About this file

This is a Task Assignment (TA) document under Contract Number HW683 between the State of Florida Department of Environmental Protection (FDEP) and Geosyntec Consultants, Inc. The TA authorizes work at the Former Luxury Laundry and Drycleaning property located at 2801 Okeechobee Boulevard, West Palm Beach, Florida (FDEP Site ID ERIC_5227). The Department Project Manager is Sarah Aduwa, and the Contractor's Project Manager is Nick Barnes. The Task Assignment is effective through February 13, 2026.

Geosyntec will conduct per- and polyfluoroalkyl substances (PFAS) screening activities comprising two subtasks: Project Management and Groundwater Sampling/PFAS Screening/PFAS Reporting. Subtask 2 involves measuring depth to water in eight monitoring wells and collecting groundwater samples for PFAS analysis from two monitoring wells (MW004S and MW002S) using low-flow purging via peristaltic pump. Deliverables include a PFAS summary email with one table, one figure showing PFOA, PFOS, and combined concentrations, field forms, equipment calibration logs, groundwater sampling forms, and a certified analytical laboratory report, due December 12, 2025. The work comprises 24 total labor hours across multiple staff categories. The Total Task Assignment Value is $4,347.06 on a Fixed Unit Rate basis, comprising $3,442.78 in direct labor with 172.70% overhead, $120.00 vehicle rental, $110.00 laboratory shipping, $330.00 equipment costs, and $344.28 completion fee. Invoice payment of the full $4,347.06 is due upon submittal and FDEP approval of the PFAS summary deliverable.

View the file

Other files

File Type Posted
CN-370000-CN802-T9.pdf PDF
CN-370000-HW683-BF01BCO1.pdf PDF
CN-370000-HW683-BF04C.pdf PDF
CN-370000-HW683-BF04CCO1.pdf PDF
CN-370000-HW683-BIL02A.pdf PDF
CN-370000-HW683-DC001E.pdf PDF
CN-370000-HW683-DC001F.pdf PDF
CN-370000-HW683-DC002D.pdf PDF
CN-370000-HW683-DC002E.pdf PDF
CN-370000-HW683-DC003B.pdf PDF
CN-370000-HW683-DC003C.pdf PDF
CN-370000-HW683-DC003E.pdf PDF
CN-370000-HW683-DC010D.pdf PDF
CN-370000-HW683-DC012A.pdf PDF
CN-370000-HW683-DC012C.pdf PDF
CN-370000-HW683-DC013B.pdf PDF
CN-370000-HW683-DC020A.pdf PDF
CN-370000-HW683-DC020C.pdf PDF
CN-370000-HW683-DC021A.pdf PDF
CN-370000-HW683-DC023A.pdf PDF
CN-370000-HW683-DC024B.pdf PDF
CN-370000-HW683-DC024C.pdf PDF
CN-370000-HW683-DC026A.pdf PDF
CN-370000-HW683-DC027A.pdf PDF
CN-370000-HW683-DC027B.pdf PDF
CN-370000-HW683-DC028A.pdf PDF
CN-370000-HW683-DC02DCO1.pdf PDF
CN-370000-HW683-DC02FCO1.pdf PDF
CN-370000-HW683-DC030C.pdf PDF
CN-370000-HW683-DC031B.pdf PDF
CN-370000-HW683-DC034C.pdf PDF
CN-370000-HW683-DC036A.pdf PDF
CN-370000-HW683-DC037D.pdf PDF
CN-370000-HW683-DC039C.pdf PDF
CN-370000-HW683-DC03CCO2.pdf PDF
CN-370000-HW683-DC03ECO1.pdf PDF
CN-370000-HW683-DC040C.pdf PDF
CN-370000-HW683-DC041D.pdf PDF
CN-370000-HW683-DC043C.pdf PDF
CN-370000-HW683-DC044A.pdf PDF
CN-370000-HW683-DC046A.pdf PDF
CN-370000-HW683-DC047A.pdf PDF
CN-370000-HW683-DC049A.pdf PDF
CN-370000-HW683-DC052A.pdf PDF
CN-370000-HW683-DC053B.pdf PDF
CN-370000-HW683-DC054A.pdf PDF
CN-370000-HW683-DC05BCO3.pdf PDF
CN-370000-HW683-DC06ACO1.pdf PDF
CN-370000-HW683-DC07BCo1.pdf PDF
CN-370000-HW683-DC08BCO2.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW683

DC038C Completion February 13, 2026

This Task Assignment authorizes Geosyntec to conduct PFAS Screening activities at Luxury Laundry Property in accordance with Geosyntec’s scope of work, cost estimate and schedule received on June 9, 2025.

Sarah Aduwa 850-245-8973 Contractor Geosyntec Contractor

Contractor Nick Barnes Contractor 813-557-1165

ERIC 5227

2801 Okeechobee Boulevard West Palm Beach, Florida 33409

Luxury Laundry and Drycleaning (Former)

Contractor Contractor

✔ $ 4,347.06

$ 4,347.06

Scope of Work

Geosyntec Contractor Todd Kafka

Contract Manager

Todd Kafka, P.G. Digitally signed by Todd Kafka, P.G.

Date: 2025.09.08 12:23:22 -04'00'

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2025.09.08 10:58:25 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtasks 1, 2 - Submittal of PFAS summary email with 1 table, 1 figure, field forms, and certified lab report, field notes 12/12/2025

Subtasks 1, 2 - Submittal and FDEP approval of PFAS summary email with 1 table, 1 figure, field forms, and certified lab report, field notes $ 4,347.06

$ 4,347.06

HW683

DC038C

To: HW683 Contract Negotiation File Former Luxury Laundry and Drycleaning West Palm Beach, Florida

ERIC_5227

From: Sarah Aduwa, Project Manager Date: September 8, 2025 Subject: Negotiation Summary

HW683_DC039C

This Task Assignment authorizes Geosyntec to conduct PFAs Screening activities at Luxury Laundry Property in accordance with Geosyntec’s scope of work, cost estimate and schedule received on June 9, 2025.

Nick Barnes is the project manager; his hours are directly computed.

Subtask 2 – Groundwater Sampling, PFAS Screening, PFAS Reporting Geosyntec will measure depth to water (DTW) in the eight (8) Site monitoring wells prior to collecting groundwater samples for PFAS analysis from two (2) monitoring wells, MW004S and MW002S. The groundwater samples will be collected using low-flow purging via a peristaltic pump in accordance with draft SOPs for PFAS sampling developed by FDEP and the SOPs for PFAS sampling prepared by Geosyntec for use at FDEP’s Site Investigation Section firefighting training facilities. PFAS free water will be used to decontaminate the water level meter between sampling wells. Excess purge water will be minimal and not containerized as a result. Geosyntec will prepare an email deliverable with attachments including one figure with groundwater analytical results for PFAS (showing PFOA, PFOS, and PFOA + PFOS concentrations for each well sampled and no isoconcentration lines), certified analytical laboratory report, and field forms including equipment calibration logs, and groundwater sampling forms.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task assignment. The final cost is $4,347.06 with 24 labor hours.

FD

EP

C O

ST

E

ST

IM

A

TE

C on tra ct or

G eo sy nt ec C on su lta nt s

D at e:

6/ 9/

Ta sk

S ub

Ta sk

P ro je ct M an ag em en t S ub Ta sk

S ite

Lu xu ry

L au nd ry

S ub

Ta sk

P

FA

S

S am pl in g an d R ep or tin g

S ub

Ta sk

A ct iv ity

/P ha se

A ss es sm en t

S ub

Ta sk

S ub Ta sk

P ro je ct

M an ag er

N ic k

B ar ne s

S ub

Ta sk

S ub Ta sk

S ub

Ta sk

S ub Ta sk

T To ta ls

La bo r

R at e C at eg or y

$6 1.

P P ro je ct M an ag er

N . B ar ne s

2.

$1

.7

Pr in ci pa l T.

K af ka

$7

0.

Se ni or P ro fe ss io na l

S . W an g

$6 1.

Pr oj ec t P ro fe ss io na l N

. B ar ne s

$4 4.

Pr of es si on al C

. S av ill e

$3 8.

Se ni or

S ta ff Pr of es si on a R

. T em pl e

To ta l H ou rs

D ire ct L ab or

$1

,2

.4

$1

.2

$1 ,1

.2

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

O ve rh ea d

2.

$2

,1

.3

$2

.8

$1 ,9

.4

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

G en

A dm in 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fr in ge

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L ab or

$3 ,4

.7

$3

.0

$3

,0

.7

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Co st

E st im at e Pa ge o f

Co st E st im e

FD

EP

C O

ST

E

ST

IM

A

TE

C on tra ct or

G eo sy nt ec C on su lta nt s

D e:

6/ 9/

Ta sk

S ub

Ta sk

P ro je ct M an ag em en t S ub Ta sk

S ite

Lu xu ry

L au nd ry

S ub

Ta sk

P

FA

S

S am pl in g an d R ep or tin g

S ub

Ta sk

A ct iv ity

/P ha se

A ss es sm en t

S ub

Ta sk

S ub Ta sk

P ro je ct

M an ag er

N ic k

B ar ne s

S ub

Ta sk

S ub Ta sk

S ub

Ta sk

S ub Ta sk

T To ta ls

TTr av el

V eh ic le

R en ta l

$1

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ile ag e

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

A ir Fa re $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P er d ie m

H ot el

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l

$ $1

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (E qu ip m en t P ro cu re m en

t) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P ro cu re m en t F ee $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

(S er vi ce s P ro cu re m en t)

D ril lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ur ve yi ng

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til iti es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

H an dl in g Fe e $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

La bo ra to ry

A na ly tic al C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fa st

T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S am pl e

S hi pp in g $1

.0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or at or y $1

.0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fi el d

E xp en se s P er so na l P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E xp en da bl es $4

0.

$4 0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( D ril lin g re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( A na ly tic al re la te d)

$2

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

ID

W re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

O th er

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l F ie ld E xp en se s

$3

.0

$3

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub to ta l $4

,0

.7

$3

.0

$3 ,6

.7

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

C om pl et io n Fe e $3

.2

$3

9.

$3

.6

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l E st im at ed C os t

$4 ,3

.0

$4

.6

$3

,9

.3

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

C os t f ro m P rio r C

E F:

M an ua l E nt ry

C os t f ro m D el ta

C E

F;

M an ua l E nt ry C os t (

P rio r + D el ta

$0

.0

A ut o- C al cu la te d R ou nd in g

E rr or

$4 ,3

.0

A ut o-

C al cu la te d

Fi na l T ot al C os t:

$4 ,3

.0

A ut o-

C al cu la te d

Co st

E st im at e Pa ge o f

Co st E st im e

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Luxury Laundry SUBTASK: PFAS Sampling and Reporting

DATE: 6/9/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 1

Senior Professional

S. Wang 2

Project Professional N. Barnes

Professional C. Saville 2

Sr. Staff Professional R. Temple

TOTAL LABOR 22

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 Day 1 $120.00 Subtotal $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

TOTAL SUB $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Shipping

Large Cooler (25 to 50 lbs) $150.00 0 $0.00 Small Cooler (0 to 25 lbs) $110.00 1 $110.00

Subtotal $110.00

TOTAL LAB $110.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Analytical Related

Groundwater Sampling Kit $290.00 Day 1 $290.00 Subtotal $290.00

Expendables $40.00 Day 1 $40.00

Subtotal $40.00

TOTAL EQUIPMENT $330.00

Data evaluation and path forward recommendation

Analytical data import and data management (1 hr); prepare MW results/parameter tables (1 hr)

Property owner and tenant notifications (1 hr). FDEP central lab sample kit coordination (1 hr);

Evaluating and interpreting field data (1 hr). Prepare PFAS summary deliverable (3 hr)

PFAS groundwater results figure

Field preparation (1 hr); Rd trip mobilization Boca office (3 hrs); Collect 8 DTW (1 hr); Sample 2 wells for PFAS including additional decon procedures (2 wells @ 2 hr/well = 4 hrs). Sample management for FDEP lab (1 hr); Compile field notes (1 hr)

7/10/2025 Page 3 of 3 Subtask 2

777 Yamato Road, Suite 600 Boca Raton, FL, Florida 33431

PH 561.995.0900

www.geosyntec.com

9 June 2025

Ms. Sarah Aduwa Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road, MS 4500 Tallahassee, Florida 32399-2400

Subject: Scope of Work and CEF/LOE – PFAS Screening Luxury Laundry and Drycleaning (Former) 2801 Okeechobee Boulevard West Palm Beach, Florida 33409 FDEP Site ID No. ERIC_5227

Dear Sarah, Geosyntec Consultants, Inc. (Geosyntec) has prepared this Scope of Work and Level of Effort (LOE) for screening of per- and polyfluoroalkyl substances (PFAS) in groundwater at the Former Luxury Laundry and Drycleaning site (“Site”) located in West Palm Beach, Florida (ERIC_5227).

Geosyntec prepared this SOW following discussions during our site review meeting with the Waste Site Cleanup Section (WSCS) staff on April 29, 2025. Geosyntec documented in the Site Assessment Report (January 2025) that volatile organic halocarbons (VOHs) were not detected in soil and Site groundwater above regulatory criteria and only one of four vapor sample exceeded 1000 micrograms per cubic meter; as a result, Geosyntec recommended no further action in the SAR, which is still under review by the WSCS. , Geosyntec has confirmed the Site Access Agreement (SAA) executed with Palm Beach Imports, Inc. on March 27, 2023 remains in effect based on information reviewed on the Palm Beach County property appraiser website on June 5, 2025. The former dry cleaning operation is no longer present, and the property is now a luxury car dearlership.

Subtask 1 – Project Management

Nick Barnes, Project Engineer, will be the project manager (PM), and his PM hours are directly computed.

Subtask 2 – Groundwater Sampling, PFAS Screening, PFAS Reporting

Geosyntec will measure depth to water (DTW) in the eight (8) Site monitoring wells prior to collecting groundwater samples for PFAS analysis from two (2) monitoring wells, MW004S and

Ms. Sarah Aduwa June 9, 2025 MW002S (see image at right). The October 2023 groundwater results indicated detectable concentrations of select VOH consittuents in samples from each monitoring well, however none of the VOH concentrations exceeded applicable GCTLs.

MW004S is in the location believed to be closest to the former source area at the Site and MW002S the nearest downgradinetr monitoring well. The groundwater samples will be collected using low-flow purging via a peristaltic pump in accordance with draft SOPs for PFAS sampling developed by FDEP and the SOPs for PFAS sampling prepared by Geosyntec for use at FDEP’s Site Investigation Section firefighting training facilities. PFAS free water will used to decontaminate the water level meter between sampling wells. Excess purge water will be minimal and not containerzed as a result.

Geosyntec will coordinate with the FDEP laboratory to ship the sampling kits with return shipping labels to our Boca Raton office. Geosyntec will ship the two collected samples to the FDEP laboratory the day of collection via overnight delivery.

Geosyntec will prepare an email deliverable with attachments including one figure with groundwater analytical results for PFAS (showing PFOA, PFOS, and PFOA + PFOS concentrations for each well sampled and no isoconcentration lines), certified analytical laboratory report, and field forms including equipment calibration logs, and groundwater sampling forms.

The email deliverable will be submitted to the FDEP within two working days of receipt of the final certified analytical laboratory report from the FDEP laboratory. Geosyntec assumes the final analytical laboratory report will be emailed by the FDEP laboratory to Nick Barnes (nick.barnes@geosyntec.com) after the report is finalized. The email deliverable will be submitted

Ms. Sarah Aduwa June 9, 2025 to Sarah Aduwa and will CC Mubeen Darji, Doris Brown, Jen Farrell, Safa Shariat, and Breck Dalton.

Deliverable and Invoicing Schedule:

Subtask Deliverable Deliverable Due Date*

Invoice Amount

1,2 Submittal of PFAS summary email with 1 table, 1 figure, field forms, and certified lab report, field notes

10/16/2025 $4,347.06

Total $4,347.06 *Assumes TA is approved by June 30, 2025.

Geosyntec appreciates the opportunity to provide this proposal and cost estimate to you and the FDEP. Please contact us if you have any questions or require additional information.

Sincerely, Todd K. Kafka, P.G.

Sr. Principal Hydrogeologist