Project Manager JM Data Validation 4

Drafting Technician PM Prepare figures for QAPP 2

Administrative Assistant DA Finalize QAPP 2

TOTAL LABOR 27

VEHICLE TYPE RATE UNIT USEAGE

$0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

$0.00 $0.00

Equipment (Analytical Related)

$0.00 $0.00

Equipment (Other) $0.00

TOTAL EQUIPMENT $0.00

FINAL --7/24/96

SUBTASK 3: Soil and Sediment Sampling

DATE: 05/26/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager JM Site Access 1 Project Manager JM Prepare HASP 3 Project Manager JM Prepare field scope of work 2 Project Manager JM Characterize IDW 0 Project Manager JM Laboratory Data Validation 2 Project Manager JM Prepare Data Summary Package 4

Staff Engineer/Scientist ED Mob/demob (4 days from Wellington) 6 Staff Engineer/Scientist ED Soil Boring Advancement and sampling (7 locations) 16 Staff Engineer/Scientist ED Sediment Sampling (7 locations) 16

Staff Engineer/Scientist CH Mob/demob (4 days from Ft Myers) 16 Staff Engineer/Scientist CH Soil Boring Advancement and sampling (7 locations) 16 Staff Engineer/Scientist CH Sediment Sampling (7 locations) 16

Drafting Technician PM Site Plan with sample Locations 1 Drafting Technician PM Prepare soil data figure 2 Drafting Technician PM Prepare sediment data figure 2

Administrative Assistant DA Data entry and prepare summary tables (soil and sediment) 5

TOTAL LABOR 108

VEHICLE TYPE RATE UNIT USEAGE

Company Truck $120.00 day 4 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW Disposal $110 drum 0 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Ice $6.50 1 $6.50

TOTAL LAB $6.50

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

Expendables $40.00 day 4 $160.00

Equipment (Analytical Related) sediment dredge $30.00 day 2 $60.00 Soil sampling kit (through concrete) $235.00 day 2 $470.00

Equipment (Other)

Jon Boat $90.00 day 2 $180.00 Drum $100.00 drum 0 $0.00

TOTAL EQUIPMENT $870.00

SUBTASK 4: Site Investigation Report

DATE: 05/26/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager JM Prepare Site Investigation Report 4

Sr Professional Geologist ES Hydrogeologic Setting 6 Sr Professional Geologist ES Sampling Locations and Rationale 4

Data Analyst JL Laboratory Data Validation 6

Sr. Professional Engineer JH Site Background 4 Sr. Professional Engineer JH Objectives 3 Sr. Professional Engineer JH Site Setting 6 Sr. Professional Engineer JH Soil Sampling Methodology 4 Sr. Professional Engineer JH Sediment Sampling Methodology 4 Sr. Professional Engineer JH Soil Analytical Results 4 Sr. Professional Engineer JH Sediment Analtycal Results 4 Sr. Professional Engineer JH Conclusion/Findings 4

Administrative Assistant DA Finalize Site Investigation Report 4

TOTAL LABOR 57

VEHICLE TYPE RATE UNIT USEAGE

$0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

$0.00 $0.00

Equipment (Analytical Related)

$0.00 $0.00

Equipment (Other) $0.00

TOTAL EQUIPMENT $0.00

Task #: CS002 SubTask 1 Project Management SubTask 6

Site: Agricultural Insecticide C SubTask 2 #REF! SubTask 7

Activity/Phase: Site Screening SubTask 3 Soil and Sediment Sampling SubTask 8

Project Manager: Brian Moore, PE SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$44.81 Project Manager JM -0.10 -0.1 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$51.08 Sr Professional Enginee JH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$40.72 Professional Engineer/S ES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $40.11 Project Engineer/Scienti TC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $44.81 Project Manager/ Engine JM -1.00 0.00 -1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $27.40 Staff Engineer/Scientist ED 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $35.10 Staff Engineer/Scientist CH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.40 Data Analyst JL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.53 Senior Technician SA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.35 Senior Technician SC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.89 Senior Technician WM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.25 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.00 Junior Technician JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.69 Drafting Technician PM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.16 Administrative Assistant DA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Driller 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 HSEQ&R Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours -1.10 -0.10 0.00 -1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor ($50.64) ($5.83) $0.00 ($44.81) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 129.80% ($65.73) ($7.57) $0.00 ($58.16) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% ($19.14) ($2.20) $0.00 ($16.94) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor ($135.51) ($15.60) $0.00 ($119.91) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW ($110.00) $0.00 ($110.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 1

Task #: CS002 SubTask 1 Project Management SubTask 6

Site: Agricultural Insecticide C SubTask 2 #REF! SubTask 7

Activity/Phase: Site Screening SubTask 3 Soil and Sediment Sampling SubTask 8

Project Manager: Brian Moore, PE SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal ($110.00) $0.00 ($110.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee ($11.00) $0.00 ($11.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost ($121.00) $0.00 ($121.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) ($100.00) $0.00 ($100.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses ($100.00) $0.00 ($100.00) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal ($356.51) ($15.60) $0.00 ($340.91) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee ($13.55) ($1.56) $0.00 ($11.99) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost ($370.06) ($17.16) $0.00 ($352.90) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 2

SUBTASK 3: Soil and Sediment Sampling

DATE: 05/26/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager JM Site Access 0 Project Manager JM Prepare HASP 0 Project Manager JM Prepare field scope of work 0 Project Manager JM Characterize IDW -1 Project Manager JM Laboratory Data Validation 0 Project Manager JM Prepare Data Summary Package 0

-1

Staff Engineer/Scientist ED Mob/demob (4 days from Wellington) 0 Staff Engineer/Scientist ED Soil Boring Advancement and sampling (7 locations) 0 Staff Engineer/Scientist ED Sediment Sampling (7 locations) 0

Staff Engineer/Scientist CH Mob/demob (4 days from Ft Myers) 0 Staff Engineer/Scientist CH Soil Boring Advancement and sampling (7 locations) 0 Staff Engineer/Scientist CH Sediment Sampling (7 locations) 0

Drafting Technician PM Site Plan with sample Locations 0 Drafting Technician PM Prepare soil data figure 0 Drafting Technician PM Prepare sediment data figure 0

Administrative Assistant DA Data entry and prepare summary tables (soil and sediment) 0

TOTAL LABOR -1

VEHICLE TYPE RATE UNIT USEAGE

Company Truck $120.00 day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW Disposal $110 drum -1 ($110.00)

TOTAL ($110.00)

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Ice $6.50 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

Expendables $40.00 day 0 $0.00

Equipment (Analytical Related) sediment dredge $30.00 day 0 $0.00 Soil sampling kit (through concrete) $235.00 day 0 $0.00

Equipment (Other)

Jon Boat $90.00 day 0 $0.00 Drum $100.00 drum -1 ($100.00)

TOTAL EQUIPMENT ($100.00)

FDEP COST ESTIMATEContractor: GHD Services Inc.

Task #: CS002 SubTask 1 Project Management SubTask 6

Site: Agricultural Insecticide C SubTask 2 QAPP SubTask 7

Activity/Phase: Site Screening SubTask 3 Soil and Sediment Sampling SubTask 8

Project Manager: Brian Moore, PE SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$44.81 Project Manager JM 21.10 21.1 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$51.08 Sr Professional Enginee JH 34.00 1.00 0.00 33.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$40.72 Professional Engineer/S ES 10.00 0.00 0.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 $40.11 Project Engineer/Scienti TC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $44.81 Project Manager/ Engine JM 39.00 22.00 13.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 $27.40 Staff Engineer/Scientist ED 38.00 0.00 38.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $35.10 Staff Engineer/Scientist CH 48.00 0.00 48.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.40 Data Analyst JL 6.00 0.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.53 Senior Technician SA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.35 Senior Technician SC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.89 Senior Technician WM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.25 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.00 Junior Technician JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.69 Drafting Technician PM 7.00 2.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.16 Administrative Assistant DA 11.00 2.00 5.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Driller 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 HSEQ&R Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 214.10 21.10 27.00 109.00 57.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $8,220.19 $945.69 $1,142.60 $3,572.78 $2,559.12 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 129.80% $10,669.81 $1,227.51 $1,483.09 $4,637.47 $3,321.74 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% $3,107.23 $357.47 $431.90 $1,350.51 $967.35 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $21,997.23 $2,530.67 $3,057.59 $9,560.76 $6,848.21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $480.00 $0.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $480.00 $0.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $110.00 $0.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 1

FDEP COST ESTIMATEContractor: GHD Services Inc.

Task #: CS002 SubTask 1 Project Management SubTask 6

Site: Agricultural Insecticide C SubTask 2 QAPP SubTask 7

Activity/Phase: Site Screening SubTask 3 Soil and Sediment Sampling SubTask 8

Project Manager: Brian Moore, PE SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $110.00 $0.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $11.00 $0.00 $11.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $121.00 $0.00 $121.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $6.50 $0.00 $6.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $6.50 $0.00 $6.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $160.00 $0.00 $160.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $530.00 $0.00 $530.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $280.00 $0.00 $280.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $970.00 $0.00 $970.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $23,574.73 $2,530.67 $3,057.59 $11,138.26 $6,848.21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $2,199.73 $253.07 $305.76 $956.08 $684.82 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $25,774.46 $2,783.74 $3,363.35 $12,094.34 $7,533.03 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 2

SUBTASK 2: QAPP

DATE: 05/26/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Professional Engineer JH Finalize QAPP 1

Project Manager JM Prepare QAPP 4 Project Manager JM Overview and Study objectives 4 Project Manager JM Sampling Locations and Rationale 2 Project Manager JM Data Generation and quality/handling 4 Project Manager JM Field Work 4 Project Manager JM Data Validation 4

Drafting Technician PM Prepare figures for QAPP 2

Administrative Assistant DA Finalize QAPP 2

TOTAL LABOR 27

VEHICLE TYPE RATE UNIT USEAGE

$0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

$0.00 $0.00

Equipment (Analytical Related)

$0.00 $0.00

Equipment (Other) $0.00

TOTAL EQUIPMENT $0.00

SUBTASK 3: Soil and Sediment Sampling

DATE: 05/26/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager JM Site Access 1 Project Manager JM Prepare HASP 3 Project Manager JM Prepare field scope of work 2 Project Manager JM Characterize IDW 1 Project Manager JM Laboratory Data Validation 2 Project Manager JM Prepare Data Summary Package 4

Staff Engineer/Scientist ED Mob/demob (4 days from Wellington) 6 Staff Engineer/Scientist ED Soil Boring Advancement and sampling (7 locations) 16 Staff Engineer/Scientist ED Sediment Sampling (7 locations) 16

Staff Engineer/Scientist CH Mob/demob (4 days from Ft Myers) 16 Staff Engineer/Scientist CH Soil Boring Advancement and sampling (7 locations) 16 Staff Engineer/Scientist CH Sediment Sampling (7 locations) 16

Drafting Technician PM Site Plan with sample Locations 1 Drafting Technician PM Prepare soil data figure 2 Drafting Technician PM Prepare sediment data figure 2

Administrative Assistant DA Data entry and prepare summary tables (soil and sediment) 5

TOTAL LABOR 109

VEHICLE TYPE RATE UNIT USEAGE

Company Truck $120.00 day 4 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW Disposal $110 drum 1 $110.00

TOTAL $110.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Ice $6.50 1 $6.50

TOTAL LAB $6.50

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

Expendables $40.00 day 4 $160.00

Equipment (Analytical Related) sediment dredge $30.00 day 2 $60.00 Soil sampling kit (through concrete) $235.00 day 2 $470.00

Equipment (Other)

Jon Boat $90.00 day 2 $180.00 Drum $100.00 drum 1 $100.00

TOTAL EQUIPMENT $970.00

SUBTASK 4: Site Investigation Report

DATE: 05/26/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager JM Prepare Site Investigation Report 4

Sr Professional Geologist ES Hydrogeologic Setting 6 Sr Professional Geologist ES Sampling Locations and Rationale 4

Data Analyst JL Laboratory Data Validation 6

Sr. Professional Engineer JH Site Background 4 Sr. Professional Engineer JH Objectives 3 Sr. Professional Engineer JH Site Setting 6 Sr. Professional Engineer JH Soil Sampling Methodology 4 Sr. Professional Engineer JH Sediment Sampling Methodology 4 Sr. Professional Engineer JH Soil Analytical Results 4 Sr. Professional Engineer JH Sediment Analtycal Results 4 Sr. Professional Engineer JH Conclusion/Findings 4

Administrative Assistant DA Finalize Site Investigation Report 4

TOTAL LABOR 57

VEHICLE TYPE RATE UNIT USEAGE

$0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

$0.00 $0.00

Equipment (Analytical Related)

$0.00 $0.00

Equipment (Other) $0.00

TOTAL EQUIPMENT $0.00

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW684

CSS02A Completion August 9, 2023

GHD Services, Inc. will conduct a CERCLA Site Screening event and generate a Site Inspection Report in accordance with the cost proposal and Level of Effort (LOE) submitted on February 3, 2023.

Allison Hankins 850 245 8990 Contractor GHD Services, Inc. Contractor

Contractor Brian Moore Contractor 813 971 3882

ERIC_14964

48 SE Avenue B, Belle Glade

Agricultural Insecticide

Contractor Contractor

✔ $ 25,774.46

$ 25,774.46

Scope of Work

GHD Services, Inc.

Contractor Brian Moore

Vice President

Brian Moore Digitally signed by Brian Moore Date: 2023.02.08 17:25:17 -05'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2023.02.08 08:31:33 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Site-specific QAPP 03/13/2023

Field notes, subcontractor receipts, waste manifest 05/18/2023

Site Investigation Report/Project Management 06/09/2023

Upon completion of QAPP preparation and DEP approval of Site-specific QAPP (Subtask 2) $ 3,363.35

Upon completion of field work and DEP approval of field notes, subcontractor receipts, waste manifest (Subtask 3) $ 12,094.34

Upon completion of site screening event and submittal and DEP approval of Site Investigation Report/Project Management (Subtasks 1 & 4) $ 10,316.77

$ 25,774.46

HW684

CSS02A

HW684_CSS02AC1_unsigned_BH
Task Assignment Change Order Form_pending info from GHD
Negotiation Summary - TACO
TA_002 Final CO1
Sub 2
Sub 3 Final CO1
Sub 4
Cost Estimate Final CO1
TA_002 Delta CO1
Cost Estimate Delta CO1
Sub 3 Delta CO1
TA_002
Cost Estimate
Sub 2
Sub 3
Sub 4

HW684_CSS02A_

File details come from the government source that posted it. Updated .