This is a Task Assignment (TA) DC018C issued under Contract HW683 by the State of Florida Department of Environmental Protection (FDEP) to Geosyntec Consultants, Inc. for groundwater monitoring and PFAS sampling at the Former First Class Cleaners site located at 591 East Semoran Boulevard, Casselberry, Seminole County, Florida (ERIC_5489). The Task Assignment was executed on December 23, 2025, with an effective completion date of June 30, 2026. Sarah Aduwa serves as the FDEP Project Manager, and Melissa Shook is the Contractor's Project Manager.
The scope of work authorizes Geosyntec to conduct four subtasks: (1) project management, (2) annual groundwater monitoring including depth-to-groundwater measurements from up to 34 monitoring wells and collection of 16 groundwater samples analyzed for volatile organic halogens via EPA Method 8260B, (3) PFAS sampling from three designated monitoring wells (MW037, MW012, MW009) for FDEP laboratory analysis, and (4) preparation of a comprehensive Natural Attenuation Monitoring Report with findings and recommendations. The total Task Assignment value is $18,644.18, based on fixed unit rates totaling 111 labor hours at the contractor's standard rates plus direct and indirect costs. The single deliverable—submittal and FDEP approval of the PFAS Field Deliverable and Annual Groundwater Monitoring Report—is due April 29, 2026, with full payment of $18,644.18 due upon invoice submission and approval.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW683
DC018C Completion June 30, 2026
This Task Assignment authorizes Geosyntec to conduct Groundwater Monitoring and PFAS sampling at Former First Class Cleaners site in accordance Geosyntec’s scope of work, cost estimate and schedule received on Dec 16, 2025.
Sarah Aduwa 850-245-8973 Contractor Geosyntec Contractor
Contractor Melissa Shook Contractor 321-914-9394
ERIC 5489
591 East Semoran Boulevard Casselberry, Seminole County, Florida
First Class Cleaners
Contractor Contractor
✔ $ 18,644.18
$ 18,644.18
Scope of Work
Geosyntec Contractor Todd Kafka
Contract Manager
Todd K. Kafka, PG (FL) Digitally signed by Todd K. Kafka, PG (FL) Date: 2025.12.29 08:38:33 -05'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2025.12.23 10:59:05 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtasks 1 - 4 - Submittal of PFAS Field Deliverable and Annual Groundwater Monitoring Report 04/29/2026
Subtasks 1 - 4 - Submittal and FDEP approval of PFAS Field Deliverable and Annual Groundwater Monitoring Report $ 18,644.18
$ 18,644.18
HW683
DC018C
To:
From:
Date:
HW683 Contract Negotiation File Former First Class Cleaners Casselberry, Seminole County, Florida
ERIC_5489
Sarah Aduwa, Project Manager
, 2025 Subject: Negotiation Summary
HW683_DC018C
This Task Assignment authorizes Geosyntec to conduct Groundwater Monitoring and PFAS sampling at Former First Class Cleaners site in accordance Geosyntec’s scope of work, cost estimate and schedule received on , 2025.
Melissa Shook is the Project Manager.
Subtask 2 and 4 – Geosyntec will mobilize to the Site to collect depth-to-groundwater measurements from each accessible monitoring well (28 wells) within a 24-hour period, collect 16 groundwater samples via low flow methods for 2025 annual groundwater monitoring. The groundwater samples will be submitted for laboratory analysis of VOHs by Environmental Protection Agency (EPA) Method 8260B. Geosyntec will prepare a report summarizing sampling activities and results and will provide conclusions and recommendations based on data evaluation. The report will contain text, tables and figures summarizing field/laboratory data.
Subtask 3 - During the Subtask 2 mobilization, Geosyntec personnel will collect three groundwater samples from the monitoring wells shown in the table below for PFAS analysis. Two of the proposed wells (MW009 and MW012) are being sampled for VOH analysis and approximately 0.25 hours of additional time is allotted to sample these wells for PFAS whereas labor for MW037 is included for sampling since it is not being sampled in Subtask 2.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost is $1 with 11 labor hours.
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
G eo sy nt ec C on su lta nt s
D at e:
/1
6/
Ta sk
D C
8C
S ub Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
S ite
Fi rs t C la ss
C le an er
Ta sk
A nn ua l G ro un dw at er
M on ito rin g S ub Ta sk
A ct iv ity
/P ha se
S ub
Ta sk
P
FA
S
S am pl in g an d R ep or tin g
S ub
Ta sk
P ro je ct
M an ag er
M
. S ho ok
Ta sk
N at ur al A tte nu at io n M on ito rin g
R ep or t
S ub
Ta sk
S ub
Ta sk
S ub Ta sk
TT
ot al s
La bo r R at e
C at eg or y $4
4.
PP
ro je ct
M an ag
M
. S ho ok
.4
$1
.7
Pr in ci pa l T.
K af ka
$4
4.
Pr of es si on al
C . S av ill e
$4
4.
Pr of es si on al
M . S ho ok
$3 8.
Se ni or
S ta ff Pr of es si on a L.
H av er lin
$3 8.
Se ni or
S ta ff Pr of es si on a G
. M om m er s
$4
3.
Ad m in is tra tiv e As si st an t
P . G al la gh er
T ot al H ou rs
D ire ct L ab or
$4
,8
.7
$5
.0
$2 ,2
.0
$6
.3
$1
,4
.2
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
O ve rh ea d
2.
$8
,3
.7
$9
.7
$3 ,8
.4
$1
,1
.8
$2 ,4
.6
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
G en
A dm in 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fr in ge
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al L ab or
$1
3, 2.
$1 ,5
.8
$6
,0
.5
$1 ,7
.1
$3
,8
.9
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
N A
M S am pl in g an d
R ep or tin g
Co st
E st im at e Pa ge o f
Co st E st im e
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
G eo sy nt ec C on su lta nt e:
/1
6/
Ta sk
D C
8C
Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
S ite
Fi rs t C la ss
C le an
Ta sk
A nn ua l G ro un dw at er
M on ito rin g S ub Ta sk
A ct iv ity
/P ha se
S ub
Ta sk
P
FA
S
S am pl in g an d R ep or tin g
S ub
Ta sk
P ro je ct
M an ag er
M
. S ho ok
Ta sk
N at ur al A tte nu at io n M on ito rin g
R ep or t
S ub
Ta sk
S ub
Ta sk
S ub Ta sk
TT
ot al s
N A
M S am pl in g an d
R ep or tin g
T ra ve l
V eh ic le
R en ta l
$6
.0
$6
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile ag e
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
A ir Fa re $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P er d ie m
H ot el
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l T ra ve l
$6
.0
$6
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (E qu ip m en t P ro cu re m en t)
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P ro cu re m en t F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
S ub co nt ra ct or C os t
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (S er vi ce s
P ro cu re m en t) ril lin g
(C on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
D ril lin g (N on -c on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ob ile L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ur ve yi ng
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
ID
W
$1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
U til iti es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or S ub to ta l
$1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
H an dl in g Fe e $1
9.
$1 9.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al
S ub co nt ra ct or C os t
$2
.5
$2
.5
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
La bo ra to ry
A na ly tic al C os ts
$9
.0
$9
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fa st
T ur na ro un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S am pl e
S hi pp in g $2
.0
$1
.0
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al L ab or at or y $1
,2
.0
$1 ,0
.0
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fi el d E xp en se
P so na l P ro te ct io n $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E xp en da bl es $1
.0
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( D ril lin g re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( A na ly tic al re la te d)
$1 ,7
.0
$1
,7
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
ID
W re la te d)
$1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
O th er
$2
.0
$2
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al F ie ld
E xp en se s $2
,1
.0
$2 ,1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub to ta l $1
7, 0.
$1 ,5
.8
$1
0, 9.
$1 ,8
.1
$3
,8
.9
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
C om pl et io n
Fe e
$1 ,3
.2
$1
.0
$6
.0
$1
.6
$3
.5
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ot al E st im at ed
C os t $1
8, 4.
$1 ,6
.8
$1
0, 0.
$2 ,0
.7
$4
,2
.4
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
C os t f ro m P rio r C
E F:
M an ua l E nt ry
C os t f ro m D el ta
C E
F;
M an ua l E nt ry C os t (
P rio r + D el ta
$0
.0
A ut o- C al cu la te d R ou nd in g
E rr or
$1 8, 4.
A ut o-
C al cu la te d
Fi na l T ot al C os t:
$1 8, 4.
A ut o-
C al cu la te d
Co st
E st im at e Pa ge o f
Co st E st im e
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : First Class Cleaners SUBTASK: Annual Groundwater Monitoring
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Professional C. Saville 1
Professional
M. Shook 6
Senior Staff Professional
L. Haverlin 29
Senior Staff Professional
G. Mommers 20
TOTAL LABOR 56
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 Day 1 $120.00 Truck $480.00 Week 1 $480.00
Subtotal $600.00
Mileage $0.59 Mile 0 $0.00 Subtotal $0.00
Air Fare $0.00 Round Trip 0 $0.00 Subtotal $0.00
TOTAL VEHICLE $600.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
IDW
Erwin Remediation T&D of one drum $195.00 $195.00
Subtotal $195.00
TOTAL SUB $195.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOHs 13 samples $73.00 13 0 $949.00 Subtotal $949.00
Shipping Large Cooler (25 to 50 lbs) $150.00 1 $150.00
Subtotal $150.00
TOTAL LAB $1,099.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Analytical Related
Groundwater Sampling Kit $290.00 Day 6 $1,740.00 Subtotal $1,740.00
IDW Related Drum $100.00 Drum 1 $100.00
Expendables Expendables $40.00 Day 3 $120.00
Subtotal $120.00 Other
GPS $175.00 Day 1 $175.00 Metal Detector $40.00 Day 1 $40.00
Subtotal $215.00
TOTAL EQUIPMENT $2,175.00
12/16/2025
Preparation of Geospatial data for use on GPS (1 hr)
Field event notifications to owners, tenant, and coordination with escort for MW20 and MW21 (3 hrs); daily field data evaluation (0.5 hr x 3 days= 1.5 h); IDW profiling, manifesting, logistics (1.5 hr)
Field preparation (1 hrs); Mobilization (2 hrs rd trip/day = 6 hrs); depth to water measurements 15 wells (4 hrs); equipment calibration (1 hr x 3 days = 3 hrs); groundwater sampling 7 widely-spaced wells (1.75 x 7 = 13 hrs ); sample management/shipping (2 hrs);
Mobilization (2 hrs rd trip); depth to water measurements 14 wells (4 hrs); equipment calibration (1 hr x 3 days = 3 hrs); groundwater sampling 6 widely-spaced wells (1.75 x 6 = 10 hrs); IDW management (1 hr)
12/17/2025 Page 3 of 5 Subtask 2
SUBTASK: PFAS Sampling and Reporting
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal T. Kafka 1
Professional C. Saville 2
Professional M. Shook 6
Senior Staff Professional L. Haverlin 5
TOTAL LABOR 14
VEHICLE TYPE RATE UNIT USEAGE
Subtotal $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL SUB $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
PFAS 3 samples (FDEP Lab) $0.00 3 0 $0.00
Subtotal $0.00 Shipping
Small Cooler (0 to 25 lbs) $110.00 1 $110.00 Subtotal $110.00
TOTAL LAB $110.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
12/16/2025
Data Evaluation and path forward recommendation.
Results figure preparation.
Prepare field summary deliverable (2 hr), prepare GW results table (1 hr). Incorporation of results into Subtask 4 Deliverable; tables, text, and reccomendations (3 hrs).
Collection of low flow sample (3 sample @ 1.5 hrs.).
12/17/2025 Page 4 of 5 Subtask 3
SUBTASK: Natural Attenuation Monitoring Report
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal T. Kafka 2
Professional C. Saville 6
Professional M. Shook 21
TOTAL LABOR 29
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
TOTAL SUB $0.00
LABORATORY COSTS
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
12/16/2025
Recommendation and path forward (1 hr); PG sign and seal (1 hr) update 6 GIS figures
Report text (16 hrs), data table update and evaluation (2 hrs), draft contour figures (2 hrs).
Compile and assemble PDF (1 hr)
12/17/2025 Page 5 of 5 Subtask 4
6770 S. Washington Ave, Suite 3 Titusville, FL 32780
PH 321.747.1909
www.geosyntec.com
First Class_2025 Annual GWM_SOW
December 16, 2025
Ms. Sarah Aduwa Florida Department of Environmental Protection Waste Cleanup Program 2600 Blair Stone Road Tallahassee, FL 32399-2400
Subject: Statement of Work – Annual Groundwater Monitoring Former First Class Cleaners 591 East Semoran Boulevard Casselberry, Seminole County, Florida
ERIC_5489
Dear Sarah:
Geosyntec Consultants, Inc. (Geosyntec) has prepared this statement of work (SOW) and attached level of effort (LOE) cost estimate for the Florida Department of Environmental Protection (FDEP) to conduct annual groundwater monitoring at the former First Class Dry Cleaner Site (FDEP Facility ID ERIC_5489). The Site is located at 591 East Semoran Boulevard, Casselberry, Seminole County, Florida. Proposed sampling activities are in accordance with the recommendations provided to FDEP from the Annual Groundwater Monitoring Report 2024.
Groundwater samples were last collected at the Site in July 2024.
The purpose of the annual groundwater monitoring is to collect groundwater samples for analysis of volatile organic halocarbons (VOHs) and Per- and polyfluoroalkyl substances (PFAS) to evaluate groundwater quality at the Site. The attached LOE consists of four subtasks and is summarized below.
SITE ACCESS
1. The Site property, located at 591 SR 436, Casselberry, FL 32707 (Parcel ID 20-21-30- 300-0A1G-0000) is owned by 591 SR 436, LLC. The existing agreement for this property was authorized in July 2021 by Tracy K. King, representative of 591 SR 436, LLC, and is still valid. However, the existing agreement should be updated to the latest FDEP site access agreement language. Therefore, an updated Source-Property Access Agreement will be pursued but will not be required to be in place in order to collect samples.
December 16, 2025
2. Several properties owned by the City of Casselberry contain monitoring wells requiring sampling and/or water level gauging. These properties are 92 Wilshire Dr. Casselberry FL 32707 (Parcel ID: 21-21-30-501-0200-0040), 720 SR 436 Casselberry FL 32707 (Parcel ID 21-21-30-501-0200-0000), and Easements. The existing agreement for these properties was authorized in 24 June 2024 by James Newlon and is valid.
3. MW027, MW028, and MW029 are located within the property at 830 Sr 436 Casselberry Fl 32707 (Parcel ID 21-21-30-501-0100-0000), owned by Floorsystems Inc. as of 20 April 2024 and is valid.
Subtask 1 – Project Management Melissa Shook will serve as the Geosyntec project manager, and her hours are directly computed in the LOE/CEF.
Subtask 2 – Annual Groundwater Monitoring Geosyntec will mobilize to the Site to collect depth-to-groundwater measurements from each accessible monitoring well (up to 34 total wells) within a 24-hour period, collect 16 groundwater samples via low flow methods for 2025 annual groundwater monitoring. Refer to the sampling plan provided in Attachment A.
Groundwater levels will be measured on the first day. Each of the 28 monitoring wells are flush-mounted, in high-traffic areas, and/or prone to collecting stormwater inside the manhole.
Geosyntec personnel will bail the manholes, measure and record groundwater levels, and re-secure the manholes. Additional time has been included due to the site-specific challenges, including (i) long distances between wells necessitating driving time and traffic navigation and (ii) flush-mounted wells located in vegetated and overgrown areas necessitating the use of a metal detector to locate wells.
Geosyntec will collect 16 groundwater samples from the monitoring well network using low-flow sampling techniques. The groundwater samples will be submitted for laboratory analysis of VOHs by Environmental Protection Agency (EPA) Method 8260B.
Geosyntec will use a metal detector and a GPS to locate several monitoring wells in overgrown vegetated areas. Geosyntec assumes the sampling event will take 2 people 3 days to complete and will require one truck per person.
Investigation derived waste (IDW) will be collected in two 55-gallon drums, which will be labeled, covered with plastic, and wrapped in orange construction fencing. Geosyntec obtained IDW transportation and disposal (T&D) estimates from Hulls, Erwin Remediation, LLC, and York
Environmental (Attachment B). It is assumed that 1 drum of IDW will be generated and that the waste will be disposed of as PFAS-containing waste due to historical PFAS concentrations at the site. Each company is a licensed waste hauler in Florida. Erwin Remediation was selected due to the lowest overall cost. No IDW sample will be collected for waste characterization, as Erwin Remediation has a current waste profile for First Class Cleaners.
Subtask 3 – PFAS Monitoring
During the Subtask 2 mobilization, Geosyntec personnel will collect three groundwater samples from the monitoring wells shown in the table below for PFAS analysis.
Geosyntec will prepare an email deliverable with attachments, including one figure with groundwater analytical results for PFAS (showing PFOA, PFOS, and the summation of PFOA and PFOS concentrations for each well sampled and no isoconcentration lines), certified analytical laboratory report, and field forms including equipment calibration logs, and groundwater sampling forms. The email deliverable will be submitted to the FDEP within two working days of receipt of the final certified analytical laboratory report from the FDEP laboratory.
Geosyntec assumes the final analytical laboratory report will be emailed to Melissa Shook (melissa.shook@geosyntec.com) by the FDEP laboratory after the report is finalized. The email deliverable will be submitted to Sarah Aduwa.
Additionally, the PFAS results will also be incorporated into Subtask 4. Costs for analysis and integration into the Subtask 4 deliverable are covered under Subtask 3.
Subtask 4– Natural Attenuation Monitoring Report Geosyntec will prepare a report summarizing sampling activities and results and will provide conclusions and recommendations based on data evaluation. The report will contain text, tables and figures summarizing field/laboratory data.
A total of three tables will be included: (i) well construction/groundwater elevation data,
(ii) groundwater analytical results, and (iii) natural attenuation data.
MW ID Screened Interval Sampling Rationale
MW037 5-15 ft BLS PFOA+PFOS P-GCTL exceedance in May 2023.
MW012 10-15 ft BLS Downgradient of MW037.
MW009 10-15 ft BLS Sidegradient of MW037.
A total of eight figures will be included: (i) site location, (ii) site features, (iii) groundwater elevation contours (one for each of three depth intervals), and (iv) VOH concentrations (one for each of three depth intervals).
The report will be signed/sealed by a Florida-licensed geologist/engineer.
Deliverable Schedule and Invoicing Note that this schedule reflects a two-week FDEP review of LOE. Geosyntec anticipates the following schedule of deliverables and invoices.
Subtask Deliverable Deliverable Date Invoice Amount
1, 2, 3, and 4
Submittal of PFAS Field Deliverable and Annual Groundwater Monitoring Report April 29, 2026 $18,644.18
TOTAL COST $18,644.18
This Deliverable schedule is based on the assumption that the SOW will be approved by December 23 2025
6770 S. Washington Ave, Suite 3 Titusville, FL 32780
PH 321.747.1909
www.geosyntec.com
First Class_2025 Annual GWM_SOW
Closure
We appreciate this opportunity to work with FDEP on this project. Feel free to contact us if you have any questions or require any additional information.
Sincerely, Melissa Shook, EI Professional
Todd K. Kafka, PG (#2338) Senior Principal
Attachments: A – 2025 Sampling Plan B – IDW cost estimates
ATTACHMENT A
Florida Department of Environmental Protection -- Bureau of Waste Cleanup -- Hazardous Waste Cleanup Section
TABLE 1: 2026 ANNUAL GROUNDWATER MONITORING PLAN
Depth to Groundwater Measurements
VOHs by US EPA
Method 8260B PFAS Sampling Method
MW001 Upper Surficial 20 to 25 Inaccessible MW002 Lower Surficial 45 to 50 Inaccessible MW006 Lower Surficial 47 to 52 X X Low-flow MW007 Intermediate 66 to 71 X X Low-flow MW008 Intermediate 85 to 90 X X Low-flow MW009 Upper Surficial 10 to 15 X X Low-flow MW010 Upper Surficial 20 to 30 X MW011 Lower Surficial 50 to 55 X X Low-flow MW012 Upper Surficial 10 to 15 X X Low-flow MW013 Lower Surficial 50 to 55 X X Low-flow MW014 Intermediate 70 to 75 X X Low-flow MW015 Upper Surficial 20 to 30 X MW016 Intermediate 70 to 75 X MW017 Upper Surficial 10 to 15 X MW018 Upper Surficial 20 to 30 X MW019 Lower Surficial 50 to 55 X MW023 Upper Surficial 10 to 15 X MW024 Upper Surficial 20 to 30 X MW025 Lower Surficial 50 to 55 X MW026 Upper Surficial 20 to 30 X MW027 Upper Surficial 20 to 30 X MW028 Lower Surficial 50 to 55 X X Low-flow MW029 Intermediate 70 to 75 X X Low-flow MW031 Upper Surficial 20 to 30 X MW034 Lower Surficial 40 to 50 X X Low-flow MW035 Lower Surficial 40 to 50 X X Low-flow MW036 Lower Surficial 40 to 50 X X Low-flow MW037 Upper Surficial 5 to 15 X X Low-flow RW002 Intermediate 66 to 96 X X Low-flow RW005 Upper Surficial 5 to 50 X X Low-flow
Notes:
1. VOH indicates volatile organic halogens.
2. EPA indicates Environmental Protection Agency.
3. ft BLS indicates feet below land surface.
Facility Name: Former First Class Cleaners Facility ID No. ERIC_5489
Analysis Screen Interval
(ft BLS)Sampling Location Aquifer Zone
Page 1 of 1 Geosyntec Consultants, Inc.
ATTACHMENT B
Dr um $9
.2
Pr of ile F ee (P
FA
S)
$3
Dr um
$6
Tr an sp or ta tio n
$3
.0
Dr um $1
Tr an sp or ta tio n $4
En ge ry /In su ra nc e
Fe e
(2 0%
$2
No te s Th e se le ct ed su bc on tr ac to r i s h ig hl ig ht ed in y el lo w in di ca te s c os tin g ba se d on d et ec tio n of P
FA
S.
in di ca te s p ro fil e fe e re qu ire d on ly fo r t he fi rs t t im e su bc on tr ac to r p ro vi de s I
DW
d isp os al fo r a si te
Su bc on tr ac to r E va lu at io n:
I
DW
M an ag em en t*
Yo rk
E nv iro nm en ta l
$1 ,2
.2
$1
.0
$1
,2
.0
ID
W
D
IS
PO
SA
L Hu lls Er w in
R em ed at io n
From: Larry Hall To: Blaine Dawson Subject: RE: Updated Generic IDW Quote Date: Friday, August 8, 2025 9:45:00 AM
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic. If you suspect fraud, click "Phish Alert Report."
Yes- if it is sampled for and has any hit it will have to go to a hazardous waste facility.
From: Blaine Dawson <BCDawson@Geosyntec.com> Sent: Friday, August 8, 2025 9:41 AM To: Larry Hall <lhall@hullsenvironmental.com> Subject: Re: Updated Generic IDW Quote
Good morning Larry, Is PFAS waste having to go hazardous now?
Thank you, Blaine
Get Outlook for iOS
From: Larry Hall <lhall@hullsenvironmental.com> Sent: Friday, August 8, 2025 9:09:19 AM To: Blaine Dawson <BCDawson@Geosyntec.com> Subject: RE: Updated Generic IDW Quote
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic. If you suspect fraud, click "Phish Alert Report."
Blaine, See pricing below.
Thanks, Larry Hall
Yes- if it is sampled for and has any hit it will have to go to a hazardous waste facility
From: Blaine Dawson <BCDawson@Geosyntec.com> Sent: Thursday, August 7, 2025 11:04 AM To: Larry Hall <lhall@hullsenvironmental.com> Subject: Updated Generic IDW Quote
Good morning Larry, In light of the update you recently provided about LES, I was hoping you might be able to prepare an updated IDW disposal quote (previous version attached) for use as part of future proposals. Please see the below list of scenarios I need updated waste disposal costs for through the remainder of 2025. We will reach out again at the beginning of 2026 for updated rates.
Scenario 1
FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has not been investigated for at the site. $260.00 per drum solid or liquid less than 50 miles- Add $95 per additional 50 miles
Scenario 2
FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has been detected at concentrations above the laboratory's method detection limit but is below the current provisional groundwater cleanup target level of 70 ng/L. $915.20 per drum solid or liquid- Transportation per drum/load up to 10 drums- $380.00
Scenario 3
FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has been detected at concentrations above the current provisional groundwater cleanup target level of 70 ng/L. $915.20 per drum solid or liquid- Transportation per drum/load up to 10 drums -$380.00
Scenario 4
FDEP PRP site where VOA concentrations are below hazardous levels for both soils and groundwater. $260.00 per drum solid or liquid less than 50 miles- Add $95 per each additional 50 miles
Please let me know if you have any questions or if you need anything else from me to support your efforts on this. If any of the above scenarios requires additional analytical results beyond those described, please let me know so I can include those in the overall cost evaluation. I really appreciate your help with this!
Thank you, Blaine Dawson, PG (FL,TN) Senior Geologist p g p g $915.20 per drum solid or liquid- Transportation per drum/load up to 10 drums- $380.00
408 Ditmar Street Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562 (850) 292-6511
To: Mr. Nicholas Barnes Geosyntec Consultants, Inc.
12802 Tampa Oaks Boulevard, Suite 151 Tampa, FL 33637
April 15, 2025
Re: Non-Hazardous Drum Disposal of PFOS/PFAS Impacted Materials
Mr. Barnes:
The price for the transportation and disposal (T&D) of 55-gallon drums of non-hazardous soil, mud, and water is listed below:
Impacted with Non-Hazardous Petroleum or Chlorinated Solvents:
Description Rate Unit T&D - Non-Haz Soil $ 110.00 Per Drum T&D - Non-Haz Mud/Water $ 125.00 Per Drum
Impacted with Non-Hazardous PFAS/PFOS:
Description Rate Unit Profile Fee (Charged once per site) $ 350.00 Per Site T&D - Non-Haz PFOS/PFAS Impacted Soil $ 195.00 Per Drum T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 195.00 Per Drum
Dry cleaning sites will require 8260-VOH lab analysis and PFAS sites will require the full FDEP lab analysis for IDW waste characterization.
This quote is valid for 120 days.
Respectfully, Robert Donado Erwin Remediation, Inc.
Email: Robert@ErwinRemediation.com Office: (850) 466-2358
Profile Fee (Charged once per site) $ 350.00 Per Site T&D - Non-Haz PFOS/PFAS Impacted Soil $ 195.00 Per Drum T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 195.00 Per Drum
From: Tony Burgess To: Blaine Dawson Subject: Re: IDW Management Quotes Date: Monday, September 22, 2025 2:27:31 PM
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic. If you suspect fraud, click "Phish Alert Report."
Blaine, We went through the scenarios described below.
Please contact me with any additional questions or concerns.
Scenario 1 FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has not been investigated for at the site.
NonHaz - $225.00/55 Liquids/Solids – No PFAS F002 - $625.00/55 Liquids and Solids – No PFAS Scenario 2 FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has been detected at concentrations above the laboratory's method detection limit but is below the current provisional groundwater cleanup target level of 70 ng/L.
PFAS only - $625.00/55 Liquids and Solids F002 & PFAS - $7.40/Lb with $625.00/55 Min – Liquids F002 & PFAS - $4.40/Lb with $625.00/55 Min – Solids Scenario 3 FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has been detected at concentrations above the current provisional groundwater cleanup target level of 70 ng/L.
PFAS only - $625.00/55 Liquids and Solids F002 & PFAS - $7.40/Lb with $625.00/55 Min – Liquids F002 & PFAS - $4.40/Lb with $625.00/55 Min – Solids Scenario 4 FDEP PRP site where VOA concentrations are below hazardous levels for both soils and groundwater.
NonHaz - $225.00/55 Liquids/Solids – No PFAS F002 - $625.00/55 Liquids and Solids – No PFAS Please add:
Energy/Insurance------------20% (Total Ticket) Transportation----------------$450.00/stop
Tony Burgess
York Environmental Services PO Box 600532 Jacksonville, FL 32260 Phone: (904) 718-0883 p g g PFAS only - $625.00/55 Liquids and Solids
Energy/Insurance------------20% (Total Ticket)gy ( Transportation----------------$450.00/stop
File details come from the government source that posted it. Updated .