Summary of Task Assignment Change Order DC009A-1
This document is a Task Assignment Change Order (TACO) between the State of Florida Department of Environmental Protection (FDEP) and Arcadis U.S. Inc., a contractor providing environmental consulting services at the Randolphs Alterations & Cleaners site located at 615 West Fourth Avenue, Tallahassee, Leon County, Florida. The original task assignment (DC009A) was executed under Contract Number HW680, with project number ERIC_4863. The change order was executed on October 27, 2022, and signed by Gus Suarez (Contract Manager for Arcadis U.S. Inc.) and Jennifer Farrell (Secretary or Designee for FDEP). Theresa Pepe served as the FDEP Project Manager, and Gus Suarez served as the contractor's project manager.
The task assignment involves annual groundwater monitoring activities to be performed according to Arcadis's March 4, 2022 Work Plan. This change order reduces the total task assignment value from $8,652.65 to $8,268.65, a reduction of $384.00, due to field conditions that prevented sampling of three monitor wells (MW015 was dry, MW003 was inaccessible due to trailer obstruction, and MW010 could not be located) and the elimination of subcontractor costs for transport and disposal of one drum of purge water that was stolen from the site. The deliverable is an Annual Monitoring Report/Project Management, with FDEP approval required by October 5, 2022, and payment of the revised total of $8,268.65 due upon completion. The task assignment completion date remains unchanged at October 31, 2022.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Name:
4. ☐ There are no changes to the TA compensation.
☐ The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO ☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. ☐ There are no changes to the TA Expiration Date.
☐ The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. ☐ There are no changes to the Attachments.
☐ Attachment ___ is replaced with Attachment -____.
7. ☐ No Additional Changes.
☐ Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
DC009A 1 HW680
Arcadis was unable to sample three monitor wells due to conditions in the field. Subcontractor costs for one IDW drum were not required.
Theresa Pepe 850-245-8966 Contractor Contractor
Contractor Contractor
Contractor
Arcadis U.S. Inc.
Gus Suarez 813-205-4703
ERIC_4863
Randolph's Alterations & Cleaners
✔ $ 8,268.65 $ 8,652.65
$ 8,268.65 $ 8,652.65 ✔ Completion
Completion 0
✔ 1 1 1
Arcadis U.S. Inc.
Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2022.10.27 13:55:12 -04'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2022.10.27 13:25:49 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01_18
Contract Number:
Task Assignment #:
Change Order #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW680
DC009A
$ 8,268.65
Annual Monitoring Report/Project Management
FDEP approval of Annual Monitoring Report/Project Management
10/05/2022
$ 8,268.65
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Interim Secretary
Memorandum
TO: Negotiation File Randolphs Alterations & Cleaners
FACID NO. 37-9501237; ERIC_4863
Tallahassee, Leon County FROM: Theresa C. Pepe, Project Manager SUBJECT: Task Assignment Change Order DC009A-1 (HW680) DATE: October 27, 2022
Arcadis was unable to sample three monitor wells during the annual event. Additionally, subcontractor cost for one IDW drum were not required. This change order backs out the unused funds. For additional information, see the October 27, 2022, change order memo from Mike O’Sullivan of Arcadis.
The original task assignment equaled $8,652.65. This change order deletes $384.00 for a new total of $8,268.65. There is no time change to the task assignment. Arcadis may invoice according to the attached schedule.
Subtask 2: Groundwater Monitoring & Reporting Analytical costs are deleted due to three wells not being sampled. One well (MW015) was dry and two wells (MW003 and MW010) were inaccessible. Potential replacement wells were either dry or unable to be located. Also, one drum of purge water was stolen from the site before pickup, so subcontractor costs for transport and disposal are deleted from the task assignment.
FDEP COST ESTIMATE
Contractor: Arcadis, U.S., Inc.
Date: 3/2/2022
Task #: SubTask 1 Project Management
Site: Randolph Alteration and Cleaners SubTask 2 Annual Groundwater Monitoring 2022
Activity/Phase: Monitoring SubTask 3
Project Manager: Mike O'Sullivan SubTask 4
SubTask 5
Totals 1 2 3 4 5
Labor Rate Category
$50.00 Project Manager O'Sullivan, Mike (MO) 6 5.8
$50.00 Senior Scientist O'Sullivan, Mike (MO) 31 31 0 0 0
$28.94 Scientist Martineau, Duncan (DM) 17 17 0 0 0
$31.48 Drafter/Designer Berndgen, Wendy (WDB) 4 4 0 0 0
$26.52 Document Technician Embras, Susan (SRE) 2 2 0 0 0
$30.96 Project Assistant McLemore, Michele (MMc) 0 0 0 0 0
Total Hours 60 6 54 0 0 0
Direct Labor $2,509.66 $288.72 $2,220.94 $0.00 $0.00 $0.00
Overhead 79.00% $1,982.63 $228.09 $1,754.54 $0.00 $0.00 $0.00
Gen & Admin 36.00% $903.48 $103.94 $799.54 $0.00 $0.00 $0.00
Fringe 37.10% $931.09 $107.12 $823.97 $0.00 $0.00 $0.00
Total Labor $6,326.86 $727.87 $5,598.99 $0.00 $0.00 $0.00
Travel
Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $120.00 $120.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $438.00 $438.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $150.00 $150.00 $0.00 $0.00 $0.00
Total Laboratory $588.00 $588.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $40.00 $40.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $561.10 $561.10 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $601.10 $601.10 $0.00 $0.00 $0.00
Subtotal $7,635.96 $727.87 $6,908.09 $0.00 $0.00 $0.00
Completion Fee $632.69 $72.79 $559.90 $0.00 $0.00 $0.00
Total Estimated Cost $8,268.65 $800.66 $7,467.99 $0.00 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
SITE : Randolph Alteration and Cleaners SUBTASK 2: Annual Groundwater Monitoring 2022
DATE: 3/2/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Annual Groundwater Monitoring - 2022 Scientist Prep; local mob/demob; full round of WLs; sample 9 MWs and 1 EB; manage IDW; sample delivery 16 Senior Scientist Local mob/demob; full round of WLs; Sample 9 MWs and 1 EB; manage IDW; sample delivery 16 Senior Scientist Access, GW monitoring technical oversight and offsite notice review 3
Data Evaluation and Letter Report Senior Scientist Technical review; sign and seal report 2 Senior Scientist Data evaluation and preparation of a brief letter report 10 Scientist Data evaluation 1 Drafter Figures preparation 4 Document Technician Editing; Letter report preparation 2
TOTAL LABOR 54
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 1 $120.00 $120.00
TOTAL VEHICLE $120.00
SUBCONTRACTOR COSTS
Services Procurement
Name Purpose Rate Units Usage Totals Erwin Remediation IDW $150.00 Drum 0 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC (Halocarbons Only) 8260C Aqueous $73.00 1.00 6 $438.00 TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $438.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 1 $150.00
Total Shipping: $150.00
TOTAL LAB $588.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals Total PPE: $0.00
Expendables Miscellaneous Expendables $40.00 Per Day 1 $40.00
Total Expendables: $40.00 Equipment Items Tubing, Poly/HDPE $0.30 Per Foot 487 $146.10
Total Equipment Items: $146.10 Equipment Kits Deep Groundwater Sampling Kit $415.00 Day 1 $415.00
Total Equipment Kits: $415.00
TOTAL EQUIPMENT $601.10
Date: 3/2/2022
Task #: SubTask 1 Project Management
Site: Randolph Alteration and Cleaners SubTask 2 Annual Groundwater Monitoring 2022
Activity/Phase: Monitoring SubTask 3
Project Manager: Mike O'Sullivan SubTask 4
SubTask 5
Totals 1 2 3 4 5
Labor Rate Category
$50.00 Project Manager O'Sullivan, Mike (MO) 0 0.0
$50.00 Senior Scientist O'Sullivan, Mike (MO) 0 0 0 0 0
$28.94 Scientist Martineau, Duncan (DM) 0 0 0 0 0
$31.48 Drafter/Designer Berndgen, Wendy (WDB) 0 0 0 0 0
$26.52 Document Technician Embras, Susan (SRE) 0 0 0 0 0
$30.96 Project Assistant McLemore, Michele (MMc) 0 0 0 0 0
Total Hours 0 0 0 0 0 0
Direct Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 79.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Gen & Admin 36.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 37.10% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel
Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW ($150.00) ($150.00) $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal ($150.00) ($150.00) $0.00 $0.00 $0.00
Handling Fee ($15.00) ($15.00) $0.00 $0.00 $0.00
Total Subcontractor Cost ($165.00) ($165.00) $0.00 $0.00 $0.00
Laboratory
Analytical Costs ($219.00) ($219.00) $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory ($219.00) ($219.00) $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal ($384.00) $0.00 ($384.00) $0.00 $0.00 $0.00
Completion Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost ($384.00) $0.00 ($384.00) $0.00 $0.00 $0.00
DATE: 3/2/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Annual Groundwater Monitoring - 2022 Scientist Prep; local mob/demob; full round of WLs; sample 9 MWs and 1 EB; manage IDW; sample delivery 0 Senior Scientist Local mob/demob; full round of WLs; Sample 9 MWs and 1 EB; manage IDW; sample delivery 0 Senior Scientist Access, GW monitoring technical oversight and offsite notice review 0
Data Evaluation and Letter Report Senior Scientist Technical review; sign and seal report 0 Senior Scientist Data evaluation and preparation of a brief letter report 0 Scientist Data evaluation 0 Drafter Figures preparation 0 Document Technician Editing; Letter report preparation 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
SUBCONTRACTOR COSTS
Services Procurement
Name Purpose Rate Units Usage Totals Erwin Remediation IDW $150.00 Drum -1 ($150.00)
Total Services: ($150.00)
TOTAL ($150.00)
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC (Halocarbons Only) 8260C Aqueous $73.00 1.00 -3 ($219.00) TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: ($219.00)
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB ($219.00)
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals Total PPE: $0.00
Expendables Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00 Equipment Items Tubing, Poly/HDPE $0.30 Per Foot 0 $0.00
Total Equipment Items: $0.00 Equipment Kits Deep Groundwater Sampling Kit $415.00 Day 0 $0.00
Total Equipment Kits: $0.00
TOTAL EQUIPMENT $0.00
Date: 3/2/2022
Task #: SubTask 1 Project Management
Site: Randolph Alteration and Cleaners SubTask 2 Annual Groundwater Monitoring 2022
Activity/Phase: Monitoring SubTask 3
Project Manager: Mike O'Sullivan SubTask 4
SubTask 5
Totals 1 2 3 4 5
Labor Rate Category
$50.00 Project Manager O'Sullivan, Mike (MO) 6 5.8
$50.00 Senior Scientist O'Sullivan, Mike (MO) 31 31 0 0 0
$28.94 Scientist Martineau, Duncan (DM) 17 17 0 0 0
$31.48 Drafter/Designer Berndgen, Wendy (WDB) 4 4 0 0 0
$26.52 Document Technician Embras, Susan (SRE) 2 2 0 0 0
$30.96 Project Assistant McLemore, Michele (MMc) 0 0 0 0 0
Total Hours 60 6 54 0 0 0
Direct Labor $2,509.66 $288.72 $2,220.94 $0.00 $0.00 $0.00
Overhead 79.00% $1,982.63 $228.09 $1,754.54 $0.00 $0.00 $0.00
Gen & Admin 36.00% $903.48 $103.94 $799.54 $0.00 $0.00 $0.00
Fringe 37.10% $931.09 $107.12 $823.97 $0.00 $0.00 $0.00
Total Labor $6,326.86 $727.87 $5,598.99 $0.00 $0.00 $0.00
Travel
Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $120.00 $120.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $150.00 $150.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $150.00 $150.00 $0.00 $0.00 $0.00
Handling Fee $15.00 $15.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $165.00 $165.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $657.00 $657.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $150.00 $150.00 $0.00 $0.00 $0.00
Total Laboratory $807.00 $807.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $40.00 $40.00 $0.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $561.10 $561.10 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $601.10 $601.10 $0.00 $0.00 $0.00
Subtotal $8,019.96 $727.87 $7,292.09 $0.00 $0.00 $0.00
Completion Fee $632.69 $72.79 $559.90 $0.00 $0.00 $0.00
Total Estimated Cost $8,652.65 $800.66 $7,851.99 $0.00 $0.00 $0.00
DATE: 3/2/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Annual Groundwater Monitoring - 2022 Scientist Prep; local mob/demob; full round of WLs; sample 9 MWs; manage IDW; sample delivery 16 Senior Scientist Local mob/demob; full round of WLs; Sample 9 MWs; manage IDW; sample delivery 16 Senior Scientist Access, GW monitoring technical oversight and offsite notice review 3
Data Evaluation and Letter Report Senior Scientist Technical review; sign and seal report 2 Senior Scientist Data evaluation and preparation of a brief letter report 10 Scientist Data evaluation 1 Drafter Figures preparation 4 Document Technician Editing; Letter report preparation 2
TOTAL LABOR 54
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 1 $120.00 $120.00
TOTAL VEHICLE $120.00
SUBCONTRACTOR COSTS
Services Procurement
Name Purpose Rate Units Usage Totals Erwin Remediation IDW $150.00 Drum 1 $150.00
Total Services: $150.00
TOTAL $150.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC (Halocarbons Only) 8260C Aqueous $73.00 1.00 9 $657.00 TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $657.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 1 $150.00
Total Shipping: $150.00
TOTAL LAB $807.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage TotalsPPE Level D $35.00 Per Man Day 0 $0.00 Total PPE: $0.00
Expendables Miscellaneous Expendables $40.00 Per Day 1 $40.00
Total Expendables: $40.00 Equipment Items Tubing, Poly/HDPE $0.30 Per Foot 487 $146.10
Total Equipment Items: $146.10 Equipment Kits Deep Groundwater Sampling Kit $415.00 Day 1 $415.00
Total Equipment Kits: $415.00
TOTAL EQUIPMENT $601.10
From: OSullivan, Mike To: Pepe, Theresa Subject: RE: need TACO to backout wells not sampled - Annual Groundwater Monitoring Report, Randolphs Date: Thursday, October 27, 2022 11:14:48 AM Attachments: image002.png image011.png image014.png image015.png image016.png image019.png image020.png image021.png image022.png image024.png image025.png image026.png image029.png image030.png image031.png image032.png image001.png image003.png image004.png image005.png HW680 Cost Estimate Form (ARC)_Randolph_GW Monitoring_2022_Final.xlsm HW680 Cost Estimate Form (ARC)_Randolph_GW Monitoring_2022_Original.xlsm HW680 Cost Estimate Form (ARC)_Randolph_GW Monitoring_2022_Delta.xlsm
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
Theresa, Arcadis is requesting a TACO to reduce the costs associated with sampling three monitoring wells during the 2022 Annual Groundwater Monitoring Event. MW015 was dry and unable to be sampled.
MW003 was covered by a trailer and unable to be sampled. MW010 could not be located and was unable to be sampled. Arcadis is also requesting that the TACO reduce the cost of transportation and disposal of one drum of purge water IDW. The drum of purge water was stolen from the Site prior to the arrival of the IDW Subcontractor scheduled to remove it from the Site.
Thanks, Mike
Mike O’Sullivan PG Senior Geologist Arcadis U.S., Inc.
1705 Metropolitan Boulevard Tallahassee, FL | 32308 | USA T +1 850 895 4739 M +1 850 491 2346 www.arcadis.com
Professional Geologist / PG-FL, 2468
From: Pepe, Theresa <Theresa.Pepe@FloridaDEP.gov> mailto:Mike.OSullivan@arcadis.com mailto:Theresa.Pepe@FloridaDEP.gov https://secure-web.cisco.com/1BxIYouXWxm5pk88d9qICO2FN_TW9Yl8XEEuOx-y1_lNWkOr7Q_LyFdmyhPcu9aQCPL9FUXcK7yf7u6XzarVKdMlab7P5cxrhDUPNuZT67IVlaun2roQhUJzHbipJUzA3gRQPDu2-MVtM-kP1X-zQXX1sCM2ovuz1OUHueoBJj3-Xhg5Z6edv5AjVMp2Ur882XFA3vVNmuxLkB5j5P-ScqJoj5GGoEFR3edxv8qZHMmUC2qI4FZxY9gqySch0bPf9OIXzdMIBbXDuYvNpXi4GirOnz9bMPZdaXN39kboP3kGvF2BXQdmVvNjtgeEw6Zik/https%3A%2F%2Fnam02.safelinks.protection.outlook.com%2F%3Furl%3Dhttp%253A%252F%252Fwww.arcadis.com%252F%26data%3D04%257C01%257C%257C207aab84dc954cc18b0308d8b4066518%257C7f90057d3ea046feb07ce0568627081b%257C0%257C0%257C637457286965667089%257CUnknown%257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%253D%257C1000%26sdata%3Do72ZsbrswpvDLlEIuzTlH6qj%252BNaPYFi9CI3V8hSudnY%253D%26reserved%3D0 https://secure-web.cisco.com/1jHyHL0WlbQLHEynqIcK6rr-wBY4_tWes5fo7-xdCDKYQQtv4Ui2Szv5_B5t8uBYjdnaAUZywohRHGbn1TV-YDF6MNuToWrt1_1cdwqXVWC4wknJ_VDGUXJbkWcDfdUO6ARp_-ZHSHJAT3UN1K9Hdb9sTLgdA5xyZjuvAGZUz3EdtsbtCBI25jkErGpCXKRY6VdNT4SArcdlMovw_DSb2SgqfNpDrTLu1HjLxhV4bc9-zo0QtWJZLhzvJZHLPEcgiLjo4UK7DdjSOw9u-VYYqJq7J-9hapbHMmSJKHQ_3pqB4yEOyAfrCfgYFVda1OlyZ/https%3A%2F%2Fwww.linkedin.com%2Fshowcase%2Farcadis-north-america%2F https://secure-web.cisco.com/1pw-r3oqGCVOVuNObupQfx1p65RjZZXSlQ2LSgrMUcQgUSwqm-Dn-919JdtPvAReRcU86JqPMxMmTqLjpG0UTFocqYWZbF9qEUPTCR0FV2X9TRZQw7mG1ZTJ41nEFPRQkP2w4TSS7lcr4_BLFW2NdBCpsnp1BhNWJgg8Qtq1Ca3ruG2PuLbPBe4iNephjM4L9OkhpdZB1wQSnQ83Ex7f7CMyCCJJ5B4wOQzlvgcV81vE_TleWGIrsZ4VxwZqkCNuRDUDnqBH_gfX2XLKvm-Q-m2h-fPcaioGa_G87q_tjqf3do0ilWTar5LK1e-j6TUW6/https%3A%2F%2Ftwitter.com%2FArcadis_NA%3Fref_src%3Dtwsrc%255Egoogle%257Ctwcamp%255Eserp%257Ctwgr%255Eauthor https://secure-web.cisco.com/1anhxH1AQiS3ZUOyBIpR1czxOHhUZWOWKXrbJA9GtOuvxOchWxqyE0wfxCxM36b3gAsl8tbjNjo6JM8-UYYmEWVCAweP1F3E-cXCoTTdn-6jZNxE0UgZLq5Yu3qL-Zc_3ungLNg2pdo2bPhiGAG9uY_pghn3IKpQp_x4_AdZraYCLFgEsen2pwbWKzeLKv58VeTB_V8M9RcHdnYvbgrrXTnDTq-s5quhjaLWQat7_nDeSGH5TdTX3z3xELQ5mkXj9fb3TzwSkz_q-LufxPt4TYpGWDSg0UN3tn_MFwJrr6fTqzXTo8Bl2gEXcqXZLISk4/https%3A%2F%2Fwww.facebook.com%2FArcadisNorthAmerica%2F https://secure-web.cisco.com/1WWaDNYPmMb2tbVf2Aa8YyBXjDeVm2dJfSuQjkki_7pucaZCIcyIE7BwFHK65VJp---6b8vijLXVxM_2W8tF3PO9RNWEhQZTL57IGZp0IuRLRgmg4iCEt3zL7PMgkl2c2rPSenKGCQCallfT7RZnxg-W_xz6Z_7n97IdOHROV3sJRKhCOWrBnrQQkfLNqzM7x9JxQGuJAbW-BEOFL7gr-GK0HXYVdKTfTHgVCUO6oOqOv1mGEDoKhuv6_ucmIYbi12yCdjQg-vQxRelNBGayUU3a4Q7X-PfbeZolz6N_DU_VqQXgLqCBhTmihTryLeCHj/https%3A%2F%2Fwww.instagram.com%2Farcadisglobal%2F%3Fhl%3Den
Cost Estimate
Contractor: Arcadis, U.S., Inc.
Date: 3/2/22
Task #: SubTask 1 Project Management SubTask 6
Site: Randolph Alteration and Cleaners SubTask 2 Annual Groundwater Monitoring 2022 SubTask 7
Activity/Phase: Monitoring SubTask 3 SubTask 8
Project Manager: Mike O'Sullivan SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
Labor Rate Category
$50.00 Project Manager O'Sullivan, Mike (MO) 6 5.8
$96.76 Principal Engineer Bedessem, Jim (JMB) 0 0 0 0 0 0 0 0 0 0
$82.29 Principal Scientist Vogelsong, William (BV) 0 0 0 0 0 0 0 0 0 0
$81.24 Principal Engineer Burtnett, Susan (SB) 0 0 0 0 0 0 0 0 0 0
$79.12 Principal Engineer Suarez, Gus (GS) 0 0 0 0 0 0 0 0 0 0
$75.11 Principal Scientist McManus, Andrew (ATM) 0 0 0 0 0 0 0 0 0 0
$74.12 Principal Scientist McMillan, Britt (BM) 0 0 0 0 0 0 0 0 0 0
$71.24 Principal Engineer Navon, Daria (DN) 0 0 0 0 0 0 0 0 0 0
$67.91 Principal Scientist Day, Chris (CD) 0 0 0 0 0 0 0 0 0 0
$61.69 Principal Scientist Burke, Brian (BRB) 0 0 0 0 0 0 0 0 0 0
$61.38 Principal Scientist McGlone, Douglas (DMc) 0 0 0 0 0 0 0 0 0 0
$61.32 Principal Scientist Dellay, Leah (LD) 0 0 0 0 0 0 0 0 0 0
$61.25 Principal Engineer Perella, John (JP) 0 0 0 0 0 0 0 0 0 0
$50.00 Senior Engineer Cardoso, Antonio (AC) 0 0 0 0 0 0 0 0 0 0
$50.00 Senior Engineer Gattenby, Jessica (JG) 0 0 0 0 0 0 0 0 0 0
$50.00 Senior Scientist O'Sullivan, Mike (MO) 31 31 0 0 0 0 0 0 0 0
$48.57 Senior Scientist Larenas, Athnony (AOL) 0 0 0 0 0 0 0 0 0 0
$45.61 Senior Scientist Jeffries, Shannon (SMJ) 0 0 0 0 0 0 0 0 0 0
$49.19 Senior Scientist O'Connell, Patrick (PJO) 0 0 0 0 0 0 0 0 0 0
$47.03 Senior Scientist Gillespie, Julie (JG) 0 0 0 0 0 0 0 0 0 0
$47.03 Senior Engineer Cansler, Theresa (TC) 0 0 0 0 0 0 0 0 0 0
$45.81 Senior Engineer Hanna, Chad (CH) 0 0 0 0 0 0 0 0 0 0
$43.40 Project Engineer Romero Cotrino, Camilo (CR) 0 0 0 0 0 0 0 0 0 0
$43.88 Project Engineer Hays, Timothy (TH) 0 0 0 0 0 0 0 0 0 0
$41.21 Staff Scientist Mott, Lyndi (LM) 0 0 0 0 0 0 0 0 0 0
$39.34 Staff Scientist Riley, Joel (JR) 0 0 0 0 0 0 0 0 0 0
$36.35 Staff Scientist Chest, Mark (MC) 0 0 0 0 0 0 0 0 0 0
$37.33 Staff Engineer Vail, Zackary (ZTV) 0 0 0 0 0 0 0 0 0 0
$36.18 Staff Scientist Singer, Jennifer (JS) 0 0 0 0 0 0 0 0 0 0
$35.93 Survey Manager Schacht, Roland (RS) 0 0 0 0 0 0 0 0 0 0
$28.94 Scientist McBath, Brandon (BMc) 0 0 0 0 0 0 0 0 0 0
$28.94 Scientist Brooks, Eric (EAB) 0 0 0 0 0 0 0 0 0 0
$28.94 Scientist Salinas, Kendall (KS) 0 0 0 0 0 0 0 0 0 0
$28.94 Scientist Bishton, Dan (DB) 0 0 0 0 0 0 0 0 0 0
$28.94 Scientist Cochran, Laura (LC) 0 0 0 0 0 0 0 0 0 0
$28.80 Scientist Guarino, Andrew (AG) 0 0 0 0 0 0 0 0 0 0
$28.94 Scientist Martineau, Duncan (DM) 17 17 0 0 0 0 0 0 0 0
$28.72 Scientist Brutscher, Katherine (KEB) 0 0 0 0 0 0 0 0 0 0
$24.77 Scientist Bridenstine, Tyler (TB) 0 0 0 0 0 0 0 0 0 0
$33.57 Technician Welch, David (DJW) 0 0 0 0 0 0 0 0 0 0
$29.14 Technician Dankerl, David (DJD) 0 0 0 0 0 0 0 0 0 0
$24.17 Technician Fortner, Kendrix (KLF) 0 0 0 0 0 0 0 0 0 0
$23.52 Technician Rhodes, John (JAR) 0 0 0 0 0 0 0 0 0 0
$39.67 Drafter/Designer Oliva, Brian (BO) 0 0 0 0 0 0 0 0 0 0
$30.99 Drafter/Designer Richards, Jim (JR) 0 0 0 0 0 0 0 0 0 0
$31.48 Drafter/Designer Berndgen, Wendy (WDB) 4 4 0 0 0 0 0 0 0 0
$35.00 Document Technician Ballheim, Debra (DJB) 0 0 0 0 0 0 0 0 0 0
$26.52 Document Technician Embras, Susan (SRE) 2 2 0 0 0 0 0 0 0 0
$30.96 Project Assistant McLemore, Michele (MMc) 0 0 0 0 0 0 0 0 0 0
Total Hours 60 6 54 0 0 0 0 0 0 0 0
Direct Labor $2,509.66 $288.72 $2,220.94 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 79.00% $1,982.63 $228.09 $1,754.54 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Gen & Admin 36.00% $903.48 $103.94 $799.54 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 37.10% $931.09 $107.12 $823.97 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $6,326.86 $727.87 $5,598.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel
Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs $438.00 $438.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $150.00 $150.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Laboratory $588.00 $588.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Tubing, Poly/HDPE $146.10 $146.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Deep GW Sampling Kit $415.00 $415.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Field Expenses $601.10 $601.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $7,635.96 $727.87 $6,908.09 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Completion Fee $632.69 $72.79 $559.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $8,268.65 $800.66 $7,467.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
&"CG Times,Bold"&16FDEP COST ESTIMATE
&"Courier New,Bold"&10REV: 02/03 &"Courier New,Bold"&10CEF ARCADIS &"Courier New,Bold"&10Page &P
Formula Sheet
Project Management
Subtask 1 Subtask 2 Subtask 3 Subtask 4 Subtask 5 Subtask 6 Subtask 7 Subtask 8 Subtask 9 Subtask 10
Labor Costs $290.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$1,550.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$491.98 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$125.92 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$53.04 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 total labor dollars $290.00 $2,220.94 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Project Management $2,220.94 = sum of Direct Labor Costs from Subtasks 2 through 10
$288.72 =13% of Direct Labor Costs (Project Management)
5.774 = Hours of Project Management (based on hourly salary of the Contractor Project Manager)
Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Service Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
ST 2
SITE : Randolph Alteration and Cleaners
SUBTASK 2: Annual Groundwater Monitoring 2022
DATE: 3/2/22
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Annual Groundwater Monitoring - 2022
Scientist Prep; local mob/demob; full round of WLs; sample 9 MWs and 1 EB; manage IDW; sample delivery 16
Senior Scientist Local mob/demob; full round of WLs; Sample 9 MWs and 1 EB; manage IDW; sample delivery 16
Senior Scientist Access, GW monitoring technical oversight and offsite notice review 3
Data Evaluation and Letter Report
Senior Scientist Technical review; sign and seal report 2
Senior Scientist Data evaluation and preparation of a brief letter report 10
Scientist Data evaluation 1
Drafter Figures preparation 4
Document Technician Editing; Letter report preparation 2
TOTAL LABOR 54
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
Van/Truck $120.00 Per Day 1 $120.00 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
Meals
Category/Staff Rate Unit Usage Totals
Scientist $36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel
Category/Staff Rate Unit Usage Totals
Scientist $150.00 Per Day 0 $0.00
$150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals
$0.00 Per Day 1 $0.00
Total Equip.: $0.00
Services Procurement
Name Purpose Rate Units Usage Totals
NAME OF COMPANY Direct-push services $0.00 Lump Sum 1 $0.00
NAME OF COMPANY Drilling services (DPT, MAG wells, SBs, VPs) $0.00 Lump Sum 0 $0.00
Erwin Remediation IDW $150.00 Drum 0 $0.00
NAME OF COMPANY On-site Mobile Laboratory analysis $0.00 Lump Sum 0 $0.00
NAME OF COMPANY Utility Locate / GPR Survey $0.00 Lump Sum 0 $0.00
NAME OF COMPANY Utilities -Telemetry $0.00 Per Month 0 $0.00
Handling Fee $0.00 Per Month 1 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs
Parameter Method Media Rate Turn Around Total Samples Totals
VOC (Halocarbons Only) 8260C Aqueous $73.00 1.00 6 $438.00
TRPH FL PRO Soil $88.00 1.00 0 $0.00
SVOCs 8270 Soil/Sediment $260.00 1.00 0 $0.00
1 RCRA Metal (Pb) 6020 Soil/Sediment $14.00 1.00 0 $0.00
1 RCRA Metal (Hg) 7470 Soil/Sediment $28.00 1.00 0 $0.00
Herbicides 8151 Soil $155.00 1.00 0 $0.00
Organochlorine Pesticides / PCBs 8081/8082 Soil/Sediment $175.00 1.00 0 $0.00
Dioxins/Dibenzofurans 8290 Soil $950.00 1.00 0 $0.00 total Cyanide 335.4 Soil/Sediment $43.00 1.00 0 $0.00 total Phenols 420.2 Soil $35.00 1.00 0 $0.00
Priority Pollutant Organics Full Suite Aqueous $735.00 1.00 0 $0.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $438.00
Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 1 $150.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $150.00
TOTAL LAB $588.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals
PPE Level D $35.00 Per Man Day 0 $0.00
PPE Level C $150.00 Per Man Day 0 $0.00
PPE Level B $230.00 Per Man Day 0 $0.00
Total PPE: $0.00
Expendables
Miscellaneous Expendables $40.00 Per Day 1 $40.00
Total Expendables: $40.00
Equipment Items
PID/FID Combo or FID $125.00 Per Day 0 $0.00
PID/FID Combo or FID $500.00 Per Week 0 $0.00
Thermal Anemometer $33.00 Per Day 0 $0.00
Vacuum Gauges (low, med & high) $19.00 Per Day 0 $0.00
Bailer, HDPE, Disp $7.00 Per Bailer 0 $0.00
Water Level: Electric Tape $25.00 Per Day 0 $0.00
Water Level: Electric Tape $100.00 Per Week 0 $0.00
Bladder Pump $134.00 Per Day 0 $0.00
Peristaltic Pump (w/bat) $30.00 Per Day 0 $0.00
Submersible Pump, 2" electric $80.00 Per Day 0 $0.00
Multimeter (pH, Temp, Cond, DO, Orp) $105.00 Per Day 0 $0.00
Turbidity Meter $27.00 Per Day 0 $0.00
Hand Auger $12.00 Per Day 0 $0.00
Terra Cores $11.00 Each 0 $0.00
Tedlar Bags $20.00 Each 0 $0.00
Survey Station transit/rod/level/tape $50.00 Per Day 0 $0.00
Portable Compressor $50.00 Per Day 0 $0.00
Portable Generator 5KW $70.00 Per Day 0 $0.00
Padlocks $3.40 Each 0 $0.00
Tubing, Poly/HDPE $0.30 Per Foot 487 $146.10
Tubing, Silicon 3/16x3/8 $3.00 Per Foot 0 $0.00
Miscellaneous Expendables $40.00 Per Day 0 $0.00
PID (ppbRae) $110.00 Per Day 0 $0.00
55-gallon Drum $100.00 Each 0 $0.00
Regenerative Blower $180.00 Per Day 0 $0.00
ColorTec Sampling Pump $80.00 Per Week 0 $0.00
PCE ColorTec tubes (hi or low range) $90.00 Box of 10 0 $0.00
[add'l equipment] $0.00 [Unit] 0 $0.00
Total Equipment Items: $146.10
Equipment Kits
Site Reconnaissance Kit $150.00 Day 0 $0.00
Monitor Well Installation Kit $325.00 Day 0 $0.00
Hydrogeological Evaluation Kit $295.00 Day 0 $0.00
Shallow Groundwater Sampling Kit $290.00 Day 0 $0.00
Deep Groundwater Sampling Kit $415.00 Day 1 $415.00
Shallow Groundwater / Soil Vapor Screening Kit $290.00 Day 0 $0.00
Soil Assessment Kit $175.00 Day 0 $0.00
Soil Vapor Sampling Kit $290.00 Day 0 $0.00
Construction/O&M Supplies $75.00 Day 0 $0.00
Soil Sampling Kit (through concrete) $235.00 Day 0 $0.00
Construction/O&M/Pilot Test Kit $360.00 Day 0 $0.00
MAGS Investigation Kit $500.00 Day 0 $0.00
Total Equipment Kits: $415.00
TOTAL EQUIPMENT $601.10
ST 3
SITE :
SUBTASK 3:
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
(Subtask Title)
Principal 0
Senior Sci 0
Staff Sci 0
Technician 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Meals
Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel
Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00
$150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals
$0.00 Per Day 1 $0.00
Total Equip.: $0.00
Services Procurement
Name Purpose Rate Units Usage Totals
NAME OF COMPANY Direct-push services $0.00 Lump Sum 1 $0.00
NAME OF COMPANY Drilling services (DPT, MAG wells, SBs, VPs) $0.00 Lump Sum 0 $0.00
NAME OF COMPANY IDW $0.00 Drum 1 $0.00
NAME OF COMPANY On-site Mobile Laboratory analysis $0.00 Lump Sum 0 $0.00
NAME OF COMPANY Utility Locate / GPR Survey $0.00 Lump Sum 0 $0.00
NAME OF COMPANY Utilities -Telemetry $0.00 Per Month 0 $0.00
Handling Fee $0.00 Per Month 1 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs
Parameter Method Media Rate Turn Around Total Samples Totals
VOC 8260 Aqueous $150.00 1.00 0 $0.00
TRPH FL PRO Soil $88.00 1.00 0 $0.00
SVOCs 8270 Soil/Sediment $260.00 1.00 0 $0.00
1 RCRA Metal (Pb) 6020 Soil/Sediment $14.00 1.00 0 $0.00
1 RCRA Metal (Hg) 7470 Soil/Sediment $28.00 1.00 0 $0.00
Herbicides 8151 Soil $155.00 1.00 0 $0.00
Organochlorine Pesticides / PCBs 8081/8082 Soil/Sediment $175.00 1.00 0 $0.00
Dioxins/Dibenzofurans 8290 Soil $950.00 1.00 0 $0.00 total Cyanide 335.4 Soil/Sediment $43.00 1.00 0 $0.00 total Phenols 420.2 Soil $35.00 1.00 0 $0.00
Priority Pollutant Organics Full Suite Aqueous $735.00 1.00 0 $0.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00
Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals
PPE Level D $35.00 Per Man Day 0 $0.00
PPE Level C $150.00 Per Man Day 0 $0.00
PPE Level B $230.00 Per Man Day 0 $0.00
Total PPE: $0.00
Expendables
Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00
Equipment Items
PID/FID Combo or FID $125.00 Per Day 0 $0.00
PID/FID Combo or FID $500.00 Per Week 0 $0.00
Thermal Anemometer $33.00 Per Day 0 $0.00
Vacuum Gauges (low, med & high) $19.00 Per Day 0 $0.00
Bailer, HDPE, Disp $7.00 Per Bailer 0 $0.00
Water Level: Electric Tape $25.00 Per Day 0 $0.00
Water Level: Electric Tape $100.00 Per Week 0 $0.00
Bladder Pump $134.00 Per Day 0 $0.00
Peristaltic Pump (w/bat) $30.00 Per Day 0 $0.00
Submersible Pump, 2" electric $80.00 Per Day 0 $0.00
Multimeter (pH, Temp, Cond, DO, Orp) $105.00 Per Day 0 $0.00
Turbidity Meter $27.00 Per Day 0 $0.00
Hand Auger $12.00 Per Day 0 $0.00
Terra Cores $11.00 Each 0 $0.00
Tedlar Bags $20.00 Each 0 $0.00
Survey Station transit/rod/level/tape $50.00 Per Day 0 $0.00
Portable Compressor $50.00 Per Day 0 $0.00
Portable Generator 5KW $70.00 Per Day 0 $0.00
Padlocks $3.40 Each 0 $0.00
Tubing, Poly/HDPE $0.30 Per Foot 0 $0.00
Tubing, Silicon 3/16x3/8 $3.00 Per Foot 0 $0.00
Miscellaneous Expendables $40.00 Per Day 0 $0.00
PID (ppbRae) $110.00 Per Day 0 $0.00
55-gallon Drum $100.00 Each 0 $0.00
Regenerative Blower $180.00 Per Day 0 $0.00
ColorTec Sampling Pump $80.00 Per Week 0 $0.00
PCE ColorTec tubes (hi or low range) $90.00 Box of 10 0 $0.00
[add'l equipment] $0.00 [Unit] 0 $0.00
Total Equipment Items: $0.00
Equipment Kits
Site Reconnaissance Kit $150.00 Day 0 $0.00
Monitor Well Installation Kit $325.00 Day 0 $0.00
Hydrogeological Evaluation Kit $295.00 Day 0 $0.00
Shallow Groundwater Sampling Kit $290.00 Day 0 $0.00
Deep Groundwater Sampling Kit $415.00 Day 0 $0.00
Shallow Groundwater / Soil Vapor Screening Kit $290.00 Day 0 $0.00
Soil Assessment Kit $175.00 Day 0 $0.00
Soil Vapor Sampling Kit $290.00 Day 0 $0.00
Construction/O&M Supplies $75.00 Day 0 $0.00
Soil Sampling Kit (through concrete) $235.00 Day 0 $0.00
Construction/O&M/Pilot Test Kit $360.00 Day 0 $0.00
MAGS Investigation Kit $500.00 Day 0 $0.00
Total Equipment Kits: $0.00
TOTAL EQUIPMENT $0.00
ST 4
SITE :
SUBTASK 4:
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
(Subtask Title)
Principal 0
Senior Sci 0
Staff Sci 0
Technician 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Meals
Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel
Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00
$150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals
$0.00 Per Day 1 $0.00
Total Equip.: $0.00
Services Procurement
Name Purpose Rate Units Usage Totals
NAME OF COMPANY Direct-push services $0.00 Lump Sum 1 $0.00
NAME OF COMPANY Drilling services (DPT, MAG wells, SBs, VPs) $0.00 Lump Sum 0 $0.00
NAME OF COMPANY IDW $0.00 Drum 1 $0.00
NAME OF COMPANY On-site Mobile Laboratory analysis $0.00 Lump Sum 0 $0.00
NAME OF COMPANY Utility Locate / GPR Survey $0.00 Lump Sum 0 $0.00
NAME OF COMPANY Utilities -Telemetry $0.00 Per Month 0 $0.00
Handling Fee $0.00 Per Month 1 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs
Parameter Method Media Rate Turn Around Total Samples Totals
VOC 8260 Aqueous $150.00 1.00 0 $0.00
TRPH FL PRO Soil $88.00 1.00 0 $0.00
SVOCs 8270 Soil/Sediment $260.00 1.00 0 $0.00
1 RCRA Metal (Pb) 6020 Soil/Sediment $14.00 1.00 0 $0.00
1 RCRA Metal (Hg) 7470 Soil/Sediment $28.00 1.00 0 $0.00
Herbicides 8151 Soil $155.00 1.00 0 $0.00
Organochlorine Pesticides / PCBs 8081/8082 Soil/Sediment $175.00 1.00 0 $0.00
Dioxins/Dibenzofurans 8290 Soil $950.00 1.00 0 $0.00 total Cyanide 335.4 Soil/Sediment $43.00 1.00 0 $0.00 total Phenols 420.2 Soil $35.00 1.00 0 $0.00
Priority Pollutant Organics Full Suite Aqueous $735.00 1.00 0 $0.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00
Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals
PPE Level D $35.00 Per Man Day 0 $0.00
PPE Level C $150.00 Per Man Day 0 $0.00
PPE Level B $230.00 Per Man Day 0 $0.00
Total PPE: $0.00
Expendables
Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00
Equipment Items
PID/FID Combo or FID $125.00 Per Day 0 $0.00
PID/FID Combo or FID $500.00 Per Week 0 $0.00
Thermal Anemometer $33.00 Per Day 0 $0.00
Vacuum Gauges (low, med & high) $19.00 Per Day 0 $0.00
Bailer, HDPE, Disp $7.00 Per Bailer 0 $0.00
Water Level: Electric Tape $25.00 Per Day 0 $0.00
Water Level: Electric Tape $100.00 Per Week 0 $0.00
Bladder Pump $134.00 Per Day 0 $0.00
Peristaltic Pump (w/bat) $30.00 Per Day 0 $0.00
Submersible Pump, 2" electric $80.00 Per Day 0 $0.00
Multimeter (pH, Temp, Cond, DO, Orp) $105.00 Per Day 0 $0.00
Turbidity Meter $27.00 Per Day 0 $0.00
Hand Auger $12.00 Per Day 0 $0.00
Terra Cores $11.00 Each 0 $0.00
Tedlar Bags $20.00 Each 0 $0.00
Survey Station transit/rod/level/tape $50.00 Per Day 0 $0.00
Portable Compressor $50.00 Per Day 0 $0.00
Portable Generator 5KW $70.00 Per Day 0 $0.00
Padlocks $3.40 Each 0 $0.00
Tubing, Poly/HDPE $0.30 Per Foot 0 $0.00
Tubing, Silicon 3/16x3/8 $3.00 Per Foot 0 $0.00
Miscellaneous Expendables $40.00 Per Day 0 $0.00
PID (ppbRae) $110.00 Per Day 0 $0.00
55-gallon Drum $100.00 Each 0 $0.00
Regenerative Blower $180.00 Per Day 0 $0.00
ColorTec Sampling Pump $80.00 Per Week 0 $0.00
PCE ColorTec tubes (hi or low range) $90.00 Box of 10 0 $0.00
[add'l equipment] $0.00 [Unit] 0 $0.00
Total Equipment Items: $0.00
Equipment Kits
Site Reconnaissance Kit $150.00 Day 0 $0.00
Monitor Well Installation Kit $325.00 Day 0 $0.00
Hydrogeological Evaluation Kit $295.00 Day 0 $0.00
Shallow Groundwater Sampling Kit $290.00 Day 0 $0.00
Deep Groundwater Sampling Kit $415.00 Day 0 $0.00
Shallow Groundwater / Soil Vapor Screening Kit $290.00 Day 0 $0.00
Soil Assessment Kit $175.00 Day 0 $0.00
Soil Vapor Sampling Kit $290.00 Day 0 $0.00
Construction/O&M Supplies $75.00 Day 0 $0.00
Soil Sampling Kit (through concrete) $235.00 Day 0 $0.00
Construction/O&M/Pilot Test Kit $360.00 Day 0 $0.00
MAGS Investigation Kit $500.00 Day 0 $0.00
Total Equipment Kits: $0.00
TOTAL EQUIPMENT $0.00
ST 5
SITE :
SUBTASK 5:
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
(Subtask Title)
Principal 0
Senior Sci 0
Staff Sci 0
Technician 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Meals
Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel
Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00
$150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals
$0.00 Per Day 1 $0.00
Total Equip.: $0.00
Services Procurement
Name Purpose Rate Units Usage Totals
NAME OF COMPANY Direct-push services $0.00 Lump Sum 1 $0.00
NAME OF COMPANY Drilling services (DPT, MAG wells, SBs, VPs) $0.00 Lump Sum 0 $0.00
NAME OF COMPANY IDW $0.00 Drum 1 $0.00
NAME OF COMPANY On-site Mobile Laboratory analysis $0.00 Lump Sum 0 $0.00
NAME OF COMPANY Utility Locate / GPR Survey $0.00 Lump Sum 0 $0.00
NAME OF COMPANY Utilities -Telemetry $0.00 Per Month 0 $0.00
Handling Fee $0.00 Per Month 1 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs
Parameter Method Media Rate Turn Around Total Samples Totals
VOC 8260 Aqueous $150.00 1.00 0 $0.00
TRPH FL PRO Soil $88.00 1.00 0 $0.00
SVOCs 8270 Soil/Sediment $260.00 1.00 0 $0.00
1 RCRA Metal (Pb) 6020 Soil/Sediment $14.00 1.00 0 $0.00
1 RCRA Metal (Hg) 7470 Soil/Sediment $28.00 1.00 0 $0.00
Herbicides 8151 Soil $155.00 1.00 0 $0.00
Organochlorine Pesticides / PCBs 8081/8082 Soil/Sediment $175.00 1.00 0 $0.00
Dioxins/Dibenzofurans 8290 Soil $950.00 1.00 0 $0.00 total Cyanide 335.4 Soil/Sediment $43.00 1.00 0 $0.00 total Phenols 420.2 Soil $35.00 1.00 0 $0.00
Priority Pollutant Organics Full Suite Aqueous $735.00 1.00 0 $0.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00
Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals
PPE Level D $35.00 Per Man Day 0 $0.00
PPE Level C $150.00 Per Man Day 0 $0.00
PPE Level B $230.00 Per Man Day 0 $0.00
Total PPE: $0.00
Expendables
Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00
Equipment Items
PID/FID Combo or FID $125.00 Per Day 0 $0.00
PID/FID Combo or FID $500.00 Per Week 0 $0.00
Thermal Anemometer $33.00 Per Day 0 $0.00
Vacuum Gauges (low, med & high) $19.00 Per Day 0 $0.00
Bailer, HDPE, Disp $7.00 Per Bailer 0 $0.00
Water Level: Electric Tape $25.00 Per Day 0 $0.00
Water Level: Electric Tape $100.00 Per Week 0 $0.00
Bladder Pump $134.00 Per Day 0 $0.00
Peristaltic Pump (w/bat) $30.00 Per Day 0 $0.00
Submersible Pump, 2" electric $80.00 Per Day 0 $0.00
Multimeter (pH, Temp, Cond, DO, Orp) $105.00 Per Day 0 $0.00
Turbidity Meter $27.00 Per Day 0 $0.00
Hand Auger $12.00 Per Day 0 $0.00
Terra Cores $11.00 Each 0 $0.00
Tedlar Bags $20.00 Each 0 $0.00
Survey Station transit/rod/level/tape $50.00 Per Day 0 $0.00
Portable Compressor $50.00 Per Day 0 $0.00
Portable Generator 5KW $70.00 Per Day 0 $0.00
Padlocks $3.40 Each 0 $0.00
Tubing, Poly/HDPE $0.30 Per Foot 0 $0.00
Tubing, Silicon 3/16x3/8 $3.00 Per Foot 0 $0.00
Miscellaneous Expendables $40.00 Per Day 0 $0.00
PID (ppbRae)…
This is the start of the file's text. The full file is on GovTribe.