Task Assignment Summary
This Task Assignment (TA) is a state-level environmental contract between the State of Florida Department of Environmental Protection (FDEP) and Arcadis U.S. Inc., a private environmental consulting contractor. The document establishes a specific task under Contract Number HW680 to conduct environmental assessment services at the West Boca Place Dry Cleaners facility located at 8177 Glades Road in Boca Raton, Palm Beach County, Florida. The Department Project Manager is Theresa Pepe, and the contractor's Project Manager is Gus Suarez. The TA is effective with a completion date of January 29, 2027.
Arcadis will complete a Site Assessment according to an approved Work Plan on a fixed unit rate basis totaling $62,999.22. The contract includes two primary invoice milestones: (1) $50,564.99 upon FDEP approval of fieldwork activities with a due date of September 30, 2026, and (2) $12,434.23 upon FDEP approval of the Site Assessment Report, IDW manifests, and project management documentation with a due date of November 30, 2026. The scope comprises three subtasks: Project Management (automatically calculated as a percentage of labor), Site Assessment (including soil, vapor, and groundwater screening with monitor well installation), and Site Assessment Report preparation. The assessment incorporates services from multiple subcontractors including Earth Tech Drilling ($18,955.00), GeoView utility survey ($900.00), Erwin IDW disposal ($500.00), laboratory analysis costs ($9,500.00), and various field equipment and materials totaling approximately $3,982.00. All work will be performed in accordance with FDEP's Standard Operating Procedures and the site-specific Health and Safety Plan.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW680
DC053B Completion January 29, 2027
Arcadis will complete a Site Assessment according to the approved Work Plan.
Theresa Pepe 850-245-8966 Contractor Arcadis U.S. Inc. Contractor
Contractor Gus Suarez Contractor 813-205-4703
ERIC_5152
8177 Glades Rd, Boca Raton, Palm Beach County
West Boca Place Dry Cleaners
Contractor Contractor
✔ $ 62,999.22
$ 62,999.22
Scope of Work
Arcadis U.S. Inc.
Contractor Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2026.02.06 08:17:04 -05'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2026.02.05 15:41:35 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Completion of Fieldwork Activities 09/30/2026
Site Assessment Report/IDW manifests/Project Management 11/30/2026
FDEP approval of Fieldwork Activities $ 50,564.99
FDEP approval of Site Assessment Report/IDW manifests/Project Management $ 12,434.23
$ 62,999.22
HW680
DC053B
FFLORIDA DEPARTMENT OF
EEnvironmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jay Collins
Lt. Governor
AAlexis A. Lambert Secretary
Memorandum
TO: Negotiation File West Boca Place Dry Cleaners Facility ID No. 50-9501467; ERIC_5152 Boca Raton, Palm Beach County FROM: Theresa Pepe, Project Manager SUBJECT: Task Assignment DC053B (HW680) DATE: January 29, 2026
This Task Assignment authorizes Arcadis to complete a Site Assessment at the West Boca Place Dry Cleaners site. The initial fieldwork will be completed in approximately six days, and a Site Assessment Report (SAR) will be submitted as the final deliverable.
The assessment may be expanded or reduced via change order depending on the complexity of the site. All work will be performed in accordance with the approved work plan.
The final task assignment total is $62,999.22. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor.
Subtask 2: Site Assessment This subtask provides funds for soil, vapor and groundwater screening and monitor well installation at the facility. Arcadis will present the data in an interim deliverable after which a change order may be authorized for additional work, if needed. The Project Manager approved sampling locations with minor comments and the overall approach to the assessment presented in the October 2025 Work Plan.
West Boca Place Dry Cleaners
(ERIC_5152)
Lab cost for Method 8260 VOCs was raised from $73 (limited scope) to $110 (full list) per the Waste Site Cleanup Section Geologist.
GeoView will provide a GPR survey to check for underground utilities based on their low bid of three bids solicited.
Earth Tech Drilling was selected as the drilling subcontractor based on their low bid of three bids solicited.
Erwin will transport and dispose of IDW. Note: IDW is presumed to be non-hazardous but will be characterized before disposal.
Subtask 3: Site Assessment Report (SAR) All activities and analytical results obtained during site assessment work will be submitted to FDEP as a written report. This report will include appropriate figures, graphs, data tables, etc. IDW manifests will also be provided to FDEP as part of the final deliverable.
FDEP COST ESTIMATEContractor: Arcadis, U.S., Inc.
Date: 12/18/2025
Task #: SubTask 1 Project Management
Site: SubTask 2 Field Activities
Activity/Phase: Site assessment SubTask 3 Site Assment Report
Project Manager: Gus Suarez SubTask 4
SubTask 5
TTotals 1 2 3 4 5 Labor Rate Category
$89.78 Project Manager Suarez, Gus (GS) 12 12.0 $73.45 Principal Engineer Perella, John (JFP) 7 3 4 0 0 $73.04 Principal Scientist McGlone, Douglas (DMc) 15 7 8 0 0 $39.34 Staff Engineer Tran, Thuy-Min (MT) 58 18 40 0 0 $28.94 Scientist Hernandez, Christopher (CH) 96 96 0 0 0 $34.89 Technician Fox, Brian (BF) 12 12 0 0 0
$39.67 Drafter/Design Oliva, Brian (BO) 12 0 12 0 0 $39.94 Project Assistant Cruz, Michele (MC) 18 6 12 0 0
Total Hours 230 12 142 76 0 0
Direct Labor $9,360.19 $1,076.84 $4,876.31 $3,407.04 $0.00 $0.00
Overhead 79.00% $7,394.54 $850.70 $3,852.28 $2,691.56 $0.00 $0.00 Gen & Admin 36.00% $3,369.66 $387.66 $1,755.47 $1,226.53 $0.00 $0.00 Fringe 37.10% $3,472.63 $399.51 $1,809.11 $1,264.01 $0.00 $0.00 Total Labor $23,597.02 $2,714.71 $12,293.17 $8,589.14 $0.00 $0.00
Travel Vehicle $720.00 $720.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Meals $0.00 $0.00 $0.00 $0.00 $0.00 Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $720.00 $720.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) ETD Drilling (Conventional) $18,955.00 $18,955.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Landmark Surveying $0.00 $0.00 $0.00 $0.00 $0.00 Erwin IDW $500.00 $500.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00 Geoview Utility survey $900.00 $900.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $20,355.00 $20,355.00 $0.00 $0.00 $0.00 Handling Fee $2,035.50 $2,035.50 $0.00 $0.00 $0.00 Total Subcontractor Cost $22,390.50 $22,390.50 $0.00 $0.00 $0.00
Laboratory Analytical Costs $9,500.00 $9,500.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $450.00 $450.00 $0.00 $0.00 $0.00 Total Laboratory $9,950.00 $9,950.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $240.00 $240.00 $0.00 $0.00 $0.00 Equipment (Drilling Related) $992.00 $992.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $2,750.00 $2,750.00 $0.00 $0.00 $0.00 Total Field Expenses $3,982.00 $3,982.00 $0.00 $0.00 $0.00
Subtotal $60,639.52 $2,714.71 $49,335.67 $8,589.14 $0.00 $0.00 Completion Fee $2,359.70 $271.47 $1,229.32 $858.91 $0.00 $0.00
Total Estimated Cost $62,999.22 $2,986.18 $50,564.99 $9,448.05 $0.00 $0.00
West Boca Cleaners
REV: 09/25 CEF ARCADIS Page 1
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : West Boca Cleaners SUBTASK 2: Field Activities
DATE: 12/18/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Soil Sampling, Vertical Profile GW Sampling, MW Install Principal Sci (DMc) PG field support and daily updates (4 hrs) 4 Staff Eng (MT) HASP (5 hrs), Property owner updates and field event preparation, data review (4 hrs) 9 Sci (CH) GPR oversight (8 hrs), Prep (3 hrs), Soil sampling and VP GW sampling (5 x 12 hrs = 60), logs/paperwork (3 hrs) 74 Project Assistant (MC) HASP (3 hrs) 3 MAGS Testing and Monitor Well Sampling Principal Eng (JP) PE field support and MAGS data evaluation (3 hrs) 3 Staff Eng (MT) Field event preparation (2 hrs), IDW characterization and waste profiling for disposal (2 hrs) 4 Sci (CH) MAGS Field Testing, restoration, and logs (12 hrs) 12 Technician (BF) MAGS Field Testing, restoration, and logs (12 hrs) 12 Sci (CH) Guage WLs, Sample six wells (12 hrs) 10 Initial Site Assessment Report Deliverable Principal Sci (DMc) Teleconference call with FDEP, next assessment or remediation discussion planning 3 Staff Eng (MT) Sketch GW gradient and data figures. Field deliverable package submit to FDEP 5 Project Assistant (MC) Field support, database management, assemble field deliverable package, lab reports 3
TOTAL LABOR 142
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 6 $720.00 $720.00 Van/Truck $480.00 Per Week 0 $0.00 $0.00
TOTAL VEHICLE $720.00
MEALS STAFF RATE UNIT USEAGE
Totals $36.00 Per Day 0 $0.00 $36.00 Per Day 0 $0.00
TOTAL MEALS $0.00
HOTEL STAFF RATE UNIT USEAGE
Totals $150.00 Per Day 0 $0.00 $150.00 Per Day 0 $0.00
TOTAL HOTEL $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 0 $0.00
Total Equipment: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals ETD Direct-push services $18,955.00 Lump Sum 1 $18,955.00 Erwin IDW - Liquid $125.00 Drum 4 $500.00 GeoView Utility Locate / GPR Survey $900.00 Lump Sum 1 $900.00
Total Services: $20,355.00
TOTAL SUBCONTRACTOR $20,355.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC 8260 Aqueous $110.00 1.00 35 $3,850.00 6 VPs x 5 samples, plus 5 MWs VOC 8260 Soil $110.00 1.00 35 $3,850.00 5 samples x 7 borings SPLP Extraction 1311/1312 Soil/Sediment $50.00 1.00 5 $250.00 assume 5 samples VOC analysis on SPLP extracted 8260 Soil/Sediment $110.00 1.00 5 $550.00 assume 5 samples VOC TO-15 Vapor $200.00 1.00 5 $1,000.00 5 MAGS points
TAT 24-hr=110% (2.1) 3-day=65% (1.65) -week=20% (1.20) Total Lab: $9,500.00 Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 3 $450.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $450.00
TOTAL LAB $9,950.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Personal Protection Expendables Miscellaneous Expendables $40.00 Per Day 6 $240.00
Total Expendables: $240.00 Equipment Items Tubing, Poly/HDPE $0.30 Per Foot 30 $9.00 Tubing, Silicon 3/16x3/8 $3.00 Per Foot 6 $18.00 EWE SVE Trailer for MAGS $2,750.00 Per Day 1 $2,750.00
Total Equipment Items: $2,777.00 Equipment Kits Monitor Well Installation Kit $325.00 Day 1 $325.00 Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00 Soil Assessment Kit $175.00 Day 2 $350.00
Total Equipment Kits: $965.00
TOTAL EQUIPMENT $3,982.00
FINAL --7/24/96
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : West Boca Cleaners SUBTASK 3: Site Assment Report
DATE: 12/18/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
SAR
Principal Sci / DMc PG write/certification of final SAR; results/risk-based mngt options with FDEP 8
Principal Engineer / JP PE analysis of SAR; remedial characterization data/preliminary remedial options evaluation 4 Staff Eng/ MT SAR writing (24 hrs); SAR figures/graphs generation (8 hrs); SAR tables (8 hrs) 40 Designer - Database Mgr / BSAR figures/graphs generation (8 hrs); data mgmt, import to CAD (4 hrs) 12
Project Assistant / MMc Process field notes, sample tracking, database entry, report assembly, report submittal 12
TOTAL LABOR 76
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
MEALS STAFF RATE UNIT USEAGE
$36.00 Per Day 0 $0.00 $36.00 Per Day 0 $0.00
TOTAL MEALS $0.00
HOTEL STAFF RATE UNIT USEAGE
$150.00 Per Day 0 $0.00 $150.00 Per Day 0 $0.00
TOTAL HOTEL $0.00
SUBCONTRACTOR COSTS
Equipment Procurement Name Equipment Rate Units Usage Totals
$0.00 Per Day 0 $0.00
Total Equipment: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals NAME OF COMPANY Utilities -Power $50.00 Per Month 0 $0.00
Handling Fee $20.00 Per Month 0 $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
TAT 24-hr=110% (2.1) 3-day=65% (1.65)-week=20% (1.20) Total Lab: $0.00 Rate Units Usage
Shipping - Large (25 to 50 lb --- --- $150.00 Per Cooler 0 $0.00 Shipping - Small (0 to 25 lbs --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Personal Protection Expendables Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00 Equipment Items
Total Equipment Items: $0.00 Equipment Kits
Total Equipment Kits: $0.00
TOTAL EQUIPMENT $0.00
FINAL --7/24/96
INITIAL SITE ASSESSMENT WORK PLAN
www.arcadis.com West Boca Plan Dry Cleaner - ISA Work Plan.docx 4
5 INITIAL SITE ASSESSMENT WORK PLAN
A flexible assessment approach will be used to create a site-specific unsaturated soil and groundwater database capable of determining the absence/presence and extent of chlorinated drycleaning solvents above soil and groundwater CTLs. In addition, potential risks and exposure pathways will be identified and a preliminary recommendations and design provided for remedial action, if justified. The proposed assessment activities will be completed in accordance with FDEP’s Standard Operating Procedures (SOP) (001/01), the site-specific HASP, Chapter 62-780 Florida Administrative Code (F.A.C.), and recent guidance provided in the July 13, 2022, Waste Cleanup Program Pollution Response Action Contract (WCP PRAC) meeting in Tallahassee, Florida.
Based on the reported historical PCE contamination in the groundwater (north of the rear door of the facility) and the anticipated depth-to-water (8 ft bls), multiple assessment methodologies are proposed. Unsaturated soil assessment will be completed by the installation of soil borings to the water table, soil sampling for fixed-based laboratory analysis of volatile organic compounds (VOCs) and completing a Modified Active Soil Gas Survey
(MAGS).
The first phase of groundwater assessment will be completed as follows:
installing a source area monitor well (MW001) inside the facility for fixed-based laboratory analysis of VOCs, completing vertical profiling using direct-push technology (DPT) for fixed-based laboratory analysis of VOCs;
and, installing monitoring wells to assess groundwater gradient conditions.
Following receipt and evaluation of the first phase of assessment, the scope of the next phase of investigation activities, such as additional monitor wells, will be developed in consultation with FDEP. The site assessment methods and techniques are described in detail below.
5.1 Site Preparation and Utility Locate
Arcadis will contact the current site operator and current property owner to share proposed sampling locations and advise schedule/notification requirements prior to completing field work. Arcadis will oversee a subsurface private utility locate using ground penetrating radar (GPR) on the site and surrounding areas. The purpose of the utility locate will be to establish/confirm the suspected locations of underground utilities (Sunshine State One Call will initially locate utilities on and surrounding the site). The initial site visit indicated the presence of underground water, sewer, natural gas and electrical lines.
5.2 Soil Assessment and Sub-Slab Soil-Gas Sampling
5.2.1 Unsaturated Soil Assessment
One continuous soil boring (SB001) will be installed in the rear of the facility to a depth of approximately 50 ft bg or into the basal confining clay at the bottom of the surficial aquifer to characterize site lithology. A lithologic log of the general geology at the site will be developed from the soil samples collected from this soil boring. Soil samples from each boring will be described by an onsite Arcadis geologist.
West Boca Plan Dry Cleaner - ISA Work Plan.docx 5
To confirm if past drycleaning operations at the site had an adverse impact to unsaturated soil quality conditions, up to six soil borings (SB001-SB006) for collection of soil samples are proposed for installation at the locations shown in Figure 3. The initial sample location will be placed in vicinity of the confirmed PCE impacts north of the unit; additional boring/sample locations will be placed within and surrounding the building. Soil boring locations may be adjusted based on the GPR results and location of the sewer lateral.
The soil borings will be installed using a hand auger and DPT. A concrete coring machine will be used to bore through the concrete floor inside the building to access the underlying soils. Soil samples at all soil borings will be collected at 0.5 ft bls, 2 ft bls, and then at two-foot depth intervals to a depth just above the water table (estimated to be at 8 ft bls). All soil samples (up to 5 samples/boring x 6 initial boring locations or a total of up to 30 soil samples) will be submitted to a fixed-based laboratory for confirmatory analysis of VOCs by EPA Method 8260.
Each soil sample will also be collected in encore samplers in anticipation of SPLP analysis. Six SPLP analysis are included in the initial costs. Following the sampling, the boreholes will be completed with MAGS wells as described below.
5.2.2 Modified Active Gas Sampling
MAGS is proposed for completion inside and outside the building. MAGS will be completed in general agreement with the Modified Active Gas Sampling Manual, dated October 12, 2004. Up to four MAGS wells (MAG01 – MAG04) will be installed. The MAGS points will be constructed of 2-inch diameter PVC with 0.010-inch slotted screen set approximately one foot below ground surface to approximately 7 ft bg. Final MAGS well construction will be field determined. One vapor sample will be collected from each MAGS well during the test for analysis of VOCs by EPA Test Method TO-15. Proposed MAGS well layout locations are depicted on Figure 3.
5.3 Groundwater Assessment
5.3.1 Groundwater Vertical Profiling
Groundwater assessment will be conducted utilizing vertical profiling by a direct-push drill rig to collect water samples for VOCs analysis. Four vertical profile (VP) locations (VP001 – VP004) are proposed as shown on Figure 3. Assuming the water table will be encountered at approximately 8 ft bg and the base of the surficial aquifer is approximately 50 ft bg, samples starting at the water table and at 10-ft depth intervals to a total depth of 50 ft-bls will be collected. Lithologic information from Soil Boring SB001 will be used to determine exact sample intervals. Each VP water sample will be submitted to a fixed-based laboratory for confirmatory analysis of VOCs by EPA Method 8260. Following sampling, each vertical profile borehole will be completed with a monitoring well as described below.
5.3.2 Monitor Well Installation and Sampling
Arcadis will hand-install a source area well inside the facility (MW001) into the water table to maximum depth possible at the location presented on Figure 3. The well will be constructed with 0.010-inch slot pre-pack screen, developed, and completed within a manhole. Arcadis will sample MW001 per SOP 001/01 methodology for laboratory analysis of VOCs using EPA Method 8260.
Arcadis will install up to four additional monitoring wells (MW002 – MW005) and utilize the interior monitor well MW001 (described above) to provide groundwater information. It is assumed that four shallow monitoring wells
West Boca Plan Dry Cleaner - ISA Work Plan.docx 6
(MW002 – MW005) will be installed with 10-ft of 0.010-inch slot pre-pack screen, between 2 to 12 ft bg using DPT (Figure 3). Final location, dimensions, including depth, and screen interval will be determined based upon groundwater elevations encountered during the initial assessment activities. Arcadis will also survey the top of casing elevations of MW001 – MW005 relative to common point so that the groundwater gradient can be determined.
Based on the results of the initial assessment activities and vertical profiling results, the installation of additional monitor wells and sampling analyses in a subsequent phase will be developed in consultation with FDEP. Also, sampling for per- and polyfluoroalkyl substances (PFAS) will be screened per FDEP guidance and tasked separately.
6 REPORTING
An Initial Site Assessment Report (ISAR) including field logs, photographs, laboratory reports will be submitted to FDEP within 30 days of receipt of laboratory data as an interim deliverable to document the fieldwork. The ISAR will provide a basis for the next phase of work which may include additional soil sampling, the installation of permanent monitor wells, a professional survey, etc. to be completed under a Task Assignment Change Order
(TACO).
A final Site Assessment Report (SAR) will serve as the final deliverable. The SAR will describe the results of the proposed site assessment tasks described in this Work Plan and will be delivered to FDEP within 60 days of completion of the field work. The SAR will contain field logs, laboratory reports, tables, and figures summarizing the results of assessment activities and include conclusions and recommendations based upon findings.
7 INVESTIGATIVE DERIVED WASTE
Investigative derived wastes (IDW - drill cuttings and purge water) generated during site assessment activities will be drummed, labeled and temporarily staged on-site in Department of Transportation (DOT)-approved, 55-gallon steel drums. Arcadis will coordinate with a waste disposal contractor for non-hazardous disposal of the IDW and provide copies of final disposal manifests to FDEP.
8 QUALITY ASSURANCE & QUALITY CONTROL
All fieldwork will be performed in accordance with FDEP’s SOP (001/01), and the site-specific HASP, to be submitted under separate cover prior to commencing field activities. Additionally, sample analyses will be performed by NELAP-certified laboratories to method practical quantitation limits. Appropriate QA/QC samples will be collected during the assessment.
West Boca Plan Dry Cleaner - ISA Work Plan.docx 7
9 PROJECT SCHEDULE AND COST
Cost estimate/level of effort (CEF-LOE) worksheets and subcontractor bid copies for the implementation of this ISAWP will be provided separately upon approval of this Work Plan. A proposed schedule for the site assessment activities, ISAR, and the final SAR document package, is presented below.
Milestone Estimated Timeline for Completion
ISAWP Approval / TA Receipt 0 days
Commence Site Assessment Activities 100 days
ISAR Deliverable 160 days
Additional Assessment (if needed) 220 days
Submittal of SAR 280 days
10 REFERENCES
Hydrogeology Division of the South Florida Water Management District. 1989. Groundwater Resource Assessment of Eastern Palm Beach County, Florida.
FDEP. 1995. Interim Registration Form.
FDEP. 1996. Drycleaning Solvent Cleanup Program Application.
FDEP. 1996. Site Screening Report Form.
FDEP. 1996. Site Visit Notes.
FDEP. 1996. Drycleaning Solvent Cleanup Program Application Review.
FDEP. 2000. Site Visit Notes.
FDEP. 2005. Registration and Insurance Verification.
FDEP. 2011. Rapid Risk Screening Form.
FDOH. 2013. Potable Well Survey.
FDEP. 2022. Waste Cleanup Program Pollution Response Action Contract (WCP PRAC) Summary Slides.
EARTH TECH DRILLING
2703 NW 19TH STREET, POMPANO BEACH, FL 33069
954.974.2424 FAX:954.974.2423
Date: 11/14/2025
FAC ID#:
PROPOSED SCOPE OF WORK:
(5) MW 1"x15' w/ 10' Pre-Pack Screen & 5" BD Completion - Install 1 Inside Bldg. by hand & 4 Outside
Drum Soil & Development water - 30 Minutes of Dev. Per well - Estimated at (4) Drums
Unit Unit Rate Number of Units Extended Price
Equipment Type: DPT Track Rig whole day $1,700.00 5 $8,500.00 half day $0.00 each $250.00 5 $1,250.00 each $0.00 each $100.00 10 $1,000.00 each $40.00 5 $200.00 per well $225.00 10 $2,250.00 daily roundtrip $450.00 5 $2,250.00 per crew / per night $0.00 each $80.00 4 $320.00 each $60.00 1 $60.00 each $0.00 each $75.00 30 $2,250.00 each $500.00 1 $500.00 each $75.00 5 $375.00 day $575.00 0 $0.00
TOTAL QUOTE PRICE $18,955.00
Notes:
Project No.: ___________________________
Date: 11/14/2025
Contractor Name: Arcadis - Doug McGlone - 561 662-7978
Site Name: W Boca Cleaners - 8177 Glades Rd - Boca Raton, FL
(HAND CLEAR ALL LOCATIONS TO 5' or REFUSAL)
(1) DPT Soil Borings to 50' - Grout Abandon
Permits - Install Well - Additional Well
MISCELLANEOUS
(5) VE 2" x 6' w/ 5' .010" Screen & 5" BD Completion - Concrete Core - Installed by hand
Mobilization Per Diem
DOT Approved 55-gal Drum
Well Riser (includes all materials) ID ___1"___ 5' Length
Well Completion (includes 30 Min Dev. 8" B-D MH & locking well cap)
Pre-Packed PVC Well Screen (includes all materials) 5' Length Pack OD ___1"____
(6) DPT GW Sample Borings to 50' - Samples collected every 10 feet for a total of 5 Samples per boring (30 Samples Total) - Grout Abandon
Decon / Decon Pit
DIRECT PUSH TECHNOLOGY
Water Sample w/ HDPE Tubing
Signature and Title of Person Submitting Quote: CCharless Bucher
Concrete Core
420M Geoprobe Dolly Rig - Upcharge
Days to Complete Scope of Work: 5 Days (Actual will be invoiced)
Subcontract Company Name: EARTH TECH DRILLING. Inc.
Subcontract Mailing Address: 2703 NW 19th Street, Pompano Beach, FL 33069
ETD Policy: If pea gravel is encountered, borehole advancement is terminated. If client would like to continue borehole advancement, it is at the risk of the consultant, FDEP or property owner.
Decon / Decon Pit
Permits -
Direct Push Daily Rate 1 - on-site day
Direct Push Half-Day Rate 1 - on-site half day
MAG/VE Wells - 2" x ~6' w/ 5' .010" Screen Auger Attachment, 4" Surface Casing
Monitoring Wells Sparge Wells Horizontal and Vertical Extraction Wells Geotechnical Drilling Direct Push
$18,955.00
Preferred Drilling Solutions, Inc.
8820 66th St. North, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
DIRECT PUSH TECHNOLOGY QUOTE FORM
Date: 11/13/25 FAC ID#:
Unit Unit Rate Number of Units Extended Price whole day $2,125.00 7 14,875.00$ half day $1,475.00 -$ per foot $25.00 -$ each $110.00 10 1,100.00$ each $50.00 5 250.00$ each $35.00 10 350.00$ per well $150.00 10 1,500.00$ roundtrip $1,275.00 2 2,550.00$ per crew / per night $575.00 5 2,875.00$ each $75.00 10 750.00$ per day $150.00 3 450.00$ each $150.00 1 150.00$ lump sum $350.00 1 350.00$ lump sum $1,025.00 1 1,025.00$
TOTAL QUOTE PRICE $26,225.00
Notes: 1. Includes saw cuts, development, standby time, and decon.
Project No.:
Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477
Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782
Signature and Title of Person Submitting Quote: RRosee Hood , Rose Hood Estimating & Scheduling Manager Date: 11/13/25
Days to Complete Scope of Work: 7
Direct Push Daily Rate 1 - on-site day
Equipment Type: Geoprobe 8040DT, 3230DT
*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner
Other (specify)
PFAS free water
Decon Pad
GeoProbe Consumables (includes tubing, points, liners, concrete patch, asphalt patch, and grouting)
DOT Approved 55-gal Drum
Per Diem Mobilization
DIRECT PUSH TECHNOLOGY
MISCELLANEOUS
Permits
Site Name and Location: W Boca Place Cleaners
Consultant Name: Arcadis
PROPOSED SCOPE OF WORK:
(5) 2" x 6' Vapor Extraction Points with 5' .010 screen, soil sampling as needed, pads and 8" manholes.
(4) 1" x 15' MWs with 10' prepack screen, soil sampling as needed, drum cuttings, pads and 8" manholes
(1) DPT boring to 50', discrete soil sampling, backfill with grout, drum cuttings, restore grade
8177 Glades Rd, Boca Raton, Palm Beach County, FL
Well Completion (includes 8" MH w/ cover, concrete pad, and locking well cap)
Well Riser (includes all materials) ID 1" 5' Length
Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5"
Pre-Packed Well Screen (includes all materials) ID 1" 5' Length Pack OD 3.5"
Auger Attachment, 2" Well Install
Direct Push Half-Day Rate 1 - on-site half day
(6) DPT borings to 50', grab (5) groundwater samples per boring, backfill with grout, drum cuttings, restore grade
(1) 1" x 15' MWs with 10' prepack screen, via hand auger, drum cuttings, pad and 8" manhole
Follow PFAS protocols, decon pad, decon between borings with PFAS free water and scrub brushes
Approximately (10) locations in thick concrete up to 6", PDS to provide concrete core drill
Drum all IDW, PFAS free water from Davis Water Service
$26,225.00
ARCADIS 11/17/2025
7000 North Federal Hwy 208109 Boca Raton, FL 33487
Palm Beach
Douglas McGlone 8177 Glades Road douglas.mcglone@arcadis.com Boca Raton
561-662-7978 FL
33434
Cascade Rep Contact Information
Scope of Work
Quantity Unit Sales Price Subtotal Mobilization/Demobilization 1 Each 2,500.00$ 2,500.00$ DPT Rig and Crew Daily Rate 7 Day 2,300.00$ 16,100.00$ Per Diem and Lodging (per worker) 14 Man/Day 225.00$ 3,150.00$ MC Liners 10 Each 5.00$ 50.00$ 1" PVC, Prepack screens 75 Foot 21.00$ 1,575.00$ 2" PVC, 10 slot screen 30 Foot 24.00$ 720.00$ SP-16 ground water sample 20 Each 25.00$ 500.00$ Flush Mounts 10 Each 150.00$ 1,500.00$ Well Development 5 Each 200.00$ 1,000.00$ Drums 4 Each 85.00$ 340.00$ Concrete Core Equipment 1 Lump Sum 400.00$ 400.00$ Borehole Abandonment 250 Foot 3.00$ 750.00$ PFAS Free Water 1 Lump Sum 3,500.00$ 3,500.00$ Patch 5 Each 15.00$ 75.00$ Florida Permits 1 Lump Sum 100.00$ 100.00$
Pre-Tax Total
Tax Percentage
Taxes
Quote Total
Contact Name Project Address Email Project City Phone Project State
Cascade will provide a track mounted Geoprobe unit with a 2-man crew to provide the following.
Concrete Core Five (5) 4" holes and hand augur to 6' BLG and install a 2" Vapor extraction well. Each well will get 5' of 10 slot screen. We will finish each with a flush mount road box. Core Five (5) locations with a 6" core barrell. Four outside and One inside. We will install a 1" PVC well at each location. Each location will get a prepacked screen. We will instal the inside location by hand. We will finsih each with a flush mount and develop. We will collect continuous soil samples at One (1) location to 50' BLG.
We will collect ground water samples using the SP-16 sampler at Four (4) locations. Each location we will collect 5 samples. We will collect samples to 50' BLG. All locations will be grouted upon completion.
Decon all tooling between locations. Decon is included in the day rate.
All soil and water will be drummed and stagged on site. CAscade will provide PFAS Free water
No union/prevailing wages or additional training is expected.
Work schedule will be daily work hours of 8am - 4:30pm including lunch and safety meetings.
Level D PPE is expected.
Cascade estimates 7 days to complete this project. All quantities are estimates. Actual accrued totals will be invoiced. Day rate includes a crew of 2. Additional crew at the site will require additional charges. Standby time, if accrued, is included in the day rate.
Description
$32,260.00
Account Name Bid Date Address Quote Number
Quote Revision Date
Bill To Account Project Zip
Project Name
Number
Prepared By Email zfordley@cascade-env.comZachary Fordley, Project Manager
This quote is based on information provided by you and is valid for 45 days from the bid date. Unless previously agreed, Cascade requires a 2-week notice prior to mobilization. Your firm is responsible for 1) Obtaining any site specific permits, 2) Locating and clearly marking underground installations or utilities, 3) Furnishing dig Alert numbers at least three working days prior to scheduled start date and proof of private locating services, 4) Obtaining access to site with no overhead wires within 20' of the holes. Cascade Drilling shall not be responsible for damages to underground improvements not clearly and accurately marked. If bedrock, cobbles, flowing sands or other adverse or unsafe drilling conditions are encountered, drilling may continue on a time and materials basis or be terminated at the discretion of Cascade. Additional costs may apply if scope is significantly changed. Well development by others may void some or all of Cascade warranties of workmanship and materials. Prices assume standard labor rates and no work hour restrictions. Due to a volatile pricing environment, Cascade is unable to guarantee the pricing for a period longer than SIX MONTHS from the date of the bid submittal. If the work extends past this DATE, the agreement can be amended to extend the period of performance and address any potential adjustment in pricing resulting from actual increases in costs of labor, materials, and fuel. If you would like to discuss it further, please feel free to reach out to Will Burdette.
$32,260.00$32,260.00
From: Mike Wightman To: McGlone, Douglas Subject: RE: W Boca Cleaners Date: Thursday, November 13, 2025 10:20:16 AM Attachments: image001.png
Arcadis Warning: Exercise caution with email messages from external sources such as this message. Always verify the sender and avoid clicking on links or scanning QR codes unless certain of their authenticity.
Thanks Douglas. Cost for markout including a marked up aerial would be $900. Thanks for the opportunity and let me know if you need a formal proposal.
MJW
Mike Wightman, P.G President, GeoView O: 727-209-2334 C: 813-690-6667 mwightman@geoviewinc.com
From: McGlone, Douglas <Douglas.McGlone@arcadis.com> Sent: Thursday, November 13, 2025 9:11 AM To: Mike Wightman <mwightman@geoviewinc.com> Subject: W Boca Cleaners
Hi, Can you please provide a quote to locate inside the cleaner’s facility (~1,100 square feet) and surrounding areas shown on the figure attached?
Please include a marked up aerial figure electronic deliverable showing the locations of identified utilities.
Feel free to contact me with any questions.
Thank you, Douglas J. McGlone | Principal Geologist | douglas.mcglone@arcadis.com Arcadis | Arcadis U.S., Inc.
7000 North Federal Hwy. Boca Raton, Florida 33487 | USA T. +1 561 393 6555 | C. +1 561 662 7978 Connect with us! www.arcadis.com | LinkedIn | Twitter | Facebook
Be green, leave it on the screen.
$900
SITE LINES PROPOSAL ACCEPTANCE
SIGNATURE PAGE
Site Lines Proposal Number: 01720p Proposal Date: November 13, 2025
Project Site: W Boca Cleaners Site – 8177 Glades Road, Boca Raton, FL
Project Fee: $900.00 for locate, $300.00 for electronic deliverable = $1,200.00
Payment Terms: [PAYABLE WITHIN 30-DAYS OF INVOICE]
INVOICE TO:
Client: ARCADIS Address: 1500 Gateway Blvd., Suite 200, Boynton Beach, FL 33426 Attention: Douglas J. McGlone, P.G.
Phone: 561-662-7978 Email: Douglas.McGlone@ARCADIS.com
Special Instructions:
In witness thereof, the parties hereto have made and executed this agreement
FOR [CLIENT] FOR SITE LINES LLC
Signature: Signature:
By: By: William L. Hardy II
Title: Title: President
Date Signed: Date Signed: November 13, 2025
$1,200.00
ESTIMATE
Blood Hound Corporate Headquarters 6500 Technology Center Dr., Suite 200 Indianapolis, IN 46278
Email: BHI@bhug.com bhug.com Website: Phone #: 888-858-9830 888-858-9829 Fax #:
WD Environmental Services, Inc.
1013 Briarwood Dr.
Wauchula, FL 33873
Phone (813) 433-7945
- 2 - WD-2470
PROPOSAL
MAG tests
Arcadis U.S., Inc.
W Boca Cleaners
8177 Glades Road Boca Raton, FL
Please initial and return to the attention of: Thomas Twitmyer – Tomt@ewithe.net
APPROVED ITEM DESCRIPTION RATES UNIT QUANTITY COST
Remedial Equipment SVE unit $1,750 /job 1 $1,750
Transportation $350 /job 1 $350
Power Supply 55 KW three phase generator $650 /job 1 $650
Effluent Treatment Vapor Phase Carbon $900 /job 0 $0
TOTAL ESTIMATED COSTS $2,750
NOTES:
Estimate valid for 90 days
DATE SERVICES NEEDED: PROPOSAL PREPARED: 11/17/2025
START TIME: ESTIMATED HOURS ON SITE:
PURCHASE ORDER NO.: WD JOB NO.: WD -2470
PAYMENT TERMS: Net 30 Days APPROVED COST
BILLING INFORMATION: Officer* Date *Signature Acts as Notice to Proceed at Contract Price
Payment Remitted to: ATTENTION: Mr. Douglas McGlone , P.G.
WD Environmental Services, Inc Arcadis U.S., Inc.
1013 Briarwood Dr 2081 Vista Parkway, Suite 200 Wauchula, FL 33873 West Palm Beach, FL 33411-
Email: Douglas.McGlone@arcadis-us.com
Thomas F. Twitmyer, WD Arcadis U.S., Inc.
File details come from the government source that posted it. Updated .